HomeMy Public PortalAbout10-0220 Chufly, Inc. I -
CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 04-28-2010 PERMIT#: 100220
WORK DESCRIPTION NEW DOORWAY/NEW STAIRS
WORK LOCATION 1311 BUTLER AVE
OWNER NAME CHUFLY INC.
ADDRESS 722 WILMINGTON ISLAND RD
CITY,ST,ZIP SAVANNAH GA 31410-4502
PHONE NUMBER
CONTRACTOR NAME KURTIS SCHUMM(270-952-3474)
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE U
TOTAL FEES CHARGED $ 0.00
PROPERTY IDENTIFICATION#
PROJECT VALUATION $1,000.00
TOTAL BALANCE DUE: $ 0.00
It is understood that if this permit is granted the builder will at all times comply with the zoning,subdivision,flood control,building,fire,
soil and sedimentation,wetlands,marshlands protection and shore protection ordinances and codes whether local,state or federal,including
all environmental laws and regulations when applicable,subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P.0.Box 2749-403 Butler Avenue,Tybee Island,Georgia 31328
(912)786-4573-FAX(912)786-9539
www.cityoftybee.org
:F.F.
rr City of Tybee Island
Community Development Department
M J
't, Occupant Load Limit
rte''�±�n t x:[c+��'�4`�
MAXIMUM LEGAL OCCUPANT LOAD
PERSONS
MINIMUM NUMBER OF APPROVED INDEPENDENT EXITS
ACCESSIBLE TO THIS OCCUPANCY IS ,ZO'
Location I'51
//%tea
This sign must be displayed in a clearly
Ray Hord
visible and conspicuous place, near the Building Inspector
main exit of the business. It shall be City of Tybee Island, Georgia
unlawful to remove or deface this sign. G Z/b
Date
„etr City ( `ybee Island • Community Deve rnent Dept.
! Inspection Report maw*
1 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 ......at v: INTERNATIONAL
"M„•__/ Phone 912.786.4573 ext. 114 • Fax 912.786.9539 CODE COUNCIL
MEMBER
Permit No. /C) ()Z.() Date Requested / i
Owner's Name 14(..)--- Date Needed r
�
////
Gen. Contractor Subcontractor
Contact Information � �
Project Address 671/ /j3L 1-77
Scope of Work /il.iccA./ ! ' ' ;- 7Z_ /csç.
Inspector ----7/q Date of Inspectio Q /v
Inspections f' - /” Pass Fail Fee
Inspection Pass 0 Fail ❑ Fee
Inspection Pass El Fail ® Fee
Inspection Pass ® Fail ® Fee
C
City C /bee Island • Community Devel silent Dept. Mk%
Inspection Report
403 Butler Ave. - P.O. Box 2749 • Tybee Island, GA 31328 ONAL
2.11.11-1
Phone 912.786.4573 ext. 114 • Fax 912.786.9539 INTERN7
CODE COUNCIL
MEMBER
Permit No. I ) (..., _71 (), Date Requested • /// //9
7 i
Owner's Name ( 1/, ,-, --/ Date Needed
I
Gen. Contractor Subcontractor
7
Contact Information -.2 T, 0) i; '- ? -A-
P roject Ad d ress I --7) i 1 173 i-- i r,..TZ..•
t i
Scope of Work k)Pc-1 130(-)77,...
/
iC
Inspector ..-7, 1 Date of Inspection 6 A cir."/
Inspection E.7.7_ Pass El Fail F C--S(--)
,
---------" i
1A-4, 1
•0)-06,--
ci
..._ ,
---\-------e_00, , .
k , (
-- -----r; C'l/
---7 (-, —. __- X-----4 ... r-------4----:(
\ -----7C )IT--'1-f-- Z. --1/..---'r (--.0-T-- --t--"
i)r 14-1Z-
Inspection IE , a s 11:1 Fail le Fee
Inspection Pass 0 Fail 0 Fee
Inspection Pass 0 Fail 0 Fee
^mutt ►���. icc
*, City o' ?bee Island • Community Dever vent Dept. lkA,_;
Inspection Report a���
%i-Y 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 iNr RN irn o-
Phone 912.786.4573 ext. 114 • Fax 912.786.9539 CODE COUNCIL
MEMBER
Permit No. ( ) -' t:,.. Date Requested ; f f '
', / r �i"' r
Owner's Name "? Date Needed :.� - / - / ,
Gen. Contractor Subcontractor ./�
f
Contact Information cJ r 1 • 5 i' .;' " J � 7 -.. El( 4
Project Address / , f t , { PJ"° Ae
f
Scope of Work P e (=.a) d o 0 r 6.` j, / hiAiu •C ( , r 1
Inspector 14 Date of Inspectio ' r .1 ?
r
Inspection i :
CIT`, .F TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
j0 - 0220
Location: 1311 PIN# -�
NAME ADDRESS TELEPHONE
Owner 12--11S Sri!-M"!t\ 11)31 :rue-e--' " 313z45 21D.95'2.3 "7/
Architect
or Engineer
Building
Contractor C o ft-A-3
(Check all that apply)
❑ Repair n Residential C Footprint Changes
Renovation n Single Family ❑ Discovery
n Minor Addition [ Duplex n Demolition
C Substantial Addition El Multi-Family
C Other [ Commercial
4
Details of Project: g�.c�p\6 C,u�i�.�„iJ1' W t tJD O� (6,811Z- � $ ,.
?-4qt—IY-5?-. wi VA �. . D" 46C; ):ADD !JtN3 �T�- s Tb
PscCbC,►blAfr'
Estimated Cost of Construction: $ I/dog
Con' ction Type (Enter appropriate number)
(1) .od Frame 4) Masonry (6) Other(please specify)
(2) Wo+d & Masonry (5) Steel &Masonry
(3) Bric Veneer
Proposed u.e:
Remarks:
ATTACH A C(I ' OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following info .tion based on the construction drawings and site plan:
#Units #Bedrooms #Bathrooms
Lot Area Living space (total sq. ft.)
# Off-str et parking s•.ces
Trees 1•cated &listed o I site plan
Acces
Driv; ay (ft.) With culvert? With swale?_
Set..cks: Front Rear Sides (L) (R)
# .tones Height Vertical distance measured from the average adjacent
ade of the building to the extre e high point of the building, exclusive of chimneys,heating
units, ventilation ducts, air conditio : g units, elevators, and similar appurtances.
During construction:
On-site restroom facilities will be provided through
On-site waste and debris containers will be provided by
Construction debris will be disposed by by means of
I understand that I must comply with zoning, flood damage control, building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as-built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: .(a Signature of Applicant: Wjajti.,
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification NFIP Flood Zone
Approved rezoning/variance?
Street address and number: New Existing
Is it in compliance with City map?
If not, has street name and/or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals: Signature D�j. FEES
Zoning Administrator `• AIM / Permit
Code Enforcement Officer Inspections
Water/Sewer %' Water Tap
Storm/Drainage Sewer Stub
Inspections Aid to Const.
City Manager
TOTAL
Se.avei 10- 2.fl3 _' 5-0
DM Of
LAGIA �„�,,.
Permit Acknowledgement of
Asbestos/Environmental Notification to Georgia EPD for
Projects Involving Demolition, Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant
permission to the owner, owner's representative, or permit holder to proceed with demolition,
wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project
Notification for Asbestos Renovation Encapsulation or Demolition” form in accordance with
the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the
rules. In most cases, the rules require both the owner and the involved contractors to assure the
portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos
Inspector for materials that contain asbestos; and the removal of the asbestos before renovation,
wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is
present in the building. Further guidance for regulatory compliance and contact telephone
numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and
Demolition. Other environmental issues such as asbestos removal techniques, lead abatement,
ground contamination, or unusual site conditions may have EPD regulations that could affect the
project.
—42 ii
Undersigned Date
g-T+S Slilkv M M
Printed Name
Office Use Only:
Project Address:
Permit Number: