HomeMy Public PortalAbout10-0017 Gatti F ♦U -
d
iG
CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 01 -12 -2010 PERMIT #: 100017
WORK DESCRIPTION FLOORNG /CABINTS/MLDING/MISC -1^ s '4/
WORK LOCATION 29 MEDDIN DR 6a�
r� P� 06 (3eC a ra ► 1 +P 3
OWNER NAME PAUL GATTI 1 C f
ADDRESS 131 PARKS RIDGE
CITY, ST, ZIP DUBLIN GA 31021
PHONE NUMBER 478 - 275 -9669
CONTRACTOR NAME PAUL GATTI
ADDRESS 131 PARKS RIDGE
CITY STATE ZIP DUBLIN GA 31021
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 60.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $5,600.00
TOTAL BALANCE DUE: $ 60.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
12 ,4444 2 . )
e
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
Dianne Otto
From: Paul Gatti [pgatti55 @gmail.com] °
Sent: Tuesday, July 05, 2011 9:55 AM
To: Dianne Otto �� S
Subject: Re: inspection AO
W
Ms Otto
It was my understanding that Ray inspected and signed off on this at the same time he came for the new doors
(1 upstairs and 1 downstairs) several months ago. Please let me know if this can be verified in your files. If
another inspection is needed, I'm planning to be on the island the week of 7/18. How much notice is needed to
schedule?
Paul Gatti
Sent from my iPad
On Jun 29, 2011, at 11:18 AM, Dianne Otto <Dotto@citvoftvbee.or> wrote:
Mr. Gatti,
The work that was done under building permit 10 -0017 / 29 Meddin Drive has not
been inspected. The permit included flooring, cabinets, molding, faucets, ceiling
fans, and deck repairs. The inspector will need access to the interior of the
house. Please reply by email or telephone (see below) to schedule the
inspection.
Thank you,
Dianne K. Otto, CFM
City of Tybee Island
phone 912.786.4573 ext. 136
fax 912.786.9539
This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are
addressed. If you are not the named addressee you should not disseminate, distribute or copy this e -mail. Please notify the sender
immediately by e -mail if you have received this e -mail by mistake and delete this e -mail from your system. Please note that any views or
opinions presented in this email are solely those of the author and do not necessarily represent those of The City of Tybee Island. The
1
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
4'•
•
�
�
Location: 6? MOP/ /4 l7I ' 7 6' LA PIN #
NAME ADDRESS TELEPHONE
Owner I i 4v L GA>� at /24..e...5 �� *7g or
b ti .b/!d CstA 3/02/
Architect (0g)290-F07,
or Engineer NV,4
Building Of p W. sr& 'max t atyt,
Contractor !U
(Check all that apply)
® Repair ® Residential ❑ Footprint Changes
74 Renovation IN Single Family ❑ Discovery
❑ Minor Addition ❑ Duplex ❑ Demolition
❑ Substantial Addition ❑ Multi- Family
❑ Other ❑ Commercial
Details of Project: Ft.d o Ro l . 01 ,6/diTS 5A-SE 7140 (-7)/rf(p F.40CE 75 6 Pt.+I e;)
CEO z tNC'a pA Ni S (Rt P1-Act n e RFMO v;
oo
Estimated Cost of Construction: $ Sb o 0 '�
Construction Type (Enter appropriate number)
(1) Wood Frame (4) Masonry (6) Other (please specify)
(2) Wood & Masonry (5) Steel & Masonry
(3) Brick Veneer
Proposed use:
Remarks:
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following information based on the construction drawings and site plan:
# Units # Bedrooms # Bathrooms
Lot Area Living space (total sq. ft.)
# Off-street parking spaces
Trees located & listed on site plan
Access:
Driveway (ft.) With culvert? With swale?
Setbacks: Front Rear Sides (L) (R)
# Stories Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction:
On -site restroom facilities will be provided through *BA'alleocrAA r N 00 USA
On -site waste and debris containers will be provided by Ci riER
Construction debris will be disposed by 0 wit Ea, by means of C't•tybo *.if/ra•r• vt:ttA.
I understand that I must comply with zoning. flood damage control, building, fire, shore
Protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
-
Date: 1/U t t 11 o Signature of Applicant:
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification NFIP Flood Zone
Approved rezoning/variance?
Street address and number: New Existing
Is it in compliance with City map?
If not, has street name and/or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals: Signature Date FEES / 3
Zoning Administrator Permit "T
Code Enforcement Officer Inspections 11
Water /Sewer Water Tap
Stoma/Drainage Sewer Stub
Inspections Aid to Const.
City Manager
TOTAL _�
MUM
t
GEORGIA
Permit Acknowledgement of
Asbestos/Environmental Notification to Georgia EPD for
Projects Involving Demolition. Wrecking. or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant
permission to the owner, owner's representative, or permit holder to proceed with demolition,
wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project
Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with
the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the
rules. In most cases, the rules require both the owner and the involved contractors to assure the
portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos
Inspector for materials that contain asbestos; and the removal of the asbestos before renovation,
wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is
present in the building. Further guidance for regulatory compliance and contact telephone
numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and
Demolition. Other environmental issues such as asbestos removal techniques, lead abatement,
ground contamination, or unusual site conditions may have EPD regulations that could affect the
project.
//// //.0
Undersigned Date
Printed Name
Office Use Only:
Project Address:
Permit Number:
LEGAL NOTICE
CITY OF TYBEE ISLAND
PERMIT IDI7
WHEREAS, VIOLATIONS OF THE CODE OF THE CITY OF
TYBEE ISLAND HAVE BEEN FOUND, NOTICE IS HEREBY
GIVEN IN ACCORDANCE WITH THE ABOVE CODE THAT
ALL PERSONS CEASE, DESIST FROM AND
STOP WORK
AT ONCE ON ANY CONSTRUCTION, ALTERATION, REPAIR,
R FURTHER USE OF THESE PREMISES KNOWN AS
UNTIL THE VIOLATION HAS BEEN CORRECTED AND
APPROVED BY THE CITY OF TYBEE ISLAND.
ALL PERSONS ACTING CONTRARY TO THIS NOTICE OR
REMOVING OR MUTILATING IT ARE LIABLE TO SUMMAR
ARREST UNLESS SUCH ACTION IS AUTHORIZED BY THE
CITY OF TYBEE ISLAND.
DATE PHONE = i
* s
lb INSPECTOR of.
Vatigk 4 " r OCCSPE
01/11"