Loading...
HomeMy Public PortalAbout2016.03.24 Financial Consulting Solutions Sewer District Rate StudyCONTRACT AGREEMENT BETWEEN FINANCIAL CONSULTING SOLUTIONS GROUP, INC. Redmond Town Center 7525 — 166th Ave. NE, Suite D-215 Redmond, Washington 98052 AND City of McCall, Idaho 216 East Park Street McCall, ID 83638 Page 1 PROJECT: City of McCall & Payette Lakes Recreational Water and Sewer District Rate Study THIS AGREEMENT combines all understandings between the Parties regarding professional services for the Project named above and supersedes all prior proposals, quotations, solicitations, negotiations, representations, agreements or understandings, whether written or oral. The performance of the professional services herein described and authorized by City of McCall, Idaho, as well as payment for such services, shall be in accordance with the terms and conditions presented in this Agreement and the following Sections and Exhibits which are attached and incorporated by reference which, taken together, shall constitute the whole Agreement. Section I Section II Exhibit A Relationship of the Parties Contract Provisions Scope of Work, Task Plan, and Budget IN WITNESS WHEREOF, the parties hereto have hereunto set their hands and seals this 2 q day of /�aVat , 20 it, . APPROVED: APPROVED: FINANCIAL CONSULTING SOLUTIONS GROUP, INC. LS, \ ‘ir-4,4,JL-c--- Angie Sanchez Virnoche ckie Ayndi Principal Mayor City of McCall, Idaho Date: 31:3-Li w Date: _j eQ�/�(Q ATTEST: 41+FCS GROUP www.fcsgroup.com Page 2 SECTION I: RELATIONSHIP OF THE PARTIES The City of McCall, Idaho ("Client"), desires to execute sewer rate study to analyze revenue requirements for its sewer collection, treatment, and disposal processes ("Project"). In furtherance of the Project, the Client hereby contracts with Financial Consulting Solutions Group, Inc. ("FCS GROUP") to perform the professional services described in Exhibit A of this Agreement. All services shall be performed under the joint supervision of the Client's Representative, Peter Borner, or a designee or designees identified in writing to FCS GROUP by the Client's Representative. This Agreement shall inure to the benefit of and be binding upon successors, assigns, and legal representatives of each of the Parties hereto. Any assignment or transfer of an interest in this Agreement by either Party without the written consent of the other shall be void. SECTION II: CONTRACT PROVISIONS 1. Scope of Work: FCS GROUP shall perform the service for the Client which as defined in Exhibit A of this Agreement. 2. Time for Completion: The Scope of Work for the conduct of the study as set forth above is anticipated to be completed by FCS GROUP within a time frame approximating that shown by the following schedule: Notice to Proceed: Upon signature of Contract Agreement by both Parties Completion of Project: October 31, 2016 FCS GROUP agrees to perform the work described in the Scope of Work according to the contract schedule. Any delays shall be agreed upon by FCS GROUP and Client prior to the due date. Changes in the schedule caused by Client delays may require additional compensation and a change order. If FCS GROUP is delayed in the performance of services by conditions which are beyond their control, or by a change in the scope of work, the schedule showing time of performance may be revised. Any revision thereto shall be submitted in writing to the Client for review and approval by the Client Representative. If FCS GROUP's services are temporarily suspended by the Client in the interest of the Project and with written notice to FCS GROUP, and the suspensions last longer than 90 consecutive days, FCS GROUP shall be compensated for any additional labor and direct expenses incurred due to the interruption and resumption of services. 3. Payment: FCS GROUP will be paid by the Client on a time and materials basis for 50% of the cost outlined below and in accordance with budget attached hereto as Exhibit B. The remaining 50% of expenses will be paid by the Payette Lakes Recreational Water and Sewer District. Direct expenses will be charged as identified in Exhibit B. FCS GROUP agrees to perform the services as set forth in Exhibit A at a cost not to exceed $35,335.00, which is half of the total budget of $70,670.00. It is understood that FCS GROUP will not exceed this amount without the Client's prior written authorization. Payment to FCS GROUP for services set forth in Exhibit A shall be: an amount equal to FCS GROUP's standard billing rates as set forth in Exhibit B multiplied by the actual hours worked. Should any unforeseen project delays, not caused by FCS GROUP, and/or any requested amendments to the original scope of work, cause this contract to extend more than 90 days past the original contracted schedule date, any work and/or amendments to the work shall be billed at the standard billing rates in effect for the period of time the work is being performed. If said change in billing rates will cause the project to, exceed the amount stated in the preceding paragraph, a change order will be prepared and signed by both parties. FCS GROUP will invoice Client monthly and payment shall be made within 30 days of receipt of invoice. •:;> FCS GROUP www.fcsgroup.com Page 3 4. Supplemental Agreements: Supplemental Agreements may be entered into upon mutual written agreement that would increase or decrease the scope and associated costs and payment. 5. Work to be Accomplished: All work accomplished will be performed under the direction of the Client Representative or his/her Designee. 6. Termination: This contract may be terminated by the Client by giving FCS GROUP written notice of such termination no fewer than fifteen (15) days in advance of the effective date of said termination. FCS GROUP shall be entitled to terminate this agreement only in the case of a material breach by the Client, and upon failure of the Client to remedy said breach within fifteen (15) days of said notice. In the event that the contract is terminated before completion, FCS GROUP shall be paid for the services to date on the basis set forth in Paragraph 3, plus 10% of the total compensation earned to time of termination to compensate for FCS GROUP's rescheduling adjustments, reassignment of personnel, and related costs incurred due to termination. The Client shall notify FCS of termination or abandonment in writing. 7. Indemnity: FCS GROUP shall comply with all Federal Government, State and local laws and ordinances applicable to the work to be done under this Agreement. FCS GROUP hereby agrees to hold the Client harmless from and shall process and defend at its own expense, specific claims, demands or suits at law or equity, arising from FCS GROUP's negligent performance of the provisions of this Agreement; provided that if the Client and FCS GROUP are concurrently negligent, FCS GROUP shall be required to indemnify and defend only in proportion to negligence of FCS GROUP. These indemnity provisions shall not require FCS GROUP to defend or indemnify the Client against any action based solely on the alleged negligence of the Client. 8. All Work Produced is Joint Property of FCS GROUP and the Client: The materials, computer programs, reports, calculations, analyses, etc., generated by FCS GROUP under this contract including the final report shall be the joint property of the Client and FCS GROUP. FCS GROUP may retain copies thereof for work paper documentation and their own use unless specifically restricted in writing by the Client as to use. Computer models use generally available software, such as Microsoft Excel (TM), and FCS GROUP does not intend or imply any warranty of those programs. 9. Financial Forecasts: Neither FCS GROUP's name nor the report and its financial projections may be referred to or included in any prospectus or as a part of any offering or representation made in connection with the sale of securities or participation interests to the public, whether through a public or private offering. The information used in developing the forecast assumptions will be derived from published information and other sources FCS GROUP considers appropriate. However, FCS GROUP cannot assume responsibility for the accuracy of such material. Moreover, forecasts are subject to many uncertainties as to the future; therefore, FCS GROUP cannot represent that the projected financial statements will be representative of the results that actually occur. FCS GROUP will endeavor to include appropriate comments drawing the readers' attention to these matters. 10. Integrated Agreement: This agreement together with attachments or addenda, represents the entire and integrated agreement between the Client and FCS GROUP supersedes all prior negotiations, representations, or agreements written or oral. This agreement may be amended by written instrument signed by both the Client and FCS GROUP. 11. Independent Contractor: The parties intend that an independent Contractor/Client relationship will be created by this agreement. No agent, employee, or representative of FCS GROUP shall be deemed to be an agent, employee, or representative of the Client for any purpose. FCS GROUP shall be •:;> FCS GROUP www.fcsgroup.com Page 4 solely responsible for all acts of its agents, employees, representatives, and subcontractors during the performance of this contract. 12. Equal Opportunity: FCS GROUP is committed to the principles of providing equal employment opportunities for all employees. The performance and diversity of our employees will help us meet the challenges of the present and the future in serving our clients. This policy statement is a reaffirmation of our long-standing commitment to provide equal opportunity on the basis of individual merit and personal qualifications to employees and applicants for employment without regard to race, color, religious creed, sex, sexual orientation or preference, gender identity, genetic characteristics or information of employee or family, age, national origin, ancestry, marital status, citizenship, the presence of sensory, mental, or physical disability, pregnancy/childbirth or related condition, medical condition, membership in the military service, veteran's status, political ideology or any other basis protected by applicable federal, state, or local laws. 13. Notices: Notices to the Client shall be sent to the following address: City of McCall, Idaho Attention: Peter Borner 216 East Park Street McCall, Idaho 83638 Notices to FCS GROUP shall be sent to the following address: Financial Consulting Solutions Group, Inc. Attention: Angie Sanchez Virnoche, Principal Redmond Town Center 7525 — 166`h Ave. NE, Suite D-215 Redmond, Washington 98052 • FCS GROUP www.fcsgroup.com Page 5 EXHIBIT A: SCOPE OF WORK, TASK PLAN, AND BUDGET •:;> FCS GROUP www.fcsgroup.com CITY OF MCCALL AND PAYETTE LAKES RECREATIONAL WATER AND SEWER DISTRICT CONSOLIDATED SEWER RATE STUDY The City of McCall (City) and Payette Lakes Recreational Water and Sewer District (District) wish to undertake a consolidated sewer rate study. The following scope of work will result in a rate evaluation for both the City and the District independently so that all revenue and expenses for each entity are identified and understood. A consolidated rate study will then be undertaken to evaluate the rate impact to each entity of moving forward with consolidation. The following Scope of Services describes the tasks that FCS GROUP proposes to conduct for this study. SCOPE OF SERVICES Assumptions: City and District to Provide • All legal review • Enabling Ordinances and/or Resolutions • Data need lists TASK 1: PROJECT INITIATION This task includes the administrative tasks that will take place during the course of the study, including: • Data Request and Review — Prepare a request for information needed for the study. Such information would include utility billing, financiaUbudget, capital and engineering information needed to perform the rate study. • Developing monthly progress reports and invoices TASK 2: REVENUE REQUIREMENT (CITY AND DISTRICT) The revenue requirement is defined as the total amount of rate revenue needed to meet the system's financial obligations, including capital, debt service, operating, and policy -driven commitments. This task will be completed for both the City and District independently to understand the requirements of each system. This independent evaluation is important to establishing the financial requirements of each entity and providing a transparent process. As costs are added or removed, a clear link to the financial impact of each system will be quantified and will inform the decision making process regarding consolidation. • Customer Statistics Validation — A review of the existing customers for each entity will be undertaken to understand the number of customers served by the City, District and under consolidation. The current rates of each entity will be applied to the billing statistics provided to determine if reported revenue can be validated. This task will provide the information needed to determine the revenue changes for each system and the rate changes that each entity's customers may experience. This task will confirm that the new rates proposed will generate sufficient revenue. Consolidated Sewer Rate Study March 15, 2016 City of McCall and Payette Lakes Recreational Water and Sewer District • Operating Forecast — FCS GROUP will forecast ongoing operating, maintenance, administrative, debt service, and other cash obligations for each entity over a 20 year period. We will incorporate economic factors for customer growth and any known changes in costs for O&M, capital improvement program or other known changes in operational requirements. The baseline expenses for each entity will be identified followed by incorporating anticipated cost changes under a no consolidation scenario. • Capital Financing Plan — Based on the Capital Improvement Plan (CIP) provided by each entity, FCS GROUP will review how existing capital costs are financed. • Revenue Needs Assessment — The revenue requirement assessment identifies the total revenue requirement of each entity under a baseline scenario. The result will identify if each entity's rates are sufficient. This will help isolate the rate impacts of consolidation versus rate impacts for other existing operational needs. TASK 3: CONSOLIDATED REVENUE REQUIREMENT The consolidated revenue requirement will bring the appropriate revenue and costs together into one system. Similar to Task 2, consolidated costs will include O&M, capital, debt service, administration, and policy -driven commitments. Existing bonded debt service for the City system will be identified and removed from the consolidated revenue requirement. • Operating Forecast — FCS GROUP will forecast ongoing operating, maintenance, administrative, debt service, and other cash obligations for the consolidated entity over a 20 year period. We will work with both entities to identify what costs are applicable to include. In addition, we will identify known changes in costs as a result of consolidation. • Capital Improvement Program — With the assistance of each entity, we will identify the capital improvement program for the consolidated system. Each capital project will be listed separately and identify the year of construction, annual cost and anticipated finding source. • Capital Financing Plan — Based on the Capital Improvement Program identified, FCS GROUP will develop a capital financing plan. Available resources will be considered such as capital replacement charges, depreciation funding and fund balances. The analysis will be developed to be flexible enough to evaluate different debt instruments such as revenue bonds, DEQ loans or USDA loans since the requirements, term and interest rates will differ for various debt instruments. • Revenue Needs Assessment - The revenue needs assessment will identify the total revenue requirement of the consolidated system. Up to three (3) alternative scenarios will be evaluated to determine changes to impact of project timing, debt instrument or other considerations the entities would like to evaluate. TASK 4: RATE DESIGN The rate design task will take the consolidated revenue requirement identified in task 3 and determine the user rate that is required to generate sufficient revenue. The number of customers under the consolidated system will be used to determine the rate. The new rate will then be compared to the existing rates paid by City or District customers to evaluate the customer impact. A new rate structure and schedule will be developed for the consolidated system. Rates will be validated to capture the necessary revenue under the consolidated system. 2 Consolidated Sewer Rate Study March 15, 2016 City of McCall and Payette Lakes Recreational Water and Sewer District TASK 5: DOCUMENTATION FCS GROUP will document the study process, methodology, assumptions, findings and recommendations in a written study report. A copy of the spreadsheet analysis for future use will be provided. • Final Report —We will submit up to ten (10) copies of the final report to the City and District along with one electronic copy in PDF format. • Spreadsheet Model — FCS GROUP will deliver a final copy of the Excel -based spreadsheet model for future use. TASK 6: MEETINGS/PRESENTATIONS FCS GROUP will prepare for and participate in the following meetings: • Initial meeting — One initial meeting to begin the study process, discuss goal, objectives and key milestone dates (onsite) • Staff Review Meetings — We will meet up to three (3) times with the project team to review draft analyses and findings. We recommend one (1) onsite meeting and two (2) meetings via Go-To- MeetingTM software and conference call. Go-To-MeetingTM allows all parties to view documents in real time via an Internet connection. • Board Meetings/City Council meetings — Prepare for and participate in up three (3) meetings with the Board and/or Council. Time for presentation development is included for each meeting. SCHEDULE It is our understanding that the draft results of the analysis should be completed by July with the final study completed before the anticipated November bond election. We have provided a proposed work plan that identifies how we believe the work flow can be completed to meet the stated deadlines. All technical effort is scheduled to be completed by the end of July with report delivery in October after meetings with the Board/Council to allow feedback and input to be incorporated. Critical to meeting this deadline is the commitment of all parties to ensure timely receipt of requested data/information; quality of data; scheduling meetings in a timely manner; and the ability of the project team to provide policy direction for the study to move forward at key study milestones. We will develop a schedule of specific timelines for receiving data and key dates for analytical results, review and feedback once the project has been initiated. We are willing to work collaboratively to develop a schedule that meets the City and District's time constraints. Schedule Task j Project Initiation Task 2 Revenue Requirement (City/District) Task 3 j Consolidated Revenue Requirement Task 4 j Rate Design Task Documentation Task 6 j Meetings/Presentations Initial Meeting Staff Review Meetings (3) Board/City Council (date to be determined) • (3) Mareh__ April. May ( June t July Aggust lSgptember j October 3 Consolidated Sewer Rate Study City of McCall and Payette Lakes Recreational Water and Sewer District March 15, 2016 BUDGET The total proposed level of effort to complete the Consolidated Sewer Rate Study is summarized below. Our normal billing practice is to bill based on time and materials actually expended, not to exceed the total budget. Each task identifies the billable hourly rate and expected number of hours required of each consultant in order to accomplish the proposed scope of work. The estimate for the identified technical tasks of the study is $37,300, or 55 percent of the total budget. The process tasks such as presentations and documentation total $30,170 accounting for 45 percent of the project budget. An optional task for a parity certificate has been included for $3,200. The City and District may wish to adjust the number of meetings budgeted to minimize budget. If we have scaled our approach out of line with the City and/or District's expectations, we would be more than happy to negotiate the appropriate level of effort. Task f Pro eet. , Plipci 7 Sanchez, Assf: PM TOrasoY Mirtfi, Se... T at, .. ° ° lEsumaierti ° }iabrs °: Labor °Su et Hourly Billing Rates': ;. $240- . $f75 ANALYTICAL TASKS Task 1- Project Initiation 8 - 4 4 16 $2,760 Task 2 - Revenue Requirement 0 Revenue Requirement City 4 8 32 - 44 6,520 Revenue Requirement District 4 8 32 - 44 6,520 Customer Statistics Validation (City and District) 2 4 36 - 42 5,860 Task 3 - Consolidated Revenue Requirement 8 16 40 - 64 9,920 Task 4 - Rate Design 5 8 24 37 5,720 Subtotal Analytical Tasks 31 44 168 4 247 $37,300 PROCESS TASKS Task 5- Documentation 4 4 40 4 52 $7,180 Task 6 - Meetings/Presentations 0 Initial Project Meeting (onsite) 12 - - - 12 2,880 Staff Review Meetings (1-onsite, 2 GoTo@ 2 hours each) 16 4 4 - 24 5,060 Board/JWAG Meetings w/ Presentation (3-onsite) 36 12 12 60 12,300 Subtotal Process Tasks 68 20 56 4 148 $27,420 TOTAL LABOR BUDGET 99 64 224 8 395 $64,720 Expenses Airfare/Car/Lodging (1 person -5 airfare, 5 lodging ) $2,750 TOTAL PROJECT BUDGET $67,470 Optional Task: Parity Certiticate 12 - 4 - $3,200 TOTAL PROJECT BUDGET (with Optional Task) $70,670 ' Hourly billing rate includes $5.00/hour bchnology charge Optional Task: Parity Certificate If necessary and requested, FCS GROUP will provide the City and District a consolidated system parity certificate. The work completed as part of the consolidated sewer rate study will be used to provide an evaluation of the cash flow analysis of the consolidated system and if the consolidated system pledged revenue will be able to adequately bond finance the identified project(s) and meet credit enhancement metrics as identified by the IBBA such as having pledged revenues that are at least 125% of the maximum annual debt service on all existing and proposed parity debt service including the debt service to be paid to the IBB SA. Per the October 1, 2010 Dodd -Frank Act Section 975 created a new class of regulated persons, "municipal advisors," and requires these advisors to register with the Securities and Exchange Commission. FCS GROUP is not a registered municipal 4 Consolidated Sewer Rate Study March 15, 2016 City of McCall and Payette Lakes Recreational Water and Sewer District advisor, our work is solely related to the feasibility and cash flow analysis of the anticipated bond issue and is not related to advice on financial products, structure, timing or issuance of municipal securities. 5 transmittal °Gil> C S GROUP Solutions -Oriented Consulting TO: BessieJo Wagner, CMC City of McCall 216 East Park Street McCall, ID 83638 FROM: Angie Sanchez Virnoche REGARDING: Contract Agreement TRANSMITTED as checked below: I-J1-J DATE: April 21, 2016 ['For approval ['For your use 0As requested ['For review & comment by ['Approved as submitted ['Approved as noted ['Returned for corrections ❑Resubmit no. copies for approval ['Submit no. copies for distribution ['For Proposal or Report due REMARKS: Attached please find one fully executed original contract agreement for the City of McCall & Payette Lakes Recreational Water and Sewer District Sewer Consolidation Rate Study. Thank you. 7525 166TH Ave. NE, Suite D-215, Redmond, WA 98052 • VOICE (425) 867-1802 • FAX (425) 867-1937 • www.fcsgroup.com