Loading...
HomeMy Public PortalAbout1528th Board Agenda 2-14-2013REVISED PAGE 6 2/8/13 A G E N D A 1528th MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT February 14, 2013 – 4:00 P.M. MSD OFFICES 2350 MARKET STREET ROOM 109 ROLL CALL THE BOARD OF TRUSTEES WILL BE IN CLOSED SESSION BETWEEN 4:00 P.M. AND 5:00 P.M. 1 CLOSED SESSION TO DISCUSS LEGAL, CONFIDENTIAL OR PRIVILEGED MATTERS UNDER §610.021(1), RSMO 1988 SUPP.; PERSONNEL ACTIONS UNDER §610.021(3) 2 APPROVAL OF JOURNAL OF PRECEDING MEETING January 10, 2013 (1527th) 3 COMMENTS BY THE CHAIR 4 REPORT OF BOARD COMMITTEES 5 REPORT OF EXECUTIVE DIRECTOR 6 COMMENTS FROM THE PUBLIC 7 SUBMISSION OF PUBLIC HEARING REPORTS – None 8 COMMUNICATIONS – None 9 CONSENT AGENDA – Item Nos. 10 through 19 2 of 2/14/13 Ordinances 10 Adoption of proposed Ord. No. 13562 appropriating $17,380,000.00 from the Sanitary Replacement Fund to be used for project costs for the construction of the Missouri River WWTP Secondary Treatment Expansion and Disinfection Facilities (10710), in the City of Maryland Heights, Missouri under Contract No. 10597 as approved by Ordinance No. 13220, adopted March 10, 2011. (Intro. 1/10/13) 11 Adoption of proposed Ord. No. 13563 appropriating $1,450,000.00 from the Sanitary Replacement Fund to be used for project costs for the construction o f sanitary sewers in RDP Foulwater Interceptor Rehabilitation (Phase I): Vent Pipes (10198), in the City of St. Louis, Missouri; and authorizing the Executive Director and Secretary -Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with XL Contracting, Inc. for the aforesaid sanitary sewer construction. (Intro. 1/10/13) 12 Adoption of proposed Ord. No. 13564 appropriating $240,000.00 from the Operations, Maintenance, Construction and Improvement Fund of Clayton Central to be used for project costs for the construction of storm sewers in Clayton Central Storm Improvements (11103) in The City of Clayton, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Pangea Group for the aforesaid construction. (Intro. 1/10/13) 13 Adoption of proposed Ord. No. 13565 appropriating $1,500,000.00 from the General Fund to be used for CCTV Inspection and Physical Inspection of Sewer s - North (10376),and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 9 to Contract No. 10615 with ADS Environmental Services, LLC for CCTV Inspection and Physical Inspection of Sewers - North (10376). (Intro. 1/10/13) 14 Adoption of proposed Ord. No. 13566 appropriating $1,500,000.00 from the General Fund to be used for CCTV Inspection and Physical Inspection of Sewers - South (10377), and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 7 to Contract No. 10616 with Ace Pipe Cleaning, Inc. for CCTV Inspection and Physical Inspection of Sewers - South (10377). (Intro. 1/10/13) 15 Adoption of proposed Ord. No. 13567 appropriating $50,000.00 from the General Fund to be used for the General Services Agreement - Survey Services (FY2011) Contract B (10627) throughout the District, and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 2 to Contract No. 10411 with Kowelman Engineering, Inc. for General Services Agreement - Survey Services (FY2011) Contract B (10627) for the surveying se rvices, including land surveys, property strip maps, easements and other general surveying services. (Intro. 1/10/13) 16 Adoption of proposed Ord. No. 13568 appropriating $50,000.00 from the General Fund to be used for the General Services Agreement - Survey Services (FY2011) Contract C (10628) throughout the District, and authorizing the Executive Director and Secretary -Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 2 to Contract No. 10412 with Sabur Surveying, Inc. for General Services Agreement - Survey Services (FY2011) Contract C (10628) for the surveying services, including land surveys, property strip maps, easements and other general surveying services. (Intro. 1/10/13) 3 of 2/14/13 17 Adoption of proposed Ord. No. 13569 appropriating $50,000.00 from the Sanitary Replacement Fund to be used for the General Services Agreement - Survey Services (FY2011) Contract E (10630) throughout the District, and authorizing the Executive Director and Secretary -Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 2 to Contract No. 10414 with Volz Incorporated for General Services Agreement - Survey Services (FY2011) Contract E (10630) for the surveying services, including land surveys, property strip maps, easements and other general surveying services. (Intro. 1/10/13) 18 Adoption of proposed Ord. No. 13570 appropriating $82,000.00 from the Operation, Maintenance and Construction Improvement Fund of Deer Creek for High Meadow Road Storm Sewer (Frontenac 2-2) (11217) in the City of Frontenac, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into an intergovernmental agreement with the City of Frontenac, Missouri to provide financial assistance for drainage improvements on flood-prone properties. (Intro. 1/10/13) 19 Adoption of proposed Ord. No. 13571 appropriating $85,000.00 from the Operation, Maintenance and Construction Improvement Fund of Deer Creek for Carole Lane Storm Improvements (Frontenac 6-1) (11241) in the City of Frontenac, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into an intergovernmental agreement with the City of Frontenac, Missouri to provide financial assistance for drainage improvements on flood-prone properties. (Intro. 1/10/13) UNFINISHED BUSINESS Ordinances None Resolutions None 4 of 2/14/13 New Business Agenda Item Number Name Page Number Ordinances 20 – Proposed Ord. No. 13572 East Watson and Kathy Ct. Storm 8 Improvement (10588) Introduction of proposed Ord. No. 13572 repealing Ordinance No. 11479 adopted May 22, 2003 and enacting a new Ordinance in lieu thereof and appropriating $65,000.00 from the Operation, Maintenance, Construction and Improvement Fund of Gravois Creek to provide flood proofing protection in East Watson and Kathy Ct. Storm Improvement (10588), in the Cities of Sunset Hills and Crestwood, Missouri. 21 – Proposed Ord. No. 13573 Page Ave. & Lindbergh Sanitary Sewer (10725) 9 Introduction of proposed Ord. No. 13573 appropriating $370,000.00 from the Sanitary Replacement Fund to be used for project costs for the construction of sanitary sewers in Page Ave. & Lindbergh Sanitary Sewer (10725) in Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Midwest Mole, Inc. for the aforesaid construction. 22 – Proposed Ord. No. 13574 Providence Place Sanitary Relief (10184) 10 Introduction of proposed Ord. No. 13574 appropriating $1,250,000.00 from the Sanitary Replacement Fund to be used for project costs for the construction of sanitary sewers in Providence Place Sanitary Relief (10184) in Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary- Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Metro Utilities, LLC for the aforesaid construction. 23 – Proposed Ord. No. 13575 Riverside and Yarnell Sanitary Relief 11 (SKME-400) (10146) Introduction of proposed Ord. No. 13575 appropriating $5,100,000.00 from the Meramec River Basin Subdistrict #449 and $2,800,000.00 from the Sanitary Replacement Fund to be used for project costs for the construction of sanitary sewers in Riverside and Yarnell Sanitary Relief (SKME-400) (10146), in City of Fenton, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Gershenson Construction Co., Inc. for the aforesaid construction. 5 of 2/14/13 Agenda Item Number Name Page Number 24 – Proposed Ord. No. 13576 Upper Maline Trunk Sanitary Relief 12 Phase III Section C (10782) Introduction of proposed Ord. No. 13576 appropriating $3,800,000.00 from the Sanitary Replacement Fund to be used for project costs for the construction of sanitary sewers in Upper Maline Trunk Sanitary Relief Phase III Section C (10782) in City of Ferguson and Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with J.H. Berra Construction Co., Inc. for the aforesaid construction. 25 – Proposed Ord. No. 13577 Gravois Trunk (Whitecliff to RDP) Sanitary 14 Relief Phase III (10496 & E-1159) Introduction of proposed Ord. No. 13577 making an appropriation of $80,000.00 from the Sanitary Replacement Fund for engineering services for the design of Gravois Trunk (Whitecliff to RDP) Sanitary Relief Phase III (10496 & E -1159) and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 7 of Contract #20009 with EDM Incorporated, for the aforesaid engineering services. 26 – Proposed Ord. No. 13578 General Services Agreement – Sewer Design 15 (FY2013) Contract A (11779) Introduction of proposed Ord. No. 13578 appropriating $90,000.00 from the Sanitary Replacement Fund to be used for the General Services Agreement - Sewer Design (FY2013) Contract A (11779) throughout the District, and authoriz ing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract #20026 with Tetra Tech, Inc. for General Services Agreement - Sewer Design (FY 2013) Contract A (11779). 27 – Proposed Ord. No. 13579 General Services Agreement – Sewer Design 16 (FY2013) Contract B (11780) Introduction of proposed Ord. No.13579 appropriating $90,000.00 from the Sanitary Replacement Fund to be used for the General Services Agreement - Sewer Design (FY2013) Contract B (11780) throughout the District, and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract #20027 with Vance Engineering, Inc. for General Services Agreement - Sewer Design (FY 2013) Contract B (11780). 28 – Proposed Ord. No. 13580 General Services Agreement – Sewer Design 17 (FY2013) Contract C (11781) Introduction of proposed Ord. No. 13580 appropriating $90,000.00 from the Sanitary Replacement Fund to be used for the General Services Agreement - Sewer Design (FY2013) Contract C (11781) throughout the District, and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract #20028 with Shalom Services Corporation for General Services Agreement - Sewer Design (FY2013) Contract C (11781). 6 of 2/14/13 REVISED 2/8/13 Agenda Item Number Name Page Number 29 – Proposed Ord. No. 13581 Prospect Hill Landfill Vertical Expansion (11094) 18 Introduction of proposed Ord. No. 13581 appropriating $587,000.00 from the Sanitary Replacement Fund for engineering services for the design of Prospect Hill Landfill Vertical Expansion (11094), and authorizing the Executive Director and Secretary- Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract #20029 with Horner & Shifrin, Inc. for the design of this project 30 – Proposed Ord. No. 13582 Ashland Avenue – Clara to Belt 20 (Property Acquisition) (11862) Introduction of proposed Ord. No. 13582 appropriating $1,000,000.00 from the Sanitary Replacement Fund for the acquisition, transfer, closing approval, demolition, and related activities for real property in the City of St. Louis, Missouri, for flood mitigation purpose for the Ashland Avenue – Clara to Belt (Property Acquisition) (11862); and authorizing the Executive Director and Secretary-Treasurer on behalf of the Metropolitan St. Louis Sewer District to acquire, transfer, approve closing, demolish and perform related activities for real property necessary for the above project. 31 – Proposed Ord. No. 13583 Jennings Station Road/North Baden Basin 21 (Property Acquisition) (11140) Introduction of proposed Ord. No. 13583 appropriating $2,000,000.00 from the Sanitary Replacement Fund for the acquisition, transfer, closing approval, demolition, and related activities for real property in the Cities of Jennings and Flordell Hills, Missouri, for flood mitigation purpose for the Jennings Station Road/North Baden Basin (Property Acquisition) (11140); and authorizing the Executive Director and Secretary-Treasurer on behalf of the Metropolitan St. Louis Sewer District to acquire, transfer, approve closing, demolish and perform related activities for real property necessary for the above project. 32 – Proposed Ord. No. 13584 Partridge Avenue 8500 Block Combined Sewer 22 Relief (Property Acquisition) (11828) Introduction of proposed Ord. No. 13584 appropriating $1,000,000.00 from the Sanitary Replacement Fund for the acquisition, transfer, closing approval, demolition, and related activities for real property in the City of St. Louis, Missouri, for flood mitigation purpose for the Partridge Avenue 8500 Block Combined Sewer Relief (Property Acquisition) (11828); and authorizing the Executive Director and Secretary-Treasurer on behalf of the Metropolitan St. Louis Sewer District to acquire, transfer, approve closing, demolish and perform related activities for real property necessary for the above project. 7 of 2/14/13 Agenda Item Number Name Page Number 33 – Proposed Ord. No. 13585 Deer Creek Watershed Storm Channel 23 Improvements (10327 & E-1251) Introduction and adoption of proposed Ord. No. 13585 making an appropriation of $13,000.00 from the Operations, Maintenance, Construction and Improvement Fund of Deer Creek for the design of Deer Creek Watershed Storm Channel Improvements (10327 & E-1251), and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 5 of Contract #10958 with Stantec Consulting Services, Inc., for the aforesaid engineering services. Resolutions 34 Adoption of Resolution No. 3070 expressing the Board of Trustees’ appreciation to Jeffrey L. Theerman for his 28 years of exemplary service to The Metropolitan St. Louis Sewer District from October 8, 1984, to his retirement effective February 1, 2013. 35 Adoption of Resolution No. 3071 expressing the Board of Trustees’ appreciation to Francis X. Kaiser for his 24 years of exemplary service to The Metropolitan St. Louis Sewer District from January 3, 1989, to his retirement effective February 1, 2013. 36 ITEMS PROPOSED FOR INTRODUCTION & ADOPTION AT THE NEXT BOARD MEETING 37 ANY OTHER BUSINESS THAT MAY PROPERLY BE BROUGHT BEFORE THE BOARD 38 CLOSED SESSION The Metropolitan St. Louis Sewer District Board of Trustees may go into closed session at this meeting if such action is approved by a majority vote of the Board members who constitute a quorum, to discuss legal, confidential, or privileged matters under §610.021(1), RSMo 1988 Supp.; leasing, purchase or sale of real estate under §610.021(2); personnel actions under §610.021(3); discussions regarding negotiations with employee groups under §610.021(9); personnel records or applications under §610.021(13); o r records under §610.021(14) which are otherwise protected from disclosure by law; or confidential or privileged communications with the District’s auditor, including auditor work products under §610.021(17). 39 ADJOURNMENT 8 of 2/14/13 AGENDA ITEM NUMBER: 20 – Proposed Ord. No. 13572 NAME OF PROJECT: East Watson and Kathy Ct. Storm Improvement (10588) LOCATION: South of Watson Road and east of Lindbergh Boulevard in the Cities of Crestwood and Sunset Hills, Missouri TYPE OF PROJECT: Stormwater Improvements (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Repeals Ordinance No. 11479 and appropriates funds. What does action accomplish?: Implements a CIP project. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: N/A Consultant: N/A Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: $65,000.00 Designer’s Estimate: N/A MBE/WBE Participation: N/A Type of Contract: N/A Properties Affected: 3 Properties Benefiting: 3 Designed by: District staff The work to be done consists of the floodproofing of three residential structures at #10209, 10215, and 10221 East Watson Road. The homeowners will contract for the work and the District will provide funding after verification of installation of acceptable devices per the floodproofing manual and policies. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2011, Pg. 136 Amount: $65,000 Fund Name: #5571 – Gravois Creek OMCI Fund Additional Comments: Funding for this work was originally appropriated under Ordinance No. 11479 in 2003. Homeowners and the District were unable to reach agreement on floodproofing methods, the project was dropped, and the funds released in 2005. The District has reached agreement with the current homeowners. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 05/22/03 – Ord. No. 11479 – Amount: $130,000 – (Repealed by this Ordinance) 9 of 2/14/13 AGENDA ITEM NUMBER: 21 – Proposed Ord. No. 13573 NAME OF PROJECT: Page Ave. & Lindbergh Sanitary Sewer (10725) LOCATION: South of Page Avenue and east of Lindbergh Boulevard in unincorporated St. Louis County, Missouri TYPE OF PROJECT: Sanitary Sewer Construction (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract. What does action accomplish?: Implements the construction of a CIP project, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: Midwest Mole, Inc. Previous District Contract: No* 6814 W. 350 N. Greenfield, IN 46140 Consultant: N/A Agency: N/A Number of bidders: 2 Low Bid: $324,968.00 High Bid: $498,935.25 Appropriation Amount: $370,000.00 Designer’s Estimate: $370,000.00 MBE/WBE Participation: 42.99% (MWBE Goal is 15%) XL Contracting, Inc. – 42.99% - MBE Type of Contract: Unit Cost Properties Affected: 3 Properties Benefiting: 97 Designed by: District staff The work to be done under Contract #20013 consists of the construction of approximately 478 lineal feet of 12 -inch diameter pipe in tunnel, 257 lineal feet of pipe sewers varying in size from 8-inches to 12-inches in diameter, and appurtenances. The purpose of this project is to alleviate sanitary sewer overflows due to blockages of the existing sewer line. This project is scheduled to be completed in 120 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2013, Pg. 121 Amount: $350,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: An additional contingency of $10,000 for utility relocation (Electric - $10,000) is included in the appropriation. Contracted planning resources utilized: Watershed Facility Planning, Separate Sewer Area I/I Assessment, Separate Sewer Area Flow Metering & Monitoring, Modeling, CCTV Inspection, and Radar Rainfall Data. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 04/08/10 – Res. No. 2904 – GSA – Geotechnical Services – Reitz & Jens Inc. – Contract No. E-1240 – Amendment No. 1 *Midwest Mole, Inc. is a Tunneling/Trenchless and Pipe and Manhole Rehabilitation Contractor with a bond capacity of $30,000,000 through Continental Casualty Company. The Company is located in Greenfield, Indiana and was organized in 1982. The company was a subcontractor on previous MSD projects and has com pleted multiple tunneling construction projects for both public and private entities, as both a prime contractor and subcontractor. 10 of 2/14/13 AGENDA ITEM NUMBER: 22 – Proposed Ord. No. 13574 NAME OF PROJECT: Providence Place Sanitary Relief (10184) LOCATION: North of Baumgartner Road and east of Lemay Ferry Road in unincorporated St. Louis County, Missouri TYPE OF PROJECT: Sanitary Sewer Construction (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract. What does action accomplish?: Implements the construction of a CIP project, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: Metro Utilities LLC Previous District Contract: Yes 4884 Mette Road Moscow Mills, MO 63362 Consultant: N/A Agency: N/A Number of bidders: 9 Low Bid: $1,195,445.00 High Bid: $1,471,589.00 Appropriation Amount: $1,250,000.00 Designer’s Estimate: $1,350,000.00 MBE/WBE Participation: 16.44% (MWBE Goal is 15%) Taylor Trucking – 2.99% - MBE J-M Eagle Manuf. (plastic pipe) – 4.53% - MBE J & J Boring – 8.92% - WBE Type of Contract: Unit Cost Properties Affected: 8 Properties Benefiting: 12 Designed by: Stantec Consulting Services, Inc. The work to be done under Contract #20022 consists of the construction of approximately 1,979 lineal feet of 15 -inch diameter sanitary sewers and appurtenances. The purpose of this project is to alleviate sanitary backups and overcharged sanitary sewers. This project is scheduled to be completed in 315 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2013, Pg. 124 Amount: $800,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: An additional contingency of $20,000 for utility relocation (Electric - $10,000 & Water - $10,000) is included in the appropriation. Contracted planning resources utilized: Watershed Facility Planning, Separate Sewer Area I/I Assessment, Separate Sewer Area Flow Metering & Monitoring, Modeling, CCTV Inspection, and Radar Rainfall Data. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 10/08/09 – Ord. No. 12967 – Amount: $167,000 – Stantec Consulting Services, Inc. – Design Contract No. E-1263 11 of 2/14/13 AGENDA ITEM NUMBER: 23 – Proposed Ord. No. 13575 NAME OF PROJECT: Riverside and Yarnell Sanitary Relief (SKME-400) (10146) LOCATION: South of Interstate 44 and west of the Meramec River located in the City of Fenton, Missouri TYPE OF PROJECT: Sanitary Sewer Construction (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract. What does action accomplish?: Implements the construction of a CIP project, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: Gershenson Construction Co., Inc. Previous District Contract: Yes #2 Truitt Drive Eureka, MO 63025 Consultant: N/A Agency: N/A Number of bidders: 8 Low Bid: $6,995,910.45 High Bid: $8,909,750.00 Appropriation Amount: $7,900,000.00 Designer’s Estimate: $9,515,000.00 MBE/WBE Participation: 45.66% (MWBE Goal is 15%) Westfall Hauling (trucking) – 3.26% - MBE Westfall Hauling (asphalt paving) – 3.04% - MBE Riley Ready Mix – 0.37% - MBE McKay’s Hauling – 1.04% - MBE J & J Boring – 37.95% - WBE Type of Contract: Unit Cost Properties Affected: 25 Properties Benefiting: 950 Designed by: BIS Frucon Engineering Inc. The work to be done under Contract #11007 consists of the construction of approximately 12,900 lineal feet of 8-inch to 48- inch sanitary relief sewers and appurtenances. The purpose of this project is to alleviate building backups and overcharged sanitary sewers. This project is scheduled to be completed in 915 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2013, Pg. 127 Amount: $4,500,000 FY2013, Pg. 128 $4,600,000 Fund Name: #5591 – Meramec River Basin Subd. #449 $5,100,000 #6660 – Sanitary Replacement Fund $2,800,000 Additional Comments: An additional contingency of $325,000 for utility relocation (Electric - $90,000, Gas - $35,000, Telephone - $125,000, Water - $65,000 & Other - $10,000) is included in the appropriation. Contracted planning resources utilized: Watershed Facility Planning, Separate Sewer Area I/I Assessment, Separate Sewer Area Flow Metering & Monitoring, Modeling, CCTV Inspection, and Radar Rainfall Data. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 08/31/06 – Ord. No. 12284 – Amount: $1,297,000 – BIS Frucon Engineering Inc. – Design Contract No. E-1183 12 of 2/14/13 AGENDA ITEM NUMBER: 24 – Proposed Ord. No. 13576 NAME OF PROJECT: Upper Maline Trunk Sanitary Relief Phase III Section C (10782) LOCATION: Generally along Maline Creek west of West Florissant Avenue to south of Ferguson Avenue in the City of Ferguson and unincorporated St. Louis County, Missouri TYPE OF PROJECT: Sanitary Sewer Construction (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract. What does action accomplish?: Implements the construction of a CIP project, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: J. H. Berra Construction Co., Inc. Previous District Contract: Yes 5091 New Baumgartner Road St. Louis, MO 63129 Consultant: N/A Agency: N/A Number of bidders: 8 Low Bid: $3,099,978.00 High Bid: $14,172,272.28 Appropriation Amount: $3,800,000.00 Designer’s Estimate: $5,120,000.00 MBE/WBE Participation: 17.09% (MWBE Goal is 15%) J & J Boring, Inc. – 9.22% - WBE Windstar Transportation – 6.24% - MBE Taylor Trucking – 1.63% - MBE Type of Contract: Unit Cost Properties Affected: 2 Properties Benefiting: 2,000 Designed by: URS Corporation The work to be done under Contract #20003 consists of the construction of approximately 4,150 lineal f eet of 8-inch diameter to 54-inch diameter sanitary sewers and appurtenances. This construction is the third phase of a multi -phase project. The purpose of this project is to alleviate building backups and overloaded sanitary sewers. This project will e liminate one (1) SSO (BP-303). This project is scheduled to be completed in 525 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2013, Pg. 134 Amount: $2,940,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: An additional contingency of $100,000 for utility relocation (Electric - $25,000, Gas - $25,000, Water - $25,000 & Other - $25,000) is included in the appropriation. An additional contingency of $400,000 is included in the appropriation for emergency by-pass pumping in the event that the existing 48-inch to 42-inch sanitary sewer is in direct conflict with the proposed 54-inch sanitary sewer. A section of the Forestwood Lateral Sanitary Relief (SKME-321) project having a construction cost estimate of $700,000 was included in this project in order to coordinate easement rights with the City of Ferguson. The total budget for this project was $4,900,000. Supplemental funding of $1,960,000 is progr ammed for FY2014. Contracted planning resources utilized: Watershed Facility Planning, Separate Sewer Area I/I Assessment, Separate Sewer Area Flow Metering & Monitoring, Modeling, CCTV Inspection, and Radar Rainfall Data. 13 of 2/14/13 PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 09/11/03 – Ord. No. 11587 – Amount: $1,469,000 – URS Corporation – Design Contract No. E-1053 12/13/07 – Ord. No. 12550 – Amount: $5,900,000 – Upper Maline Trunk Sanitary Relief Phase III Section A (90080A) 01/14/10 – Ord. No. 13013 – Amount: $5,050,000 – Upper Maline Trunk Sanitary Relief Phase III Section B (90080B) 14 of 2/14/13 AGENDA ITEM NUMBER: 25 – Proposed Ord. No. 13577 NAME OF PROJECT: Gravois Trunk (Whitecliff to RDP) Sanitary Relief Phase III (10496 & E-1159) LOCATION: South of Interstate 55 and west of Avenue H in unincorporated St. Louis County, Missouri TYPE OF PROJECT: Design of sanitary sewers (011.0 Design Phase Project Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates additional funds and authorizes staff to amend a design contract What does action accomplish?: Implements the design of a CIP project, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: EDM Incorporated 220 Mansion House Center St. Louis, MO 63102 Corporate Headquarters – St. Louis, Missouri Agency: N/A Number of proposers: N/A Appropriation Amount: $80,000.00 Designer’s Estimate: N/A MBE/WBE Participation: 25.73% (30.45% for the total project) (MWBE Goal is 20%) ABNA Engineering, Inc. – 25.73% - MBE (For this amendment only) Tech Service, Inc. – 0% - MBE (For this amendment only) Type of Contract: Lump Sum Properties Affected: Approximately 6 Properties Benefiting: Approximately 2,000 Designed by: N/A This ordinance authorizes the District to enter into Amendment No. 7 under Contract #20009 with EDM Incorporated for the design and preparation of construction documents for approximately 3,740 feet of 84 -inch to 90-inch diameter sanitary sewer and appurtenances. The preliminary estimate of all costs associated with sewer construction, railroad removal and replacement, relocation of AmerenUE facilities, and impact to a local business is $17,135,000.00. This is the third of a 14 - phase project to provide for the elimination of 23 sanitary bypasses after the Lemay No. 1 pump station is improved. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2006, Pg. 42 Amount: $700,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: The scope of this project has increased due to subsurface conditions and the need to coordinate with significant stakeholders including Ameren, Union Pacific Railroad, MoDOT, Republic Services Recycling (an industrial facility whose operation will be impacted by the project), and Trailnet. These factors have necessitated the need for an additional $30,000 for construction phase services. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 11/10/05 – Ord. No. 12115 – Amount: $522,000 – EDM Incorporated – Design Contract No. E-1159 15 of 2/14/13 AGENDA ITEM NUMBER: 26 – Proposed Ord. No. 13578 NAME OF PROJECT: General Services Agreement – Sewer Design (FY2013) Contract A (11779) LOCATION: Various locations within the District TYPE OF PROJECT: General Engineering Services (011.0 Design Phase Project Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a design contract. What does action accomplish?: Design of small capital improvements and Operations projects. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: No* Consultant: Tetra Tech, Inc. 806 Horan Drive Fenton, MO 63026 Corporate Headquarters – Pasadena, California Number of proposers: (3) Bernardin, Lochmueller and Associates, Inc., Juneau Associates, Inc., P.C., and Tetra Tech, Inc. Appropriation Amount: $90,000.00 Designer’s Estimate: N/A MBE/WBE Participation: 30.00% (MWBE Goal is 30%) EFK Moen, LLC – 10.0% - WBE Pangea Engineering & Surveying, LLC – 10.0% - MBE Taliaferro & Browne, Inc. – 10.0% - MBE Type of Contract: Hourly Billing Rate Plus Reimbursables Properties Affected: To Be Determined Properties Benefiting: To Be Determined Designed by: N/A This ordinance authorizes the District to enter into Contract #20026 for one year with two option years with Tetra Tech, Inc. for the design of various projects. This project consists of the design of small sanitary and combined sewer projects as needed throughout the District in support of an ongoing internal design effort. This contract is for a total maximum contrac t amount of $90,000. Projects will be issued by letter agreement per individual scopes of services. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2013, Pg. 38 Amount: $90,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: There were two other proposals considered on this project. If any non -capital projects will be required, the funds will be transferred to #1101 – General Fund. Contracted planning resources utilized: None PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A *Tetra Tech, Inc. is an engineering and environmental consulting firm of 13,000 employees founded in 1966. They have 7 engineers and technicians locally and this is their first contract with the District as Tetra Tech, Inc. 16 of 2/14/13 AGENDA ITEM NUMBER: 27 – Proposed Ord. No. 13579 NAME OF PROJECT: General Services Agreement – Sewer Design (FY2013) Contract B (11780) LOCATION: Various locations within the District TYPE OF PROJECT: General Engineering Services (011.0 Design Phase Project Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a design contract. What does action accomplish?: Design of small capital improvements and Operations projects. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: Vance Engineering, Inc. 10779 Page Avenue St. Louis, MO 63132 Corporate Headquarters – St. Louis, Missouri Number of proposers: (3) Glasper Professional Services, Inc., Vance Engineering, Inc., and William Tao & Associates, Inc. Appropriation Amount: $90,000.00 Designer’s Estimate: N/A MBE/WBE Participation: 30.00% (MWBE Goal is 30%) Access Engineering, Inc. – 25.00% - WBE Sabur, Inc. – 5.00% - MBE Type of Contract: Hourly Billing Rate Plus Reimbursables Properties Affected: To Be Determined Properties Benefiting: To Be Determined Designed by: N/A This ordinance authorizes the District to enter into Contract #20027 for one year with two option years with Vance Engineering, Inc. for the design of various projects. This project consists of the design of small sanitary and combined sew er projects as needed throughout the District in support of an ongoing internal design effort. This contract is for a total maximum contract amount of $90,000. Projects will be issued by letter agreement per individual scopes of services. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2013, Pg. 39 Amount: $90,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: There were two other proposals considered on this project. If any non -capital projects will be required, the funds will be transferred to #1101 – General Fund. Contracted planning resources utilized: None PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 17 of 2/14/13 AGENDA ITEM NUMBER: 28 – Proposed Ord. No. 13580 NAME OF PROJECT: General Services Agreement – Sewer Design (FY2013) Contract C (11781) LOCATION: Various locations within the District TYPE OF PROJECT: General Engineering Services (011.0 Design Phase Project Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a design contract. What does action accomplish?: Design of small capital improvements and Operations projects. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: No* Consultant: Shalom Services Corporation 737 Southshire Drive St. Louis, MO 63125 Corporate Headquarters – St. Louis, Missouri Number of proposers: (2) Basilico Engineering Incorporated and Shalom Services Corporation Appropriation Amount: $90,000.00 Designer’s Estimate: N/A MBE/WBE Participation: 100% - MBE (MWBE Goal is 30%) EFK Moen, LLC – 7.5% - WBE Sabur, Inc. – 7.5% - MBE Shalom Services Corporation – 85.0% - MBE Type of Contract: Hourly Billing Rate Plus Reimbursables Properties Affected: To Be Determined Properties Benefiting: To Be Determined Designed by: N/A This ordinance authorizes the District to enter into Contract #20028 for one year with two option years with Shalom Services Corporation for the design of various projects. This project consists of the design of small sanitary and combined sewer projects as needed throughout the District in support of an ongoing internal design effort. This contract is for a total maximum contract amount of $90,000. Projects will be issued by letter agreement per individual scopes of services. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2013, Pg. 40 Amount: $90,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: There was one other proposal considered on this project. If any non-capital projects will be required, the funds will be transferred to #1101 – General Fund. Contracted planning resources utilized: None PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A *Shalom Services Corporation is a consulting firm of 15 employees founded in 2005. They have 13 employees locally and this is their first contract with the District as Shalom Services Corporation. 18 of 2/14/13 AGENDA ITEM NUMBER: 29 – Proposed Ord. No. 13581 NAME OF PROJECT: Prospect Hill Landfill Vertical Expansion (11094) LOCATION: North of Scranton and west of Riverview Drive in the Cities of Riverview and St. Louis, Missouri TYPE OF PROJECT: Design of Landfill Vertical Expansion (011.0 Design Phase Project Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a design contract. What does action accomplish?: Implements the design of a CIP project. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: Horner & Shifrin Inc. 5200 Oakland Avenue St. Louis, MO 63110 Corporate Headquarters – St. Louis, Missouri Number of proposers: (2) Horner & Shifrin Inc. and Pangea Engineering and Surveying LLC Appropriation Amount: $587,000.00 Designer’s Estimate: N/A MBE/WBE Participation: 32.11% (MWBE Goal is 30%) David Mason & Associates, Inc. – 6.37% - MBE Tech Service, Inc. – 25.74% - MBE Type of Contract: Lump Sum (Cost Plus for Contingency Work) Properties Affected: Approximately 15 Properties Benefiting: Entire Lemay and Bissell Service Area Designed by: N/A This ordinance authorizes the District to enter into Contract #20029 with Horner & Shifrin Inc. for the permitting design of Prospect Hill Landfill Vertical Expansion (11094) project. This project consists of preparing the documents for a permit application to MDNR and the design and preparation of construction documents for landfill improvements and appurtenances to upgrade the landfill. This project will provide additional landfill capacity for incinerator ash extending the useful lif e expectancy by approximately eight years and 1,398,000 cubic yards of incinerator ash fill. A detailed cost estimate will be developed as part of the design process and depending on MDNR approval. Construction is anticipated to begin in FY2015. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2013, Pg. 61 Amount: $350,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: There was one other proposal considered on this project. The appropriation for design services is $237,000 above the proposed funding presented in the CIP Budget Supplement. The appropriation includes the following contingencies for special services that may be required to obtain a permit for vertical expansion of the landfill from MDNR: $17,214.00 for additional public engagement, $12,949.00 for anticipated level of effort for plans for MDNR Permit Modification, $19,189.00 for Operations Manual, $19,669.00 for anticipated level of effort for Design Completion, $25,131.00 for anticipated level of effort to respond to MDNR Review, $47,600.00 for services to investigate installation of ground wate r monitoring wells, $53,000.00 for services to perform anticipated geotechnical Laboratory Testing, $58,000.00 for anticipated geotechnical drilling and well installation services, and $888.00 for expenses. The appropriation also includes $17,060.00 f or construction phase services. These services include constr uction field surveys, review of shop drawings and submittals, 19 of 2/14/13 responding to design questions and changes during construction, as -built surveys, and preparation of as-built record drawings. Contracted planning resources utilized: Watershed Facility Planning PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 20 of 2/14/13 AGENDA ITEM NUMBER: 30 – Proposed Ord. No. 13582 NAME OF PROJECT: Ashland Avenue – Clara to Belt (Property Acquisition) (11862) LOCATION: West of Union and south of Natural Bridge in the City of St. Louis, Missouri TYPE OF PROJECT: Property acquisition, demolition and related activities of real property for flood mitigation purposes (13.2 Land Purchase) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds related to the purchase of properties, demolition, and related activities and authorizes District staff to acquire property without additional Board action unless sett lement cannot be reached to complete the project. What does action accomplish?: Purchase of property will allow improvements of the area for flood mitigation purpose, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: N/A Consultant: N/A Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: $1,000,000.00 District’s Estimate: N/A MBE/WBE Participation: N/A Plan Approval Date: N/A Type of Contract: N/A Properties Affected: 31 Properties Benefiting: Entire Watershed Designed by: N/A Acquisition of properties in the area of the 5500 block of Ashland, in the City of St. Louis, to allow the removal of improvements in this area that are prone to flooding due to inadequate sewer capacity and drainage, and to enable the potential construction of a detention basin; to relieve combined sewer overflows (CSO), basement backups and flooding in a low elevation area containing a major trunk sewer. The effort will include the acquisition of the properties through negotiation and/or condemnation if necessary, demolition of approximately 31 structures and securing the site. Through the approval of this Board action, District Staff will be authorized to negotiate with property owners and purchase all properties included in the scope without further Board action. Additional Board action will be necessary in the event an agreement cannot be reached with the property owners. A real property acquisition consultant will perform all negotiations and management of the property acquisition from the first contact with the owners through the closing. The consultant will perform all services in accordance with the Code of Federal Regulations Uniform Relocations and Real Property Assistance Act (49CFR Part 24, amended). The District will contract for the demolition, asbestos removal, and final restoration of the site and structures under separate contracts through the Purchasing Division. All of these activities will be funded from this appropriation. Any development of a detention basin would be funded by a separate Board action. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2013, Pg. S 2 Amount: $1,000,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: None PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 21 of 2/14/13 AGENDA ITEM NUMBER: 31 – Proposed Ord. No. 13583 NAME OF PROJECT: Jennings Station Road/North Baden Basin (Property Acquisition) (11140) LOCATION: South of West Florissant and east of Jennings Station Road in the City of Jennings & Flordell Hills, Missouri TYPE OF PROJECT: Property acquisition, demolition and related activities of real property for flood mitigation purposes (13.2 Land Purchase) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds related to the purchase of properties, demolition, and related activities and authorizes District staff to acquire property without additional Board action unless settlement cannot be reached to complete the project. What does action accomplish?: Purchase of property will allow improvements of the area for flood mitigation purpose, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: N/A Consultant: N/A Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: $2,000,000.00 District’s Estimate: N/A MBE/WBE Participation: N/A Plan Approval Date: N/A Type of Contract: N/A Properties Affected: 31 Properties Benefiting: Entire Watershed Designed by: N/A Acquisition of properties in the area of the 5700 block of Jennings Station Road in the City of Flordell Hills and Jennings, to allow the removal of improvements in this area that are prone to flooding due to inadequate sewer capacity and drainage, and to enable the potential construction of a detention basin; to relieve combined sewer overflows (CSO), basement backups and flooding in a low elevation area containing a major trunk sewer. The effort will include the acquisition of the properties through negotiation and/or condemnation if necessary, demolition of approximately 31 structures and securing the site. Through the approval of this Board action, District Staff will be authorized to negotiate with property owners and purchase all properties included in the scope without further Board action. Additional Board action will be necessary in the event an agreement cannot be reached with the property owners. A real property acquisition consultant will perform all negotiations and management of the property acquisition from the first contact with the owners through the closing. The consultant will perform all services in accordance with the Code of Federal Regulations Uniform Relocations and Real Property Assistance Act (49CFR Part 24, amended). The Distr ict will contract for the demolition, asbestos removal, and final restoration of the site and structures under separate contracts through the Purchasing Division. All of these activities wil l be funded from this appropriation. Any development of a detention basin would be funded by a separate Board action. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2013, Pg. S 6 Amount: $2,000,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: None PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 22 of 2/14/13 AGENDA ITEM NUMBER: 32 – Proposed Ord. No. 13584 NAME OF PROJECT: Partridge Avenue 8500 Block Combined Sewer Relief (Property Acquisition) (11828) LOCATION: East of Riverview and south of Switzer in the City of St. Louis, Missouri TYPE OF PROJECT: Property acquisition, demolition and related activities of real property for flood mitigation purposes (13.2 Land Purchase) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds related to the purchase of properties, demolition, and related activities and authorizes District staff to acquire property without additional Board action unless settlement cannot be reached to complete the project. What does action accomplish?: Purchase of property will allow improvements of the area for flood mitigation purpose, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: N/A Consultant: N/A Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: $1,000,000.00 District’s Estimate: N/A MBE/WBE Participation: N/A Plan Approval Date: N/A Type of Contract: N/A Properties Affected: 10 Properties Benefiting: Entire Watershed Designed by: N/A Acquisition of properties in the area of the 8500 block of Partridge, in the City of St. Louis, to allow the removal of improvements in this area that are prone to flooding due to inadequate sewer capacity and drainage, and to enable the potential construction of a detention basin; to relieve combined sewer overflows (CSO), basement backups and flooding in a low elevation area containing a major trunk sewer. The effort will include the acquisition of the properties through negotiation and/or condemnation if necessary, demolition of approximately 10 structures and securing the site. Through the approval of this Board action, District Staff will be authorized to nego tiate with property owners and purchase all properties included in the scope without further Board action. Additional Board action will be necessary in the event an agreement cannot be reached with the property owners. A real property acquisition consult ant will perform all negotiations and management of the property acquisition from the first contact with the owners through the closing. The consultant will perform all services in accordance with the Code of Federal Regulations Uniform Relocations and Re al Property Assistance Act (49CFR Part 24, amended). The District will contract for the demolition, asbestos removal, and final restoration of the site and structures under separate contracts through the Purchasing Division. All of these activities will be funded from this appropriation. Any development of a detention basin would be funded by a separate Board action. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2013, Pg. S 7 Amount: $1,000,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: None PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 23 of 2/14/13 AGENDA ITEM NUMBER: 33 – Proposed Ord. No. 13585 NAME OF PROJECT: Deer Creek Watershed Storm Channel Improvements (10327 & E-1251) LOCATION: North of Manchester Road and east of Ballas Road in the City of Des Peres, Missouri, and two locations in the Deer Creek Watershed in the Cities of Ladue and Des Peres, Missouri TYPE OF PROJECT: Design of storm channel and sewers DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates additional funds and authorizes staff to amend a design contract What does action accomplish?: Implements the design of a CIP project SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: Stantec Consulting Services Inc. 1859 Bowles Avenue, Suite 250 St. Louis, MO 63026 Corporate Headquarters – Rochester, New York & Edmonton, Alberta, Canada (Parent Co.) Agency: N/A Number of proposers: N/A Appropriation Amount: $13,000.00 Designer’s Estimate: N/A MBE/WBE Participation: 0.00% (31.71% for the total project) Pangea Engineering and Surveying, LLC – 14.25% - MBE Tech Services, Inc. – 12.41% - MBE Vector Communications Corporation – 5.05% - MBE Type of Contract: Lump Sum Properties Affected: Approximately 35 Properties Benefiting: Approximately 35 Designed by: N/A This ordinance authorizes the District to enter into Amendment No. 5 under Contract #10958 with Stantec Consulting Services Inc. for litigation services for Fawnvalley Storm Channel Improvements (10192) designed under t his contract. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2009, Pg. 109 Amount: $420,000 Fund Name: #566 – Deer Creek OMCI Additional Comments: None. Contracted planning resources utilized: Watershed Facility Planning and Stormwater Facility Planning. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 01/08/09 – Ord. No. 12803 – Amount: $387,000 – Stantec Consulting Services Inc. – Design Contract No. E-1251 06/14/12 – Ord. No. 13399 – Amount: $990,000 – Fawnvalley Storm Channel Improvements (10192)