Loading...
HomeMy Public PortalAbout11-0624 City of Tybee BFE . 7 :2 CITY OF TYBEE ISLAND BUILDING PERMIT DATE ISSUED: 11 -10 -2011 PERMIT #: 110624 WORK DESCRIPTION ELECTRICAL - 2 OUTLETS WORK LOCATION 5 FORT AVE OWNER NAME CITY OF TYBEE - CAMPGROUND ADDRESS CITY, ST, ZIP TYBEE ISLAND GA 31328 PHONE NUMBER CONTRACTOR NAME BRADDY ELECTRIC COMPANY INC ADDRESS PO BOX 5598 CITY STATE ZIP SAVANNAH GA 31414 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEES CHARGED $ 0.00 PROPERTY IDENTIFICATION # PROJECT VALUATION $ 600.00 TOTAL BALANCE DUE: $ 0.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether Local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org z ; - C ity of Tybee Island • • Planning & Zoning Dept. �� � � N � Inspection Report 4 03 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 � , `/, y INiCRNai NAL Phone 912.472.5032 • Fax 912.786.9539 CODECCUNCtL MEMBER Permit No. /1- 0 6 Date Requested of >Q q IJ3 Owner's Name e/T} OF Y &- Date Needed Gen. Contractor Subcontractor Contact Information 0 . 4 Vil PCB of /‘) A Project Address -.- mP64/2otlAil) Scope of Work L ce-ra le AL- - D 14 rLE 7--5 Inspector Date of Inspection r / iRFt Inspection Pass � `�" a � Fee Inspection Pass ❑ Fail ❑ Fee Inspection Pass El Fail El Fee Inspection Pass 0 Fail ❑ Fee ��'' CITY OF TYBEE ISLAND e ' ., B UILDING & ZONING DEPARTMENT �a ' � ' r P.O. Box 2749, Tybee Island, GA 31328 Phone (912) 786 -4573 • Fax (912) 786 -9539 ELECTRICAL PERMIT APPLICATION & TEMPORARY SERVICE AFFIDAVIT f Date ic/v //i New Work Replacement j,-,74, --z eArNikoi Location of work (street addres ,vrrz 6 F,.tO f 0 u,/,, ;EV y;0 6 /So: 44 4 ee ire Contractor Br p,Ci AL.4. L, 1,Q c Telephone 9/a. 3 6 g90,0 Q Address of Contractor 2/'j/ Za./v e xreric_ Property Owner C r , y ©r 'e Y.9 l34,h,.0 Telephone 41. , 70, 5:616 1/47 Date work will be ready for inspection, if known ichi /i 1 Permit Numbe 1I O (oZ Estimated cost of construction - ( - A/C Unit and Heat Pump Range Hood - commercial Attic Ventilation Fan Service: amps ALL WIRING, Bell Transmitter - low voltage Sign Circuit - wattage Border /Outline Lighting Smoke Detector - low voltage SERVICE Building Saw Spa or Tub - grounding INCLUDED Exit Lights - life safety Special Outlet , Heat Pump Swimming Pool - grounding MUST BE Meter Box Water Heater Motor(s): hp Welder - 220 volts circuit COPPER. NO a Outlets - 110 volts circuit Well Pump - grounding ALUMINUM Parking Lot Lights X -ray Pool Lights - grounding Other ALLOWED. Range - commercial APPLICATION FOR TEMPORARY SERVICE REQUEST In requesting temporary electrical service, the undersigned understands and agrees: 1. Connection of temporary electrical service does not remove the requirement to comply with all State of Georgia minimum construction codes. 2. Temporary electrical power is intended for completion of the construction process and testing equipment installed within the structure. 3. Issuing approval for temporary power connection does not constitute approval to occupy the structure. A Certificate of Occupancy must be issued by the City of Tybee Island prior to any occupancy. 4. The owner and contractor are hereby held responsible for any violations of this policy. A violation of this polic may esult in disconnection of the electrical service until all violations and deficiencies are corrected. ,..../i Owner /Con�racto(Signature Date Owner /Contractor Printed Name APPROVAL Fee g ' 4,p � e� � r/ �— Building Official Date