HomeMy Public PortalAbout10-0172 Clarno Realty actogi
CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 04 -8 -2010 PERMIT #: 100172
WORK DESCRIPTION PLUMBING - RELAY SEWER LATERAL
WORK LOCATION 1102 BAY ST
OWNER NAME CLARNO REALTY
ADDRESS 6205 ABERCORN EXT
CITY, ST, ZIP SAVANNAH GA 00000
PHONE NUMBER 354 -8490
CONTRACTOR NAME CITY OF TYBEE
ADDRESS PO BOX 2749
CITY STATE ZIP TYBEE ISLAND GA 313282749
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 0.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $1,900.00
TOTAL BALANCE DUE: $ 0.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
i
Signature of Building Inspector or Authorized Agent: _C _tir4z bib
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
` CITY OF TYBEE ISLAND
BUILDING & ZONING DEPARTMENT
7 ? P.O. Box 2749
Tybee Island, GA 31328
i , 6 � Phone (912) 786 -4573 • Fax (912) 786 -9539
PLUMBING PERMIT APPLICATION
Date L1 , - � 0
Location of work (street address) I k C 2 n u
Contractor e ( p � - 1
Address of Contractor •■
Telephone number of Contractor
Name of Property Owner O I Qr o
Mailing address of Property Owner
Telephone number of Property Owner
Date work will be ready for inspection, if known ^^ Permit Number
Estimated cost of construction 1 R o V i o - D) .' 2-
New Work — Replacement Oil Gas Electric
Backflow Preventor
Disposal Unit
Domestic Water Connection to Main
Drain Roof or Area
Drainage or Vent Piping
Fire Protection Sprinkler System; Number of Heads/Nozzles
Grease / Oil Trap
Hose Bib � r
Hot Water Heater
Icemaker ,
Lawn Sprinkler System
Plumbing Fixture ' I . ,, r .
Residential House Sewer Connection to Main t
Sewer Cleanout ' U
Sewer Stub
Vacuum Breaker
Water Meter
Water Service Line – New Residence
Water Service Line – Replacemept
Water Softener fn.3?
Other P C� /? P Tr-1_1
0 -- -