HomeMy Public PortalAbout10-0167 Investors LLC CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 04-7-2010 PERMIT#: 100167
WORK DESCRIPTION PERMEABLE PARKING AREA
WORK LOCATION 6 TWELFTH TERR
OWNER NAME INVESTORS LLC CHATHAM/TYBEE
ADDRESS ENVIROVAC INDUS
CITY,ST,ZIP SAVANNAH GA 31408-2409
PHONE NUMBER
CONTRACTOR NAME INVESTORS LLC CHATHAM/TYBEE
ADDRESS ENVIROVAC INDUS
CITY STATE ZIP SAVANNAH GA 31408-2409
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 135.00
PROPERTY IDENTIFICATION#
PROJECT VALUATION $15,000.00
TOTAL BALANCE DUE: $ 135.00
It is understood that if this permit is granted the builder will at all times comply with the zoning,subdivision,flood control,building,fire,
soil and sedimentation,wetlands,marshlands protection and shore protection ordinances and codes whether local,state or federal,including
all environmental laws and regulations when applicable,subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent: (9)(b)
P.0.Box 2749-403 Butler Avenue,Tybee Island,Georgia 31328
(912)786-4573-FAX(912)786-9539
www.cityoftybee.org
Received Fax : Mar 29 2010 1:43PM Fax Station : MOCK CONSTRUCTION 1 . 1
'From:CITY OF TYBEE ISLAND 912 786 9539 03/29/2010 13:29 #609 P.001/004
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
l,
Location: �o 7-fre°� g/'3% re PIN #
D,./Lolt ` ' 1(/es ?D -.�/ 7- cy^/
NAME ADDRESS TELEPHONE
•
Owner 4kt-if-A A/I ..ice G 7 15',,,w
/ e44 -tor►r,4t-ce
355-ZS4eer
Architect /t'/4 or Engineer
Building 5-icgf
Contractor
(Check all that apply)
❑ Repair ❑ Residential ❑ Footprint Changes
❑ Renovation ❑ Single Family _ Discovery
❑ Minor Addition ❑ Duplex Demolition
❑ Substantial Addition ❑ Multi-Family
►j Other fp/?%al El Commercial
Details of Project: _7 rJ7 7 /x==.446 ,qi -r a r Z,;„4.1e'FQ
cm
Estimated Cost of Construction: $ /$, err&
Construction Type (Enter appropriate number)
(1 Wood Frame (4) Masonry (6) Other (please specify)
(2) ood &Masonry (5) Steel &Masonry
(3) :rick Venee'
Prop•.ed use:
Remar.s:
ATTAC A ( OPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following 'n'ormation based on the construction drawings and site plan:
#Units . #Bedrooms #Bathrooms
Lot Area Living space(total sq. ft.)
#Off-str-et pa king spaces
Trees located : listed on site plan
Acces•.
Drive, ay (ft.) With culvert? With swale?
Seth.cks: Front Rear Sides (L) (R)
#S'•ries -ight Vertical distance measured from the average adjacent
gr.le of the building to he extreme high point of the building, exclusive of chimneys, heating
un ts, ventilation ducts, at conditioning units, elevators, and similar appurtances.
Received Fax : Mar 29 2010 1:43PM Fax Station : MOCK CONSTRUCTION . 2
•
' From:CITY OF TYBEE ISLAND 912 786 9539 03/29/2010 13:29 #609 P.002/004
During construction:
On-site restroom facilities will be provided through 70A/ '5' 079Nf
On-site waste and debris containers will be provided by ,44 v/ die/ ,
Construction debris will be disposed by - by means of
I understand that I must comply with zoning, flood damage control,building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met, I understand also that a certified plot plan showing elevation must
be attached to this application and that an as-built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: �7 °7 / Signature of Applicant: a" „
Note: A permit normally takes 7 to 10 days to process,
The following is to be completed by City personnel:
Zoning certification NFIP Flood Zone
Approved rezoning/variance?
Street address and number: New Existing
Is it in compliance with City map?
If not,has street name and/or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals: Signature Date FEES
Zoning Administrator Permit
Code Enforcement Officer Inspections _
Water/Sewer Water Tap _
Storm/Drainage Sewer Stub
Inspections Aid to Const.
City Manager
TOTAL J 3S.
Received Fax : Mar 29 2010 1:43PM Fax Station : MOCK CONSTRUCTION . 3
From:CITY OF TYBEE ISLAND 912 786 9539 03/29/2010 13:29 #609 P.003/004
•
mICAO
/ ik
u, AAA Y�
•g"
`
GEORGIA :'
Permit Acknowledgement of
Asbestos/Environmental Notification to Georgia EPD for
Projects Involving Demolition, Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant
permission to the owner, owner's representative, or permit holder to proceed with demolition,
wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project
Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with
the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the
rules. In most cases, the rules require both the owner and the involved contractors to assure the
portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos
Inspector for materials that contain asbestos; and the removal of the asbestos before renovation,
wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is
present in the building. Further guidance for regulatory compliance and contact telephone
numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and
Demolition. Other environmental issues such as asbestos removal techniques, lead abatement,
ground contamination, or unusual site conditions may have EPD regulations that could affect the
project.
Undersigned Date
Printed Name
Office Use Only:
Project Address:
Permit Number:
7.N p ow I F ... B t ,A C H L 0 T N U M •6 E R 7 4
'OP s^ 1
F �._"' MOO' _..._... __ 1 6090• r . . =- ..� •.
1 I<Nr IRS S 70'30'00"1[ 71
I
c _ yl `q, 15-EACH I L 'OT nor NUM $ L' R '7 .LOT •
1 1 I /, /
`PORMCR P.1.Ni j / //% /
'r $ 3 Y-02SOT-69014 ;\ y r-4, �, ,,,,,,/??,/,,.._,,._�Ef�i � ,%' 'LA$1RN
ALOT 'ill I I 9� I. / /,PORYI i9P(j/'//� FORTII:IN'OF
PIN.4.0007-05-000E € J iNY\ I Al I,,,/,//./,i Lr7/i i f1, 4 LOT ZA Er LOT 018133 Apr. ,\. \! • �� I:>j:/ ,///./ /.//'f//i U 4 0, 'v
C TYELEkTL'RRACC I er23.r. \ill• \\ .J;/%�/// wia I'I// /'//I g ,< •
3070 PTere 8 !o;
• PI PHAS TWO 4. I; ,,ar �iP`w.. ' I //'., //' i "° + 'A •
' t° . . . •/ ./
N 10.30,00"V ' N 70.3000•V , / / 55.00•
, B0.3a 69.7 0'7 ., . ::. 1
50 �� _ 10RNER 1.67 LINE _ _ ..'OAE'__ __ /� r�E,�� I MV 1300 LINE M d K n ew[[ruw n _°^� -°° _. is+a �. •-` r�cn:wmoN m 15 i
m.40-xRE NA vN !4 , ',r1 •PSivATE.4N4 I CNr_ 0.3 00 E N
YY 1>036'
r TPS Oa' "J"PRIVAIE;V,ILIIVA'S 03000000 b _ -• Y PRIVATE WALKWAY ENSoNENT' $I
C
ns
OxK4fAe OJ= IOS.60, ^ 'N 70100'°0"V ���J N 70.20'00.v
• 8IE 'A;C H L O T N U M B ER 7'8
0N17N44 v[xiN4 51tprA,0ESiriv.tit, MVN
Fa aros041wsOrezi r,Tx44..wa.
„N1SN 714it.V ti iM16Tx1N t'"
tsx4OT[NPRE.NO s[IlNSif101 OT Rf1.
WOW i. E-0007-0.1-023
DOUR EXx 3Py s ��TY0(%A0
meg EOUWVIf MO.soap-m.01010m suNo1
wr=°a OE:mN °Er NN RNmwo AS—SU]LT SURVEY AND ALOT 'PLA'N OF A i'ROPO 'ED
SWIMMING 'POOL„ POOL DECK, AND PARKING AREA ON .
LOT B •AND THE WESTERN SO FEET OF
' ." LOT ,4 OF -A SUBDIVISION OF BEACH LOT 75 m4„N1u4 uu.�au'u n'n,e,1xv4,90.1
WARD 'NUMBER 4
WY/CPO ,.E9i0RA¢74iPMYMNN AND A PORTION 'O1= A FORM1ER 1,5, "PRIVATE ROAD
or 1444 Wm Ho Na e01 A180000.0
R(00.61305 Of 000020.NN 04,1N; fNa TY6E'E =ISLAND, CHA"HA,'M ;COUNTY, ,GEORGIA u. FOR
a r ANESp..626500 ALAN 'NOOK
` •_0,j.f.'� CHATHAM SURVEYING'SERVICE'S,INC. '_�°
,' r of •A,0 80X'61249 -.04t 1.0O TT
'Iye,N L.A *SAVANNM4 GEORGIA 301E0
912-303-0302 MARC' H 05.2010
el
--.111rf
f f l,4 n •ti �t�� `
Ila
11 cc. DD3/ 0 ek3
t.,rt,.._ . .
. , tii. f, ! , , . t. .,A . s' ' __2:-.11111111111111.111111, . .'r
•= c o.._ Permeable Pavers
ti
•
7
" .t t
M ,
•_ - i,'2� Sizes
'sr Turf-Block-23 5/8"x 15?f<"-31/8"Thick
w •
u.a••• ••--.. .r.e °- - --+ .rte �....-..�
Mn-......w.' --.:",,..•' ,r±+..."`�• yam. ....•. .r. ✓• _ ""•`. - ,
-- .••.-- — -....°-. ^....--. rr!' .r-'- .r^. - ✓ .. -F -• -. . ..+'..-..- r
.nom" ..,n.,.• - •.P"-_ ,..- -- �, r .a+r ... r .,,..._, ? _ "
•
r -... _
.- .. ..f •,.,4 - ..r- .,..- ,..•- - - - -
V.
.'., • ✓-.
`- .rte. r• _ ... � ''*„,0"........'° `,.►�'k
' r " .� -..
' '"- om T ,
..!!.: .rte:° �:'"' •'
i - �.. - .
O`-" 4.10°•. -...°-' • ,.r'-""a
•
.►•
1. ''` ' ..,... '`
,rte' ' " .+ ° `,�k + '
Tres
&>e ,y •.
rte- r; y..- -
// AY/ 1, 'r ..y�'�. P" �' ", 1
/, 4" .ors '.." �' .'
/j R
Ir
f
1
♦ ir x
� atww C ve r Co
,A
88'� 714 trf4 free 866 ri681356 ..