PREPARED FOR: The City of Parkville, Mo
PREPARED BY: Lee Baer, EI
REVIEWED BY: Mike McKenna, PE, PTOE
Affinis Project Number: 17-2359.01
Lewis Street and Mo Highway 45
TEAP Study
1
March 10, 2017
Mrs. Alysen Abel
Public Works Director
City of Parkville, Mo
8880 Clark Avenue
Parkville, Missouri 64152
RE: TEAP STUDY
LEWIS STREET AND MO HIGHWAY 45
PARKVILLE, MISSOURI
Dear Mrs. Abel,
At the request of the City of Parkville, Missouri, Affinis Corp has completed a TEAP study for
geometric improvements south of the intersection at Lewis Street and Mo Highway 45 (Tom
Watson Parkway). The purpose of this study is to evaluate the traffic patterns and analyze the
changes associated with the removal of a median break approximately 50 feet south of the
intersection. This study includes summary of the impacts associated with the median changes,
analysis of the existing conditions and alternatives, three concept drawings and recommended
improvements.
Sincerely,
Michael P. McKenna, PE, PTOE
Lewis Street and Mo Highway 45
TEAP Study
2
LEWIS STREET AND MO HIGHWAY 45
PARKVILLE, MISSOURI
TEAP STUDY
MARCH 2017
Prepared For: The City of Parkville, Mo
Prepared By: Lee Baer, EI
Reviewed By: Mike McKenna, PE, PTOE
Lewis Street and Mo Highway 45
TEAP Study
3
TABLE OF CONTENTS
TABLE OF CONTENTS...........................................................................................................................3
1. PURPOSE OF STUDY .........................................................................................................................4
2. EXISTING CONDITIONS ....................................................................................................................5
3. DATA COLLECTION ..........................................................................................................................6
4. CONCEPT ANALYSIS ........................................................................................................................6
5. CONCLUSIONS AND RECOMMENDATIONS ................................................................................ 10
APPENDIX A – Peak Hour Turning Movement Count Data .................................................................... 11
APPENDIX B – Concept Drawing .......................................................................................................... 13
Lewis Street and Mo Highway 45
TEAP Study
4
1. PURPOSE OF STUDY
At the request of the City of Parkville, Missouri, Affinis Corp conducted a TEAP study south of the
intersection at Lewis Street and Mo Highway 45 (Tom Watson Parkway). The median opening
approximately 50 feet south of this intersection provides
southbound access to the Walgreens parking lot located to the east
of Lewis Street. A concern of the City of Parkville is the traffic
movement that is allowed by this median opening as shown in
Figure 1, when the eastbound through traffic is stopped by a red
signal. The location of the development can be seen in Figure 2.
The purpose of this study is to analyze the impacts of closing a
median opening on the south leg of this intersection. This study includes recommendations for
improvements that are needed to maintain an acceptable Level of Service (LOS).
Figure 2: Vicinity Map – Parkville, Missouri
Lewis Street and Mo Highway 45
TEAP Study
5
2. EXISTING CONDITIONS
The study area is located in the northern part of Parkville as shown in
Figure 2. The limits of the project are from the intersection at Mo
Highway 45 and Lewis Street to the roundabout approximately 350
feet south, as shown in Figure 3.
Mo Highway 45 at this location is a four-lane divided roadway section
with curb and gutter. The eastbound traffic has two through lanes and
existing left and right turn lanes at the Lewis Street intersection and
the westbound traffic has two through lanes and an exclusive left turn
lane and a 6 foot bike path on the right. This intersection is signalized
with single family residential to the north and retail developments to
the south.
The Lewis Street roundabout is a single lane roundabout with four
access points. The roundabout is surrounded by Walgreens on the
northeast corner, retail development on the southeast corner, Price
Chopper on the southwest corner, and parking on the northwest
corner. Two-lane roadway sections come into the roundabout from
the east, west, and south directions, while an offset three-lane median
divided roadway section comes in from the north. The northbound
lane of Lewis Street exiting the roundabout is a single lane with curb
and gutter on each side. Southbound Lewis Street into the
roundabout includes one lane that enters the roundabout and one lane that drops as a free flowing right
into the Price Chopper parking lot. The roundabout has curb and gutter in and on all approaches with a
grassy and flowered center as seen in Figure 3.
In addition the initial concern with the movement shown in Figure
1, the movement shown in Figure 4 was observed four times
within the p.m. peak hour count. Tire marks from this eastbound
to northbound movement can be seen in Figure 4.This is
effectively cars or truck driving through the roundabout in the
wrong direction.
Figure 3: Study Area
Figure 4: Movement of Concern
Lewis Street and Mo Highway 45
TEAP Study
6
3. DATA COLLECTION
Turning Movement counts were taken at both intersection locations on Tuesday, February 28th from
7:00 a.m. to 9:00 a.m. and 4:00 p.m. to 6:00 p.m. The a.m. and p.m. peak hours were determined to be
7:45 a.m. to 8:45 a.m. and 4:45 p.m. to 5:45 p.m. at the intersection of Mo Highway 45 and Lewis Street.
The Lewis Street roundabout peak hours were determined to be 8:00 a.m. to 9:00 a.m. and 4:45 p.m. to
5:45 p.m. Peak hour turning movement volumes for each intersection are shown in Appendix A.
4. CONCEPT ANALYSIS
As requested by the City of Parkville, Affinis has evaluated three concepts that eliminate the median
access along Lewis Street. This median access is within the intersection influence area and negatively
impacts the intersection. The westbound to southbound traffic
that would like to turn back east into Walgreens parking lot, as
illustrated in Figure 5, was observed backing up into the
intersection at Mo Highway 45 and Lewis Street.
It is understood that the closure of an access can be disruptive
to a destination business if minimal access points are available.
There are currently three entrance points for the Walgreens
business and all three concepts analyzed in this study maintain 3
entrances for this business.
Intersection capacity analysis was performed using Synchro,
Version 9.0, based on the Highway Capacity Manual (HCM). For simplicity, the amount of delay is
equated to a grade, or Level of Service (LOS), based on the amount of delay experienced per vehicle. A
letter grade between A and F is assigned, where LOS A represents the best operation. All three
conceptual drawings can be found in Appendix B.
Figure 5: Traffic Back Up Issue
Lewis Street and Mo Highway 45
TEAP Study
7
Concept 1
Concept 1 evaluates the closure of the existing median opening and changing the west entrance/exit for
Walgreens to Right-in/Right-out entrance.
After the median change, both the roundabout and the intersection continue to operate at a LOS A. The
northbound thru-left lane requires a 95th percentile queue length of 89 feet for the p.m. volumes and
with only 50 feet from the stop bar to the west exit from the Walgreens parking lot, this can cause an
issue between the queue and traffic exiting Walgreens and wanting to head west on Mo Highway 45.
Concept 1 would be the cheapest option of the three, with a construction cost estimate of $57,000.
Lewis Street TEAP Improvements
City of Parkville, Mo
AFFINIS PROJECT NO. 17-2359.01
CONCEPT 1
Bid Approx. Unit
Item No.Item Description Unit Quantity Price Total
Roadway Items
1 Mobilization Lump Sum 1 5,000.00$ 5,000.00$
2 Contractor Construction Staking Lump Sum 1 1,000.00$ 1,000.00$
3 Contractor Utility Potholing Each 0 1,000.00$ -$
4 Traffic Signal Modification (All New Equipment) Lump Sum 1 10,000.00$ 10,000.00$
5 Street Lighting Modification Lump Sum 0 18,000.00$ -$
6 Traffic Control Lump Sum 1 5,000.00$ 5,000.00$
7 Sidewalk Modification Lump Sum 0 3,000.00$ -$
8 Storm Sewer Modification Lump Sum 0 10,000.00$ -$
9 Pavement Marking - Left Turn Arrow Each 2 175.00$ 350.00$
10 Pavement Marking - Right Turn Arrow Each 1 175.00$ 175.00$
11 Pavement Marking - Thru-Right Turn Arrow Each 1 325.00$ 325.00$
12 Pavement Marking - 6 " White Lane Line Lin. Ft. 100 1.00$ 100.00$
13 Signing - R4-7 Complete Assembly Lump Sum 1 300.00$ 300.00$
14 Remove Type E Curb & Gutter Lin. Ft. 246 25.00$ 6,150.00$
15 Curb & Gutter Combined (Type E)Lin. Ft. 295 50.00$ 14,750.00$
16 Asphaltic Concrete Modified Superpave Base Ton 65 130.00$ 8,482.50$
17 Asphaltic Concrete Modified Superpave Surface Ton 45 120.00$ 5,400.00$
18 Seeding Lump Sum 1 100.00$ 100.00$
Grand Total 57,132.50$
Engineer's Cost
Estimate
Lewis Street and Mo Highway 45
TEAP Study
8
Concept 2
Concept 2 evaluates the closure of the existing median opening and relocating the west entrance/exit for
Walgreens to the south to create a larger distance between the exit and the intersection influence area.
Additionally the relocated west entrance/exit will be south of the improved northbound left turn lane.
The location assumes the storm sewer will not need relocation, but there is a possibility of minor lighting
relocation.
This concept, similar to Concept 1, continues to allow the intersection and roundabout to operate at a
LOS A.
The estimated construction cost for this concept is $87,000.
Lewis Street TEAP Improvements
City of Parkville, Mo
AFFINIS PROJECT NO. 17-2359.01
CONCEPT 2
Bid Approx. Unit
Item No.Item Description Unit Quantity Price Total
Roadway Items
1 Mobilization Lump Sum 1 7,400.00$ 7,400.00$
2 Contractor Construction Staking Lump Sum 1 1,500.00$ 1,500.00$
3 Contractor Utility Potholing Each 1 1,000.00$ 1,000.00$
4 Traffic Signal Modification (All New Equipment) Lump Sum 1 10,000.00$ 10,000.00$
5 Street Lighting Modification Lump Sum 1 1,000.00$ 1,000.00$
6 Traffic Control Lump Sum 1 5,000.00$ 5,000.00$
7 Sidewalk Modification Lump Sum 1 3,000.00$ 3,000.00$
8 Storm Sewer Modification Lump Sum 0 10,000.00$ -$
9 Pavement Marking - Left Turn Arrow Each 2 175.00$ 350.00$
10 Pavement Marking - Right Turn Arrow Each 2 175.00$ 350.00$
11 Pavement Marking - Thru-Right Turn Arrow Each 1 325.00$ 325.00$
12 Pavement Marking - 6 " White Lane Line Lin. Ft. 100 1.00$ 100.00$
13 Signing - R4-7 Complete Assembly Lump Sum 1 300.00$ 300.00$
14 Remove Type E Curb & Gutter Lin. Ft. 456 25.00$ 11,400.00$
15 Curb & Gutter Combined (Type E)Lin. Ft. 505 50.00$ 25,250.00$
16 Asphaltic Concrete Modified Superpave Base Ton 94 130.00$ 12,252.50$
17 Asphaltic Concrete Modified Superpave Surface Ton 65 120.00$ 7,800.00$
18 Seeding Lump Sum 1 125.00$ 125.00$
Grand Total 87,152.50$
Engineer's Cost
Estimate
Lewis Street and Mo Highway 45
TEAP Study
9
Concept 3
Concept 3 evaluates the closure of the existing median opening and relocating the west entrance/exit for
Walgreens to the south, making it part of the existing roundabout. The major obstacle associated with
this option is the storm sewer adjustments that would be required
adjacent to the roundabout. As seen in Figure 6, there is an inlet
located in this corner of the Walgreens parking lot that collects the
parking lot runoff, this inlet would be costly to relocate as part of
Concept 3. Concept 3 would also require the movement of a city
pedestal lighting pole.
After the median change, both the roundabout and the
intersection continue to operate at a LOS A.
The estimated construction cost for this concept is $99,000.
Lewis Street TEAP Improvements
City of Parkville, Mo
AFFINIS PROJECT NO. 17-2359.01
CONCEPT 3
Bid Approx. Unit
Item No.Item Description Unit Quantity Price Total
Roadway Items
1 Mobilization Lump Sum 1 8,200.00$ 8,200.00$
2 Contractor Construction Staking Lump Sum 1 1,700.00$ 1,700.00$
3 Contractor Utility Potholing Each 5 1,000.00$ 5,000.00$
4 Traffic Signal Modification (All New Equipment) Lump Sum 1 10,000.00$ 10,000.00$
5 Street Lighting Modification Lump Sum 1 5,000.00$ 5,000.00$
6 Traffic Control Lump Sum 1 5,000.00$ 5,000.00$
7 Sidewalk Modification Lump Sum 1 5,000.00$ 5,000.00$
8 Storm Sewer Modification Lump Sum 1 10,000.00$ 10,000.00$
9 Pavement Marking - Left Turn Arrow Each 2 175.00$ 350.00$
10 Pavement Marking - Right Turn Arrow Each 2 175.00$ 350.00$
11 Pavement Marking - Thru-Right Turn Arrow Each 1 325.00$ 325.00$
12 Pavement Marking - 6 " White Lane Line Lin. Ft. 220 1.00$ 220.00$
13 Signing - R4-7 Complete Assembly Lump Sum 1 300.00$ 300.00$
14 Remove Type E Curb & Gutter Lin. Ft. 447 25.00$ 11,175.00$
15 Curb & Gutter Combined (Type E)Lin. Ft. 565 50.00$ 28,250.00$
16 Asphaltic Concrete Modified Superpave Base Ton 109 130.00$ 14,137.50$
17 Asphaltic Concrete Modified Superpave Surface Ton 75 120.00$ 9,000.00$
18 Seeding Lump Sum 1 125.00$ 125.00$
Grand Total 99,232.50$
Engineer's Cost
Estimate
Figure 6: SW Walgreens Parking
Lot Inlet
Lewis Street and Mo Highway 45
TEAP Study
10
5. CONCLUSIONS AND RECOMMENDATIONS
The study team recommends that Concept 2 be pursued by the City of Parkville. Concept 2 provide a LOS
A at both the intersection of Mo Highway 45 (Tom Watson Parkway) and Lewis Street as well as the Lewis
Street roundabout. While Concept 1 is cheaper, the negative impact of having the west Walgreens right-
in/right-out entrance/exit located north of the beginning of the northbound left turn lane is
unacceptable. Closing the median and relocating the west Walgreen entrance is the best option.
Concept 3 is the most expensive option and also has many variables that could drive the construction
cost higher. Until survey of this location determines the storm sewer and utility locations, the true costs
of relocation are difficult to determine. The cost estimate shown should be used as a baseline.
These recommendations are to improve safety and reduce conflict, but also have a secondary benefit of
reducing delay.
Lewis Street and Mo Highway 45
TEAP Study
11
APPENDIX A – Peak Hour Turning Movement Count Data
Lewis Street and Mo Highway 45 (Tom Watson Parkway) – AM EXISTING
Lewis Street and Mo Highway 45 (Tom Watson Parkway) – PM EXISTING
Lewis Street and Mo Highway 45
TEAP Study
12
APPENDIX A – Peak Hour Turning Movement Count Data (Continued)
Lewis Street Roundabout – AM EXISTING
Lewis Street Roundabout – PM EXISTING
Lewis Street and Mo Highway 45
TEAP Study
13
APPENDIX B – Concept Drawing
CONCEPT 1
Lewis Street and Mo Highway 45
TEAP Study
14
APPENDIX B – Concept Drawing (Continued)
CONCEPT 2
Lewis Street and Mo Highway 45
TEAP Study
15
APPENDIX B – Concept Drawing (Continued)
CONCEPT 3