Loading...
HomeMy Public PortalAbout07-0275 Hul w , � y CITY OF TYBEE ISLAND BUILDING PERMIT DATE ISSUED: 06 -26 -2007 PERMIT #: 070275 WORK DESCRIPTION: MECHANICAL PERMIT - HEAT PUMP WORK LOCATION: 103 TWELFTH ST OWNER NAME JOE HUL ADDRESS 103 TWELFTH ST CITY, ST, ZIP TYBEE ISLAND GA 31328 PHONE NUMBER CONTRACTOR NAME SMITH AIR CONDITIONING INC ADDRESS 4131 OGEECHEE RD STE 131 CITY STATE ZIP SAVANNAH GA 31405 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEE'S CHARGED $ 34.00 PROPERTY IDENTIFICATION # PROJECT VALUATION $2,300.00 TOTAL BALANCE DUE: $ 34.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the. property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will he stopped. The building contractor will replace curb paving and glitter broken during construction. This permit will be voided unless work has begun within six months- of the date of issuance. 4a ct e A4iii Signature of Building Inspector or Authorized Agent: P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -5737 www.cityoftybee.org i ini JCJ GVVV VJ• JG 1.1 l I Vr I I DCG 1JL. 71G (tab 7D37 r. U1 /U1 CITY OF TYBEE ISLAND INSPECTIONS DEPARTMENT P.O. BOX 2749 TYBEE ISLAND, GA® 31328 MECHANICAL PERMIT' DATE : " 6— O r I CONTRACTOR : S M A l� CONTRACTORS ADDRESS : "11 c e Yves U CONTRACTORS PHONE .e9► / is S O NAME OF PROPERTY OWNER : v • ADDRESS OF PROPERTY OWNER: I b3 ► ' ' WORK WILL BE READY FOR INSPECTION: \ NEW WORK 6 REPLACEMENT OIL GAS ELECTR I ( ESTIMATED COST OF CONSTRUCTION (- 00' o" = f" `) -7 0 J� I (DISTRIBUTION SYSTEMS (WATER HEATER (BOILER- COMPLETE ,AIR CONDITIONING UNIT vw HEAT PUMP 5 tcvas} -R.;p I REFRIGERATION SYSTEMS I OIL BURNER ABSORPTION UNIT CONVERSION BURNER EXHAUST HOOD OTHER GAS PIPING DIST. WARM AIR FURNANCE GAS DRYER SPACE HEATERS (VENTED) FLOOR FURNANCE WALL HEATERS UNIT HEATER TOTAL P.01