Loading...
HomeMy Public PortalAbout12-0563 Kaufman ��KU(KTf/ CITY OF TYBEE ISLAND BUILDING PERMIT ADDED SCOPE AND VALUE DATE ISSUED: 10-23-2012 PERMIT#: 120563 WORK DESCRIPTION R&R GARAGE SIDING-ADD FOAM INS ADDED SOLAR PV WORK LOCATION 1517 CHATHAM \ _ 1 c e\ G OWNER NAME DIANE KAUFMAN ADDRESS PO BOX 2677 I 6- 12J CITY,ST,ZIP TYBEE ISLAND GA 31328 1 PHONE NUMBER ad d I poo 4-0 CONTRACTOR NAME CORY SCOVILLE CONSTRUCTION ADDRESS 604 ATKINSON AVE m(UMM., 1�' o S(O3 CITY STATE ZIP SAVANNAH GA 31404 � �` e1 P c. c - -\f- FLOOD ZONE Dikb BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEES CHARGED $216.00 PROPERTY IDENTIFICATION# PROJECT VALUATION $21,250.00 TOTAL BALANCE D O C DUE: $ 139.00 It is understood that if this permit is granted the builder will at all times comply with the zoning,subdivision,flood control,building,fire,soil and sedimentation,wetlands,marshlands protection and shore protection ordinances and codes whether local,state or federal,including all environmental laws and regulations when applicable,subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: a, . - 1 P.O.Box 2749-403 Butler Avenue,Ty bee Island,Georgia 31328 (912)786-4573-FAX(912)786-9539 www.cityoftybee.org J� a CITY OF TYBEE ISLAND BUILDING PERMIT ADDED SCOPE/VALUE DATE ISSUED: 10-23-2012 PERMIT#: 120563 WORK DESCRIPTION R&R GARAGE SIDING-ADD FOAM INS WORK LOCATION 1517 CHATHAM—PIN#4-0010-03-004 OWNER NAME DIANE KAUFMAN ADDRESS PO BOX 2677 CITY,ST,ZIP TYBEE ISLAND GA 31328 PHONE NUMBER CONTRACTOR NAME CORY SCOVILLE CONSTRUCTION ADDRESS 604 ATKINSON AVE CITY STATE ZIP SAVANNAH GA 31404 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEES CHARGED $219.00 PROPERTY IDENTIFICATION# PROJECT VALUATION $22,250.00 Added$1,000 for electrical TOTAL BALANCE DUE: $ 3.00 It is understood that if this permit is granted the builder will at all times comply with the zoning,subdivision,flood control,building,fire,soil and sedimentation,wetlands,marshlands protection and shore protection ordinances and codes whether local,state or federal,including all environmental laws and regulations when applicable,subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: _qlM14 . A l,,tt- (/1 ` P.O.Box 2749-403 Butler Avenue,Tybee Island,Georgia 31328 (912)786-4573-FAX(912)786-9539 www.cityoftybee.org Esc J =ice ,4i 1-4-,, City of Tybee Island • Planning & Zoning Dept. ■��, `� Inspection Report iii ' ' 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 IstLimg Phone 912.472.5032 • Fax 912.786.9539 CODE�COUNCIL MEMBER Permit No. 1` ,' S-6 as Date Requested 2�/.3 Owner's Name 4./t./4--'714,74J Date Needed Gen. Contractor f'z ,i,//,zi _ Subcontractor Contact Information :rP).[_', 1 ?,>/-47e7_ /) ..&/‘.9 Project Address !'')I !'Lg--,4 1-z,, 1/4.,.. Scope of Work -,,r /. ;G r n1‹,./4-,‘‘, !` , Inspector ',7i c, Date of Inspection V/211 -) Inspection /-----A---_. :Z Pass Fail ❑ Fee _ SAS ` ar!- r' /y, - FP r ,7 -_' Inspection 6),A-- - i? Pass Fail ❑ Fee fw Inspection Pass 111 Fail ❑ Fee Inspection Pass ❑ Fail 0 Fee 0(OP ,- - CRY of Tybee Island • Planning & Zoning Dept. Inspection Report mum* immum...- 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 —....mo INTERNATIONAL •-' ,,,,,-‘")' Phone 912.472.5032 • Fax 912.786.9539 CODE COUNCIL MEMBER I /1 f 2 / Permit No. / , / , i , -) Date Requested // /-',/ /1 i ' ,. 1 Owner's Name /.- w), ,,, /, ] Date Needed 1 / -;', )//_-_, / / Gen. Contractor --- -)/1/17;_.. Subcontractor ,/ Contact Information 7.--(9/ -...7 / (:, //, - .- Project Address / /-)71 Scope of Work ---1--)//)// 1-:7 i ,-„)--;,_4-7-7 /: A Inspector --2 17 Date of Inspection / -2/ Olt \ Inspection / 7 - Pass , 7 :, Fail /, ,, C-> - -----) ---- , / Inspection KC() I /-, r74 1 - Pass , ' fri ,,Fall Inspection Pass El Fail 0 Fee Inspection Pass Ei Fail 0 Fee 44_, &J6 - ci- - CV 51 T'- p}.F. � ,o k;, CITY OF TYBEE ISLAND E BUILDING&ZONING DEPARTMENT (l$ t ,. P.O. Box 2749,Tybee Island, GA 31328 �' � Phone(912) 786-4573 • Fax(912) 786-9539 lhua m*? ELECTRICAL PERMIT APPLICATION & TEMPORARY SE l'VICE AFFIDAVIT Date /— /6 - / New Work Replacement.;_. Location of work(street address) /5i? U 4- l' .v41_ CB) Contractor ('f y S .v v, f)4- Telephone 90 6- 970,0 6 16 f'c CICaokLt.Y'- (Go .Address of Contractor( v (A. B,L) Property Owner 1) c.t.nN c kk.- e, C,,, Telephone Date work will be ready for inspection,if known Permit Number Estimated cost of construction /00 0 A/C Unit and Heat Pump Range Hood—commercial ALL wiring, service Attic Ventilation Fan Service: amps included, must be Bell Transmitter—low voltage Sign Circuit-wattage COPPER. NO Border/Outline Lighting Smoke Detector—low voltage Building Saw Spa or Tub—grounding aluminum allowed. Exit Lights—life safety Special Outlet _ Heat Pump Swimming Pool—grounding Means shall be Meter Box Water Heater provided to Motor(s): hp Welder—220 volts circuit disconnect all Outlets— 110 volts circuit 4 Well Pump—grounding Parking Lot Lights X-ray conductors from the Pool Lights—grounding Other service-entrance Range—commercial conductors.NEC 230.70 APPLICATION FOR TEMPORARY SERVICE REQUEST In requesting temporary electrical service,the undersigned understands and agrees: 1. Connection of temporary electrical service does not remove the requirement to comply with all State of Georgia minimum construction codes. 2. Temporary electrical power is intended for completion of the construction process and testing equipment installed within the structure. 3. Issuing approval for temporary power connection does not constitute approval to occupy the structure. A Certificate of Occupancy must be issued by the City of Tybee Island prior to any occupancy. 4. The owner and contractor are hereby held responsible for any violations of this policy. A violation of this policy may result in disconnection of the electrical service until all violations and deficiencies are corrected. _,-..,,2 - z..rdie --- I — 1 r° Owner/Contractor Signature Date C°��y SC© �; ) 1C_, Owner/Co'ntractor Printed Name • • APPROVAL Fee Building Official Date p,13 ,::, x__.04 4 I2 --U .,_,N,,_,..„ i-- %� CITY OF TYBEE ISLAND �'kt: ' , BUILDING&ZONING DEPARTMENT � :%/i P.O.Box 2749,Tybee Island,GA 31328 ., % Phone(912) 786-4573 • Fax (912) 786-9539 ELECTRICAL PERMIT APPLICATION & TEMPORARY SERVICE AFFIDAVIT Date 12 pc JT 20 (2.. New Work Replacement Location of work(street address) i S.t7 eL Tla,,,,_ Contractor Telephone `S 13 " 4 76 •- 8448 Ca41t.5f-as.1 Sofav- Pow-e Co. 9 ("4 - a 513 7633 Address of Contractor Property Owner • vi.e , "P,, Telephone Q t Z (3 —0 78.4 Date work will be ready for inspectio ,if known PIS(4 " ! (z CU J ember Permit Number Estimated cost of construction 17, R5-0. 00 ,Z,vt"QO 690 elec A/C Unit and Heat Pump Range Hood—commercial ALL wiring, service Attic Ventilation Fan Service: amps included, must be Bell Transmitter—low voltage Sign Circuit-wattage COPPER. NO Border/Outline Lighting Smoke Detector—low voltage Building Saw Spa or Tub—grounding aluminum allowed. Exit Lights—life safety Special Outlet Heat Pump Swimming Pool—grounding Means shall be Meter Box Water Heater provided to Motor(s): hp Welder-220 volts circuit disconnect all Outlets— 110 volts circuit Well Pump—grounding Parking Lot Lights X-ray conductors from the Pool Lights—grounding Other service-entrance Range—commercial SWQv•- PV conductors.NEC 230.70 APPLICATION FOR TEMPORARY SERVICE REQUEST In requesting temporary electrical service,the undersigned understands and agrees: 1. Connection of temporary electrical service does not remove the requirement to comply with all State of Georgia minimum construction codes. 2. Temporary electrical power is intended for completion of the construction process and testing equipment installed within the structure. 3. Issuing approval for temporary power connection does not constitute approval to occupy the structure. A Certificate of Occupancy must be issued by the City of Tybee Island prior to any occupancy. 4. The owner and contractor are hereby held responsible for any violations of this policy. A violation of this •olicy may result in disconnection of the electrical service until all violations and deficiencies are corrected. ii - // , xlcii ,, - (Z Oc-t 2017— Owner/Contractor Signature Date 7D S trey' v►i.a v\ Owner/Contractor Printed Name • • APPROVAL Fee /e !4 * Building Official j�Ad Date n VI CITY OF TYBEE ISLAND BUILDING PERMIT ELECTRICAL SERVICE AND OTHER ELECTRICAL FOR GARAGE MUST BE ON SEPARATE PERMIT DATE ISSUED: 10-23-2012 PERMIT#: 120563 WORK DESCRIPTION R&R GARAGE SIDING-ADD FOAM INS WORK LOCATION 1517 CHATHAM OWNER NAME DIANE KAUFMAN ADDRESS PO BOX 2677 CITY,ST,ZIP TYBEE ISLAND GA 31328 PHONE NUMBER CONTRACTOR NAME CORY SCOVILLE CONSTRUCTION ADDRESS 604 ATKINSON AVE CITY STATE ZIP SAVANNAH GA 31404 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEES CHARGED $ 77.00 PROPERTY IDENTIFICATION# PROJECT VALUATION $3,300.00 1 TOTAL BALANCE DUE: $ 77.00 It is understood that if this permit is granted the builder will at all times comply with the zoning,subdivision,flood control,building,fire,soil and sedimentation,wetlands,marshlands protection and shore protection ordinances and codes whether local,state or federal,including all environmental laws and regulations when applicable,subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: j ,j��, . 4w � / I P.O.Box 2749-403 Butler Avenue,Tybee Island,Georgia 31328 (912)786-4573-FAX(912)786-9539 www.cityoftybee.org /o( -05 ,.. E/-i-,4\,, //f.. City of Tybee Island, Georgia 7 \y`,, 912-472-5033 or 912-472-5031 - Fax 912-786-9539 APPLICATION FOR BUILDING PERMIT Property Address: ) 5 /7 LI// T1-1A J',, A mac- -- ‘-arQ,3)9--, Name Mailing Address Telephone �/ v Home: Owner ) `..,n-c /�a /0hch Cell: Architect or Engineer • Home: Contractor r��_. � Ct, //C ' Cell: 706 -C '?o - 0676 (Check all that apply) ❑ Single Family ❑ Discovery/Tearout ❑ Demolition of Structure ❑ Duplex ❑ Footprint Changes— ❑ Other ❑ Multi-Family units new square feet ❑ Commercial units heated/cooled Details of Project: Rep (cCC c S i A i hA' / I n S tom.) ( �-Oo Av+-z p S cre,�C Estimated Cost of Construction: $ (materials + labor+ profit/overhead) If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon the scope of the work, two sets of construction drawings and/or a site plan may be required. Year Built: Listed on National Historic Register or located within a National Historic District? Y / N *Buildings older than 50 years may be eligible to be listed on the State/National Register. With this designation,you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. *Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction: On-site restroom facilities will be provided through . Construction debris will be disposed by by means of . I understand that I must comply with zoning,flood damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date: 701.Z 7/ . Signature of Applicant: 7J / FEES Printed Name CA,r S ot.()/c Permit Y Inspections Note: A permit normally takes 7 to 10 days to process Cap Cost Rec Water Tap Approvals: Signature Date Sewer Stub Eng. Fees Planning &Zoning Manager Aid to Const. Building Official /0 L� Water/Sewer Storm/Drainage City Manager TOTAL LEAD-BASED PAINT RRP RULES Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform renovation, repairs, and painting jobs in pre-1978 housing and child-occupied facilities must, before beginning work, provide owners, tenants, and child-care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard information for Families, Child Care Providers, and Schools. Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you to be certified and to use lead-safe work practices. Georgia Environmental Protection Division Lead-Based Paint and Asbestos Program (404) 363-7026. Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator When disturbing lead-based painted or coated surfaces or components more than 6 ft2 per interior room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size. * * * * * * * * * * * * * * * * * * * * * Asbestos/Environmental Notification to Georgia EPD for Projects Involving Demolition, Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. * * * * ** * * * * * * * * * * * * * * * BMPs While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility. Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 — Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission; http://www.gaswcc.org/docs/field_manual_4ed.pdf. Problems with the Co is not limited to the installation, but to material. The stone will be a representation of 1.5"-3.5" stone or larger. Type A sediment barriers have been installed where Type C is required and shown on the permit drawings. Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall over) without impacting the second one. The complete assembly and installation must be compliant; steel or wood posts, post spacing, Type C or A. (Q, , y c ,.... /& - 23 - )2 Signature for receipt of Lead Paint, Asbestos, and BMP notices. Date Printed Ndme