Loading...
HomeMy Public PortalAboutCARPENTER RD_10.pdf � O Nsa d o 1 CITY OF TYBEE ISLAND BUILDING PERMIT DATE ISSUED: 01 -22 -2013 PERMIT #: 130041 WORK DESCRIPTION REROOF WORK LOCATION 10 CARPENTER RD — PIN #4- 0002 -02 -005 OWNER NAME MARY INGALLS ADDRESS PO BOX 662 CITY, ST, ZIP TYBEE ISLAND GA 31328 -0662 PHONE NUMBER CONTRACTOR NAME L.E. STEWART CONSTRUCTION, INC ADDRESS P.O. BOX 3562 CITY STATE ZIP SAVANNAH GA 31414 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEES CHARGED $ 80.00 PROPERTY IDENTIFICATION # PROJECT VALUATION $4,000.00 TOTAL BALANCE DUE: $ 80.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property, must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. if this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: (114,4,(4, r P. O. Box 2749 - 403 Butler Avenue, Ty bee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org gt''''' ICC City uf Tybee Island • Planning & Zoning Dept. /6",.•ZP ;ks Midinvos..- Inspection Report ark* , 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 INTERNAMAI '\. Phone 912.472.5032 • Fax 912.786.9539 CODE COUNCIL MEMBER Permit No. /3-0041 Date Requested Owner's Name I f\,) C3 A L L 6 ‘ Date Needed , , LA / Gen. Contractor Stealli e - 1 - Subcontractor Contact Information Project Address i 1 /1/eefAi Oct Scope of Work Inspector '37(':/ Date of Inspection , Inspection / 7") i r: 7 / 4- /0- 7— Pass 12 '\ Fee Inspection Pass El Fail 0 Fee Inspection Pass El Fail El Fee Inspection Pass 0 Fail 0 Fee 3 "C % / City of Tybee Island, Georgia -0. 912 - 472 -5033 or 912- 472 -5031 - Fax 912- 786 -9539 • APPLICATION FOR BUILDING PERMIT Ll G Property Address: / •xpEb"Te A RD, 7 7,j-- Name 1 Mailing Address 1 Telephone Home: Owner Al R- t y J ,•)c, lkLt 51 Cell: Architect or Engineer 5're-' *,cr C .1 1 o . B ®,f— 3 560 Home: N/ Contractor - Logivice 5711A',4gty SAvre+PW Ail. GA 3 /`' /5t Cell: 9/,- yw- 34.33 (Check all that apply) [T Famity ❑ DiscoverylTearout ❑ Demolition of Structure ❑ Duplex ❑ Footprint Changes — new F9 RE A d e F ❑ Multi Family units _ square feet heated /cooled ❑ Commercial units {� L Details of Project_ 6- At ve- ,Amy /ZEP/ A 3s�lj q 51(,'.8!9 //J ®N' l oPSc' Estimated Cost of Construction: $ r, ®oo {materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon the scope of the work, two sets of construction drawings and /or a site plan may be required. Year Built: Listed on National Historic Register or located within a National Historic District? Y * Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee island. * Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction: On -site restroom facilities will be provided through 4/a Oudivet Construction debris will be disposed by C o N r 1 Cr v rt by means of 74/cr. I understand that I must com ply with zoning, flood damage control, building, fire, shore protection and wetland ordinances. FEMA regulations and all applicable codes and regulations. 1 realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management, l accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date: I c - 13 Signature of Applicant: ' FEES Printed Name ,�q v cr 6 , SrE &. #_r- Permit Inspections Note: A permit normally takes 7 to 10 days to process Cap Cost Rec Water Tap Approvals: Signature Date Sewer Stub Planning & Zoning Manager / / Eng. Fees Building Official 6 /2Zj Aid to Const. Water /Sewer ' �� - /' Storm /Drainage City Manager TOTAL LEAD -BASED PAINT RRP RULES Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform renovation, repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning work, provide owners, tenants, and child -care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard information for Families, Child Care Providers, and Schools. Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based Paint and Asbestos Program (404) 363 -7026. Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator When disturbing lead -based painted or coated surfaces or components more than 6 ft per interior room or 20 ft of exterior surfaces AND all window replacements and partial demolitions of any size. * * * * * * * * * * * * * * * * * * * * * Asbestos /Environmental Notification to Georgia EPD for Proiects Involving Demolition. Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. * * * * * * * * * * * * * * * * * * * * * BMPs While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility. Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sdl — Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission; http./twww.gaswec.orgiaoes/ileia_manuaLzfecLoo . Problems with the Co is not limited to the installation, but to material. The stone will be a representation of 1.5 " -3.5" stone or larger. Type A sediment barriers have been installed where Type C is required and shown on the permit drawings. Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall over) without impacting the second one. The complete assembly and installation must be compliant; steel or wood posts, post spacing, Type C or A. SIbnature for receiVf of Lead Paint, Asbestos, and BMP notices. Date /A /v cC STS Printed Name ALL ROOF OR REROOF INSTALLATIONS Asphalt shingles shall comply with Section 905 of the international Residential Code shall have self -seal strips or shall be interlocking. Asphalt shingles shall have the type and number of fasteners recommended by the manufacturer. EXCEPTIONS: Asphalt shingles with self -seal strips shall have a minimum of 6 fasteners per shingle on roofs meeting any one of the following conditions: 1. The eave height is 20 feet or greater above grade, or 2. The Use Factor for the building is 1.15, or 3. The Basic Wind Speed is 100 mph or greater. December 2009 Metal Roofing — Materials for metal roofing shall be naturally corrosion resistant or provided with corrosion resistance in accordance with this table: 55% Aluminum -zinc alloy coasted steel 1 ASTM A 792 AZ 50 5% Aluminum Alloy- coated steel 1 ASTM A 875 GF60 Aluminum- coated steel 1 ASTM A 463 T2 65 Galvanized steel 1 ASTM A 653 G -90 Prepainted steel ASTM A 755 (Paint systems shall be applied over steel products with corrosion - resistant coatings complying with ASTM A 792, ASTM A 875, ASTM A 463, or ASTM A 653. For panel systems, two rows of fasteners shall be used along the eaves, hips, and ridges. The first row should be within two to three inches of the edge and the next row three to four inches from the first. Other fastening to be per the IRC, IBC, or Manufacturer's installation instructions. All screws and other fasteners to be corrosion resistant. DAMAGE PREVENTION ORDINANCE The Federal Emergency Management Association (FEMA) mandated adoption of new Flood Insurance Rate Maps (FIRMS) and a new Flood Damage Prevention Ordinance (FDPO) by September 26, 2008. It was required that the FDPO that the City of Tybee Island adopted meet or exceed the minimum standards outlined by FEMA. Some of the more significant changes are outlined below, however, be aware that this outline does not address all of the changes. AE ZONES • SURVEY REQUIREMENT — All new construction /substantial improvement projects are required to submit an as -built certification immediately after the lowest floor or flood- proofing is completed. • FINISHED FLOOR ELEVATION — All new construction /substantial improvement projects are required to be elevated at least one foot above the base flood elevation. The following are included in the requirement and must be elevated: o All heating and air conditioning equipment and components, including ductwork; o All electrical; o All plumbing fixtures; o All other service facilities. • NON - RESIDENTIAL — New construction /substantial improvement for non - residential projects may elect to floodproof the project in lieu of elevation. VE ZONES • SURVEY REQUIREMENT — All new construction /substantial improvement projects are required to submit an as -built certification after placement of the lowest horizontal structural members. • FINISHED FLOOR ELEVATION — All new construction /substantial improvement of existing structures shall be elevated so that the bottom of the lowest supporting horizontal structural member (excluding pilings or columns) is located no lower than one foot above the base flood elevation level. Substantial Improvement means any combination of repair, reconstruction, alteration, or improvement to a structure taking place during a 5-year period, in which the cumulative cost equals or exceeds 50% of the market value before the start of construction of the improvement. October2008