Loading...
HomeMy Public PortalAbout10-0012 Friends of the Tybee Theater CITY OF TYBE I SLAND BUIL P ERMIT DATE ISSUED: 01 -8 -2010 PERMIT #: 100012 WORK DESCRIPTION WNDWS/DOORS /TRANSOM WORK LOCATION 10 VAN HORN OWNER NAME FRIENDS OF THE TYBEE THEATER ADDRESS PO BOX 2356 CITY, ST, ZIP TYBEE ISLAND GA 31328 PHONE NUMBER 786 -0901 CONTRACTOR NAME J T TURNER CONST CO INC. ADDRESS PO BOX 6190 CITY STATE ZIP SAVANNAH GA 31414 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE U TOTAL FEES CHARGED $ 350.00 PROPERTY IDENTIFICATION # PROJECT VALUATION $20,000.00 TOTAL BALANCE DUE: $ 350.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. � Signature of Building Inspector or Authorized Agent: ��._ ✓1' P. 0. Box 2749 -403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org T}{ Result Report P 03/01 /2010 13:47 Serial No. CM35228060004 TC: 164229 Destination 1 Start Time 1 Time 1 Prints 1 Result) Note f 13565615 103 -01 13:46 100:00:16 1001/001 1 OK 1 Nate, TMR: Timer TX. PoL: Polling oR6: on final Size Setting FM Fra Erase Tx, MIX: Mixed Origin TX CALL: M anua l TX CSRC: CSRC FWD: Forward. PC: PC -F ax. BND: Double -Sided Binding Direction. SP: Special on inal� FCODE: F -code. RTX: Re -TX, RVAX: IL: Relay MBX: Fax Confidential. BUL: Bulletin. SIP: SIP Fax, IPADR: IP Address Fax, I -Fnternet Result OK: Communication Olt, S - Olt: Stop Communication, PW -OFF: Power Switch OFF, TEL: RX from TEL, NG: Other Error, Cont: Continue, Na Ans: No Answer, Refuse: Receipt Refused, Busy: Busy, M Full:Memory Full, LOVR :Receiving length Over, POVER :Receiving page Over, FIL :File Error, DC :Decode Error, MDN :MDN Response Error, DSN:DSN Response Error. 3—t — — Co ! S `� —777 }-- ' — g - x-5 ° 73 X / 3 Cv CSTSt OF TYKE ISLAND CITY OF T BEE ISLAND osi.5 e 9‘ 511 7/2.1 . • •_. lt 7:301.1 3.0 60 se IP 21 ' 7 1 9tet r ? -22 -At)- 11/19Jcyr q V'FJO I zr21 )2rx ELs - 93 L " 0 r-n4 Isro • J3 ?r*. a , oJ — E / •• - - - - ---- - • I - N, / c ()\ ( ) . ■ ' -_____.) • .. • ( 7 , ............,. .,, , ..; ..c..,.. ,....: .% • cit of Tyke I4end - Community Developn Dept. \ ......- • • „ , .::...- • • - :,;!: Inspection Report C 4 ......„.... /fa , I ' 403 Butler Ave. • P.O. Boor 2749 • Tybee lalEincI GA 31328 ------ Phone 912.786.4573 ext. 114 - F 412.7786.9539 ____._... 1 , 7 0 ,. (0 • Permit No. 1U -- 0 0 k 2— Date Requested Owner's Name I --f \D ,i1Q, - 7- 0-- • 42 - .7 " -- Date Needed 1 - -- 2, i -- 1 0 i Gen. ContrFick=ar 7.1- 1 , 7 r AZ Subcontractor • Contact Info iZtiO n .- , rr 0 e •-• L. 2- 5 - i‘ 4 g 4 ---T-7 _ Project Adcifeg5 1 ■:-.) V0 ,.. , Scope of Week t ,1 , IA '',"--., ■ t ,) 1 (-) c __< / -- is A • Date of Inspection ")--- - ./ Inspection -4-1 v\ 0 c‘ 5 + ■ IJ L r■ CA '3 (..,--- Pass 1:2 Fai Fee - P It !...0 i 3 - 3a,„1:;;) . - 1 ', --- "t= 0- ) r) Oiii 1 -477 /. ))2, cA re, Y4-- -- " . 7: -. ' ---1 - 44- i 0 — 6):21:::: - ,--).:::-Y PI i —"" I nspection Pass 0 Fail 0 Fee ...._ Ins-pectio n Pass 0 Fail 0 Fee Inspection Pass 0 Fail 0 Fee ! . i' 01- 07 -'10 17: 05 FROM- T -013 P0001/0008 F -076 CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT Location: Q61 7 4102 PIN # 1-P003- - V9 - NAME ADDRESS TELEPHONE owner ' i(A d? /0 Vim l`� I X12 77 '7 Architect lq or Engineer Building t i 7-0 � A v �c��orz b I 2, f t Contractor Cows elteC #') f /4 P17., '4 W (Ch all that apply) Repair ❑ Residential ❑ Footprint Changes ❑ Renovation 0 Single Family ❑ Discovery ❑ Minor Addition ❑ Duplex ❑ Demolition Q Substantial Addition ❑ Multi- Family ❑ Other ❑ Commercial Details of Project: E244 +4M 7 .'il i w /.2 .2:44)454-r /42Z 7;1- /fr' Avefre a ./, . 74 . ` 9Jf Estimated Cost of Construction: $ 2D, 5 e> S, CV ♦ �Imf. D t d 9� z, o Construction Type (Enter appropriate ntymber) °l &is ft Prie 0 (1) Wood Frame (4) Masonry (6) Other (p ease speci ) (2) Wood & Masonry (5) Steel & Masonry (3) Brick Veneer Proposed use Remarks: ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF' LOT and complete the following information based on the construction drawings and site plan: # Units # ,Bedrooms # Bathrooms Lot Area Living space (total sq. ft.) # Off- street parking spaces - - Trees located & listed on site plan Access: Driveway (ft.) With culvert? With swale? Setbacks: Front Rear Sides (L) (R) # Stories Height Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. 01- 07 -'10 17:05 F1OCM- T -013 P0002/0008 F -076 buying construction.: /� On -site restroom facilities will be provided through �"E� orb• On-site waste and debris containers will be provided by AV&_ Construction debris will be disposed by rvr4 by means of I understand that 1 must comply with zoning, flood daznaw control, building, fire, shore protections and wetlands ordinances, FEMA revelations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established, Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. r . Date: ihio Signature of Applicant: '' . ` ' sra. . Note: A nern it normally takes 7 to 10 days to process. Thefollowing is to be completed by City personnel: Zoning certification NFIP Flood Zone Approved rezoning/variance? Street address and number: New Existing Is it in compliance with City map? If not, has street name and /or number been reported to MPC? FEMVIA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) Access to building site Distance to water main tap site Distance to sewer stub site Water meter size _ Storm drainage Approvals: Signature Date FEES Zoning Administrator Permit 1 . Code Enforcement Officer Inspections ( Water/Sewer Water Tap Storm/Drainage Sewer Stub Inspections Aid to Const. City Manager o k oJ4- ky,AN, i4- _- TOTAL d ,J b1t s x2 55 O 01- 07 -'10 17:06 FFOM- T -013 P6003/0008 F -076 MaVitAi. e} a • raEQFi3IA Permit Ackn.owledgennent of Asbestos/Environmental Notification to Georgia rPD for 1" roiects Involving Demolition. Wrecking. or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "project .Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules, In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition, notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory . compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. Undersigned Date "f4,4,11 Printed Name Dce l:Tse Only: Project Address. 'ermit .tt�'umber: 01- 07 -'10 17:6 FROM- T -013 P0004/0008 F -076 REQUIRED FOR: Building Permits Relocation Permits Sign Permits Demolition Permits Land Clearing, Disturbance or Excavation Permits Tree Removal Permits Relocation, Permits Special Review Permits Site Plan Approval Subdivision of Land Sketch Plan Approval Preliminary Plan Approval Final Plat Approval Minor Subdivision Plat Approval Major Subdivision Plat Approval In addition to specific requirements for the above permits and approvals, applicants must demonstrate that they are in compliance with the City of Tybee Island Storm Water Management requirements as outlined in Chapter 5 -4, Code of Ordinances. Section 5 -4 -9 Prohibition provides, in part, as follows: (4.) It is unlawful for any person to cause or permit any storm water to flow from their property onto the property of another person, unless such storm water naturally flowed thereon prior to any development activity. (5.) It is unlawful for any person to interrupt the flow of any storm water runoff from adjacent property onto their property by any development activity. As part of the City's approval process applicants must illustrate how these storm water management prohibitions will be met, including a showing of how storm water naturally flowed on the affected property (prior to any development activity), and what changes in storm water flow have occurred or are expected to occur, as attachments to this form. The City's approval or permit does not guarantee that the applicant's plans will result in meeting requirements. The final product must actually meet the City Ordinance requirements. Applicant name: ras.criar+ Project :1.17.: Attachments approved by: Date: 1 / 7/0 t ( , 01-07-'10 17:06 FROM- T -013 P000b /1000 — 0/b Sound level means the weighted sound pressure level obtained by the use of a sound level meter and frequency weighting network, such as A, B, or C as specified in American National Standards Institute Specifications for Sound Level Meters (ANSI 51.41971, or the latest approved revision thereof). If the frequency weighting employed is not indicated, the A- weighting shall apply. Sound level meter means an instrument which includes a microphone, amplifier, RMS detector, integrator or time average, output or display meter, and weighting networks used to measure sound pressure levels, which complies with American National Standards Institute Standard L4 -1971 as revised, Sound pressure means the instantaneous difference between the actual pressure and the average or barometric pressure at a given point in space, as produced by sound energy. Used and occupied mean and include the words "intended," "designed," or "arranged to be used or occupied." (Code 1583, § 11 -3 -2) See, 22 -111. Exceptions. The provisions of this article shall not apply to (1) The emission of sound for the purpose of alerting persons to the ereistcnce of an emergency. (2) The emission of sound in the performance of emergency work. (3) Agricultural activities, exclusive of those involving the ownership or possession of animals or birds. (4) Public mass transportation vehicles. (5) Church or clock carillons, bells, or chimes, (6) The emission of sound in the discharge of weapons or in fireworks displays for which a permit has been issued. (7) Public works projects specifically approved by the mayor and council. (Code 1983, § 11 -3 -3) See. 22-112. Noise disturbance prohibited, (a) Prohlbfied No person shall make, continue, or cause to be made or continued, except as permitted, any noise disturbance, or any noise in grease o£ the limits for such noise established in this section, (b) Maximum permissible Spend levels. With the exception of sound levels elsewhere specifically authorized by this article, table 1 sets forth the maximum permissible sound levels allowed at or within the real property boundary of a receiving land use Any activity or use that produces a sound in access of such noise levels for a receiving land use shall be deemed a noise disturbance and is in violation of this article. (c) Measurement of sound, The measurement of sound or noise shall be trade with a sound level meter meeting the standards prescribed by the American National Standards Institute or its successor body. The instrument shall be maintained in calibration and good working order. Octave band oorrections may be employed in meeting the response specification. A calibration check shall be made of the system at the time of any noise measurement. Measurements recorded shall be taken so as to provide a proper representation of the noise source. The microphone used during measurement shall be positioned so as not to create any unnatural enhancement or diminution of the measured noise. A windscreen for the microphone shall be used when required. Traffic, other transportation noise sources and other background noises shall not be considered in taking measurements except where such background noise interferes with the primary noise being measured, It is the intention that this sound to be measured is what is being created by the sound complained of excluding intruding noises from isolated identifiable sources, but including ambient sound level. The measure of all sound levels shall be made as close to the property line of the receiving land use as is practical. TABLE 1 Sound Levels by Receiving Land Use Zoning twutegaryof Receiving Land Time Use Sound Level Limit,dBAt ° a 1 esidemial At all times 60 Commercial At all times 75 Noise Sensitive Area At aIl times 55 (1) As at forth in the Land Development Code, (2) Any zoning district containing the letter "R." taa Unless otherwise stated in this article. tal lror any source of sound which emits a pure tome:, the, maximum sound level limits set shall be reduced by five dRA, (d) Equipment use restrictions. Regardless of decibel levels, the following equipment may not be operated between the hours of &O0 p.m. and 7:00 a.tn.: Monday- Friday and on Saturday and Sunday 8:00 p.m. to 10 :00 a,m„ (1) Electrical power tools. (2) Motor powered, muffler equipped lawn, garden, and true trimming equipment except residential lawn mowers_ (3) Construction equipment, which includes tandseaper's lawn mowers and other landscaping motorized equipment. (Code 1983, § 11 -3-4; Ord. of 4-29-2005; Ord, of 7-26-2007) 01-07-'10 17:06 FROM- T -013 P0006/0008 F -076 TIKE CODE OF TYI3EE ISLAM), GEORGIA ARTICLE IV. NOISES Sec. 22-110. Definitions, Definitions of technical terms used which are not herein defined shall be obtained from publications of acoustical terminology issued by the American National Standards Institute (ANSI) as its successor body_ The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning: Ambient sound levet means the noise associated with a given environment, exclusive of a particular noise being tested,. being usually a composite of sounds from many sources near and fax, exclusive of intruding noises from isolated identifiable sources. A - weighted sound level means the sound pressure level in deoibels as measured on a sound level meter using the A- weighting network, The level is designated dfi(A) or dBA, Construction means any site preparation, assembly, erection, substantial repair, alteration, or similar action, for or of public or private nights -of -way, structures, utilities, or similar property. Decibel (dB) means a logarithmic and dimensionless unit of treasure aged in describing the relative loudness of level of sound, Demolition means any dismantling, intentional destruction or removal of streetores, utilities, public or private right-of-way surfaces, or similar property. Emergency means any occurrence or Set of Circumstances involving actual or imminent physical or psychological trauma or property damage which demands immediate action. Emergency work means any work performed for the purpose of alleviating or resolving an emergency. Impulsive sound means a sound of short duration, usually less than one second, with an abrupt onset and rapid decay, Examples of sources of impulsive Sound include explosions, drop forge impacts, and the discharge of firearms. Motor vehicle means any motor-operated vehicle Licensed for use on the public highways, but not including a motorcycle_ Motorboat means any vessel which operates on water and which is propelled by a motor, including, but not limited to, boats, barges, amphibious craft, water ski towing devices and hover craft. Motorcycle means any motor vehicle having a saddle or seat for the use of the rider and designed to travel on not more than three wheels ip contact With the ground. The terns shall include, but not be limited to, motorized bicycles and motor scooters. Noise means any sound which disturbs humans or which causes or tends to cause an adverse psychological or physiological effect on humans. Noise control officer means the parson designated by the city having responsibility for the enforcement of any provision of this article, Noise disturbance means any sound which endangers or injurea the welfare, safety or health of human beings, or disturbs a rcaonable person of normal sensitivities, or devalues or injures personal or real property, or is hereinafter defined, Noise sensitive activities means activities which should be conducted under conditions of exceptional quiet including, but not limited to, operation ofsohools, libraries open to the public, churches, hospitals, and nursing homes. Noise sensitive area means any area designated for the purpose of ensuring exceptional quiet and clearly posted with "noise sensitive area" signs, because of the noise sensitive activities conducted therein. Person means any individual, partnership, firm, association, joint venture, public or private corporation, trust, estate, commission, board, public or private institution, utility, operative, state agency, municipality or other political subdivisions of this atate, any intetatate body, or any other legal entity, Powered modal vehicle means any self-propelled airborne, waterborne, or land borne model plane, vessel, or vehicle, which is not designed to carry persons, including, but not limited to any model airplane, boat, car or rocket. Public right - - way means any street, avenue, boulevard, highway, sidewalk, lane or similar place which is owned or controller] by a governmental entity_ Public space means any real property, including any structure thereon, which is owned or controlled by a governmental entity_ Pure tone means any sound which can be diatinctly heard as a single pitch or a set of single; pitebes. Real properly boundary means an imaginary line along the ground surface, and its vertical extension, which separates the real property owned by one person from that owned by another person, but not including intra - building real property divisions. Receiving land use means the use or occupancy of the property from which a complaint is made concerning noise which received the transmission of sound as hereinafter defined, however, the allowable decibel levels are based on the zoning district as opposed to the use of the receiving land. Recreational vehicle means any race car, motorcycle, or any other motorized vehicle equipped for use in racing or other recreational events or uses off ofpoblie rights -of -way on public or private property_ Residential means any property on which is located a building or structure used wholly or partially for living or sleeping purposes. Sound means an oscillation in pressure, particle displacement, particle velocity or other physical parameter, in a medium with internal forces that cause compression and rarefaction of that medium. The description of sound may include any characteristic of such sound, including duration, intensity and fr equ ency. 01- 07 - '10 17:07 FROM- T -013 P0007/0008 F -076 A, Ductile Iron Pipe - Shall conform to ANSI /AWWA C150/A21.50 latest revision and ANSI /AWWA C151/A21.51 latest revision for laying condition two. Al) pipe shall be cement lined in accordance with ANSI/AWWA C104/A21.4 Idlest revision. -All Pipe larger than 12 inches shall be ductile iron unless PVC is tnecifically allowed by the City. 1.05 GATE VALVES D. Valve Manhole - Gate valves -4'=- Viand larger shall be installed in a manhole. Gig valves se and Lerner within oavement shall be installed in a rnanhnle. 2.01 INSTALLATION 4. Depth of Pipe - The Contractor shall perform excavation of whatever substances are encountered to a depth that will provide a minimum cover over the top of the pipe cf 36- inches from the existing or proposed finished grade, for pipe 12- inches end smaller. Pipe Larger than 12- inches in diameter shall have 3648- inches of cover from the finished grade. A minimum coyer of 33" lirtchesLeele cover of 60" (inches) Hat& ). from finished grade shall be accented as withiejolerance erseel unless approved by the City to avoid a conflict. If the design cover will be less than 36 ", duct iron pipe mee_leee City ehall be used, ?d dine shaft h ner spec ceetpns intf, stry association stendarele or reenetegerere recommendations, whichever is amen. 2.05 PROCEDURES FOR CONNECTIONS OF WATER MAINS: B. Procedure 6. If a wet tap is required, the contractor will be responsible for preparing the site. This preparation includes the excavation and installation of the tapping sleeve. The contractor will make available a lifting device for the Lapping machine and at least a 100 CFM Alr Compressor to power the tapping machine. The City c'.nntfaetor will provide the tapping machine and eee-meer Personnel to operate the unit. All taps will be made under the supervision of the City of Tybee Island Water Department, SECTION 02554 - WASTEWATER COLLECTION SYSTEM 2.12 MANHOLES d,, Fe 0- deg. The drop the_gh manhniesshall be equal to the steepest nereentaoe of the u; em _and ieloyeeetregm lines matte used at the discretion of the City of Tybee Island.. Horizontal alignment Changes greater than 90 degrees at a single manhole shall not be allowed. A wide sweep invert shall be required for all manholes where the horizontal alignment change is 90 degrees, Section 03300 CAST -IN- PLACE CONCRETE CHAPTER 1, - GENERAL 1.1 -Scope 1.3- Design of Concrete Structures shall be performed and stamped bye Professional Engineer registered in the State of Georgia, In no Instance shall a concrete sidewalk be less than 4" thick nor a driveway less than 6" thick. The Engineer shall refer to City of Savannah Standard Construction Details for minimum design requirements of various structures, CHAPTER 3 - PROPORT'IONING 3.2 -Strength The specified compressive strength of the concrete (f c) for each portion of sidewalks and curb and gutters shall be a minimum of no 4,000 psi unless a greater strength requirement is indicated on the contract drawings or herein. Driveway and road paving shall have a compressive strength of not less than 5000 psi. Strength requirements shall be based on 28 -day compressive strength unless a different test age is specified- The compressive strength of the concrete shall be determined by ASTM C39. CHAPTER 5 - REINFORCEMENT e.7- Sidewalks shall be reinforced by one of the following methods: _ -; - - - ... • " . -- - - . ; - _ - - ; . Minimum size of mesh shall be 6 "x6" - W2.9 x W2,9, 5.7.2- Concrete shall be fiber reinforced. 5.7.3 - Deformed reinforcing bars providing no less than 0.25 square inches per foot (each way). SECTION 11100 - SUBMERSIBLE WASTEWATER. PUMPS 5 -25 HORSE POWER DUPLEX ACROSS THE LINE MAGNETIC PART III — ih'INAL INSPECTION 3.01 FINAL INSPECTION / ACCEPTANCE B. Dry Pumping Test: T- effea-witt-t.4 ec -- - -- The pump will be tested by both a Facility Test and a Site Test. 01-27-'10 17:07 FROM- T -013 F0008/0008 F -07b SPECIAL CONDITIONS All work shall conform to the City of Savannah Technical Specifications except as stated in these Special Conditions. The City of Savannah Technical Specifications are available online at the City of Savannah web site. Where in Conflict, these Special Conditions shall govern. GENERAL • Engineer refers to both the Engineer for the project and the City of Tybee Island's Engineer. Justifications of the Engineer's approval inciuding but not limited to required testing shall by submitted to the City of Tybee Island prior to the City of Tybee Island issuing concurrence. Where requirements differ from those stated in the GASWCS "Green Hook ", the stricter Will govern. AU Communications required of the departments referenced in the City of Savannah ordinances will be submitted to the following City of Tybee Island Departments; 1) Department of Planning, Zoning & Economic Development 2) Public Works 3) Water & Sewer Time of notification to the City of Tybee Island excludes: 1) Any and all federal, state, county and city holidays. 2) Weekends 3) Times of community alerts or disasters including, but not limited to, tropical storm and hurricane alerts, periods of rainfall exceeding the 25 year storm as determined by the City of Tybee Island and the following two weekdays. Tim of notification to the State Department of Transportation and other departments is the minimum. Such time of notification may be greater if required by those agencies, All text for signage and markings shall be submitted to the City of Tybee Island for approval. All materials will be domestic. Imported materials shall be allowed only after the City of Tybee Island approves a written request from the Ciwner's agent. SECTION 02100 CLEARING / PART 2 — EXECUTION / 2.05 EXISTING TREE PROTECTION / A, SITE DEVELOPMENT PROTECTS Tree Quality Points as defined in the City of Savannah Specifications are not required. SECTION 02100 CLIE:ARING 1 PART 2 — EXECUTION / 2.05 EXISTING TREE PROTECTION / A. SITE DEVELOPMENT PRO3ECTS. • The following requirements pertain - ' - _ - - r • - • - • - -- , • • - • ' - _ • .. • .. : o all protects. SECTION 02270 - EROSION AND SEDIMENTATION CONTROL Where requirements differ from those stated in the GASWCS "Greed Took ", the stricter will govern. SECTION 02400 - STORM DRAINAGE 2,18 TELEVISING; After the completion of cleaning, al! constructed storm lines must be teleVised e-Gity prior to acceptance, Accordingly, atl storm lines that are installed - - - • - • • : • - will be televised, - ' . - -' t 4M tr y.. r: r a te 1 e ,.;,-,i iig :. _ - • - • ,.. �....°,. v- cc�cvTam Details aria procedures of this program are included in the "Televising Procedures Manual" developed by the City's Water Quality Control Department who will be providing the television services. Contractors will be responsible for becoming familiar with this manual and for the costs of televising. The City may waive the teleyjsing requirement if the lines are short.uah and of a_dlameter thatdow5 vjsu InsoertiQn by {arming. SECTION 02550 - WATER DISTRIBUTION SYSTEM / PART 1 - PRODUCTS L01 PIPE: