Project Description
The requested project seeks to significantly improve the condition of the Babe Ruth Baseball
Field located at the Freemans Way Recreation Facility. The Babe Ruth Field truly is the flagship
field in Brewster. When local organizations reach our department for field rentals, it is for this
field. This field draws players from all over the state. The work described in this project is not
regular maintenance, but major rehabilitation of the field.
Over the past two years, the Recreation Department has worked on renovating the entire
property, including replacing all of the fencing, repairing dugouts and storage building, major
repairs to the irrigation system and the complete rehab of the infields (turf and infield mix) of the
two Little League fields located at the property. Total investment to date is approximately
$120,000. The described rehab work to be performed on the Babe Ruth Field will bring the
quality and safety level of the field up to the standards of the rest of the property. The scope of
work to be performed at the Babe Ruth Field would be very similar to the recent repairs of the
two Little League Fields.
The following describes the steps of the planned work:
1. Town will do soil augers and perform soil testing to confirm existing topsoil depths, soil
characteristics and drainage, and soil pH and nutrients and provide to Town’s consultant for
incorporation into infield renovation plan and specifications.
2. Utilizing recently obtained site survey for the Babe Ruth Infield (completed at same time as
Little League fields), Town’s consultant will prepare infield renovation plan, details and
technical specifications suitable for use in public bid document. This work is anticipated to
include several meetings with consultant and Town representatives to confirm approach, project
requirements and coordinate activities with Town.
3. Town will assemble bid document package, advertise for bids, distribute bid packages, open
bids and assemble tabulation of bids.
4. Town’s consultant working with Town will evaluate bids and bidders and recommend bid
award by Town.
5. Selected contractor will perform the following work for infield renovation:
a. Attend preconstruction meeting and site walk with Town and its consultant,
document existing conditions, and provide schedule of values and project schedule for
review and approval by Town.
b. Flag irrigation system with Town assistance prior to start of any site work.
2
c. Identification and approval of access to field site.
d. Maintenance of temporary fencing and signage installed by Town during contractor’s
operations until field acceptance by Town.
e. Layout of anticipated field improvements for review by Town and its consultant.
f. Removal of existing loam and skinned mix to obtain corrected field lay out and
grading.
g. Adjust irrigation head locations and elevations as required and as noted on drawings,
as approved by Town and its consultant.
h. Mound reconstruction and installation of new pitcher’s rubber, home plate and three
base anchors furnished by Town.
i. Edging of skinned infield areas and placement of additional specified skinned infield
mix and sandy loam to create corrected infield layout and grading.
j. Installation of sand based sod in all disturbed areas along skinned infield edges.
k. Slice seeding, and fertilizing, of turf infield and outfield areas to outfield fence line
and limits (to be shown on plans).
l. Re-edging/turf removal, regrading and rolling of skinned infield mix area in early
spring, as requested by Town.
6. Town with assistance of consultant will provide construction oversight, review and approve
shop drawing submittals, contractor pay requisitions and inspect field for substantial completion
and project closeout.
7. The contractor would be required in Spring 2017 to re-edge and groom infield.
3
Please see before and after pictures of the repairs recently completed at the Little League Fields
to illustrate the type of work we hope to complete at the Babe Ruth Field:
Before
4
After
5
For Historic Preservation Projects
N/A
CPA Goals/Criteria
The Town’s recreation fields are a vital asset to the community as a whole, not just to those who
play baseball. Having usable parks and green space increases the value of Brewster
economically, socially and environmentally. The Town has a responsibility to its residents to
maintain the safety and vitality of these spaces so therefore should make capital investments
toward these facilities. This request meets the criteria of the CPC to preserve the recreational use
of these properties. Without investing in these repairs, there is a high likelihood that these areas
would have to be closed as they could become liability concerns. The town fields are for many
uses; expanding from baseball, softball and soccer games, to walking and exercise, bike riding,
walking, dog walking, picnicking, family reunions and games, social activities, fundraisers,
special events and many others.
Community Benefits
The Brewster community as a whole benefits from a safe, clean and usable park and field
system. By not investing in repairing fields, they will eventually not be able to be used.
Residents will have to seek recreational opportunities outside of our community or lose access
completely. Maintaining strong recreation facilities supports and promotes a healthy community
in all aspects for a positive quality of life. The Recreation Department would also lose a revenue
source, which would lead to increased fees for residents. This would again lead to lost recreation
opportunities for residents that could not afford higher fees nor travel for other options.
6
Community Support
• Ryan Kinski, Owner, Dugout Baseball & Softball Club
Friday, October 23, 2015
Ryan,
I have a concern about the full size baseball field for this upcoming season as the condition of the
field has become worse in the past year. At one point the grass to dirt level was almost a foot. This has
created a safety issue for players. Also, the sprinkler heads have created huge puddles on the infield dirt.
This forces us to use lots of “turface” material to get field playable.
I hope that these issues may be corrected so we can continue to use the field in the future. It is a
great location and a great setting for parents to watch the games but the field needs some serious
attention in order to safely play games there.
Thanks,
Ryan Kinski
The Dugout Baseball & Softball Club
105 Ferndoc Street Unit C-1
Hyannis, MA 02601
Email: ryan@thedugoutdawgs.com
7
• Steve Porter, President, Junior Babe Ruth Baseball League
November 16, 2015
To Whom It May Concern;
My name is Steven Porter and I am the President of Lower Cape Babe Ruth. Our program regularly uses
the baseball field off of Freemans Way in Brewster. We play on average up to 20 games during the
spring season at this field
Throughout the past several years the field has become increasingly dangerous and unusable in some
conditions. The pitching mound became unbalanced and the rubber was cracked and warped. The
baselines had become uneven over the years and the irrigation drainage often times led to huge puddles
and muddy playing conditions.
Due to the difficulty of getting this field in sufficient enough playing shape we have had to utilize
different, less convenient fields.
Our hope is that Brewster is given what is needed in order to make the repairs necessary that allow all
programs to use the baseball field again in a safe and efficient manner.
Sincerely,
Steven Porter
President, Lower Cape Babe Ruth
8
• Karen Scichilone, Athletic Director, Lighthouse Charter School
9
Timeline
• May 2016 to July 2016, review plans & specifications
• Bid Posting: July 2016
• Award of Contract: August 2016
• Project started: September 2016
• Project Completion: October 2016
• Fields to be monitored by DPW Staff and re-open for use in April of 2017, based
on winter weather
Credentials
• John Kissida – RLA, CDM Smith
• Ellen Bearse – Town of Brewster Recreation Director
• Patrick Ellis – Town of Brewster Superintendent of Public Works
• Brewster Recreation Commission; Roland Basset, Jr., Chair, George Bausch, Vice
Chair, Sherrie McCoullough, Secretary, Allen Ryone, Treasurer, Tom Wingard,
Member
Budget
The budget for the proposed project is $60,000. This includes $50,000 for the renovation with a
small contingency built into that amount. The remaining $10,000 covers the cost for Town
consultant to provide Town with technical assistance and needed renovation plan, technical
specifications and limited bid and construction administration support (contingency amount
included). All amounts include prevailing wages for labor.
Based on a similar renovation project, the general breakdown of the proposed rehabilitation,
including larger project as well, would be:
10
Project Need Cost/Quote Revenue Source
Town Consultant $10,000 Requested CPA Funds
Proposed Renovations $50,000 Requested CPA Funds
Mobilization 10%
Irrigation 5%
Infield Sod 11%
Base Path repair 13%
Home Plate Area renov 11%
Pitchers Mound renov 11%
Infield remediation 12%
Topdressing 16%
Aerification 6%
Base Installation 2%
Finalization 2%
Little League Renovation $60,000 Town of Brewster
Freemans Way Upgrades $62,000 Received CPA Funds, 2014
Project Total: $182,000
Price quote is based on consultant’s professional opinion and similar past renovations.
We are requesting $60,000 in this application request. Any funds that are not granted by the CPC
will be listed as a Capital Request from the Recreation Department on the Spring 2016 Town
Meeting.
Maintenance
Ongoing maintenance is shared between the Brewster Recreation Department and the
Department of Public Works. There is a line item budget of $10,000 in the DPW operating
budget that is meant to be used for maintenance and fertilization. The current state of repair is
out of the work scope of the DPW crew. Once corrected, regular maintenance can keep the fields
safe and usable.
Maintenance will also be contributed to by the Golf Department by use of equipment and other
resources. As listed in the Project Description, the contractor will be required to provide final
maintenance at the start of the next spring season after the winter.
Site Control
N/A