Loading...
HomeMy Public PortalAbout10-0018 Marine Science Center CITY OF TYBEE ISLAND BUILDING PERMIT DATE ISSUED: 01 -15 -2010 PERMIT #: 100018 WORK DESCRIPTION INCREASE SIZE OF DOOR OPENING WORK LOCATION 1510 STRAND OWNER NAME MARINE SCIENCE CENTER ADDRESS 1510 STRAND CITY, ST, ZIP TYBEE ISLAND GA 31328 PHONE NUMBER CONTRACTOR NAME BARRY A BROWN CONSTRUCTION CO ADDRESS 1106 E 59TH ST CITY STATE ZIP SAVANNAH GA 31404 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE U TOTAL FEES CHARGED $ 0.00 PROPERTY IDENTIFICATION # PROJECT VALUATION $1,300.00 TOTAL BALANCE DUE: $ 0.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether Local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: QJ) - P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org r y 7 - N ( City of T -ee Island • Community Develornt Dept. 51111‘, i■Y s 0) Inspection Report musk irum. \ifti.z/ 403 Butler Ave. • P.Q. Box 2749 • Tybee Island, GA 31328 INT770NAL , Phone 912.786.4573 ext. 114 • Fax 912.786.9539 CODE COUNCIL MEMBER Permit No. 1 0 - 00 i c ( c Date Requested *wner's Name /II al i r\R„, 5c , enc c 0-r, Date keeded Gen Contracto2Gr /f oc. ...)," C3Y - 1. Subcontractor 7 6 Contact Knforrnat / ilon -- a c 3 o Project ress i 5 I 0 S4 r „a Scope of Work I (\Cr COSQ-) 5 2- e- D-C door n q Inspector 1 / Date of Inspection rf 9 TS' inspection r o i P c__" 4 , A 0 I Pass E . ail 0 Fee inspection Pass 0 Faii - 0 Fee Inspection Pass El Fail 0 Fee Inspection Pass 0 FaH 0 Fee CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT D I Location: /; 5 Tp p iv c' 4,/e. PIN # NAME ADDRESS TELEPHONE Owner e ify of Tydee A4 /IAR /NP Ct0= P Cp e Architect or Engineer AIM Building 5 i - 4 • `URacve. 821 Fr 2 s.r 572 eT '714 '79 /4 Contractor C b's7 cu NC.. ice. �3.o,r 2S /mow.D - - - (Check all that apply) n Repair I 1 Residential Footprint Changes Renovation 1 Single Family n Discovery n Minor Addition 1 Duplex 1 1 Demolition 1 1 Substantial Addition Multi- Family [ Other L.— Commercial Details of Project: / / em &v,". • E/a ck d- l Avc R P. s e 17t-e f.J, D f Dive 0 D/2 One/0. Estimated Cost of Construction: $ 3 OD. ± Construction Type (Enter appropriate number) (1) Wood Frame (4) Masonry (6) Other (please specify) (2) Wood & Masonry (5) Steel & Masonry (3) Brick Veneer Proposed use: Remarks: ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the following information based on the construction drawings and site plan: # Units # Bedrooms # Bathrooms Lot Area Living space (total sq. ft.) # Off - street parking spaces Trees located & listed on site plan Access: Driveway (ft.) With culvert? With swale? Setbacks: Front Rear Sides (L) (R) # Stories Height Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. During construction: On -site restroom facilities will be provided through /WA On -site waste and debris containers will be provided by All 4 Construction debris will be disposed by /L/,d by means of p. / � I understand that I must comply with zoning, flood damage control, building, fire, shore protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that 1 must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date: / - /V- /0 Signature of Applicant: 40 _ _ f i ��,____ �✓` Note: A permit normally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification NFIP Flood Zone Approved rezoning /variance? Street address and number: New Existing Is it in compliance with City map? If not, has street name and /or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Stolin drainage Approvals: Signature Date FEES Zoning Administrator /—� / _ Permit _ Code Enforcement Officer --' //)S7/c., Inspection W ater /Sewer � ` Water Tap n A u Storm /Drainage Sewer Stub Inspections Aid to Const. y ,i, /".? City Manager / ('•°� a5 - TOTAL \ DEPT. NATURAL A-9k MERMEN GEORGIA K ,n) / Permit Acknowledgement of Asbestos /Environmental Notification to Georgia EPD for Proiects Involving Demolition. Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. - 2/ -- L�lndersigd Date / "- . "° ,zic� 4 ?2e5. `rinted N4me Office Use Only: Project Address: Permit Number: