Loading...
HomeMy Public PortalAbout1982-014Member 01/1 1 Scitt'e'r introduced the following resolution and moved its adoption: CITY OF MEDINA RESOLUTION NO. ca,2—%'j1- RESOLUTION APPROVING A CONDITIONAL USE PERMIT FOR HOLY NAME OF JESUS CATHOLIC CHURCH WHEREAS, the Reverend Arnold Weber, pastor of. Holy Name of Jesus Catholic Church has requested approval of a conditional use permit to allow the expansion and construction of class- rooms, gymnasium, parking, liturgical and social functions on property owned by the church and legally described as set forth on Exhibit A which is attached hereto and made a part hereof by reference; and WHEREAS, the matter was heard by the Medina Plannj.ng Commis- sion on June 8, 1982, and pursuant to suggestions of the Commission, revised plans were submitted which are attached hereto and made a part hereof by reference as Exhibit B; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Medina that the Holy Name of Jesus Catholic Church is hereby granted a conditional use permit, subject to the following conditions: 1. Construction and development of the project shall proceed in accordance with Exhibit B and the minutes of the Medina City Council meeting dated July 6, 1982, and this resolution; 2. That the portion of the church property lying South of County Road 24 be combined and divided into two parcels; 3. That the church convey easements for street and utilities purposes to the City of Medina for Brockton Lane and for Holy Name Drive as .recommended by the City Engineer; 4. That the access from County Road 24 to the church property which lies South of County Road 24 and which access is described in the letter from Hennepin County dated June 1.8, 1982 be closed; that access from County Road 24 to the church property lying South of County Road 24 at the two remaining locations as shown on Exhibit B be continued and maintained; that access from Brockton Lane to the church property lying South of County Road 24 be opened and maintained to provide access to the new parking area; that appropriate traffic and vehicular signs and controls be designed by the City Engineer and installed at the expense of the church; 5. That asphalt surfacing of the proposed new parking lot be deferred for a period of one year to allow a study of the church's need for parking and that the parking lot be surfaced with gravel in the interim, with the exception that the Easterly 50 feet of the driveway to Brockton Lane be finished with asphalt surfacing; 6. That the City Engineer conduct a study of the stacking and turning movements on Brockton Lane and report back to the City Council within one year on recommendations, if necessary, for handling stacking and turning movements, including the possi- bility of widening of Brockton Lane to provide for additional lanes of traffic; that the church pay the cost of the engineering study and the construction costs of any improvements which are reasonably required; 7. That all grading base and surfacing for parking lots, streets, driveways, drainage corrections and other associated construction be subject to specifications as set out by the City Engineer; 8. That no parking be permitted on County Road 24 beginning on the date of this resolution, and that no parking be permitted on the church property North of County Road 24 after construction of the new parking lot, with or without asphalt surfacing; 9. That prior to a decision by the church to raze, remove or discontinue maintenance of the existing church structure, the church shall give the City 180 days notice and thereafter cooperate with the City in any efforts it may make to preserve the church as a historic landmark; 10. That regular school bus traffic use the permitted access points from County Road 24 only, for ingress and egress to the church property lying South of County Road 24; 11. That any changes in the sewer agreement between the cities of Plymouth and Medina dated October 17, 1977 be initiated by the church and approved by both cities; 12. That the church enter into a development contract to insure the construction of the project in accordance with the plans approved; 13. That the church reimburse the City for all engineering, legal and administrative costs incurred by the City to date and to be incurred by the City in the future in furtherance of the project, said costs to date to include the following: Dated: ATTEST: 0 uJ Donna Roehl, Clerk The motion for the a option of the foregoing resolution was duly seconded by member cvhs_5 �,� Sb and upon vote being tak n thereon/ the following yotdd in favor thereof: IL�"5pn, f-L�•Z� CroSbc and the following voted gainst same: ,✓o ,✓e. Whereupon said resolution was declared duly passed and adopted.