HomeMy Public PortalAbout07-0408 Solomon CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 09 -19 -2007 PERMIT #: 070408
WORK DESCRIPTION: DEMOLITION FIRE DAMAGED STRUCTURE
WORK LOCATION: 1004 LAUREL AVE
OWNER NAME MARIA SOLOMON
ADDRESS Wira 86 ea 8
CITY, ST, ZIP
PHONE NUMBER T be 3l 32-E
CONTRACTOR NAME MARIA SOLOMON
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEE'S CHARGED $ 200.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $3,000.00
TOTAL BALANCE DUE: $ 200.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -5737
www.cityoftybee.org
SEP -12 -2007 12.52 CITY OF TYBEE ISL. 912 786 9539 P.02/03
!.�' _ CITY OF TYBEE ISLAND, GEORGIA I
rl is �'�
., APPLICATION FOR BUILDING PERMIT �) 6 En c ! o5e
41 — 1) - Is ;
01 (} V )
t ion: t DD LI 1 .fi i ffel is 11 PIN #
i NAME ADDRESS TELEPHONE
✓ Owner
Maria s - Ao mo Schc4et ?.o 6n. (a?) Tihe.e_ ,l'i)f IqM `7Rto'-til
Architect
v Contractor +,cp t — ( )) I
(Check all that apply)
❑ Repair ❑ Residential ❑ Footprint Changes
❑ Renovation ❑ Single Family Discovery
❑ Minor Addition ❑ Duplex liDemolition
❑ Substantial Addition ❑ Multi - Family
❑ Other ❑ Commercial
Details of Project: :T )e_ i■ h — .mow c v "vt c T F ■ 1r.
V
a.
w ,
(Enter 1 U gate number)
Type Ill /A.. (� copra �� )
(1) Wood Frame 1 (4) Masonry (6) Other (please specify)
(2) Wood & Masonry (5) Steel & Masonry
(3) Brick Veneer
/ Proposed use:
Remarks:
ATTACH A COPY OF THE c r x i it u i) ELEVATION SURVEY OF LOT and complete the
following information based =- • • ction drawings and site plan:
# Units # : 4" , : # Bathrooms
Lot Area / 1F :., . (total sq. ft.)
Off-street ._, 11 ' -r -, •
Trees 10 atod list , • . , ; V
Access:
Driveway \ (ft.) culvert? With Swale?
Setbacks: Front Sides (L) (R)
# Stories Height _ V , • measured from the average adjacent
grade of the building to the ex , .. , 1. .2., _ o the building, exclusive of chimneys, heating
units, ventilation ducts, air ►, , ,, '#t ` ■ .
• r - evators, and similar appuntances.
�
SEP-12-2007 12:52 CITY OF TYBEE ISL. 912 786 9539 P.27s22
bty uring construction:
On-site restroom facilities will be Provided through
" On-site waste and debris containers will beprovided mc.
Construction debris will be disposed by bymeans of
I understand that I must comply with Z011illiL flood damage control. buildin e. fire. shore
Protections and wetlands ordinances. FEMA reeulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met I understand also that a certified plot plan showing elevation must
be attached to this application and that an as-built elevation certification is due as soon as the
habitable floor level is established. la 61:,. 1 realize that 1 must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
:;bffity for zwy corrective action that may be necessary to restore drainage impaired by this
pennitted construction.
4
14tt 91 /7/07/ i€S of Applicant: tii,4 ,41 af hi/ ettf //,3
, o
Note: A permi((orntallv takes 7 to 10 days to process. 78 9 1.1..,53a5,,A2 wusband ed2
Li 4 1-L 1SO
The following is to be completed by City personnel:
Zoning certification NM Flood Zone
Approved rezoning/variance?
Street address and mmiber: New Existing
Ls it in conipliance with City map?
If not has street name and/or lumber been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual findings)
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
•
Approvals: Signature Date FEES
Zoning Administrator Permit
Code E, T. . 11AL wirr Officer Inspections
Water/Sewer Water Tap
Stoim/Drainagp Sewer Stub
Inspections Aid to Const.
City Manager
TOTAL
TOTAL P.03