HomeMy Public PortalAbout1981-011, a public
utility licensed to do business in the City of Medina, has made application
to the City for the installation of
i024.72Z, att./0, d .57' 7J&.( 6o . /7 aC •
within the City of Medina;
Member il.
and moved its adoption:
introduced the following Resolution
CITY OF MEDINA
RESOLUTION NO. O /_ //
PERMIT/ RESOLUTION FOR PUBLIC UTILITY INSTALLATION
IN CITY RIGHT OF WAY
WHEREAS
located at
zr
NOW„ THEREFORE, BE IT RESOLVED that said application be b_rranted
in accordance with the plans and specifications submitted, subject to the
following conditions:
I. Street and Right of Way shall be restored to their
original condition upon c.ompletition of Installation
and Applicant shall be liable for settlement or other
damage caused by said installation for a period of
one year following coMpletio.n.
9
Completion Date:
3. Performance Bond in the Amount of:
4. Depth of Conduit:
City c'lerl,
Mayor
The motion foy tl adoptio of the foregoing R. solution is duly
seconded by Me mbel• � and upon vote being taken
thereon the follywing votedin t�v�reof:
u o
and the following vested against
•
whereupon said Resolution was
declared passed anti adopted.
U O O
Issued by the City Clerk this ,aa day of
, 1-4+E;./9f/
CITY OF
'Permit No
APPLICATION FOR PERMIT FOR INSTALLATION OF UTILITIES
OR FOR PLACING UNDERGROUND CONSTRUCTION
Name of Party or Organization performing work MINNESOTA GAS COMPANY
Address 733 Marquette Avenue Telephone No 372-4838
1. Nature of Work Installation of gas service main
Type of Surface to be Disturbed
(Check type) (Gravel) (Bituminous) (Concrete)
(Boulevard)
2. Location
Street, Avenue and House number
(Additional information attached when necessary)
3. Size and kind of pipe, conduit or cable
Depth from Surface 2.5 feet ±
Dimensions of Excavation
4. Method of Installation or Construction (including method of compaction and excavation)
In accordance with procedures as described in Minnegasco Distribution Department Operations Manual,
Section 500, "Excavating, Backfilling and Surfacing', the most recent edition on file with the permitting authority
Machine Excavation: Yes X No
5. Work to start within days and completed with 5
6. Will detouring of traffic be necessary? No If so, describe rerouting:
days thereafter.
For
Minnesota Gas Company
(Applicant)
Signed By
Dated
The date when work is completed must be reported to the person designated by municipality.
AUTHORIZATION OF PERMIT
Upon payment of permit fee in the amount of $ and in consideration of the agreement to comply in all
respects with the Street or Alley excavation ordinances and regulations applicable covering such operations, permission is here-
by granted for the work to be done as described in the above application, said work to be done in accordance with special pre-
cautions required, as hereby stated:
It is expressly understood that this permit is conditioned upon replacement or restoration of the road surface to its proper
condition in accordance with the appropriate rules and regulations. It is further understood that this permit is subject to re-
vocation within ten (10) days of receipt of copy of application by the County Engineer when the permit is for work on a
County Road.
APPROVED
DATE
All requirements shown on reverse side to be complied with.
White copy to applicant, yellow to Municipality Engineer, blue to Municipality Street Superintendent.
Form 16 R3/78
RULES PERTAINING TO STREET AND ALLEY EXCAVATIONS
SAFETY
1. Excavations shall be properly protected and identified by barricades and flags in the daytime, and flares, red lanterns
or flashing signals at night, to protect persons and traffic at all times.
2. Barricades to be erected in a manner which will provide suitable visibility in all directions.
3. Excavations must be cribbed when necessary, depending upon type of soil, in order to prevent cave-i ns.
4. No guys or stays to be attached to trees on Right of Way.
5. Underground construction must be so constructed as not to harm or unnecessarily destroy the root growth of sightly
or ornamental trees.
ROADWAY
1. Installation of pipe under concrete or high type of bituminous pavements to be done by jacking or boring unless other-
wise authorized by Engineer. When an installation is made by jacking or boring a pipe three inches or larger in diame-
ter, a casing of larger dimension must be used to encase the service pipe.
2. All back -filling must be placed in 6-i nch layers and thoroughly tamped, and material must be flush and even with the
road surface when finally in place, unless Engineer authorizes alternate method of construction.
3. Finished surface, base, and sub -base of road after excavation and back -fill, shall be at least equal in stability to
finished surface, base, and sub -base prior to excavation.
4. Concrete pavement to be replaced according to specifications which will be provided by the Engineer.
5. If settlement occurs or excavation caves in within one year from completion date so that replaced materials settle
(bituminous mat or concrete base), same shall be restored to its original condition by the holder of this permit.
6. No pole anchors, anchors, braces, or other construction to be put on roadway shoulder except by special authorization.
7. No driving onto highway from ditch or driving on shoulders except when authorized by the Engineer, and if damage oc-
curs, permit holder will make proper repairs.
8. No machine excavation shall be permitted except when noted in application for permit.
9. Excavations greater than four feet in width at top of trench will not be generally permitted and may be made only when
expressly provided for on the permit.
10. Streets may not be closed to traffic unless expressly authorized by the permit.
LIMITATIONS
1. No lugs shall be used on equipment traversing road which will damage the road surface.
2. Roadside shall be cleaned up after work is completed.
3. No work shall be done which will create a nuisance.
4. Within 24 hours, (Saturdays, Sundays and legal holidays excluded) the permit holder shall notify,the municipality
issuing the permit and, when applicable, the County Engineer, that such work has been completed and is ready for
final inspection.
5. Within ten days after receipt of a copy of the permit application the County Engineer shall notify the applicant of any
objection the County may have to the application.