HomeMy Public PortalAbout10-0142 Tattnall Bank I `
1� I
v
444;
CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 03-29-2010 PERMIT#: 100142
WORK DESCRIPTION REPLACE ROTTEN WOOD
WORK LOCATION 7 TENTH CT
OWNER NAME TATTNALL BANK
ADDRESS 7 10TH COURT
CITY,ST,ZIP TYBEE ISLAND GA 31328
PHONE NUMBER
CONTRACTOR NAME STEPHEN REMLER CONSTRUCTION
ADDRESS PO BOX 13471
CITY STATE ZIP SAVANNAH GA 31416
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 91.00
PROPERTY IDENTIFICATION#
PROJECT VALUATION $9,500.00
TOTAL BALANCE DUE: $ 91.00
It is understood that if this permit is granted the builder will at all times comply with the zoning,subdivision,flood control,building,fire,
soil and sedimentation,wetlands,marshlands protection and shore protection ordinances and codes whether local,state or federal,including
all environmental laws and regulations when applicable,subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
f
Signature of Building Inspector or Authorized Agent: Cyt
P.O.Box 2749-403 Butler Avenue,Tybee Island,Georgia 31328
(912)786-4573-FAX(912)786-9539
www.cityoftybee.org
401
CITY OF TYBEE ISLAND
BUILDING PERMIT
ADDED SCOPE & VALUE
DATE ISSUED: 05/12/2010 PERMIT#: 100142
WORK DESCRIPTION REPLACE ROTTEN WOOD/20 WINDOWS
WORK LOCATION 7 TENTH CT
OWNER NAME TATTNALL BANK
ADDRESS 7 10TH COURT
CITY,ST,ZIP TYBEE ISLAND GA 31328
PHONE NUMBER
CONTRACTOR NAME STEPHEN REMLER CONSTRUCTION
ADDRESS PO BOX 13471
CITY STATE ZIP SAVANNAH GA 31416
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 163.00
PROPERTY IDENTIFICATION#
°3A
PROJECT VALUATION $15,500.00
ADDED 20 WINDOWS AT $6,000 TOTAL BALANCE DUE: $ 72.00
It is understood that if this permit is granted the builder will at all times comply with the zoning,subdivision,flood control,building,fire,soil
and sedimentation,wetlands,marshlands protection and shore protection ordinances and codes whether local,state or federal,including all
environmental laws and regulations when applicable,subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
r �
Signature of Building Inspector or Authorized Agent: /L/A! ♦�,
P.0.Box 2749-403 Butler Avenue,Tybee Island,Georgia 31328
(912)786-4573-FAX(912)786-9539
www.cityoftybee.org
�tti�" City of rybee Island • Community Development Dept. =W
Inspection Report �=��
iii 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 .. -.�
INTERNATIONAL
TM=_ Phone 912.786.4573 ext. 114 • Fax 912.786.9539 CODE COUNCIL
(o - MEMBER
1 Permit No. c ° £ t 2- Date Requested w I 1 - 10
Owner's Name 1 "I -4-4r) a I t ( Date Needed (z) - I q- _ I 0
Gen. Contractor P r" ( p Y 0 0 05`l.-'. Subcontractor
Contact Information S\.1..4)° � Iv in Lt I - I a
Project Address ! {� ,) 4-k C4 .
Scope of Work k 4 vm 1 jJ D c j 2 o („t).--1 c c...4. ci 15'-',
Inspector ''7l �f Date of
Inspec : tJ
Inspection ) ` s c 4-- .C. �a I Pass t
0 Fee
i
C o i S 1 ,l; ' .
Inspection Pass El Fail ® Fee
Inspection Pass ® Fail ® Fee
Inspection Pass 0 Fail 0 Fee
h rsi \ ►\�\
City of T,_ :,ae Island • Community Develop, ,nt Dept. i�`�
��
CI v Inspection Report imm�
==�:
\�� �/, 403 Butler Ave. P.O. Box 2749 • Tybee Island, GA 31328 INTERNATIONAL
,,,,.,, Phone 912.786.4573 ext. 114 • Fax 912.786.9539 CODE COUNCIL
/ I MEMBER
Permit No. 1 -0 147_ Date Requested ff%()
Owner's Name i P-i-II,YVl 64r3� Date Needed /j-/ r l�
,//, // r
Gen. Contractor K t 2 AJ Subcontractor
Contact Information / /- /‘CS
Project Address -4.9 ( n 2-� ! �c)z--1
1
Scope of Work . ) _ r(,,-(tr,._i ,,), - 0,-)1,-)S ` c -� -(-)Z S
r ►
Inspector Date of Inspection
Inspection -tI• P ; (_ Pass 0 Fail is Fee OD
\W Pi-C-(fr--S , 1-11_11- \
7
I S t/ )' 1-.)
Inspection Pass ❑ Fail ❑ Fee
Inspection Pass 0 Fail ❑ Fee
Inspection Pass ❑ Fail ❑ Fee
C__ _\,Tizzie,_ ,:- _-__e_Dyiz_.,
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
f '
(D- 042,
� -
Location: 1 PIN# 000(o - %6- 004
` NAME ADDRESS TELEPHONE
Owner C-L-9 hz,.c "4, 1 toy` C ,,f d- t'�3 i�:_,ti,,� ° t 44� -1
Architect
or Engineer /4/A t1/A Al/A
Building
Contractor � � �"�� c., .r. 1.0. 13411 64 3 v-k►b 1)52.- 404G2
(Check all that apply)
[' Repair Residential Footprint Changes
Renovation L Single Family — Discovery
E Minor Addition n Duplex Demolition
n Substantial Addition Multi-Family
E. Other [ Commercial
Details of Project: Q 2 , gxk,,,, a , Z-,M-O.Js c h p,w s o. rac4,4
'163 e la+3 CLr I Ra �C m 0 2 . in+ut l4.1 ^cte
Estimated Cost of Construction: $ c1,S coo
Construction Type (Enter appropriate number)
(1) Wood Frame (4) Masonry (6) Other(please specify)
(2) Wood&Masonry (5) Steel &Masonry
(3) Brick Veneer
Proposed use:
Remarks:
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following information based on the construction drawings and site plan:
#Units #Bedrooms #Bathrooms
Lot Area Living space(total sq. ft.)
#Off-street parking spaces
Trees located &listed on site plan
Access:
Driveway (ft.) With culvert? With swale?
Setbacks: Front Rear Sides (L) (R)
#Stories Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys,heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction:
On-site restroom facilities will be provided through K x,c.- ��5r �,� •
On-site waste and debris containers will be provided by S; „4,,ze \a/4,,
Construction debris will be disposed by Et,,,J by means of do,,,,ns./E
I understand that I must comply with zoning, flood damage control,building, fire, shore
protections and wetlands ordinances,FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as-built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: 1\14Zc , Signature of Applicant: t,
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification NFIP Flood Zone
Approved rezoning/variance?
Street address and number: New Existing
Is it in compliance with City map?
If not,has street name and/or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site
Distance to sewer stub site _
Water meter size
Storm drainage
A pp rovals: Signature Date
Zoning Administrator Permit FEES to
j +
Code Enforcement Officer '∎�r���1 Inspections 2$' ÷ Z.
Water/Sewer �-- � Water Tap L�tt 1
Storm/Drainage Sewer Stub
Inspections Aid to Const.
City Manager
TOTAL 1 I 'P
a (P3
fOM idOf
KATUFILL
R
4 :sW I 4
YM 1
GEORGIA
Permit Acknowledgement of
Asbestos/Environmental Notification to Georgia EPD for
Projects Involving Demolition,Wrecking,or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant
permission to the owner, owner's representative, or permit holder to proceed with demolition,
wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project
Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with
the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the
rules. In most cases, the rules require both the owner and the involved contractors to assure the
portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos
Inspector for materials that contain asbestos; and the removal of the asbestos before renovation,
wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is
present in the building. Further guidance for regulatory compliance and contact telephone
numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and
Demolition. Other environmental issues such as asbestos removal techniques, lead abatement,
ground contamination, or unusual site conditions may have EPD regulations that could affect the
project.
k 260
Undersigned Date
Printed Name
Office Use Only:
Project Address:
Permit Number: