HomeMy Public PortalAbout07-0326 Dombroski •
CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 07 -27 -2007 PERMIT #: 070326
WORK DESCRIPTION: SIDING & SOFFIT
WORK LOCATION: 406 MILLER AVE
OWNER NAME RONALD DOMBROSKI
ADDRESS PO BOX 461
CITY, ST, ZIP TYBEE ISLAND GA 31328 -0461
PHONE NUMBER
CONTRACTOR NAME EXTERIOR INNOVATIONS
ADDRESS 5108 AUGUSTA RD
CITY STATE ZIP SAVANNAH GA 31408
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEE'S CHARGED $ 115.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $12,500.00
TOTAL BALANCE DUE: $ 115.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, Tire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and glitter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
•
Signature of Building Inspector or Authorized Agent: AlFa
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -5737
www.cityoftybee.org
07/27/2007 08:30 FAX fj
JUL -2? - 2007 09.39 CITY OF TYBEE ISL. `,'12 786 9539 P.01/02
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
;1
o o32(
Location: 4. C6 l4- r Aj • — PIN #
NAME ADDRESS TELEPHONE
Owner
%14)c u / Art, Ave - _ 706 - 790 -oaS
Architect I
or Engineer
Building 61053 A-c o v .5 R cc
Contractor can }error- noo.io,\-ar, Somi r -cnr, . Aft - 0016
(Check all that apply)
n Repair ❑ Residential ❑ Ftntprint Changes
✓ Renovation n Single Family ❑ D scovery
n Minor Addition ❑ Duplex ❑ Di'anolition
L Substantial Addition ❑ Multi -Family
❑ Other ❑ Commercial
'7
Details of Project: die /c c (b &IC vun u I .C` tclet - �--Q
►' C ei /")4 —e. , el*, s
) ,
Estimated Cost of Construction: $ (2, S c' dv . vti
Construction Type (Enter appropriate number)
(1) Wood Frame (4) Masonry (6) Orzer (please specify)
(2) Wood & Masonry (5) Steel & Masonry Urki d , do-.
(3) Brick Veneer
Proposed use:
Remarks; 514, ( ( il, 4,6 (E P i
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF L011 and complete the
following information based on the construction drawings and site plan:
# Units # Bedrooms # Bathrooms
Lot Area Living space (total sq. ft.)
# Off-street parking spaces
Trees located & listed on site plan
Access:
Driveway (ft.) With culvert? With ;wale?
Setbacks: Front Rear Sides ;L) (R)
# Stories Height Vertical distance measured from the twerage adjacent
grade of the building to the extreme high point of the building, exclusive of climneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtarrces.
JUL -27 -2007 09:55 96% P.01
Vi /ZI /LUUT ue :Ju FAA 2002
JUL -27 - 2007 09'39 CDT' OF TYSEE ISL. 9ft2 786 9539 P.0'6
During construction:
On -site restroom facilities will be provided through •
On -site waste and debris containers will be provided by •
Construction debris will be disposed by(ia,f by means of ,,,e qt.,/ 4 y
F
I understand that I must comply with zoning, flood damage control, buildin . fire, shore
protections and wetlands ordinances. FEMA regulations and all applicable cedes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is ddile as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the: adequacy of
drainage of this property so that surrounding property is in no way adversel}. affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: 7/'z 0 Signature of Applicant: (�
Note: A permit normally takes 7 to 10 days to Process.
The following is to be completed by City personnel,-
Zoning certification NFIP Flood Ze:'ne
Approved rezoninglvariartce?
Street address and number: New Existing
Is it in compliance with City map?
If not, has street name and/or number been reported to MPC7
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site 1n )
Distance to sewer stub site C 1 v
Water meter size
Storm drainage
Approvals: ignature/4 Date FEES
Zoning Administrator /2 A Ptrznit D
Code Enforcement Officer ,,,�f 1 .. (7'7 —Z 7 - Inspections 3 -
Water/Sewer liter Tap
Stozm/Drainage Svwar Stub
Inspections P,. to Const.
City Manager —
)TAL�
TOTAL P.02
JUL -27 -2007 09 :55 96% P.02
Must be visible from street at all times!
Permit Number: 09 0 � i� , G Issued Date: D • 2. 7- 0 1'
Address: frhYIe r Ake .
Job Name: 3)OreNbrOS K I "
Type of Work: °RE, � vr � � ��� r � � ikse � L A g 1
P
Rough Ins Date Finals Date Fire Date
Footings Firewall
Under Slab /PL Temp. Power Sprinkler permit #
Under Slab /EL Electrical Alarm permit #
Slab Sprinkler Final
Nail Pattern Plumbing
71 ectrical HVAC Life Safety
Sprinkler Building Water Meter
Plumbing Size: # Paid For:
HVAC FEMA S tub
Firewall
Size: # Paid For:
Framing Certificate of ,
Insulation Occupancy TO SCHED A NE cal9 78-
11 b 4 ULE p . m . the d
y before you CTION want l ( an i 12) nspect 4573. ion. extension