CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 03 -30 -2010 PERMIT #: 100145
WORK DESCRIPTION REPLACE 3 WINDOWS
WORK LOCATION 144 LEWIS AVE
OWNER NAME DAVID & JUDITH MCNAUGHTON
ADDRESS PO BOX 587
CITY, ST, ZIP TYBEE ISLAND GA 31328 -0587
PHONE NUMBER
CONTRACTOR NAME DAVID & JUDITH MCNAUGHTON
ADDRESS PO BOX 587
CITY STATE ZIP TYBEE ISLAND GA 31328 -0587
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 35.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $1,000.00
TOTAL BALANCE DUE: $ 35.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent: ila;Nes—A._----.) 0456:3
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityofty bee.org
d . L•;,..-
City of ( ,,__,iee Island '• Community Develo C __ent Dept. (Ai e MIK%
(,--.., • v ', Inspection Report mum
403 Butler Ave. . P.O. Box 2749 • Tybee Island, GA 31328 Iniam—i.-•
Phone 212..786.4573 ext. 114 • Fax 912.786.9539 INTERNATIONAL
CODE COUNCIL'
t) - 0 f (4„-- MEMBER
1 --) --% .--
Permit No. 1 ,-- ',--- — "--- S Date Requested
Owner's Name N\ c qa Li Ok4 Date Needed 3 -2_1
..)
Gen. Contractor Subcontractor
Contact Information ------)
1 aie.) - )S?)(0- q i 2 " 0
Project Address 1 L + 1 4 Le L,0 , s
Scope of Work r- ei)
I . L
Inspector ) /5 Date of Inspection _.-- /
O i
Inspection 1 ---C r- c r NO\ Pass Fee
I U
IE2spection Pass -, Faii 0 Fee
Inspection Pass 0 Fail 0 Fee
Inspection Pass r— Fait', 0 Fee
d li IL...,
During construction: / /
On -site restroom facilities will be provided through j- �,C Cs ^--r ✓d /d-i'F7•C e
On -site waste and debris containers will be provided by
Construction debris will be disposed by,$$,L, d by means of d, ,t i c y� 4 crz
I understand that I must comply with zoning, flood damage control, building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: /V7/ C{,.1 3 7 k 0( Signature of Applicant.__—(
Note: A pei normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification NFIP Flood Zone
Approved rezoning /variance?
Street address and number: New Existing
Is it in compliance with City map?
If not, has street name and /or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals: Signature Date FEES
Zoning Administrator Permit .2
Code Enforcement Officer Inspections I {'
Water /Sewer Water Tap
Storm /Drainage Sewer Stub
Inspections Aid to Const.
City Manager
TOTAL 3