HomeMy Public PortalAbout07-0257 Sweeney CS
CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 06 -8 -2007 PERMIT #: 070257
WORK DESCRIPTION: STORAGE BLDG
WORK LOCATION: 1207 SIXTH AVE
OWNER NAME WILLIAM & DENIS SWEENEY
ADDRESS 3 CEDAR POINT DR
CITY, ST, ZIP SAVANNAH GA 314051022
PHONE NUMBER
CONTRACTOR NAME HOME DEPOT
ADDRESS
CITY STATE ZIP WILMINGTON ISLAND GA
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEE'S CHARGED $ 50.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $3,500.00
TOTAL BALANCE DUE: $ 50.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be void
unless work has begun within six moths of the date of issuance.
Signature of Building Inspector or Authorized Agent: tit' AA ')
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -5737
www.cityoftybee.org
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
Q
7 o 2 C7
(2) 1-.1*
ocation: / ; A Q 1 UJ 4 / 1- U a PIN #
T NAME ADDRESS TELEPHONE
v tOf (( .g 0 1 0 7 (0 �� Ze.,5� 3
Architect
or Engineer
uilding I ' r (f/ Contractor M6� _ W GS S -'t S -- (03
(Check all that apply)
❑ Repair ❑ Residential n Footprint Changes
❑ Renovation ❑ Single Family ❑ Discovery
, Minor Addition ❑ Duplex ❑ Demolition
r Substantial Addition ❑ Multi - Family
❑ Other n Commercial
Details of Project: /0 X / 2- c5 i1 e 8Li / ,�d in Q
✓
stimated Cost of Construction: $ .�
Construction Type (Enter appropriate number)
(1) Wood Frame (4) Masonry (6) Other (please specify)
(2) Wood & Masonry (5) Steel & Masonry
(3) Brick Veneer
Proposed use:
Remarks:
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following information based t - k on drawings and site plan:
# Units ° # B ooms # Bathrooms
Lot Area Liv' g s ce to al sq. ft.)
# Off-street parking space
Trees located & lis a on itean
Access:
Driveway ( With c , ert? With swale?
Setbacks: Front ' `ar Sides (L) (R)
# Stories Height V 'c . . < measured from the average adjacent
grade of the building to the extreme 0 p • it 4ao - r uilding, exclusive of chimneys, heating
units, ventilation ducts, air conditio • _ um s, eleva ors, and similar appurtances.
During construction:
On -site restroom facilities will be provided through c9 /''V (S1 .
On -site waste and debris containers will be provided by C ,y 7 4 ?, _- •
Construction debris will be disposed by £AJie4ckr by means of '7 4.4c k .
I understand that I must comply with zoning, flood damage control, building, fire, shore
Protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage imp ired by this
permitted construction.
Date: & / 7 /) 7 g nature of Applicant: ( 0'i , /,(�, / ,84
L v,,, /
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification NFIP Flood Zone
Approved rezoning/variance?
Street address and number: New Existing
Is it in compliance with City map?
If not, has street name and/or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site t ' } ,.
Distance to water main tap site ,,, , ,—i-- Act _ cm
Distance to sewer stub site i ,)(,1 ' ) J V 19
Water meter size
Storm drainage
Approvals: Signature Date FEES
cC
Zoning Administrator C i i� /� Permit 4
Code Enforcement Officer j/`C._}41 (r >-- °G%' Inspections I.'`�
Water /Sewer O Water Tap
Storm/Drainage Sewer Stub
Inspections Aid to Const.
City Manager
Nore ,' ilk ll j J � 0 i, �Li'x/'� Zc9c:) ? TOTAL 3 0
/ 6,oe_ // w, >/A f� 7`4 ?ze,pt/-11 (.
,t: ;n rf4 6 �,�ty.-'45'17-7 k i . L�E+cea