CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 07-31-2007 PERMIT#: 070334
WORK DESCRIPTION: INSTALL FENCE
WORK LOCATION: 1207 HWY 80
OWNER NAME DOYLE LANDSCAPE DESIGN&MGMT
ADDRESS PO BOX 1035
CITY,ST,ZIP TYBEE ISLAND GA 31328-1035
PHONE NUMBER 912-786-7113
CONTRACTOR NAME DOYLE LANDSCAPE DESIGN&MGMT
ADDRESS PO BOX 1035
CITY STATE ZIP TYBEE ISLAND GA 31328-1035
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEE'S CHARGED $ 25.00
PROPERTY IDENTIFICATION#
PROJECT VALUATION $ 0.00
TOTAL BALANCE DUE: $ 25.00
It is understood that if this permit is granted the builder will at all times comply with the zoning,subdivision,flood control,building,fire,
soil and sedimentation,wetlands,marshlands protection and shore protection ordinances and codes whether local,state or federal,including
all environmental laws and regulations when applicable,subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will he voided
sinless work has begun within six months of the date of issuance.
iC):Aiiiznevisz) (Cyj:6
Signature of Building Inspector or Authorized Agent:
P.O.Box 2749-403 Butler Avenue,Tybee Island,Georgia 31328
(912)786-4573-FAX(912)786-5737
www.cityoftybee.org
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
O7- o 33 4 ' w;
v
Location: I 6W 41 PIN#
NAME ADDRESS TELEPHONE
Owner 061 1,1' (,C � l°lD `� 6 �� 7 `�� - 7 7/3
Architect
��%, 1 '7
or Engineer
Building DO(e
Contractor
(Check all that apply)
n Repair ❑ Residential n Footprint Changes
NI Renovation ❑ Single Family n Discovery
❑ Minor Addition ❑ Duplex Demolition
Substantial Addition n Multi-Family
❑ Other I I Commercial
Details of Project: ( a g i CLO vk 5
d re (oc��� �
Estimated Cost of Construction: $ t UCH. 00
Construction Type Cl b fic4x (Enter appropriate number)
(1) Wood Frame (4) Masonry (6) Other(please specify)
(2) Wood &Masonry (5) Steel &Masonry
(3) Brick Veneer
Proposed use:
Remarks:
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following information based on the construction drawings and site plan:
#Units #Bedrooms #Bathrooms
Lot Area Living space(total sq. ft.)
# Off-street parking spaces
Trees located &listed on site plan
Access:
Driveway (ft.) With culvert? With swale?
Setbacks: Front Rear Sides (L) (R)
# Stories Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction:
On-site restroom facilities will be provided through
On-site waste and debris containers will be provided by
Construction debris will be disposed by by means of
I understand that I must comply with zoning, flood damage control,building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as-built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
`1 a o ? L
Date: Signature of Applicant:
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification NFIP Flood Zone
Approved rezoning/variance?
Street address and number: New Existing
Is it in compliance with City map?
If not, has street name and/or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals: Signature Date FEES
Zoning Administrator Permit
Code Enforcement Officer Inspections
Water/Sewer Water Tap
Storm/Drainage Sewer Stub
Inspections Aid to Const.
City Manager
TOTAL
■
CMF
cu 3'"Y:s .1:1D
R
D"1-o3- \:13° cMF
3 O O m
M 0
N M N
N� LOT 1 0
va a vr-_
N W
P/P.
S 77° 18' 35" E 82. 91' 01 CO
'i8" RBS ,j 0.3'
" " 5/8" RBS CMF
6' C MN LINK FENCE
N 77° 18' 35"W
x 2.9' Q 200.00'
0 w 1n: ••0' „
F a X "ROPOSE! 3
o uJ 24' X 24
-� Wl/,,j* :UELDING I3 M W
: u. s LOT 8 r_
XY n N — N
Z .D CO— Z
o L T 6 LOT 7 0 LK)ro
��
S� �U N
x<o c‘i
2 to
3.O'
N77'001'5' 35"W
200.
MF 5/8' RBS CMF
N 77° 18' 35"W 98. 53'
U . S . HIGHWAY 80
PLAT OF LOTS 6 8 7 , BLOCK 9 ,
GARDEN LOTS , TYBEE 1 SLAND ,
CHATHAM COUNTY , GE ORG I A
FOR : FIRST CITY ENTERPRISES
REVISED JUNE 28, 2007 TO SHOW
LOCATION OF PROPOSED
BUILDING.
EQUIPMENT:
LIETZ SET 4