Loading...
HomeMy Public PortalAbout10-8088 Change Order for Sherbondy Village Sponsored by: City Manager RESOLUTION NO. 10-8088 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF OPA-LOCKA,FLORIDA, APPROVING A CHANGE ORDER FOR THE CONSTRUCTION CONTRACT FOR SHERBONDY VILLAGE COMMUNITY CENTER,CONFIRMING THAT CBHC,LLC, HAS AGREED TO UNDERTAKE RESPONSIBILITY FOR THE CONSTRUCTION PHASE DESIGN SERVICES FOR THE SHERBONDY VILLAGE COMMUNITY CENTER PROJECT, INCLUDING ALL RESPONSIBLILITY FOR SUBMITTAL REVIEW,RFI RESPONSES,COORDINATION OF REVISIONS TO THE DESIGN DRAWINGS, INCORPORATION OF CHANGES INTO THE DESIGN DRAWINGS AND FINAL REVISIONS AND AS BUILT DRAWINGS,WITH THE CITY CONTRACT ALLOWANCE OF $75,000.00 REALLOCATED TO PAY FOR THE SERVICES; PROVIDING FOR INCORPORATION OF RECITALS;PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the current plans for Sherbondy Village Community Center require certain revisions, both to adapt the building to a Silver Certified Green building, and to correct certain deficiencies in the original plans; and WHEREAS, the City of Opa-locka has terminated their agreement with the previous project Architect; and WHEREAS, the City of Opa-locka has retained CBHC,LLC,as contractor,to complete the project; and WHEREAS, CBHC, LLC has agreed to undertake the additional responsibility of construction phase design services for the Sherbondy Village Community Center project,including all responsibility for Submittal Review, RFI responses, coordination of revisions to the design Resolution No. 10-8088 drawings, incorporation of changes into the design drawings and final revisions and as built drawings, at a cost of Seventy Five Thousand Dollars ($75,000.00): NOW,THEREFORE,BE IT DULY RESOLVED BY THE CITY COMMISSION OF THE CITY OF OPA-LOCKA,FLORIDA: Section 1. The recitals to the preamble herein are incorporated by reference. Section 2. Change Order number 0001, submitted to the City of Opa-locka by CHBC, LLC,is hereby approved,and CBHC,LLC,shall undertake responsibility for the construction phase design services for this project, including all responsibility for Submittal Review, RFI responses, coordination of revisions to the design drawings,incorporation of changes into the design drawings and final revisions and as built drawings. The City contract allowance of$75,000 will be reallocated to pay for these services. The City Manager is hereby authorized to execute Change Order No. 0001 in substantially the form attached hereto. Section 3 This resolution shall take effect immediately upon adoption. PASSED AND ADOPTED THIS 23 day of June,2010. •S:PH . KEL► Y M- YOR Attest to: Deborah S. Irby City Clerk Resolution No. 10-8088 Approved as t e form and legal sufficiency: r•IT //11pp i �'I/1 • _ osI S. Geller Cit Attorney Moved by: JOHNSON Seconded by: HOLMES Commission Vote: 5-0 Commissioner Holmes: YES Commissioner Johnson:YES Commissioner Tydus: YES Vice-Mayor Taylor: YES Mayor Kelley: YES 1492649 vl City of Opa Locka CHANGE ORDER 780 Fisherman Street No. 00001 4th Floor Opa Locak,FL 33054 TITLE: Construction Phase Design Services DATE:4/22/2010 PROJECT:Sherbondy Village Community Center JOB: 10-160-000 TO: CBHC, LLC. CONTRACT NO: 2 2251 Blount Road Pompano Beach, FL 33069 ATTN: Michael C Taylor RE: To: From: Number: DESCRIPTION OF CHANGE This Change Order will confirm that CBHC has agreed to undertake responsibility for the construction phase Architectural and Engineer services for this Project,including all responsibility for Submittal Review,RFI responses,coordination of revisions to the drawings, incorporation of changes into the drawings and final revisions and as built drawings. The City Allowance of$75,000.00 will be reallocated to pay for these services. It is our understanding that you have terminated your agreement with the project Architect who will be giving a release of the drawings so that we may employ a successor design professional to undertake the responsibilities referenced above.Once you have the release and the electronic files for the project drawings,please let us know so that we can get the successor architect involved. The Original Contract Sum was $3,760,000.00 Net Change by Previously Authorized Requests and Changes $0.00 The Contract Sum Prior to This Change Order was $3,760,000.00 The Contract Sum Will Not be Changed $0.00 The New Contract Sum Including This Change Order $3,760,000.00 The Contract time will be increased by Days or will be determined at a later date The compensation and completion time allowed by this Contract Modification does not include any amounts for changes in the sequence of work,delays, disruptions,rescheduling,extended overhead,acceleration,and/or impact cost,and the right is expressly reserved to make claim for any and all of these and related items of cost prior to final settlement of this Contract. ACCEPTED: ACCEPTED: CBHC,LLC. City of Opa Locka By: By: Michael C Taylor Clarance Patterson Date: 531" Date: