Loading...
HomeMy Public PortalAbout07-0477 Mahany 0 CITY OF TYBEE ISLAND BUILDING PERMIT DATE ISSUED: 11 -12 -2007 PERMIT #: 070477 WORK DESCRIPTION: REPAIR DECKS/HANDRAILS /STEPS WORK LOCATION: 1115 SECOND AVE OWNER NAME HUGH MAHANY ADDRESS 12502 APACHE AVE CITY, ST, ZIP SAVANNAH GA 31419 PHONE NUMBER CONTRACTOR NAME HUGH MAHANY ADDRESS 12502 APACHE AVE CITY STATE ZIP SAVANNAH GA 31419 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEE'S CHARGED $ 79.00 PROPERTY IDENTIFICATION # PROJECT VALUATION $8,000.00 TOTAL BALANCE DUE: $ 79.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: ^ � P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -5737 www.cityoftybee.org 1 ..."..,,, i" ( j 1. ,.,..„,,,; , , ,.,. 1 i ,....:,\, • - ..s.;:/ frilspectics)n Report CItylDt Tyee Island 4113 Filgtier Atfla.nue , P.O. Box 2749 Tvbee 'stand, GA: 31328 '_, d ii phone: (912 786-4513 extension 114 fiti Fax: (912) 786-9539 r- -7 / / - t) V7 7 Vern) it hi 6 , C. L--' nal-p Fteivia3stect 0 nf es fc3rne / a i'l Z4 1 1 1 Oate. N ceded /tit) //, / 200 1. Gen., Contractor SI/bcontractor Contact Number ---) " kr - Trv4pecto r -r- --- 5, , , natf, of T lispet Lir ..3 Type 4 §ospectiort 1/-61frld r e:/ Pass q Fail i u.--..-„,,, CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT C). 7{ ✓Location: / /'� ~�� v� PIN # NAME ADDRESS TELEPHONE v Owner Architect or Engineer 1 Contractor rYf�r�� �1 ��A,er2 EhOcill that apply) Repair ❑ Residential ❑ Footprint Changes ❑ Renovation ❑ Single Family ❑ Discovery ❑ Minor Addition ❑ Duplex ❑ Demolition ❑ Substantial Addition ❑ Multi- Family ❑ Other ❑ Commercial etails of Project: ,t;',=" s i tim s/ ' ated Cost of Construction: $ �� -1, Construction Type (1) (Enter appropriate number) (1) Wood Frame (4) Masonry (6) Other (please specify) (2) Wood & Masonry (5) Steel & Masonry (3) Brick Veneer Proposed use: Remarks: ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the following information based on the construction drawings and site plan: # Units # ':drooms # Bathrooms Lot Area Livi'� space (total sq. ft.) # Off - street parki • a' - s Trees located & st; d • top : 4 Al Access: Driveway \ (ft. it culvert? With swale? Setbacks: Front \ \ Re.• Sides (L) (R) # Stories Height V - rti • al ', *. tance measured from the average adjacent grade of the building to the extre e : p t!.' the building, exclusive of chimneys, heating units, ventilation ducts, air condi .' • i u ► ' • e levators, and similar appurtances. v e D 'ng construction: site restroom facilities will be provided through ley c On -site waste and debris containers will be provided by C� , 73c;:'//�J- Construction debris will be disposed by Z— yPv^fr by means of I understand that I must comply with zoning. flood damage control, building, fire, shore protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this p ermitted construction. ate: ,A /0-c, 7 lS"lgnature of Applicant: � �„ �.y Note: A permit normally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification NFIP Flood Zone Approved rezoning/variance? Street address and number: New Existing Is it in compliance with City map? If not, has street name and /or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: �ignature Date FEES Zoning Administrator / / G . ' Permit S� Code Enforcement Officer ( f�3f.d- G , ,--.,,,_ /Z _d x 2 Inspections aii Water /Sewer /) Water Tap Storm/Drainage Sewer Stub Inspections Aid to Const. City Manager TOTAL 7(1