HomeMy Public PortalAbout07-0425 Reeve .
CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 10-1-2007 PERMIT#: 070425
WORK DESCRIPTION: INSTALL FENCE
WORK LOCATION: 1 SHIRLEY RD
OWNER NAME SYLVIA REEVE
ADDRESS PO BOX 15844
CITY,ST,ZIP SAVANNAH GA 31416
PHONE NUMBER
CONTRACTOR NAME SYLVIA REEVE
ADDRESS PO BOX 15844
CITY STATE ZIP SAVANNAH GA 31416
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEE'S CHARGED $ 25.00
PROPERTY IDENTIFICATION#
PROJECT VALUATION $ 0.00
TOTAL BALANCE DUE: $ 25.00
It is understood that if this permit is granted the builder will at all times comply with the zoning,subdivision,flood control,building,fire,
soil and sedimentation,wetlands,marshlands protection and shore protection ordinances and codes whether local,state or federal,including
all environmental laws and regulations when applicable,subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P.0.Box 2749-403 Butler Avenue,Tybee Island,Georgia 31328
(912)786-4573-FAX(912)786-5737
www.cityoftybee.org
CITY OF TYBEE ISLAND, GEORGIA
c_i-v APPLICATION FOR BUILDING PERMIT
4,440 -''' ..,,,
0
pooh-06- Da/
Location: L p-1-y - 3 SL‘,,c-\7 I. PIN#
NAME ADDRESS TELEPHONE
Owner Po_S I v;� A.0) IS- '0 "0-1-
Architect
or Engineer VII T \c77 L Cy tin1\ , S4✓t e+, 63C Sc ��,(h > A-c 3 S /-0'16. '1
Building 1 / / Q
Contractor �i a,,l)�t), C.._o h s 1 P.V. B 15 a Li `-I SJA A-vc 11'"i -71D)
(Check all that apply)
❑ Repair ❑ Residential ❑ Footprint Changes
❑ Renovation ❑ Single Family ❑ Discovery
❑ Minor Addition ❑ Duplex El Demolition
❑ Substantial Addition ❑ Multi-Family
nOther ❑ Commercial
I
Details of Project: P)„,,\ ��.sA c..e '/;•- -
Estimated Cost of Construction: $ I ess 4I0, ooD
Construction Type Vm d m (Enter appropriate number)
(1) Wood Frame (4) Masonry (6) Other(please specify)
(2) Wood&Masonry (5) Steel &Masonry
(3) Brick Veneer
Proposed use: P1 Vac y Fc,,�c
Remarks: /
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following information based on the construction drawings and site plan:
#Units # t -+rooms #Bathrooms
Lot Area i iv'i g space tota sq. t.
#Off-street parking spaces
Trees located&listed on s' e pl,:
Access:
Driveway (ft.) W th culve ? With swale?
Setbacks: Front • •ar Sides (L) (R)
# Stories Height Vertic. dist. . -e measured from the average adjacent
grade of the building to the extr- - e e'- • the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction:
On-site restroom facilities will be provided through V Pk c:\
On-site waste and debris containers will be provided by
Construction debris will be disposed by by means of �-
I understand that I must comply with zoning, flood damage control,building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as-built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage i paired by this
permitted construction. 1
J
Date: )D! 1 IO Signature of Applicant: -
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification NFIP Flood Zone
Approved rezoning/variance?
Street address and number:New Existing
Is it in compliance with City map?
If not,has street name and/or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals: Signature Date FEES
Zoning Administrator Permit
Code Enforcement Officer Inspections
Water/Sewer Water Tap
Storm/Drainage Sewer Stub
Inspections Aid to Const.
City Manager
TOTAL
'
x �
0V
,.4- x x x x x x x x x x x x- x x HAINxLINK FENCE x x x x x x x x x—x x x-- —x x
�~ + S 72°00'00"E 126.04' -- - - ' +°b~--._ _ — 1 4.011..0. "'1110
N.
_ --�1 --
+o'
I
�~ SPA-�- "� ENE GRAVEL DRIVE } 1 1 6'
SHIRLEY ROAD 20 R/W I 1 +� ��
P al
....._,
. .
-Feb-
, ( PT. TH ST'l ND
r ------ + 1 , TIE
o
+ ti S 72°00'00"E 126.40 00 ix ,°� 0°, :"' iI:2 11 72° '00 60.10' 488 TO ORD. HIGH WATER LINE
HI H
.._ _.- �" �, t _1111" .'_ ,.... A _ ...,�* ...,. �l"..'_ 11..'_ s_ o t>
1010'r`/8" RBS- " 60.010' 5.00'r RBS 1110" 61.40' . - ; - Z + it _ - 1►_ 'lam
, r/ -.'
Oti ______— `� �O 9 �� \ + /L 24"SEAWALL— /
+O. e '',..A •/is. \ - . ,
N.OO� � � +� '� ` Q� 18'
Z °�' I "~-- \ ) ' = +1/1, 24"SEAWALL
+'N%;; 11`9 e� 'C '+ S S +� �' 9 +• +9. + + ELEVATION OF TOP OF ROOF = 43.6— +O• \ 4 ° l
CO x x x x x x �Qr�x----xa—x x —x x W Q, __ \
' \ o
le0 o x
x ,�� +°' +g' ` +°1010 1+ O I 2 STORY FRAME BUILDING a o 6 `� � O
N o a.
+ 4 ^Y i
Al i o •
LOT 43 1 o o w at
LOT 44 + z LOT 45 P.:4" + ° x CO W p'I' I • 1 r°' a
x
I CV
C A
P.
4x \ Z;,?' ''' + +4Q +Op +may 44 O oli +� +A I +�• 11 Q / I !
+ ` x + 4 , 1
II I 549 I 0, ti � ,.. I/ S
iAS) V "e. >c1,1-°' / cb
00 A +O• .. cr .fir ^i +
xxi
+ e +`b' Obi .--4 Qa o
�6 co ro ■• / L75 1/ ft$ 72 0000"E 6Q.00' x
1#X �Xlc�c. . x x X X 8" RBS +� +�• N. �, 1
o -- — — — — — 5/8„ RB ,, -,-.. r-----x° .x x— x +.,0,, f, N 72°00'00"W 189. 1'
0
.)/8 RBS
to 1;%) ti
' t CK•1 BENCHMARK +
NAIL IN P/P
ELEV 9.86 MSL l
I LOT 3f5 NGVD 1929 LOT 36
TOPOGRAPHIC SURVEY tOF LOTS 44, 45, A PORTION OF
THE STRAND 8c A PORTION OF THE SHIRLEY ROAD R/W,
WARD NO. 3, TYBEE ISLAND, CHATHAM COUNTY, GEORGIA
REVISED JULY 19, 2006
REVISED JULY 13, 2006
c$,ORGIA FOR: FIDELITY CCINSTRUCTION, INC.
J. W'HITLEY REYNOLDS 1 r NO. 2249 A FILE NO. 05-224 NOVEMBER 28, 2005
LAND SURVEYOR .Kid _to v
636 STEPHENSON AVENUE STIR 10 0 10 20 30
SUITE C I?'LEY g'
SAVANNAH, GEORGIA 31405
TELEPHONE: 912-352-0464 GRAPHIC SCALE - FEET
FAX: 912-352-7787
•