AGENDA
1649th MEETING OF THE BOARD OF TRUSTEES
THE METROPOLITAN ST. LOUIS SEWER DISTRICT
September 9, 2021
4:00 CLOSED SESSION
5:00 P.M. ROLL CALL & PUBLIC BOARD MEETING
MSD OFFICES
2350 MARKET STREET
ROOM 109
1. CLOSED SESSON TO DISCUSS LEGAL, CONFIDENTIAL OR PRIVILEGED MATTERS
UNDER § 610.021(1), AND TO DISCUSS THE LEASE, PURCHASE OR SALE OF REAL
ESTATE UNDER §610.021(2); RSMO 1988 SUPP.
2. ROLL CALL
3. APPROVAL OF JOURNAL OF PRECEDING MEETING:
August 12, 2021 (1648th)
4. COMMENTS BY THE CHAIR - None
5. REPORT OF THE BOARD COMMITTEES - Yes ( Prog. Mgmnt., Finance,Stakeholder)
6. REPORT OF EXECUTIVE DIRECTOR – None
7. COMMENTS FROM THE PUBLIC –
If you wish to attend the Board meeting remotely, you may access the Board meeting at:
https://msdprojectclear.org/about/boardtrustees/streamingmeetings/ and submit your
comments and questions online to: tclinton@stlmsd.com by Noon of the Board meeting on
September 9, 2021. Due to the spike in Covid cases, the Board meetings will be closed
to the public until further notice.
8. SUBMISSION OF PUBLIC HEARING REPORTS – None
9. COMMUNICATIONS - None
10. CONSENT AGENDA: - 11 through 29
2
Rev/Edited 9/8/21
CONSENT AGENDA
ORDINANCES
11 Adoption of Proposed Ordinance No. 15726 - Coldwater Creek OMCI Reimbursements Program (City of
Florissant Agreement) (13488)
Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District
to enter into an intergovernmental agreement with the City of Florissant, for cost sharing for municipal stormwater
expenditures in Coldwater Creek OMCI Reimbursements Program (City of Florissant Agreement) (13488) in St.
Louis County, Missouri.
12 Adoption of Proposed Ordinance No. 15727 - Deer Creek OMCI Reimbursements Program (City of Frontenac
Agreement) (13487)
Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District
to enter into an intergovernmental agreement with the City of Frontenac , for cost sharing for municipal stormwater
expenditures in Deer Creek OMCI Reimbursements Program (City of Frontenac Agreement) (13487) in St. Louis
County, Missouri.
13 Adoption of Proposed Ordinance No. 15728 - Canterbury and Roland Sanitary Relief (Nelson Dr to Roland
Blvd) (12110)
Making an appropriation of One Million Fifteen Thousand Dollars ($1,015,000.00) from the Sanitary Replacement
Fund and Three Hundred Sixty-Five Thousand Dollars ($365,000.00) from the Districtwide Stormwater Fund to be
used for sanitary sewer construction in Canterbury and Roland Sanitary Relief (Nelson Dr to Roland Blvd) (12110)
in the Cities of Northwoods and Pasadena Hills, Missouri; and authorizing the Executive Director and Secretary-
Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 22048 with Aztec
Construction Specialties, LLC for sanitary sewer construction.
14 Adoption of Proposed Ordinance No. 15729 - DC-02 & DC-03 Sanitary Relief (Brentwood Blvd to Conway
Rd) Phase III and Phase IV (12472)
Making a supplemental appropriation of Seventeen Million Five Hundred Thousand Dollars ($17,500,000.00) from
the Sanitary Replacement Fund to be used for sanitary sewer construction in DC-02 & DC-03 Sanitary Relief
(Brentwood Blvd to Conway Rd) Phase III and Phase IV (12472) in the City of Ladue, Missouri; and authorizing the
Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to appropriate
additional funds to Contract No. 21786 with J. H. Berra Construction Co., Inc. for sanitary sewer construction.
15 Adoption of Proposed Ordinance No. 15730 - Geyer Sanitary Relief and Windsor Springs P-521 Storage (Big
Bend Blvd to Windsor Springs Dr) (12175)
Making an appropriation of Five Million Four Hundred Thousand Dollars ($5,400,000.00) from the Sanitary
Replacement Fund to be used for pump station improvements in Geyer Sanitary Relief and Windsor Springs P-521
Storage (Big Bend Blvd to Windsor Springs Dr) (12175) in the Cities of Kirkwood and Sunset Hills, Missouri ; and
authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District
to enter into Contract No. 22045 with Unnerstall Contracting Company, LLC for pump station improvements.
16 Adoption of Proposed Ordinance No. 15731 - Infrastructure Repairs (Facilities) (2022) (12996)
Appropriating Three Million Dollars (3,000,000.00) from the Sanitary Replacement Fund to be used for repair,
replacement, or improvement projects to address needs at facilities in Infrastructure Repairs (Facilities) (2022)
(12996) in various locations throughout the District; and authorizing the Executive Director and Secretary -Treasurer
on behalf of The Metropolitan St. Louis Sewer District to appropriate funds for infrastructure repair projects to be bid
through purchasing for repair, replacement, or improvement projects to address needs at facilities.
17 Adoption of Proposed Ordinance No. 15732 - St. Jacques Sanitary Relief (St. Jacques St to N Lafayette St)
(12213)
Making an appropriation of Two Hundred Twenty -Five Thousand Dollars ($225,000.00) from the Sanitary
Replacement Fund to be used for sanitary sewer construction in St. Jacques Sanitary Relief (St. Jacques St to N
Lafayette St) (12213) in the City of Florissant, Missouri; and authorizing the Executive Director and Secretary-
Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 22050 with Gershenson
Construction Co. for sanitary sewer construction.
3
Rev/Edited 9/8/21
18 Adoption of Proposed Ordinance No. 15733 - Washington Terrace 14 Sewer Replacement (13292)
Making an appropriation of Two Hundred Seventy Thousand Dollars ($270,000.00) from the Sanitary Replacement
Fund to be used for combined sewer construction in Washington Terrace 14 Sewer Replacement (13292) in the
City of St. Louis, Missouri; and authorizing the Executive Director and Secretary -Treasurer on behalf of The
Metropolitan St. Louis Sewer District to enter into Contract No. 22042 with Fred M. Luth & Sons, Inc. for combined
sewer construction.
19 Adoption of Proposed Ordinance No. 15734 - Kingsland Sanitary Storage Facility (Engelholm) (12841)
Declaring the necessity for the acquisition of easements and temporary easements in certain real property within
The Metropolitan St. Louis Sewer District for the purpose of construction of sewers and related appurtenances in
the project known as Kingsland Sanitary Storage Facility (Engelholm) (12841) in the City of Pagedale, Missouri to
serve the needs of residents of the area, and authorizing staff to proceed with further condemnation efforts related
to the project, including but not limited to the purchase and/or the filing of all necessary court pl eadings or documents
to commence and prosecute formal legal proceedings for the acquisition of said easements and temporary
construction easements.
20 Adoption of Proposed Ordinance No. 15736 - Bissell & Lemay WWTF Fluidized Bed Incinerators (12565)
Making a supplemental appropriation of Two Million Fifty Thousand Dollars ($2,050,000.00) from the Sanitary
Replacement Fund to be used for design in Bissell & Lemay WWTF Fluidized Bed Incinerators (12565) in the City
of St. Louis and Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary -
Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 3 to Contract No.
21783 with Black & Veatch Corporation for design
21 Adoption of Proposed Ordinance No. 15737 - Caulks Creek Pump Station B (P-751) Relocation (12114)
Making a supplemental appropriation of One Million Thirty-Five Thousand Dollars ($1,035,000.00) from the Sanitary
Replacement Fund to be used for design of pump station and appurtenances in Caulks Creek Pump Station B (P-
751) Relocation (12114) in the City of Chesterfield, Missouri; and authorizing the Executive Director and Secretary-
Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 1 to Contract No.
21995 with Thouvenot, Wade & Moerchen, Inc. for design of pump station and appurtenances.
22 Adoption of Proposed Ordinance No. 15738 - Eltora Wet Weather Storage Facility (11737)
Making a supplemental appropriation of One Hundred Thousand Dollars ($100,000.00) from the Sanitary
Replacement Fund to be used for design in Eltora Wet Weather Storage Facility (11737) in the City of Pagedale,
Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis
Sewer District to enter into Amendment No. 2 to Contract No. 21997 with KAI 360 Construction Services, LLC for
design.
23 Adoption of Proposed Ordinance No. 15739 - General Services Agreement – Facility & Sewer Design (2018)
Contract B (12894)
Making a supplemental appropriation of Fifty Thousand Dollars ($50,000.00) from the Sanitary Replacement Fund
to be used for general engineering services in General Services Agreement – Facility & Sewer Design (2018)
Contract B (12894) at various locations within the District; and authorizing the Executive Director and Secretary -
Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 3 to Contract No.
21615 with CDG Engineers, Inc. for general engineering services.
24 Adoption of Proposed Ordinance No. 15740 - Critical Infrastructure Assessment and Asset Investigation
(2020) (12907)
Making a supplemental appropriation of One Million Seven Hundred Thousand Dollars ($1,700,000.00) from the
General Fund to be used for asset investigations and assessment of sewer systems in Critical Infrastructure
Assessment and Asset Investigation (2020) (12907) throughout The Metropolitan Sewer District Service Area; and
authorizing the Executive Director and Secretary -Treasurer on behalf of The Metropolitan St. Louis Sewer District
to enter into Amendment No. 4 to Contract No. 21832 with TREKK Design Group, LLC for the aforesaid asset
investigations and assessment of sewer systems .
4
Rev/Edited 9/8/21
25 Adoption of Proposed Ordinance No. 15741 - Flow Metering and Monitoring (2022) (12801)
Appropriating Two Million Five Hundred Thousand Dollars ($2,500,000.00) from the General Fund for flow meter
and monitoring in Flow Metering and Monitoring (2022) (12801) in various locations throughout the District and
authorizing the Executive Director and the Secretary -Treasurer on behalf of The Metropolitan St. Louis Sewer
District to enter into Contract No. 22069 with ADS Environmental Services for the aforesaid flow meter and
monitoring.
26 Adoption of Proposed Ordinance No. 15742 - Stream Flow Gauge Operation and Maintenance (USGS)
(10766)
Making a supplemental appropriation of Four Hundred Eighty-Nine Thousand Dollars ($489,000.00) from the
General Fund to be used for stream flow monitoring in Stream Flow Gauge Operation and Maintenance (USGS)
(10766) Districtwide; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan
St. Louis Sewer District to enter into Contract No. 10422 with U. S. Geological Survey for stream flow monitoring.
27 Adoption of Proposed Ordinance No. 15743 - Stream Flow Water Quality Sampling (2020) (12004)
Making a supplemental appropriation of Two Hundred Sixty-Seven Thousand One Hundred Sixty-Nine Dollars
($267,169.00) from the General Fund to be used for water quality sampling in Stream Flow Water Quality Sampling
(2020) (12004) Districtwide; and authorizing the Executive Director and Secretary -Treasurer on behalf of The
Metropolitan St. Louis Sewer District to amend Contract No. 21859 with Geosyntec Consultants, Inc. for water
quality sampling.
28 Adoption of Proposed Ordinance No. 15744 - Conflict of Interest Policy
Repealing Ordinance No. 15282 as adopted September 12, 2019, and enacting a new ordinance in lieu thereof,
establishing a Conflict of Interest Policy for District trustees, officers, and employees.
29 Adoption of Proposed Ordinance No. 15745 - Classification Plan
Repealing Ordinance No. 15657, as adopted on May 13, 2021 , and enacting a new Ordinance prescribing changes
to the Classification Plan to update classifications to reflect the removal of obsolete positions and to retitle existing
positions.
UNFINISHED BUSINESS
ORDINANCES
None
RESOLUTIONS
None
NEW BUSINESS
ORDINANCES
30 Introduction of Proposed Ordinance No. 15747 - CSO Volume Reduction Green Infrastructure – Hickory
Street Homes (13647)
9
Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District
to enter into an agreement with Gladiator Homes, LLC, for cost sharing for green infrastructure construction in CSO
Volume Reduction Green Infrastructure – Hickory Street Homes (13647) in the City of St. Louis, Missouri.
31 Introduction of Proposed Ordinance No. 15748 - CSO Volume Reduction Green Infrastructure – 301
DeBaliviere TOD (13574)
10
Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District
to enter into an agreement with Expo at Forest Park, LLC, for cost sharing for green infrastructure construction in
CSO Volume Reduction Green Infrastructure – 301 DeBaliviere TOD (13574) in the City of St. Louis, Missouri.
32 Introduction of Proposed Ordinance No. 15749 - CSO Volume Reduction Green Infrastructure – Delmar
Divine (13542)
11
Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District
to enter into an agreement with Delmar Divine Master Landlord Residential, LLC , for cost sharing for green
infrastructure construction in CSO Volume Reduction Green Infrastructure – Delmar Divine (13542) in the City of
St. Louis, Missouri.
5
Rev/Edited 9/8/21
33 Introduction of Proposed Ordinance No. 15750 - CSO Volume Reduction Green Infrastructure – Missouri
Botanical Garden Visitors Center (13642)
12
Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District
to enter into an agreement with Missouri Botanical Gardens, for cost sharing for green infrastructure construction
in CSO Volume Reduction Green Infrastructure – Missouri Botanical Garden Visitors Center (13642) in the City of
St. Louis, Missouri.
34 Introduction of Proposed Ordinance No. 15751 - CSO Volume Reduction Green Infrastructure – Unify
Grove Various Sites (13644)
13
Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District
to enter into an agreement with Vista Apartments, LLC, for cost sharing for green infrastructure construction in CSO
Volume Reduction Green Infrastructure – Unify Grove Various Sites (13644) in the City of St. Louis, Missouri.
35 Introduction of Proposed Ordinance No. 15752 - Union Road 100 Block Storm Improvements (10366) 14
Making an appropriation of Four Hundred Ninety Thousand Dollars ($490,000.00) from the Districtwide Stormwater
Fund to be used for storm sewer construction in Union Road 100 Block Storm Improvements (10366) in
Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on
behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 22021 with Aztec Construction
Specialties, LLC for storm sewer construction.
36 Introduction of Proposed Ordinance No. 15753 - Coldwater Sanitary Relief Section B, C & D – Section B
Rehabilitation (11724)
15
Making an appropriation of Three Million Dollars ($3,000,000.00) from the Sanitary Replacement Fund to be used
for sanitary sewer rehabilitation in Coldwater Sanitary Relief Section B, C & D – Section B Rehabilitation (11724)
in the Cities of Florissant and Hazelwood, Missouri; and authorizing the Executive Director and Secretary-Treasurer
on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 22040 with SAK Construction, LLC
for sanitary sewer rehabilitation.
37 Introduction of Proposed Ordinance No. 15754 - Lemay Public I/I Reduction and Rehabilitation (2022)
Contract A (12590)
16
Making an appropriation of Three Million Three Hundred Fifty Thousand Dollars ($3,350,000.00) from the Sanitary
Replacement Fund to be used for sanitary sewer rehabilitation in Lemay Public I/I Reduction and Rehabilitation
(2022) Contract A (12590) in the Cities of Maplewood, Richmond Heights, Shrewsbury, and Webster Groves,
Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis
Sewer District to enter into Contract No. 22044 with Insituform Technologies USA, LLC for sanitary sewer
rehabilitation.
38 Introduction of Proposed Ordinance No. 15755 - Sub-Trunk #2 Sanitary Relief (Birmingham Ct to Cove Ln)
(12221)
17
Making an appropriation of Three Million Two Hundred Thousand Dollars ($3,200,000.00) from the Sanitary
Replacement Fund to be used for sanitary sewer construction in Sub-Trunk #2 Sanitary Relief (Birmingham Ct to
Cove Ln) (12221) in Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and
Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 22056 with
Bates Utility Company, Inc. for sanitary sewer construction.
39 Introduction of Proposed Ordinance No. 15756 - Sub-Trunk #3 Sanitary Relief (Muriel Dr to Jenner Ln)
(11669)
18
Making an appropriation of One Million Seven Hundred Seventy Thousand Dollars ($1,770,000.00) from the
Sanitary Replacement Fund to be used for sanitary sewer construction in Sub-Trunk #3 Sanitary Relief (Muriel Dr
to Jenner Ln) (11669) in Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and
Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 22067 with
Unnerstall Contracting Company, LLC for sanitary sewer construction.
6
Rev/Edited 9/8/21
40 Introduction of Proposed Ordinance No. 15757 - Watkins Creek Pump Station (P-101) Replacement
(12491)
19
Making a supplemental appropriation of Two Million Nine Hundred Thousand Dollars ($2,900,000.00) from the
Sanitary Replacement Fund to be used for pump station improvements in Watkins Creek Pump Station (P-101)
Replacement (12491) in the City of St. Louis, Missouri ; and authorizing the Executive Director and Secretary -
Treasurer on behalf of The Metropolitan St. Louis Sewer District to appropriate additional funds to Contract No.
21991 with Plocher Construction Company, Inc. for pump station improvements.
41 Introduction of Proposed Ordinance No. 15758 - Dekamay Drive Storm Sewer (MGJB-130) (11535) 20
Making an appropriation of Three Hundred Eighty-Five Thousand Dollars ($385,000.00) from the Districtwide
Stormwater Fund to be used for storm sewer construction in Dekamay Drive Storm Sewer (MGJB-130) (11535) in
Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on
behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 22059 with Fred M. Luth & Sons, Inc.
for storm sewer construction.
42 Introduction of Proposed Ordinance No. 15759 - Reasor Drive Storm Sewer (11273) 21
Making an appropriation of Five Hundred Fifty Thousand Dollars ($550,000.00) from the Operation, Maintenance,
Construction, Improvement Fund of Coldwater Creek to be used for storm sewer construction in Reasor Drive
Storm Sewer (11273) in the Cities of Calverton Park and Ferguson, Missouri; and authorizing the Executive Director
and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 22064
with TaylorMade Construction Co., LLC for storm sewer construction.
43 Introduction of Proposed Ordinance No. 15760 - MC-02 Watson to Edgar Rd Sanitary Relief (SKME-580A)
(10024)
22
Declaring the necessity for the acquisition of easements and temporary easements in certain real property within
The Metropolitan St. Louis Sewer District for the purpose of construction of sewers and related appurtenances in
the project known as MC-02 Watson to Edgar Rd Sanitary Relief (SKME-580A) (10024) in the Cities of Shrewsbury,
Webster Groves, and Unincorporated St. Louis County, Missouri to serve the needs of residents of the area, and
authorizing staff to proceed with further condemnation efforts re lated to the project, including but not limited to the
purchase and/or the filing of all necessary court pleadings or documents to commence and prosecute formal legal
proceedings for the acquisition of said easements and temporary construction easements.
44 Introduction of Proposed Ordinance No. 15761 General Services Agreement – Construction Management
(2022) (12387)
23
Making an appropriation of Two Million Dollars ($2,000,000.00) from the Sanitary Replacement Fund to be used
for general construction management services in General Services Agreement – Construction Management (2022)
(12387) in Various Locations Within the District; and authorizing the Executive Director and Secretary -Treasurer
on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 22086 with KAI 360 Construction
Services, LLC for general construction management services.
45 Introduction of Proposed Ordinance No. 15762 - L51 Pump Station Forcemain Improvements (13227) 24
Making an appropriation of One Million Seventy -Three Thousand Dollars ($1,073,000.00) from the Sanitary
Replacement Fund to be used for design of sanitary sewers in L51 Pump Station Forcemain Improvements (13227)
in the City of Maryland Heights, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf
of The Metropolitan St. Louis Sewer District to enter into Contract No. 22087 with M3 Engineering Group, PC for
design of sanitary sewers.
46 Introduction of Proposed Ordinance No. 15763 - Normandie Sanitary Relief (Page Ave to Saint Charles
Rock Road) (12360)
25
Making an appropriation of One Million Six Hundred Fourteen Thousand Dollars ($1,614,000.00) from the Sanitary
Replacement Fund to be used for design of sanitary sewers in Normandie Sanitary Relief (Page Ave to Saint
Charles Rock Road) (12360) in the Cities of Pagedale and Bel-Nor, the Village of Hanley Hills, and Unincorporated
St. Louis County, Missouri; and authorizing the Executive Director and Secretary -Treasurer on behalf of The
Metropolitan St. Louis Sewer District to enter into Contract No. 22088 with Jacobs Engineering Group Inc. for
design of sanitary sewers.
7
Rev/Edited 9/8/21
47 Introduction of Proposed Ordinance No. 15764 - St. Joachim’s Sanitary Relief (St. Genevieve Ln to Lynros
Dr) (12214)
27
Making an appropriation of Five Hundred Ten Thousand Dollars ($510,000.00) from the Sanitary Replacement
Fund to be used for design of sanitary sewers in St. Joachim’s Sanitary Relief (St. Genevieve Ln to Lynros Dr)
(12214) in the City of St. Ann, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf
of The Metropolitan St. Louis Sewer District to enter into Contract No. 22089 with Access Engineering, LLC for
design of sanitary sewers.
48 Introduction of Proposed Ordinance No. 15765- Westwood Country Club Sanitary Relief (Deer Creek to
Westwood Ct) (12132)
29
Making an appropriation of Five Hundred Thirty-Five Thousand Dollars ($535,000.00) from the Sanitary
Replacement Fund to be used for design of sanitary sewers in Westwood Country Club Sanitary Relief (Deer Creek
to Westwood Ct) (12132) in the Village of Westwood, Missouri; and authorizing the Executive Director and
Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 22090 with
EDM Incorporated for design of sanitary sewers.
49 Introduction of Proposed Ordinance No. 15766 - Stormwater Asset Investigations (2022) (13595) 31
Making an appropriation of Eight Hundred Thousand Dollars ($800,000.00) from the District Wide Stormwater
Fund to be used for asset investigations and assessment of stormwater systems in Stormwater Asset Investigations
(2022) (13595) Throughout the Metropolitan Sewer District Service Area; and authorizing the Executive Director
and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 22091
with TREKK Design Group, LLC for asset investigations and assessment of stormwater systems.
50 Introduction of Proposed Ordinance No. 15767 - Oracle EBS Upgrade to the Cloud 33
Making an appropriation of Three Hundred Thousand Dollars ($300,000.00) from the General Fund to be used for
professional services in Oracle EBS Upgrade to the Cloud District-wide to appropriate funds to develop needed
interfaces for a budgeted Oracle upgrade project.
RESOLUTIONS
51 Adoption of Resolution No. 3695 - Expressing the Board of Trustees’ appreciation to Donald L. Aulbach for his
28 years of exemplary service to the Metropolitan St. Louis Sewer District from July 9, 1993, to his retirement
effective September 1, 2021.
52 Adoption of Resolution No. 3696 - Expressing the Board of Trustees’ appreciation to Donald L. Beck for his 43
years of exemplary service to the Metropolitan St. Louis Sewer District from July 5, 1978, to his retirement effective
September 1, 2021.
53 Adoption of Resolution No. 3697 - Expressing the Board of Trustees’ appreciation to Michael G. Marsh for his
35 years of exemplary service to the Metropolitan St. Louis Sewer District from May 7, 1986, to his retirement
effective September 1, 2021.
54 Adoption of Resolution No. 3698 - Expressing the Board of Trustees’ appreciation to Joseph E. Anselmo for his
42 years of exemplary service to the Metropolitan St. Louis Sewer District from March 25, 1979, to his retirement
effective September 1, 2021.
55 Adoption of Resolution No 3699 – FY21 Budget Transfer 34
Transferring unencumbered appropriated balances totaling Ten Million Three Hundred Eighty -six Thousand Nine
Hundred Eighty-eight Dollars ($10,386,988) from the 2020B Project Bond Fund #6833, Water Backup Fund #4104,
and the Districtwide Stormwater Fund #5120 to the 2004B SRF - Principle & Interest - WW Fund #2804, 2011B SR
Rev Bond - Principle & Interest – WW Fund #2816, 2013A SRF - Principle & Interest – WW Fund #2820, 2015A
SRF - Principle & Interest – WW Fund # 2821, 2019B SR Rev Bond - Principle & Interest – WW Fund #2830,
2019C SR Ref Taxable Rev Bond - Principle & Interest – WW Fund #2831, 2021C SR Ref Rev Bond - Principle &
Interest – WW Fund #2836, General Insurance Fund #4105, Watkins Creek OMCI Fund #5587, Wellston OMCI
Fund #5589, Stormwater Regulatory Fund #5110, Maline Creek OMCI Fund #5576, Black Creek Subd. #455 OMCI
Fund #5594, Improvement Fund #4102, and the Wastewater Emergency Fund #4122 to allow for the proper
classification of expenses in the District’s year-end financial statements.
8
Rev/Edited 9/8/21
56 Adoption of Resolution No. 3700 – Transfer of Fund Balance 36
The adoption of Resolution No. 3700 will transfer a fund balance of Twelve Thousand Dollars ($12,000.00) from
the 2019B Wastewater Principle and Interest Fund 2830
57 Adoption of Resolution No. 3701 - Pension Investment Consultant 37
Resolution No. 3701 will exercise option year three (3) of the contract previously authorized by Ordinance No.
15006, adopted August 13, 2018, which authorized the Executive Director and Secretary -Treasurer on behalf of
The Metropolitan St. Louis Sewer District to enter into a contract with AON Hewitt Investment Consulting, Inc.
(AON), whereby AON would provide investment advisory services for the District’s Defined Benefit Plan, Deferred
Compensation Plan and Defined Contribution Plan.
58 Adoption of Resolution No. 3702 – Covid Testing 38
As part of the Metropolitan St. Louis Sewer District’s (MSD) continued commitment to protecting the workplace
during an infectious disease outbreak the District will require all employees to be vaccinated or provide a negative
COVID-19 test weekly as part of the MSD Mandatory COVID Testing Program
59 ANY OTHER BUSINESS THAT MAY PROPERLY BE BROUGHT BEFORE THE BOARD
60 ADJOURNMENT
9
Rev/Edited 9/8/21
AGENDA ITEM NUMBER: Introduction of Proposed Ordinance No. 15747
NAME OF PROJECT: CSO Volume Reduction Green Infrastructure – Hickory Street Homes (13647)
LOCATION: 2726-2736 Hickory Street in the City of St. Louis, Missouri
TYPE OF PROJECT: Cost Share for Green Infrastructure Construction (015.0 Construction Costs)
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Authorizes staff to enter into an agreement with Gladiator Homes, LLC.
What does action accomplish?: Provides Green Infrastructure Grant for construction of green infrastructure to
reduce combined sewer overflows, as required by Consent Decree.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: N/A
Consultant: N/A
Agency: Gladiator Homes, LLC
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A Designer’s Estimate: N/A
Total MWBE Participation: N/A
Type of Contract: N/A
Properties Affected: N/A Properties Benefiting: N/A
Designed by: N/A
This ordinance authorizes the District to enter into an agreement with Gladiator Homes, LLC to provide financial assistance
through a Green Infrastructure Grant Program for construction of green infrastructure. The purpose of this project is to
reduce combined sewer overflows into the Mississippi River per the Long Term Control Plan. This project will reduce runoff
volume with the installation of permeable pavement and amended soils. Total cost of the project is estimated at $45,300
and Gladiator Homes, LLC is requesting approximately $45,300 reimbursement for the cost of green infrastructure.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2021, Pg. 89 Amount: $8,000,000*
Fund Name: #1101 – General Fund
Additional Comments: None.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
09/10/20 – Ord. No. 15469 – Amount: $8,000,000 – CSO Volume Reduction Green Infrastructure (11146) – Supplemental
*Requesting Board approval of an ordinance for which $45,300 is being encumbered from Ordinance No.15469.
10
Rev/Edited 9/8/21
AGENDA ITEM NUMBER: Introduction of Proposed Ordinance No. 15748
NAME OF PROJECT: CSO Volume Reduction Green Infrastructure – 301 DeBaliviere TOD (13574)
LOCATION: 5720 DeGiverville Avenue and 301 DeBaliviere Avenue in the City of St. Louis, Missouri
TYPE OF PROJECT: Cost Share for Green Infrastructure Construction (015.0 Construction Costs)
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Authorizes staff to enter into an agreement with Expo at Forest Park, LLC.
What does action accomplish?: Provides Green Infrastructure Grant for construction of green infrastructure to
reduce combined sewer overflows, as required by Consent Decree.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: N/A
Consultant: N/A
Agency: Expo at Forest Park, LLC
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A Designer’s Estimate: N/A
Total MWBE Participation: N/A
Type of Contract: N/A
Properties Affected: N/A Properties Benefiting: N/A
Designed by: N/A
This ordinance authorizes the District to enter into an agreement with Expo at Forest Park, LLC to provide financial
assistance through a Green Infrastructure Grant Program for construction of green infrastruct ure. The purpose of this
project is to reduce combined sewer overflows into the River Des Peres per the Long Term Control Plan. This project will
reduce runoff volume with the installation of a green roof. Total cost of the project is estimated at $144,271 and Expo at
Forest Park, LLC is requesting approximately $32,400 reimbursement for the cost of green infrastructure.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2021, Pg. 90 Amount: $3,000,000*
Fund Name: #1101 – General Fund
Additional Comments: None.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
09/10/20 – Ord. No. 15470 – Amount: $3,000,000 – CSO Volume Reduction Green Infrastructure – River Des Peres
(13078) – Supplemental
*Requesting Board approval of an ordinance for which $32,400 is being encumbered from Ordinance No.15470.
11
Rev/Edited 9/8/21
AGENDA ITEM NUMBER: Introduction of Proposed Ordinance No. 15749
NAME OF PROJECT: CSO Volume Reduction Green Infrastructure – Delmar Divine (13542)
LOCATION: 5535 Delmar Blvd in the City of St. Louis, Missouri
TYPE OF PROJECT: Cost Share for Green Infrastructure Construction (015.0 Construction Costs)
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Authorizes staff to enter into an agreement with Delmar Divine Master Landlord
Residential, LLC.
What does action accomplish?: Provides Green Infrastructure Grant for construction of green infrastructure to
reduce combined sewer overflows, as required by Consent Decree.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: N/A
Consultant: N/A
Agency: Delmar Divine Master Landlord Residential, LLC
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A Designer’s Estimate: N/A
Total MWBE Participation: N/A
Type of Contract: N/A
Properties Affected: N/A Properties Benefiting: N/A
Designed by: N/A
This ordinance authorizes the District to enter into an agreement with Delmar Divine Master Landlord Residential, LLC to
provide financial assistance through a Green Infrastructure Grant Program for construction of green infrastructure. The
purpose of this project is to reduce combined sewer overflows into the River Des Peres per the Long Term Control Plan.
This project will reduce runoff volume with the installation of three bioretention basins. Total cost of the project is estimated
at $603,375 and Delmar Divine Master Landlord Residential; LLC is requesting approximately $576,000 reimbursement for
the cost of green infrastructure.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2021, Pg. 90 Amount: $3,000,000*
Fund Name: #1101 – General Fund
Additional Comments: None.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
09/10/20 – Ord. No. 15470 – Amount: $3,000,000 – CSO Volume Reduction Green Infrastructure – River Des Peres
(13078) – Supplemental
*Requesting Board approval of an ordinance for which $576,000 is being encumbered from Ordinance No.15470.
12
Rev/Edited 9/8/21
AGENDA ITEM NUMBER: Introduction of Proposed Ordinance No. 15750
NAME OF PROJECT: CSO Volume Reduction Green Infrastructure – Missouri Botanical Garden Visitors Center
(13642)
LOCATION: 4434 Shaw Blvd. in the City of St. Louis, Missouri
TYPE OF PROJECT: Cost Share for Green Infrastructure Construction (015.0 Construction Costs)
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Authorizes staff to enter into an agreement with Missouri Botanical Gardens.
What does action accomplish?: Provides Green Infrastructure Grant for construction of green infrastructure to
reduce combined sewer overflows, as required by Consent Decree.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: N/A
Consultant: N/A
Agency: Missouri Botanical Gardens
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A Designer’s Estimate: N/A
Total MWBE Participation: N/A
Type of Contract: N/A
Properties Affected: N/A Properties Benefiting: N/A
Designed by: N/A
This ordinance authorizes the District to enter into an agreement with Missouri Botanical Gardens to provide financial
assistance through a Green Infrastructure Grant Program for construction of green infrastructure. The purpose of this
project is to reduce combined sewer overflows into the River Des Peres per the Long Term Control Plan. This project will
reduce runoff volume with the installation of two underground cisterns. Total cost of the projec t is estimated at $794,951
and Missouri Botanical Gardens is requesting approximately $185,400 reimbursement for the cost of green infrastructure.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2021, Pg. 90 Amount: $3,000,000*
Fund Name: #1101 – General Fund
Additional Comments: None.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
09/10/20 – Ord. No. 15470 – Amount: $3,000,000 – CSO Volume Reduction Green Infrastructure – River Des Peres
(13078) – Supplemental
*Requesting Board approval of an ordinance for which $185,400 is being encumbered from Ordinance No.15470.
13
Rev/Edited 9/8/21
AGENDA ITEM NUMBER: Introduction of Proposed Ordinance No. 15751
NAME OF PROJECT: CSO Volume Reduction Green Infrastructure – Unify Grove Various Sites (13644)
LOCATION: 4401 Vista Ave and Nearby Sites in the City of St. Louis, Missouri
TYPE OF PROJECT: Cost Share for Green Infrastructure Construction (015.0 Construction Costs)
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Authorizes staff to enter into an agreement with Vista Apartments, LLC.
What does action accomplish?: Provides Green Infrastructure Grant for construction of green infrastructure to
reduce combined sewer overflows, as required by Consent Decree.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: N/A
Consultant: N/A
Agency: Vista Apartments, LLC
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A Designer’s Estimate: N/A
Total MWBE Participation: N/A
Type of Contract: N/A
Properties Affected: N/A Properties Benefiting: N/A
Designed by: N/A
This ordinance authorizes the District to enter into an agreement with Vista Apartments, LLC to provide financial assistance
through a Green Infrastructure Grant Program for construction of green infrastructure. The purpose of this project is to
reduce combined sewer overflows into the River Des Peres per the Long-Term Control Plan. This project will reduce runoff
volume with the installation of bioretention basins and amended soils. Total cost of the project is estimated at $365,866
and Vista Apartments, LLC is requesting approximately $309,600 reimbursement for the cost of gree n infrastructure.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2021, Pg. 90 Amount: $3,000,000*
Fund Name: #1101 – General Fund
Additional Comments: None.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
09/10/20 – Ord. No. 15470 – Amount: $3,000,000 – CSO Volume Reduction Green Infrastructure – River Des Peres
(13078) – Supplemental
*Requesting Board approval of an ordinance for which $309,600 is being encumbered from Ordinance No.15470.
14
Rev/Edited 9/8/21
AGENDA ITEM NUMBER: Introduction of Proposed Ordinance No. 15752
NAME OF PROJECT: Union Road 100 Block Storm Improvements (10366)
LOCATION: South of Weber Road and East of Morgan ford Road in Unincorporated St. Louis County, Missouri
TYPE OF PROJECT: Storm Sewer Construction (015.0 Construction Costs)
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract.
What does action accomplish?: Implements the construction of a CIP project.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: Aztec Construction Specialties, LLC Previous District Contract: Yes
249 Lime St.
Dupo, IL 62239
Consultant: N/A
Agency: N/A
Number of bidders: 7 Low Bid: $412,699.00 High Bid: $497,590.00
Appropriation Amount: $490,000.00 Designer’s Estimate: $550,000.00
Total MWBE Participation: 18.44% (MBE Goal is 17% - African American)
TaylorMade Construction Co. LLC (African American) – 18.44% - MBE
Type of Contract: Unit Cost
Properties Affected: 19 Properties Benefiting: 24
Designed by: EDM Incorporated
The work to be done under Contract #22021 consists of the construction of approximately 1,284 lineal feet of storm sewers
varying in size from 12-inches to 21-inches in diameter, approximately 99 lineal feet of 8-inch sanitary sewers and
appurtenances, and the removal of inflow sources from one private property. The purpose of this project is to alleviate yard
flooding and road ponding at 21 residences along Union Road in Unincorporated St. Louis County, Missouri. This project
is scheduled to be completed in 335 days.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2021, Continued Amount: $600,000
Fund Name: #5120 – Districtwide Stormwater Fund
Additional Comments: An additional contingency of $55,000 for utility relocation (Gas - $45,000 & Electric - $10,000) is
included in the appropriation. This project was one of 14 design projects included in Stormwater Infrastructu re Improvement
Design (Contract B) (12689). This project is a Stormwater Grant Project with MDNR. Upon completion of the project, an
additional reimbursement of $75,000 will be paid by St. Louis County in accordance with the Intergovernmental Cooperation
Agreement dated October 1, 2018.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
09/13/18 – Ord. No. 15001 – Amount: $300,000 – EDM Incorporated – Stormwater Infrastructure Improvement Design
(Contract B) (12689) – Design Contract No. 20512 – Amendment
15
Rev/Edited 9/8/21
AGENDA ITEM NUMBER: Introduction of Proposed Ordinance No. 15753
NAME OF PROJECT: Coldwater Sanitary Relief Section B, C & D – Section B Rehabilitation (11724)
LOCATION: Various Sites in the Cities of Florissant and Hazelwood, Missouri
TYPE OF PROJECT: Sanitary Sewer Rehabilitation (015.0 Construction Costs)
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract.
What does action accomplish?: Implements the construction of a CIP project, as required by Consent Decree.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: SAK Construction, LLC Previous District Contract: Yes
864 Hoff Road
O’Fallon, MO 63366
Consultant: N/A
Agency: N/A
Number of bidders: 1 Low Bid: $2,876,288.00 High Bid: $2,876,288.00
Appropriation Amount: $3,000,000.00 Designer’s Estimate: $1,405,000.00
Total MWBE Participation: 20.18% (MBE Goal is 10% - WBE Goal is 10%)
David Mason & Associates, Inc. (African American) – 4.30% - MBE
Girdner Contracting LLC (Native American) – 5.74% - MBE
Girdner Contracting LLC (Native American) – 10.14% - WBE
Type of Contract: Unit Cost
Properties Affected: 10 Properties Benefiting: Coldwater Creek Watershed
Designed by: Wood Environment & Infrastructure Solutions, Inc.
The work to be done under Contract #22040 consists of the rehabilitation of approximately 2,631 lineal feet of sanitary
sewers varying in size from 54-inches to 66-inches in diameter using cured-in-place pipe (CIPP) methods. The purpose of
this project is to provide structural rehabilitation for existing reinforced concrete pipe which has significantly deteriorated
due to corrosion and age. This project is scheduled to be completed in 365 days.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2022, Pg. 80 Amount: $1,600,000
Fund Name: #6660 – Sanitary Replacement Fund
Additional Comments: An additional contingency of $20,000 for utility relocation (Electric - $20,000) is included in the
appropriation. The designer’s estimate was found to be low and inaccurate for failure to account for significant b y-pass
pumping system required for this large diameter sewer. Also failed to account for recent increases in CIPP Resin costs.
This project is expected to be funded by a low interest loan from the State of Missouri, under the State Revolving Loan Fund
(SRF).
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
08/16/18 – Ord. No. 14946 – Amount: $650,000 – Wood Environment & Infrastructure Solutions, Inc. – Design Contract
No. 11011 – Amendment
16
Rev/Edited 9/8/21
AGENDA ITEM NUMBER: Introduction of Proposed Ordinance No. 15754
NAME OF PROJECT: Lemay Public I/I Reduction and Rehabilitation (2022) Contract A (12590)
LOCATION: Various Sites in the Cities of Maplewood, Richmond Heights, Shrewsbury, and Webster Groves,
Missouri
TYPE OF PROJECT: Sanitary Sewer Rehabilitation (015.0 Construction Costs)
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract.
What does action accomplish?: Implements the construction of a CIP project, as required by Consent Decree.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: Insituform Technologies USA, LLC Previous District Contract: Yes
17988 Edison Avenue
Chesterfield, MO 63005
Consultant: N/A
Agency: N/A
Number of bidders: 2 Low Bid: $3,207,004.68 High Bid: $3,539,801.18
Appropriation Amount: $3,350,000.00 Designer’s Estimate: $3,785,000.00
Total MWBE Participation: 20.52% (MBE Goal is 10% - WBE Goal is 10%)
David Mason & Associates, Inc. (African American) – 8.34% - MBE
Synergy Construction Group, LLC (African American) – 1.83% - MBE
CSD Environmental Services – 7.10% - WBE
Tramar Contracting, Inc. dba Tramar Traffic – 3.25% - WBE
Type of Contract: Lump Sum
Properties Affected: 614 Properties Benefiting: 1,828
Designed by: Burns & McDonnell Engineering Co., Inc.
The work to be done under Contract #22044 consists of the rehabilitation of approximately 42,107 lineal feet of sanitary
sewers varying in size from 6-inches to 42-inches in diameter using cured-in-place pipe (CIPP) methods, 20 manholes, and
572 service connections. The purpose of this project is to reduce inflow/infiltration in the Gravois Creek watershed. This
project is scheduled to be completed in 400 days.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2022, Pg. 100 Amount: $2,932,000
Fund Name: #6660 – Sanitary Replacement Fund
Additional Comments: The designer’s estimate increased due to an increase in project scope by adding approximately
9,000 lineal feet of sewer rehabilitation based on CCTV review. This project is expected to be funded by a low interest loan
from the State of Missouri, under the State Revolving Loan Fund (SRF).
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
08/13/20 – Ord. No. 15458 – Amount: $48,000 – Burns & McDonnell Engineering Co., Inc. – Design Contract No.
11003 – Amendment
17
Rev/Edited 9/8/21
AGENDA ITEM NUMBER: Introduction of Proposed Ordinance No. 15755
NAME OF PROJECT: Sub-Trunk #2 Sanitary Relief (Birmingham Ct to Cove Ln) (12221)
LOCATION: North of Larimore Road and East of Bellefontaine Road in Unincorporated St. Louis County, Missouri
TYPE OF PROJECT: Sanitary Sewer Construction (015.0 Construction Costs)
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract.
What does action accomplish?: Implements the construction of a CIP project, as required by Consent Decree.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: Bates Utility Company, Inc. Previous District Contract: Yes
841 Westwood Industrial Park Dr.
Weldon Springs, MO 63304
Consultant: N/A
Agency: N/A
Number of bidders: 4 Low Bid: $2,756,382.00 High Bid: $3,627,950.25
Appropriation Amount: $3,200,000.00 Designer’s Estimate: $2,930,000.00
Total MWBE Participation: 17.01% (MBE Goal is 17% - African American)
McKay’s Hauling Company, Inc. (African American) – 5.56% - MBE
OBAX Infrastructures, LLC (African American) – 11.45% - MBE
Type of Contract: Unit Cost
Properties Affected: 23 Properties Benefiting: 780
Designed by: Wood Environment & Infrastructure Solutions, Inc.
The work to be done under Contract #22056 consists of the construction of approximately 4,856 lineal feet of sanitary
sewers varying in size from 8-inches to 18-inches in diameter and appurtenances. The purpose of this project is to reduce
basement backups and relieve overcharged sanitary sewers. This project will provide for the elimination of three (3)
constructed SSO’s (BP-210, BP-211 & BP-213). This project is scheduled to be completed in 400 days.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2022, Pg. 119 Amount: $2,515,000
Fund Name: #6660 – Sanitary Replacement Fund
Additional Comments: An additional contingency of $325,000 for utility relocation (Gas - $50,000, Electric - $50,000 &
Water - $225,000) is included in the appropriation. This project is expected to be funded by Bond proceeds.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
08/16/18 – Ord. No. 14952 – Amount: $526,000 – Wood Environment & Infrastructure Solutions, Inc. – Design Contract
No. 11011 – Amendment
18
Rev/Edited 9/8/21
AGENDA ITEM NUMBER: Introduction of Proposed Ordinance No. 15756
NAME OF PROJECT: Sub-Trunk #3 Sanitary Relief (Muriel Dr to Jenner Ln) (11669)
LOCATION: North of Interstate 270 and West of Bellefontaine Road in Unincorporated St. Louis County, Missouri
TYPE OF PROJECT: Sanitary Sewer Construction (015.0 Construction Costs)
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract.
What does action accomplish?: Implements the construction of a CIP project, as required by Consent Decree.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: Unnerstall Contracting Company, LLC Previous District Contract: Yes
2803 West Osage
Pacific, MO 63069
Consultant: N/A
Agency: N/A
Number of bidders: 4 Low Bid: $1,563,991.50 High Bid: $1,871,315.00
Appropriation Amount: $1,770,000.00 Designer’s Estimate: $2,057,000.00
Total MWBE Participation: 17.07% (MBE Goal is 17% - African American)
OBAX Infrastructures, LLC (African American) – 17.07% - MBE
Type of Contract: Unit Cost
Properties Affected: 28 Properties Benefiting: 844
Designed by: Wood Environment & Infrastructure Solutions, Inc.
The work to be done under Contract #22067 consists of the construction of approximately 4,201 lineal feet of sanitary
sewers varying in size from 8-inches to 24-inches in diameter and appurtenances. The purpose of this project is to reduce
basement backups and relieve overcharged sanitary sewers. This project will provide for the elimination of one (1)
constructed SSO (BP-214). This project is scheduled to be completed in 365 days.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2022, Pg. 120 Amount: $1,905,000
Fund Name: #6660 – Sanitary Replacement Fund
Additional Comments: An additional contingency of $125,000 for utility relocation (Electric - $45,000,Gas - $30,000 &
Water - $50,000) is included in the appropriation. This project is expected to be funded by Bond proceeds.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
08/16/18 – Ord. No. 14953 – Amount: $452,000 – Wood Environment & Infrastructure Solutions, Inc. – Design Contract
No. 11011 – Amendment
19
Rev/Edited 9/8/21
AGENDA ITEM NUMBER: Introduction of Proposed Ordinance No. 15757
NAME OF PROJECT: Watkins Creek Pump Station (P-101) Replacement (12491)
LOCATION: North of Interstate 270 and East of Riverview Drive in the City of St. Louis, Missouri
TYPE OF PROJECT: Pump Station Improvements (015.0 Construction Costs)
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Appropriates additional funds.
What does action accomplish?: Provides additional funding for the construction of a CIP project, as required by
Consent Decree.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: Plocher Construction Company, Inc. Previous District Contract: Yes
2808 Thole-Plocher Road
Highland, IL 62249
Consultant: N/A
Agency: N/A
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: $2,900,000.00 Designer’s Estimate: $9,111,000.00
Total MWBE Participation: 17.00% (MBE Goal is 17% - African American)
Armstrong Supply, LLC (African American) – 8.51% - MBE
XL Contracting, Inc. (African American) – 1.11% - MBE
Penn Services LLC (African American) – 3.04% - MBE
J. West Electrical Contracting, LLC (African American) – 4.34% - MBE
Type of Contract: Lump Sum
Properties Affected: 3 Properties Benefiting: 7,875
Designed by: Thouvenot, Wade & Moerchen, Inc.
The work to be done under Contract #21991 consists of the construction of a new submersible pump station at an alternate
location outside of the floodplain. The purpose of this project is to replace aging mechanical and electrical equipment and
to address flooding issues from backwater from the Mississippi River. This project is scheduled to be completed in 395
days.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2022, Pg. 124 Amount: $2,900,000 (Partial)
Fund Name: #6660 – Sanitary Replacement Fund
Additional Comments: This is a partial funding request. This supplemental appropriation of $2,900,000 will bring the total
appropriation for this project to $7,900,000 and fully fund the construction for this project. This project is expected to b e
funded by Bond proceeds.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
12/13/18 – Ord. No. 15069 – Amount: $478,000 – Thouvenot, Wade & Moerchen, Inc. – Design Contract No. 20469 –
Amendment No. 4
03/11/21 – Ord. No. 15621 – Amount: $5,000,000 – Watkins Creek Pump Station (P-101) Replacement (12491) –
Original Construction Contract No. 21991
20
Rev/Edited 9/8/21
AGENDA ITEM NUMBER: Introduction of Proposed Ordinance No. 15758
NAME OF PROJECT: Dekamay Drive Storm Sewer (MGJB-130) (11535)
LOCATION: North of Interstate 255 and West of Telegraph Road in Unincorporated St. Louis County, Missouri
TYPE OF PROJECT: Storm Sewer Construction (015.0 Construction Costs)
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract.
What does action accomplish?: Implements the construction of a CIP project.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: Fred M. Luth & Sons, Inc. Previous District Contract: Yes
4516 McRee Avenue
St. Louis, MO 63110
Consultant: N/A
Agency: N/A
Number of bidders: 7 Low Bid: $308,956.00 High Bid: $420,799.10
Appropriation Amount: $385,000.00 Designer’s Estimate: $345,000.00
Total MWBE Participation: 17.15% (MBE Goal is 17% - African American)
Armstrong Supply, LLC (African American) – 7.44% - MBE
OBAX Infrastructures LLC (African American) – 5.83% - MBE
Tee & E Trucking, Inc. (African American) – 3.88% - MBE
Type of Contract: Unit Cost
Properties Affected: 7 Properties Benefiting: 8
Designed by: EDM Incorporated
The work to be done under Contract #22059 consists of the construction of approximately 1,003 lineal feet of storm sewers
varying in size from 12-inches to 24-inches in diameter and appurtenances. The purpose of this project is to alleviate
basement and rear yard flooding at 3404, 3400, 3386, 3382, and 3378 Dekamay Drive; and at 3215, 3211, and 3207 Ringer
Road in Unincorporated St. Louis County, Missouri. This project is scheduled to be completed in 260 days.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2022, Pg. 149 Amount: $355,000
Fund Name: #5120 – Districtwide Stormwater Fund
Additional Comments: An additional contingency of $60,000 for utility relocation (Electric - $30,000, Gas - $10,000 &
Water - $20,000) is included in the appropriation. This project was one of 14 design projects included in Stormwater
Infrastructure Improvement Design (Contract B) (12689).
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
09/13/18 – Ord. No. 15001 – Amount: $300,000 – EDM Incorporated – Stormwater Infrastructure Improvement Design
(Contract B) (12689) – Design Contract No. 20512 – Amendment
21
Rev/Edited 9/8/21
AGENDA ITEM NUMBER: Introduction of Proposed Ordinance No. 15759
NAME OF PROJECT: Reasor Drive Storm Sewer (11273)
LOCATION: South of Interstate 270 and East of Interstate 170 in the Cities of Calverton Park and Ferguson, Missouri
TYPE OF PROJECT: Storm Sewer Construction (015.0 Construction Costs)
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract.
What does action accomplish?: Implements the construction of a CIP project.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: TaylorMade Construction Co., LLC Previous District Contract: Yes
1861 Chambers Road
St. Louis, MO 63136
Consultant: N/A
Agency: N/A
Number of bidders: 4 Low Bid: $371,555.00 High Bid: $439,547.00
Appropriation Amount: $550,000.00 Designer’s Estimate: $357,000.00
Total MWBE Participation: 17.49% (MBE Goal is 17% - African American)
XL Contracting, Inc. (African American) – 17.49% - MBE
TaylorMade Construction Co., LLC (African American) – 82.51% - MBE Prime
Type of Contract: Unit Cost
Properties Affected: 10 Properties Benefiting: 4
Designed by: Oates Associates, Inc.
The work to be done under Contract #22064 consists of the construction of approximately 1,003 lineal feet of storm sewers
varying in size from 15-inches to 24-inches in diameter and appurtenances. The purpose of this project is to alleviate yard
flooding, yard erosion, and miscellaneous structure flooding at 46 Reasor Drive; a nd 29, 31, and 901 Buckeye Drive in the
Cities of Calverton Park and Ferguson, Missouri. This project is scheduled to be completed in 260 days.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2022, Pg. 167 Amount: $465,000
Fund Name: #5564 – Coldwater Creek OMCI Fund
Additional Comments: An additional contingency of $158,000 for utility relocation (Gas - $20,000, Water - $113,000 &
Electric - $25,000) is included in the appropriation. This project was one of 23 design projects included in Stormwater
Infrastructure Improvement Design (Contract C) (12690).
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
09/13/18 – Ord. No. 15002 – Amount: $875,000 – Oates Associates, Inc. – Stormwater Infrastructure Improvement
Design (Contract C) (12690) – Design Contract No. 20513 – Amendment
22
Rev/Edited 9/8/21
AGENDA ITEM NUMBER: Introduction of Proposed Ordinance No. 15760
NAME OF PROJECT: MC-02 Watson to Edgar Rd Sanitary Relief (SKME-580A) (10024)
LOCATION: North of Watson Road, East of Edgar Road, South of Florence Avenue and West of Mackenzie Road
in the Cities of Shrewsbury, Webster Groves and Unincorporated St. Louis County, Missouri.
TYPE OF PROJECT: Easement Condemnation
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Authorizes staff to proceed with further condemnation efforts including the filing of
all necessary court pleadings or documents.
What does action accomplish?: Acquires permanent easements and temporary construction easem ents to
construct a sanitary sewer project with appurtenances, as required by Consent
Decree.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: N/A
Consultant: N/A
Agency: N/A
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A District’s Estimate: N/A
Total MWBE Participation: N/A
Type of Contract: N/A
Properties Affected: 3 Properties Benefiting: 4
Designed by: N/A
This ordinance authorizes the staff to proceed with further condemnation efforts including the filing of all necessary court
pleadings or documents leading to the acquisition of permanent easements and temporary construction easements on three
(3) parcels of ground located in the Cities of Shrewsbury, Webst er Groves, and Unincorporated St. Louis County, Missouri.
The easements and temporary construction easements are needed to construct this project, which consists of the
construction of approximately 9,050 lineal feet of 8-inch to 36-inch diameter sanitary sewers, and provide for the elimination
of one (1) constructed SSO (BP-557). The purpose of this project is to eliminate building backups and overcharged sanitary
sewers as required by the consent decree. Currently, the District has been unable to negot iate a settlement with the owners.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2022 Pg. 109 Amount: $2,000,000
FY2022 Pg. 110 $4,000,000
FY2023 $2,130,000
$8,130,000
Fund Name: #6660 – Sanitary Replacement Fund
Additional Comments: None
PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A
23
Rev/Edited 9/8/21
AGENDA ITEM NUMBER: Introduction of Proposed Ordinance No. 15761
NAME OF PROJECT: General Services Agreement – Construction Management (2022) (12387)
LOCATION: Various Locations Within the District
TYPE OF PROJECT: General Construction Management Services
(014.0 Construction Inspection and Management Services Costs)
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction management
contract.
What does action accomplish?: Provides construction management services for contract and development
projects, as required by Consent Decree.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: Yes
Consultant: KAI 360 Construction Services, LLC
2060 Craigshire Road
St. Louis, MO 63146
Corporate Headquarters: St. Louis, Missouri
Agency: N/A
Number of proposers: (2) KAI 360 Construction Services, LLC and KWAME Building Group Inc.
Appropriation Amount: $2,000,000.00 Designer’s Estimate: N/A
Total MWBE Participation: 100.00% (No MWBE Goal)
Gonzalez Companies, LLC (Hispanic) – 20.00% - MBE
Lion CSG, LLC – 10.00% - WBE
KAI 360 Construction Services, LLC (African American) – 70.00% - MBE Prime
Type of Contract: Hourly Billing Rate
Properties Affected: To be determined Properties Benefitting: To be determined
Designed by: N/A
This ordinance authorizes the District to enter into Contract #22086 for one (1) year with one (1) option year with KAI 360
Construction Services, LLC for various construction management services which include testing of materials, inspection o f
electrical and mechanical work at MSD’s WWTPs and various pumping stations, and other inspection services on an as
needed basis to supplement the District’s work force. The projects are located throughout the District in various cities and
in St. Louis County, Missouri. This contract is for a total maximum contract amount of $2,000,000.00. Projects will be
issued by letter agreement per individual scopes of services. This contract is renewable for up to one (1) additional year
based on performance.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2022, Pg. 22 Amount: $2,000,000
Fund Name: #6660 – Sanitary Replacement Fund
Additional Comments: There was one (1) other proposal considered on this project. The appropriation for construction
management services is equal to the proposed funding presented in the CIP Budget Supplement.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A
24
Rev/Edited 9/8/21
AGENDA ITEM NUMBER: Introduction of Proposed Ordinance No. 15762
NAME OF PROJECT: L51 Pump Station Forcemain Improvements (13227)
LOCATION: East of Prichard Farm Road Along Creve Coeur Mill Road in the City of Maryland Heights, Missouri
TYPE OF PROJECT: Design of Sanitary Sewers (011.0 Design Phase Project Costs)
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Appropriates funds and authorizes staff to enter into a design contract.
What does action accomplish?: Implements the design of a CIP project, as required by Consent Decree.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: Yes
Consultant: M3 Engineering Group, PC
911 Washington Avenue, Suite 620
St. Louis, MO 63101
Corporate Headquarters: St. Louis, Missouri
Agency: N/A
Number of proposers: (3) Burns & McDonnell Engineering Company Inc.; George Butler Associates, Inc.; and M3
Engineering Group, PC
Appropriation Amount: $1,073,000.00 Designer’s Estimate: N/A
Total MWBE Participation: 65.72% (No MWBE Goal)
Hart Engineering, LLC – 4.98% - WBE
Kaskaskia Engineering Group, LLC – 7.63% - WBE
M3 Engineering Group, PC (African American) – 53.11% - MWBE Prime
Type of Contract: Lump Sum
Properties Affected: 10 Properties Benefiting: 14,000
Designed by: N/A
This ordinance authorizes the District to enter into Contract #22087 with M3 Engineering Group, PC for the design of the
L51 Pump Station Forcemain Improvements (13227) project. L51 Pump Station Forcemain Improvements (13227) is a
lump sum cost project for the design of approximately 8,800 lineal feet of 36-inch force main and appurtenances. The
purpose of this project is to construct a replacement force main parallel to the existing force main allowing for a future
abandonment or rehabilitation of the existing force main which has corroded and has potential for failure. The construction
cost estimate for this project is $6,900,000. Construction is anticipated to begin in FY2024.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2022, Pg. 42 Amount: $1,161,000
Fund Name: #6660 – Sanitary Replacement Fund
Additional Comments: There were two (2) other proposals considered on this project. The appropriation for design
services is $88,000 below the proposed funding for this project presented in the CIP Budget Supplement. The appropriation
includes $902,840 in design services; $45,160 in contingencies; $14,264 for a flood plain study; $10,534 for levee seepage
analysis; and $100,202 for construction phase services. These services include construction field surveys, review of shop
drawings and submittals, responding to design questions and changes during construction, as-built surveys, and preparation
of as-built record drawings. This project is expected to be funded by Bond proceeds.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A
25
Rev/Edited 9/8/21
AGENDA ITEM NUMBER: Introduction of Proposed Ordinance No. 15763
NAME OF PROJECT: Normandie Sanitary Relief (Page Ave to Saint Charles Rock Road) (12360)
LOCATION: North of Page Avenue and West of Pennsylvania Avenue in the Cities of Pagedale and Bel-Nor, the
Village of Hanley Hills, and Unincorporated St. Louis County, Missouri
TYPE OF PROJECT: Design of Sanitary Sewers (011.0 Design Phase Project Costs)
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Appropriates funds and authorizes staff to enter into a design contract.
What does action accomplish?: Implements the design of a CIP project, as required by Consent Decree.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: Yes
Consultant: Jacobs Engineering Group Inc.
501 No. Broadway
St. Louis, MO 63102
Corporate Headquarters: Dallas, Texas
Agency: N/A
Number of proposers: (3) Farnsworth Group Inc.; Jacobs Engineering Group Inc.; and Stantec Consulting Servic es Inc.
Appropriation Amount: $1,614,000.00 Designer’s Estimate: N/A
Total MWBE Participation: 25.77% (No MWBE Goal)
David Mason & Associates, Inc. (African American) – 18.35% - MBE
TSI Geotechnical, Inc. (African American) – 7.42% - MWBE
Type of Contract: Lump Sum
Properties Affected: 45 Properties Benefiting: 800
Designed by: N/A
This ordinance authorizes the District to enter into Contract #22088 with Jacobs Engineering Group Inc. for the design of
the Normandie Sanitary Relief (Page Ave to Saint Charles Rock Road) (12360) project. Normandie Sanitary Relief (Page
Ave to Saint Charles Rock Road) (12360) is a lump sum cost project for the design of approximately 8,930 lineal feet of 24 -
inch to 48-inch diameter sanitary sewers and appurtenances. The purpose of this project is to alleviate wet weather building
backups and overcharged sanitary sewers. This project will provide for the elimination of two (2) constructed SSOs (BP -
454 and BP-457). The construction cost estimate for this project is $9,059,000. Construction is anticipated to begin in
FY2024.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2022, Pg. 51 Amount: $1,661,000
Fund Name: #6660 – Sanitary Replacement Fund
26
Rev/Edited 9/8/21
Additional Comments: There were two (2) other proposals considered on this project. The appropriation for design
services is $47,000 below the proposed funding for this project presented in the CIP Budget Supplement. The appropriation
includes $1,339,491 in design services; $67,509 in contingencies; $15,000 for potholing; $12,000 for wetland delineation
investigation; $30,000 for bat habitat investigation; and $150,000 for construction phase services. These services include
construction field surveys, review of shop drawings and submittals, responding to design questions and changes during
construction, as-built surveys, and preparation of as-built record drawings. This project is expected to be funded by Bond
proceeds.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A
27
Rev/Edited 9/8/21
AGENDA ITEM NUMBER: Introduction of Proposed Ordinance No. 15764
NAME OF PROJECT: St. Joachim’s Sanitary Relief (St. Genevieve Ln to Lynros Dr) (12214)
LOCATION: South of St. Charles Rock Road and North of Breckenridge Road, Along St. Joachim Lane in the City
of St. Ann, Missouri
TYPE OF PROJECT: Design of Sanitary Sewers (011.0 Design Phase Project Costs)
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Appropriates funds and authorizes staff to enter into a design contract.
What does action accomplish?: Implements the design of a CIP project, as required by Consent Decree.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: Yes
Consultant: Access Engineering, LLC
11820 Tesson Ferry Road, Suite 203
St. Louis, MO 63128
Corporate Headquarters: St. Louis, Missouri
Agency: N/A
Number of proposers: (3) Access Engineering, LLC; Benham Design, LLC; and HR Green, Inc.
Appropriation Amount: $510,000.00 Designer’s Estimate: N/A
Total MWBE Participation: 75.34% (No MWBE Goal)
Engineering Design Source, Inc. (Asian American) – 20.14% - MBE
Access Engineering, LLC – 55.20% - WBE Prime
Type of Contract: Lump Sum
Properties Affected: 99 Properties Benefiting: 1,755
Designed by: N/A
This ordinance authorizes the District to enter into Contract #22089 with Access Engineering, LLC for the design of the St.
Joachim’s Sanitary Relief (St. Genevieve Ln to Lynros Dr) (12214) project. St. Joachim’s Sanitary Relief (St. Genevieve Ln
to Lynros Dr) (12214) is a lump sum cost project for the design of approximately 3,613 lineal feet of 18 -inch to 24-inch
diameter sanitary sewers and appurtenances. The purpose of this project is to alleviate wet weather building backups and
overcharged sanitary sewers. The construction cost estimate for this project is $3,222,000. Construction is anticipated to
begin in FY2024.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2022, Pg. 59 Amount: $550,000
Fund Name: #6660 – Sanitary Replacement Fund
28
Rev/Edited 9/8/21
Additional Comments: There were two (2) other proposals considered on this project. The appropriation for design
services is $40,000 below the proposed funding for this project presented in the CIP Budget Supplement. The appropriation
includes $391,537 in design services; $43,463 in contingencies; $15,000 for utility potholing; and $60,000 for construction
phase services. These services include construction field surveys, review of shop drawings and submittals, responding to
design questions and changes during construction, as-built surveys, and preparation of as-built record drawings. This
project is expected to be funded by Bond proceeds.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A
29
Rev/Edited 9/8/21
AGENDA ITEM NUMBER: Introduction of Proposed Ordinance No. 15765
NAME OF PROJECT: Westwood Country Club Sanitary Relief (Deer Creek to Westwood Ct) (12132)
LOCATION: North of Interstate 64 and East of South New Ballas Road in the Village of Westwood, Missouri
TYPE OF PROJECT: Design of Sanitary Sewers (011.0 Design Phase Project Costs)
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Appropriates funds and authorizes staff to enter into a design contract.
What does action accomplish?: Implements the design of a CIP project, as required by Consent Decree.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: Yes
Consultant: EDM Incorporated
220 Mansion House Center, Suite 300
St. Louis, MO 63102
Corporate Headquarters: St. Louis, Missouri
Agency: N/A
Number of proposers: (3) ABNA Engineering, Inc.; David Mason & Associates, Inc.; and EDM Incorporated
Appropriation Amount: $535,000.00 Designer’s Estimate: N/A
Total MWBE Participation: 35.00% (No MWBE Goal)
Hart Engineering, Inc. – 7.80% - WBE
Sabur, Inc. (African American) – 17.54% - MBE
TSI Geotechnical, Inc. (African American) – 9.66% - MWBE
Type of Contract: Lump Sum
Properties Affected: 25 Properties Benefiting: 90
Designed by: N/A
This ordinance authorizes the District to enter into Contract #22090 with EDM Incorporated for the design of the Westwood
Country Club Sanitary Relief (Deer Creek to Westwood Ct) (12132) project. Westwood Country Club Sanitary Relief (Deer
Creek to Westwood Ct) (12132) is a lump sum cost project for the design of approximately 4,580 lineal feet of 12 -inch to
18-inch diameter sanitary sewers and appurtenances. The purpose of this project is to alleviate wet weather building
backups and overcharged sanitary sewers. The construction cost estimate for this project is $2,834,000. Construction is
anticipated to begin in FY2024.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2022, Pg. 66 Amount: $513,000
Fund Name: #6660 – Sanitary Replacement Fund
30
Rev/Edited 9/8/21
Additional Comments: There were two (2) other proposals considered on this project. The appropriation for design
services is $22,000 above the proposed funding for this project presented in the CIP Budget Supplement. The appropriation
includes $399,882 in design services; $30,118 in contingencies; $5,000 for geotechnical access/restoration in golf course;
$20,000 for flood study and no rise certification; $5,000 for special golf course creek bank restoration; $5,000 for potholin g
utilities; $10,000 for additional rock cores in the golf course; and $60,000 for construction phase services. These services
include construction field surveys, review of shop drawings and submittals, responding to design questions and changes
during construction, as-built surveys, and preparation of as-built record drawings. This project is expected to be funded by
Bond proceeds.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A
31
Rev/Edited 9/8/21
AGENDA ITEM NUMBER: Introduction of Proposed Ordinance No. 15766
NAME OF PROJECT: Stormwater Asset Investigations (2022) (13595)
LOCATION: Throughout the Metropolitan Sewer District Service Area
TYPE OF PROJECT: Asset Investigations and Assessment of Stormwater Systems
(016.0 Consultant/Vendor Services)
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Appropriates funds and authorizes staff to enter into a contract.
What does action accomplish?: Provided investigations will determine sewer conditions and system defects and
will form the basis for preventive maintenance and rehabilitation activities.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: Yes
Consultant: TREKK Design Group, LLC
17 Cassens Court
Fenton, MO 63026
Corporate Headquarters: Kansas City, Missouri
Agency: N/A
Number of proposers: (6) Civil Design, Inc.; Kowelman Engineering, Inc.; Oates Associates, Inc.; Engineering Design
Source, Inc.; RJN Group, Inc.; and TREKK Design Group, LLC
Appropriation Amount: $800,000.00 Designer’s Estimate: N/A
Total MWBE Participation: 100.00% (No MWBE Goal)
Gonzalez Companies, LLC (Hispanic) – 37.50% - MBE
TREKK Design Group, LLC – 62.50% - WBE Prime
Type of Contract: Unit Cost
Properties Affected: N/A Properties Benefiting: N/A
Designed by: N/A
This ordinance authorizes the District to enter into Contract #22091 with TREKK Design Group, LLC for Stormwater Asset
Investigations (2022) (13595). The purpose of this contract is to provide District staff with detailed information regarding
stormwater systems by performing services such as project inspection reconnaiss ance, field investigations of storm system
and structures, inspection prioritization, field verification, map updates, asset ownership, work order management, and post
inspection review. These services will form the basis for District led preventive maint enance and rehabilitation activities.
These investigations also provide assistance for the Operations Department with their sewer cleaning and manhole
inspection activities. In addition to the field inspections, CCTV review and system mapping updates are also provided. This
contract for Stormwater Asset Assessment is for $800,000. This contract is renewable for up to two (2) additional years
based on performance.
32
Rev/Edited 9/8/21
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2022, Pg. 145 Amount: $800,000
Fund Name: #5120 – Districtwide Stormwater Fund
Additional Comments: This project for Stormwater Asset Investigations was identified in the District’s Capital
Improvement and Replacement Program to provide support for Operations, design, and planning activities. The
appropriation for vendor services is equal to the total proposed funding presented in the CIP Budget Supplement.
The District, through the Purchasing division, solicited price and qualification proposals for this project. Six qualification
proposals were received. All proposals were evaluated based on five weighted criteria. TREKK Design Group, LLC had
the highest overall score as the best firm for the services requested in the RFP. TREKK Design Group, LLC was selected
for this contract.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A
33
Rev/Edited 9/8/21
AGENDA ITEM NUMBER: Introduction of Proposed Ordinance No. 15767
NAME OF PROJECT: Oracle EBS Upgrade to the Cloud
LOCATION: District-wide
TYPE OF PROJECT: Professional Services
DEPARTMENT REQUESTING ACTION: Information Technology
REQUESTED ACTION:
Why is this action necessary?: To appropriate funds to develop needed interfaces for a budgeted Oracle upgrade
project.
What does action accomplish?: These funds will allow the hiring of temporary help to provide project support for
an upgrade of our Oracle Enterprise Business Systems (EBS) from on premise
to the latest cloud based system.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: No
Consultant: N/A
Agency: N/A
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: $300,000.00 District’s Estimate: N/A
Total MWBE Participation: 0.00% (No MWBE Goal)
N/A – There are no MWBE goals for this Professional Services project.
Type of Contract: N/A
Properties Affected: N/A Properties Benefiting: N/A
Designed by: N/A
This ordinance will authorize the partial appropriation of $300,000 that will be used on temporary help to develop a
Maximo/Oracle adaptor, and a Contractor Pay Application for engineering contracts. It is important to start this work in
advance of the Oracle Upgrade Project to assure timely project completion and proper testing. Future appropriations for
remaining funds to be used for vendor services will follow.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2022 Amount: $6,400,000
Fund Name: #1101-General Fund
Additional Comments: None.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A
34
Rev/Edited 9/8/21
AGENDA ITEM NUMBER: RESOLUTION NO. 3699
NAME OF PROJECT: Budget Transfer
LOCATION: Finance
TYPE OF PROJECT: N/A
DEPARTMENT REQUESTING ACTION: Finance
REQUESTED ACTION:
Why is this action necessary?: To properly classify expenses for The District’s year-end financial statements.
What does action accomplish?: Allows District staff to transfer unencumbered FY21 appropriated balances from
the 2020B Project Bond Fund #6833, Water Backup Fund #4104, and the
Districtwide Stormwater Fund #5120 to the 2004B SRF - Principle & Interest - WW
Fund #2804, 2011B SR Rev Bond - Principle & Interest – WW Fund #2816, 2013A
SRF - Principle & Interest – WW Fund #2820, 2015A SRF - Principle & Interest –
WW Fund # 2821, 2019B SR Rev Bond - Principle & Interest – WW Fund #2830,
2019C SR Ref Taxable Rev Bond - Principle & Interest – WW Fund #2831, 2021C
SR Ref Rev Bond - Principle & Interest – WW Fund #2836, General Insurance
Fund #4105, Watkins Creek OMCI Fund #5587, Wellston OMCI Fund #5589,
Stormwater Regulatory Fund #5110, Maline Creek OMCI Fund #5576, Black
Creek Subd #455 OMCI Fund #5594, Improvement Fund #4102, and the
Wastewater Emergency Fund #4122.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: NA Previous District Contract: NA
Consultant: NA
Agency: NA
Number of bidders: NA Low Bid: NA High Bid: NA
Appropriation Amount: NA District’s Estimate: NA
MBE/WBE Participation: NA
Plan Approval Date: NA Type of Contract: NA
Properties Affected: NA Properties Benefiting: NA
Designed by: NA
FUNDING/COST SUMMARY:
Budgeted: NA Budget Year: FY 2021 Amount: NA
Fund Name: 2020B Project Bond Fund #6833, Water Backup Fund #4104, Districtwide Stormwater Fund #5120,
2004B SRF - Principle & Interest - WW Fund #2804, 2011B SR Rev Bond - Principle & Interest – WW Fund #2816, 2013A
SRF - Principle & Interest – WW Fund #2820, 2015A SRF - Principle & Interest – WW Fund # 2821, 2019B SR Rev Bond
- Principle & Interest – WW Fund #2830, 2019C SR Ref Taxable Rev Bond - Principle & Interest – WW Fund #2831,
2021C SR Ref Rev Bond - Principle & Interest – WW Fund #2836, General Insurance Fund #4105, Watkins Creek OMCI
Fund #5587, Wellston OMCI Fund #5589, Stormwater Regulatory Fund #5110, Maline Creek OMCI Fund #5576, Black
Creek Subd #455 OMCI Fund #5594, Improvement Fund #4102, and the Wastewater Emergency Fund #4122
35
Rev/Edited 9/8/21
Additional Comments: This resolution approves the transfer of $10,386,988 of unencumbered appropriated balances
between multiple funds as indicated in the tables below.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
06/11/2020 - Ordinance No. 15420 - Fiscal Year 2021 Budget Ordinance
Fund Cost Center Natural Account Business Line Amount
(xxxx) (xxxxx) (xxxxx) (xxxxx)
6833 00202 58051 - Premium on Bond Issuance 00 $ 9,705,300
4104 00105 54900 - Water Backup Costs 00 $ 460,000
5120 00109 59205 - SW CIRP Interfund Labor 00 $ 200
5120 00109 59205 - SW CIRP Interfund Labor 00 $ 221,488
Total Transfer From: $10,386,988
Fund Cost Center Natural Account Business Line
(xxxx) (xxxxx) (xxxxx) (xxxxx) Amount
2804 00202 58020 - Interest Payments 00 $ 37,000
2816 00202 58030 - Agent Fees 00 $ 200
2820 00202 58030 - Agent Fees 00 $ 7,000
2821 00202 58030 - Agent Fees 00 $ 10,000
2830 00202 58030 - Agent Fees 00 $ 1,000
2831 00202 58020 - Interest Payments 00 $ 100
2836 00202 58081 - Repayment to refunding Escrow Agent 00 $ 9,650,000
4105 00103 54400 - Judgments & Claims Settlements 00 $ 460,000
5587 00205 54455 - Commission Fee - St. Louis County 00 $ 100
5589 00205 54455 - Commission Fee - St. Louis County 00 $ 100
5110 00109 59205 - SW CIRP Interfund Labor 20 $ 33,772
5576 00109 59205 - SW CIRP Interfund Labor 20 $ 60,454
5587 00109 59205 - SW CIRP Interfund Labor 20 $ 6,452
5594 00109 59205 - SW CIRP Interfund Labor 20 $ 11,511
4102 00109 59206 - WW CIRP Interfund Labor 10 $ 43,056
4122 00109 59206 - WW CIRP Interfund Labor 10 $ 66,243
Total Transfer To: $10,386,988
36
Rev/Edited 9/8/21
AGENDA ITEM NUMBER: Proposed Resolution No. 3700
NAME OF PROJECT: Transfer of Fund Balance
LOCATION:
TYPE OF PROJECT:
DEPARTMENT REQUESTING ACTION: Finance
REQUESTED ACTION:
Why is this action necessary? This resolution is necessary to allow the District to account for revenues
and expenses in a manner consistent with the District’s current operations.
What does action accomplish? This resolution accomplishes the transfer of fund balance from 2019B
Wastewater Principle and Interest Fund (2830) to the 2017A Wastewater
Principle and Interest Fund (2826) in fiscal year 2021 and if applicable,
authorizes staff to make the appropriate reversing entries in fiscal year
2022.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: N/A
Consultants: N/A Agency: N/A
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A District Estimate: N/A
MBE/WBE Participation: N/A
Plan Approval Date: N/A Type of Contract: N/A
Properties Affected: N/A Properties Benefiting: N/A
Designed by: N/A
FUNDING/COST SUMMARY: N/A
Budgeted: N/A Budget Year: N/A Amount: N/A
Fund Name: 2019B Wastewater Principle and Interest Fund (2830) and 2017A Wastewater Principle and Interest Fund
(2826).
Additional Comments: $12,000 will be transferred from Fund 2830 to Fund 2826.
Fund to be reduced Fund to receive any remaining balance
2830 2019B Wastewater Principle and Interest Fund 2826 2017A Wastewater Principle and Interest Fund
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
37
Rev/Edited 9/8/21
AGENDA ITEM NUMBER: Proposed RESOLUTION NO. 3701
NAME OF PROJECT: Pension Investment Consultant
LOCATION: District Wide
TYPE OF PROJECT: Pension and Retirement Plan Consulting
DEPARTMENT REQUESTING ACTION: Secretary-Treasurer
REQUESTED ACTION:
Why is this action necessary?: This action is necessary to authorize a contract with AON Consulting to
monitor the District’s pension investments and provide investment
advisory services for the District’s Defined Benefit Plan, Deferred
Compensation Plan and Defined Contribution Plan.
What does action accomplish?: This action authorizes a flat fee contract with AON consulting for
investment monitoring and consulting services for the 3rd one year
renewal term with the possibility of 1 more renewal year
SUMMARY EXPLANATION/BACKGROUND:
Contractor: Previous District Contract: N/A
Consultant: AON Hewitt Investment Consulting
200 E. Randolph St., Suite 1500
Chicago, IL 60601
Agency: N/A
Number of Proposers: NA Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A District’s Estimate: N/A
MBE/WBE Participation: 0% (There are no MBE/WBE Goals)
Plan Approval Date: N/A Type of Contract: Flat fee with no % increases for term of contract.
Properties Affected: N/A Properties Benefitting: N/A
Designed by: N/A
FUNDING/COST SUMMARY:
Budgeted: Pension Plan & Secretary-Treasurer Budget Year: 2022/23 Amount: $120,000
Fund Name: N/A
Additional Comments:
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
09/13/2018 - Ord. No. 15006: Ordinance authorizing District to enter into contract with
AON Hewitt Investment Consulting, Inc.
38
Rev/Edited 9/8/21
AGENDA ITEM NUMBER: Proposed Resolution No. 3702
NAME OF PROJECT: MSD’s Mandatory COVID Testing Program
LOCATION: District-wide
TYPE OF PROJECT: N/A
DEPARTMENT REQUESTING ACTION: Board of Trustees
REQUESTED ACTION:
Why is this action necessary?: The Board of Trustees directed Staff to fully implement the MSD
Mandatory COVID Testing Program by November 1, 2021.
What does action accomplish?: Delegates full authority to MSD’s Executive Director to implement and
revise MSD’s Mandatory COVID Testing Program.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: N/A
Consultant: N/A Agency: N/A
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A District’s Estimate: N/A
MBE/WBE Participation: NA
Plan Approval Date: N/A Type of Contract: N/A
Properties Affected: N/A Properties Benefiting: N/A
Designed by: N/A
FUNDING/COST SUMMARY:
Budgeted: N/A Budget Year: N/A Amount: N/A
Fund Name: N/A
Additional Comments: As part of the Metropolitan St. Louis Sewer District’s (MSD) continued commitment to
protecting the workplace during an infectious disease outbreak the District will requ ire all employees to be vaccinated or
provide a negative COVID-19 test weekly as part of the MSD Mandatory COVID Testing Program. The purpose of
implementing the Mandatory COVID Testing Program is to support the continuance of the District’s mission of p roviding
essential services while taking steps to keep our employees safe within the workplace.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
N/A