HomeMy Public PortalAbout11-0266 Thomas CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 05 -9 -2011 PERMIT #: 110266
WORK DESCRIPTION REPLACE DECK BOARDS
WORK LOCATION 2 MARSH CREEK COVE
OWNER NAME KEN & VICTORIA THOMAS
ADDRESS PO BOX 1998
CITY, ST, ZIP TYBEE ISLAND GA 31328 -1998
PHONE NUMBER
CONTRACTOR NAME THE HANEYMAN
ADDRESS PO BOX 131
CITY STATE ZIP TYBEE ISLAND GA 31328
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 50.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $ 760.00
TOTAL BALANCE DUE: $ 50.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent: 1:2010
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
CITY OF TYBEE ISLAND
A 2c S it oI) c- r Val ve-
BUILDING PERMIT
DATE ISSUED: 05 -9 -2011 S �Z $.�) PERMIT #: 110266
WORK DESCRIPTION DECK BOARDS/BULKHEAD/RIP RAP
WORK LOCATION 2 MARSH CREEK COVE
OWNER NAME KEN & VICTORIA THOMAS
ADDRESS PO BOX 1998
CITY, ST, ZIP TYBEE ISLAND GA 31328 -1998
PHONE NUMBER
CONTRACTOR NAME THE HANEYMAN
ADDRESS PO BOX 131
CITY STATE ZIP TYBEE ISLAND GA 31328
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 91.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $5,760.00
TOTAL BALANCE DUE: $ 41.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tv bee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
y -r City of Tybee Island • Planning & Zoning Dept. t
F
f. Inspection Report ■t
7- 1';' 403 Butler Ave. • P.O. Box 2749 • T bee Island GA 31328
F Y INTERNATII L
�: Phone 912.472.5032 • Fax 912.786.9539 CODE COUNCIL
MEMBER
Permit No. 1/ - 4,26 Date Requested 0 / 10q /i3
Owner's Name it I—to 1 't 5 Date Needed
Gen. Contractor Subcontractor
Contact Information �j�
Project Address Ai gsi-i 6 /, k e0 ii
Scope of Work Deck' 4-40 D' 1 NL.K.'- &'m I RIP All'
Inspector Date of Inspection�
1 %L... I /`
s
Inspection / ,UPYL Pass ®� ❑ Fee
li
A Inspection Pass Fail Fee
p El
Inspection Pass ❑ Fail ❑ Fee
Inspection Pass ❑ Fail ❑ Fee
Dianne Otto
From: Dianne Otto
Sent: Wednesday, May 25, 2011 9:12 AM
To: 'Deb Barreiro'
Cc: savtootall @aol.com
Subject: RE: thomas, #2 marsh creek cove. tybee
Attachments: 4363_001.pdf
Thank you for the email. The applicant needs to increase the scope and value of Tybee permit 11-0266 to
include the bulkhead and rip rap work.
Dianne K. Otto, CFM
City of Tybee Island
phone 912.786.4573 ext. 136
fax 912.786.9539
Original Message
From: Deb Barreiro fmailto :Deb.Barreiro @dnr.state.aa.usl_
Sent: Tuesday, May 24, 2011 3:18 PM
To: Dianne Otto
Cc: savtootall @aol.com
Subject: thomas, #2 marsh creek cove. tybee
the purpose of this email is to inform you that i met onsite and reviewed the proposed project with the
owner of the above referenced property.
as discussed on site,
the applicant proposes to construct a bulkhead seaward of the existing bulkhead.
the bulkhead will tie in with the seaward side of the existing deck.
additional rip rap will be hand - placed immediately adjacent to the seaward side of the improved
structure.
see the attached plan.
call with questions.
thanks
Deb Barreiro
Coastal Permit Coordinator
Georgia Department of Natural Resources
1 Conservation Way, Suite 300
Brunswick, Georgia 31520 -8687
Phone 912.266.3695
FAX 912.756.2561
1
r ..
kl;ri,,:k,0001 .. ,.... ' r y ' ' ' . 4 r r t r
.- M r S ..
r ■ a N ` ✓ 'iii. . ` ti t. • ' l
fir.
i . # ,,, .
,. . '
0 f
. T '! Vi i_ .l
u4 F . y
A- ---F' : D
o �,''� Pr
k' a- C t --/ - tea - tom 6 1
p , C L1SkS p 1�'
� ' ` A �S �,= 1.n a'- -Is -- k_. '= . d e-
CITY OF TYBEE ISLAND, GEOI.GIA
APPLICATION FOR BUILDING PERMIT
0Z (O (° v
I I
Location: 197 r/�o -57417: f T 0Z ✓ li4e S t' PIN #
NAME ADDRESS TELEPHONE
Owner
Fc c 1v r�fii s 2 7/4 "25 11- 7% -_,-y ?
Architect
or Engineer
Building
Contractor l�r' - "IC1
/4„1.1. / 15— - * Tld/-21 :" 'a 7C 0 3 W
(Che that apply)
Repair ❑ Residential
Renovation n Footprint Changes
❑ Single Family ❑ Discovery
_ Minor Addition n Duplex 111 Demolition
n Substantial Addition n Multi- Family
ID Other n Commercial
Details of Project: A f / c x e D e c k & , 2 /)1' G., 4 ( 1 , Q . - b u f k oQ ,J -I--
ri r-a� —
�S o,-,ti 's Vie_..
Estimated Cost of Construction: $ 7 cir5' o0 8
\.,,, ______ l
�cnisrruction Type (Enter appropriate number)
(1) Woo Frame (4) Masonry (6) Other please (pecify)
(2) Woo & Masonry (5) Steel & Masonry
(3) Brick eneer
Proposed u e:
Remarks: /
ATTACH A (0 OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following info ation based on the construction drawings and site plan:
# Units # Bedrooms # Bathrooms
Lot Area / Living space (total sq. ft.)
# Off -stree parking '•aces
Trees loc ed & listed • site plan
Access:
Drivew (ft.) With culvert? With swale?
Setback : Front '.ear Sides (L) (R)
# Stories Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction:
On -site restroom facilities will be provided through ga
On -site waste and debris containers will be provided by A14,uE '1 ✓a�,ti
Construction debris will be disposed by J_ /� c � r `i4 ., by means of ,6 4' 7 7' Pv"?/ '
I understand that I must comply with zoning, flood damage control, building, fire, shore
Protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: = 2 O! ( Signature of Applicant:
5 � � pP _ _ v
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification NFIP Flood Zone
Approved rezoning/variance?
Street address and number: New Existing
Is it in compliance with City map?
If not, has street name and /or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals: Signature Date FEES
Zoning Administrator Permit
Code Enforcement Officer Inspections
Water /Sewer Water Tap
Storm /Drainage Sewer Stub
Inspections Aid to Const.
City Manager
TOTAL
LEAD -BASED PAINT
Adapted from htto: / /www.eoa.00v /lead /cubs /renovation.htm. Please use that site to access the following information.
Information for Property Owners of Rental Housing, Child- Occupied Facilities
Property owners who renovate, repair, or prepare surfaces for painting in pre -1978 rental housing or space
rented by child -care facilities must, before beginning work, provide tenants with a copy of EPA's lead hazard ®;.
information pamphlet Renovate Riaht: Important Lead Hazard Information for Families. Child Care Providers, FYOU'REtVOT
and Schools. Owners of these rental properties must document compliance with this requirement. EPA's sample ' EAD
ore - renovation disclosure form may be used for this purpose. 1ISTURBING
After April 22, 2010, property owners who perform these projects in pre -1978 rental housing or space rented ° • JUST SIX
by child -care facilities must be certified and follow the lead -safe work practices required by EPA's Renovation, SQUARE FEET
Repair and Remodeling rule. To become certified, property owners must submit an application for firm COULD COST YOU
certification and fee payment to EPA. The Agency has up to 90 days after receiving a complete request for ' BIG
TIM
certification to approve or disapprove the application.
Property owners who perform renovation, repairs, and painting jobs in rental property should also:
• Take training to learn how to perform lead -safe work practices.
• Learn the lead laws that apply regarding certification and lead -safe work practices beginning in April 2010.
• Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead -
safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeenino checklist that EPA has
developed to help contractors comply with the renovation recordkeeping requirements that took effect April 2010.
• Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Richt.
• Read about how to use lead -safe work practices in EPA's Steps to Lead Safe Renovation. Repair and Paintina.
Information for Homeowners Working at Home
If you are a homeowner performing renovation, repair, or painting work in your own home, EPA's RRP rule does not cover your project.
However, you have the ultimate responsibility for the safety of your family or children in your care. If you are living in a pre -1978 home
and planning to do painting or repairs, please read a copy of EPA's Renovate Right: Important Lead Hazard Information for Families. Child
Care Providers, and Schools lead hazard information pamphlet. You may also want to call the National Lead Information Center at 1 -800-
424 -LEAD (5323) and ask for more information on how to work safely in a home with lead -based paint.
Information for Tenants and Families of Children under Age 6 in Child Care Facilities and Schools
As a tenant or a parent or guardian of children in a child care facility or school, you should know your rights when a renovation job is
performed in your home, or in the child care facility or school that your child attends.
• Before starting a renovation in residential buildings built before 1978, the contractor or property owner is required to have tenants
sign a ore- renovation disclosure form, which indicates that the tenant received the Renovate Right lead hazard information
pamphlet.
• Beginning in December 2008, the contractor must also make renovation information available to the parents or guardians of
children under age six that attend child care facilities and schools, and to provide to owners and administrators of pre -1978 child
care facilities and schools to be renovated a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child
Care Providers. and Schools lead hazard information pamphlet.
Information for Contractors
As a contractor, you play an important role in helping to prevent lead exposure. Ordinary renovation and maintenance activities can create
dust that contains lead. By following the lead -safe work practices, you can prevent lead hazards. Contractors who perform renovation,
repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning work, provide owners, tenants, and
child -care facilities with a copy of EPA's lead hazard information pamphlet Renovate Richt: Important Lead Hazard Information for Families,
Child Care Providers, and Schools. Contractors must document compliance with this requirement. EPA's ore - renovation disclosure form may
be used for this purpose. Understand that after April 22, 2010, federal law will require you to be certified and to use lead -safe work
practices. To become certified, renovation contractors must submit an application and fee payment to EPA. See: Application for firm
certification. The Agency has up to 90 days after receiving a complete request for certification to approve or disapprove the application.
Contractors who perform renovation, repairs, and painting jobs should also:
• Take training to learn how to perform lead -safe work practices.
• Find a training provider that has been accredited by EPA to provide training for renovators under EPA's Renovation, Repair,
and Painting (RRP) Program. Please note that if you previously completed an eligible renovation training course you may
take the 4 -hour refresher course instead of the 8 -hour initial course from an accredited training provider to become a
certified renovator. Click here for a list of eligible courses.
• Provide a copy of your EPA or state lead training certificate to your client.
• Tell your client what lead -safe methods you will use to perform the job.
• Learn the lead laws that apply to you regarding certification and lead -safe work practices beginning in April 2010.
• Ask your client to share the results of any previously conducted lead tests.
• Provide your client with references from at least three recent jobs involving homes built before 1978.
• Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead -
safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeenino checklist that EPA has
developed to help contractors comply with the renovation recordkeeping requirements.
• Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Richt.
• ad about h to use a!:ssafe work practices in EPA's Steps to Lead Safe Renovation. Repair and Paintina.
r iz'
Signature G` ,, Date
DA V / a7 //% X
Prihted Name
OF
NANRN.
RESOURCESI�.
i!1`r A r
GEORGIA
Permit Acknowledgement of
Asbestos/Environmental Notification to Georgia EPD for
Proiects Involving Demolition. Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant
permission to the owner, owner's representative, or permit holder to proceed with demolition,
wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project
Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with
the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the
rules. In most cases, the rules require both the owner and the involved contractors to assure the
portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos
Inspector for materials that contain asbestos; and the removal of the asbestos before renovation,
wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is
present in the building. Further guidance for regulatory compliance and contact telephone
numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and
Demolition. Other environmental issues such as asbestos removal techniques, lead abatement,
ground contamination, or unusual site conditions may have EPD regulations that could affect the
proj ect.
Undersigned Date
Printed Name
Office Use Only:
Project Address:
Permit Number: