HomeMy Public PortalAbout15709 Bissell – Coldwater – Missouri – Meramec Public II Reduction (2023) Contract F (13124)ORDINANCE NO. 15709
AN ORDINANCE, appropriating Fifty-Two Thousand Dollars ($52,000.00) from
the Sanitary Replacement Fund to be used for design of public I/I removal in Bissell – Coldwater
– Missouri – Meramec Public I/I Reduction (2023) Contract F (13124) in the City of Florissant,
Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The
Metropolitan St. Louis Sewer District to amend Contract No. 11011 with Wood Environment &
Infrastructure Solutions, Inc. for design of public I/I removal.
WHEREAS, the Director of Finance has certified that there is an unencumbered
balance in the above-named fund sufficient to pay the obligation authorized herein.
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF
THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of Fifty-Two Thousand Dollars ($52,000.00) is hereby
appropriated from the Sanitary Replacement Fund to be used for design of public I/I removal in
Bissell – Coldwater – Missouri – Meramec Public I/I Reduction (2023) Contract F (13124) in the
City of Florissant, Missouri.
Section Two. The Executive Director and Secretary-Treasurer are hereby
authorized on behalf of The Metropolitan St. Louis Sewer District to amend Contract No. 11011
with Wood Environment & Infrastructure Solutions, Inc. for design of public I/I removal in Bissell
– Coldwater – Missouri – Meramec Public I/I Reduction (2023) Contract F (13124) in the City of
Florissant, Missouri; and said contract shall be comprised of such other terms and conditions as
are approved by the Office of the General Counsel of the District.
Section Three. This ordinance, being an appropriation ordinance, shall take effect
immediately upon its enactment.
The foregoing Ordinance was adopted on August 12, 2021.