HomeMy Public PortalAbout12-0603 SBRC f�
CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 11 -15 -2012 PERMIT #: 120603
WORK DESCRIPTION ASPHALT OVERLAY AT ENTRANCE
WORK LOCATION 1217 BAY ST
OWNER NAME SBRC
ADDRESS 1217 A BAY STREET
CITY, ST, ZIP TYBEE ISLAND GA 31328
PHONE NUMBER
CONTRACTOR NAME DUSTCOM LTD INC
ADDRESS PO BOX 7724
CITY STATE ZIP GARDEN CITY GA 31418
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 0.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $2,500.00
TOTAL BALANCE DUE: $ 0.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
From:CITY OF TYBEE iSLANO 912 786 9539 1104i2012 15:41 #337 P.001/002
-- '' > City of Tybee Island, Georgia
" i ` ' S 912 472 - 6033 or 912- 472 -5031 - Fax 912 - 7868539
V\'.! .. APPLICATION FOR BUILDING PERMIT
Property Address: /a) 1., r .a ,.
i I Name I Mailing Address I Telephone
Home: , ,3p
Owner . , . : .. .1 10"1 CeII:
Architect or - Engineer
�/ I
� Office: 1dw -.d6' )
Contractor avi;or+..) l enifie ' 4)--1 tioor7 iqr h. Zr- 4 44 1 ../ 61. " t I Cell: 7i 3 - r5 7v
(Check all that apply)
❑ Single Family D Disooveryttearout ❑ Demolitio c tur
o Duplex ❑ Footprint Changes - jI Other
❑ Multi - Family units new __ square feet
❑ Commercial units heated/cooled
Details of Protect: 0 e ,, I" .. /--
i' " Qa s , a�reQ 13 Q A S4- i S t 1S I ROuJ
e n d nn J T /fr I oq I- l "1 , tA k k : b I A 4
Estimated Cost of Construction: $ ar firr, " (materials + labor + proflt/overhead)
If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon
the scope of the work, two sets of construction drawings and /or a site plan may be required.
Year Built: Listed on National Historic Register or located within a National Historic District? Y / N
* Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you
may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island.
* Also see the Tybee Island Land Development Code Article 14: Historic Preservation
purt,,,_na certstf Lgg2n. ��t
On-ssite s t om facilities will be provided through , inP. - n 7Pi1k. e . Construction debris will be disposed
by • - by means of _0 . 1 understand that I must comply with zonino. flood
damage c9ntroi. bulldinp. fire. shore oroteotion and wetland ordinances. FEMA regulations and all applicable codes and
regulations. 1 realize that i must ensure the adequacy of drainage of this property so that surrounding property is In no way
adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective action that
may be necessary to restore drainage impaired by this permitted construction.
-
Date: 11 - IT 9 Signature of Appl nt: . _. ..r Permit FEES
Printed Name .4, r //, nw Inspections
Note: A derma normally takas 7 to 10 days to process Cap Cost Rea
Water Tap 1
Approvals: r�nature Date Sewer Stub
Planning & Zoning Manager K 1 1- i .S-( E � Fps
Building Official .0 to Cont, s ,. n S -
Water /Sewer / - / (
Stomi/Drainage f' J- '2 -t--,, / // / //
City Manager // \
TOTAL
•
Eoo /zo071 MLR oo ;ot OHS zTOZ /5T /TT
From :CITY OF TYBEE ISLAND 912 78$ 9539 11/14/2012 15:41 #337 P.0021002
LEAD -PASED PAINT RRP RULES
Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform
renovation, repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning
work, provide owners, tenants, and child -care facilities with a copy of EPA's lead hazard information pamphlet
Renovate Rjpht mportant Lead Hazard information for Fernilif Child Care Provident. and Schools.
Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you
to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based
Paint and Asbestos Program (404) 363 -7028.
Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator
When disturbing lead -baeod painted or coated surfaces or components more than 6 it' per interior
room or 20 ft of exterior surfaces AND all window replacements and partial demolitions of any size.
+r**t*e* ke ** * ** * * * ****
Asbestos /Environmental Notification to Georgia EPD for
2jects involving Demolition. Wrecking. or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission
to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a
structure prior to the filing of any required ten (10) day "Protect Notification for Asbestos Renovation
Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia
Environmental Protection Division administers the rules. In most cases, the rules require both the owner and
the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by
an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before
renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the
building. Further guidance for regulatory compliance and contact telephone numbers are provided by the
brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such
as asbestos removal techniques. lead abatement, ground contamination, or unusual site conditions may have
EPD regulations that could affect the project.
M
While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility.
Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sdl -
Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment
Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission;
http: l /www.gaswcc.org /docs/field _ manual_4ed.pdf.
Problems with the Co Is not limited to the installation, but to material. The stone will be a representation of
1.5" -3.5" stone or larger.
Type A sediment barriers have been installed where Type C is required and shown on the permit drawings.
Where two rows, are called for they will be installed with a separation that allows for the first one to fail (fall
over) without impacting the second one. The complete assembly and installation must be compliant; steel or
wood posts, post spacing, Type C or A.
S gnature for receiproir Lead Paint, Asbestos, and BMP notices. Date
Printed ame
E00 /E0071 x' t0;Ot f1HS ZIOZ /5T /IT
FAX COVER SHEET
DUSTCOM LIMITED, INC.
112 AIRPORT IND PARK DRIVE (31408)
P 0 BOX 7724
GARDEN CITY, GA 31418
USA
912 -964 -1S ao
D12484-1543
SAND TO
'77 e 7L s
Attention Date
01' 1/-1,c-`12
Fax Number n re- !? Phone Number
76 9z -2 3B-°7q -
>renoe
�•. is v - �. + sue...,. '.•:
Urperrt ® Reply ASAP r Please comment ® Please review For your information
Total pages, Jncluding cover.
COMMENTS
cxr►
V 7 f ✓ �s�6�� + ('�rr!iv„�'" c r + .#�11.�T �jrE+ it r )
4 �rTri S
1101/'
•
Eoo /tooM xe3 00 01 nxs zI QZ /fit /ZZ