HomeMy Public PortalAbout10-0058 Schneider City of( )4ee Island • Community Develo,,_,Dent Dept. iti%
L4 Inspection Report ����
/ E�""
403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328
nnrx.�iint+/
Phone 912.786.4573 ext. 114 • Fax 912.786.9539 CODE COUNCIL
MEMBER
■
Permit No. ! ■ �' _i `'� Date Requested 0 - I '0 — I C
J
Owner's Name cc k e , Date Needed- 1 I t 0
Gen. Contractor V n r,Q.oy C 3 x.54 Subcontractor
Contact Information 'J I,, 1 a +4 .�-e-- -6 I S - 0 (, 0
i c4 Project Address ) i 01 - ,j 4 ra r ct
Scope of Work , ) ! c 011) ( H c,_) 10-)t_) 1r-) //
Inspector i' Date of Inspections , ///
D
Inspections i)r r>rr-- s" (,�, i Pass 1 Fail ® Fee
i
IPSS
-t-
Inspection Pass ® Fail ❑ Fee
Inspection Pass ❑ Fail 0 Fee
Inspection Pass 0 Fail ❑ Fee
Cl
i 4 0 A o -/- l : rz-'ILK 447 5 P45-e ,t, - 6
2:2;s4
-eity of Tybee Island Community Development Dept. P
rzwarra
. Inspertion Report
14:b..ra.'sit4
403 Butler Ave. - P.O. Box 2749 - Tybee Island, GA 31323 .1.,d;;*i•
Phone 912.786.4573 ext. 114 - Fax 912.7345.9539
VI:5 ER
Permit No. JJ 1 . a 6 Date Requested 11-
Owner's Name_ Date Needed (-)
Gen. Contractor Subcontractor
Contact I nf rm at ion I),k)4-t-i f -
Project Address I I 0 I
Scope of Work rola-I-I f .-Pa:--)
77-
Inspector 2 f1 Date of Inspection _
Inspection 1 Pass Fail n Fee )IF
0
07)
i,\J /63,0
Inspection_ Fail Fee
Inspection Fail Fee
Inspection_ Pass Fail Fee
'-...../ ,.:
Itti
City of Tybee Island • Community Development Dept. . i
Inspection Report girg,
403 Butler Ave„ • P.O. Box 2749 • Tybee Island,. GA 31328 r.2141 x PIA
:.1....C;d :'
Phone 912.786.4573 ext. 114 = Fax 912.786.9539
...........-
:k*,EtAlii.:!4.
Permit PO. V L..) - 03 .:3 "IS' Date Requested
,.-.....Th
Owner's Name ,--, 0._ r\ r‘ 3.-(9....7" Date Needed Li - I - I
—
--T-,
Gen. contractor i , 9 r\JLQY Subcontractor Q. S.,- 0 4,..1 r
Contact information ,
‘....„ok..:4 J.:: ,,..) -3 E (.....) i- - o - •QC
...„ ,
Project Address \ 13 I - T4 irr\c: -
1
Scope of Work I--1/4,,.-,) r c \--,, i.,...., ,-, c 1 D.,.,---,,.; 1 C...) .
I Inspector i Date of inspection . ,Zie4 • /4')
Inspection 7 ' J ') k -e. e c Pass 71 Fay Fee
! .
Inspection_ Pass 0 Fail Fee
Inspection•_ Pass 0 Fail El Fee
Inspection_ Pass Fail Fee
- - - — -
1 , _
..- ,
./'
It"''if tar
City clif Tybee Island • Community Development Dept.
,... ....
WM,.#if
*,''.-••' • '‘ Inspection Report nr,, it/
403 Butler Ave. • P.O. Box 2749 - Tybee Island, GA 31328
`.2,--'1..,-.•;:r..
Phone 912.736.4573 ext. 114 • Fax 912.786.9539
......____
i
/
Permit No. I 0– -) <-,::1-.? Date Requested ______ _
f /
Owner's Name 2 -..e.L___LI,..., Date Needed __-.3. iff .',,. ij D
• i
Gen. Contractor _n 1.-.);:),T -ra. Subcontractor
Contact Information ..- ...--, p, ....., ---) .c. ..._
1
, • —
. ‘1.-"' t-S1;'''
Project Address _. 1 I 0 I 1-(-) ,_ 1.<.,P.
---,
Scope of Work 1---iL- 7z-/-tl F---ralusor-if-.
,
1.
r .1. --, I :11/
Inspector .7/ LI Date of Inspection / _...-1 Z f 0
r—
o c,rn
Inspection 4— I
12_-- Pass f Li j Fee
;
_.) -)
„,,,,<t: 1/-,--7 -.7 c__.
- Inspection \-I__.,,t-T-- ,..,- ( ) Pass Fail 0 Fee
.N --
, --,
I nspertio n Pass 0 Fail 0 Fee
Inspection Pass 0 Fail Ej Fee
1
Mar . 23. 2010 8 : 12AM P1mIEER No . 1795 P. 1
pci PIONEER
CONSTRUCTION,INC.
Memorandum
TO: Ray Hard,City of Tybee Island,GA
CC: Project File
FROM: (Gra` m Cooper, P 'eat Manager
(Signature of Memo Writer)
DATE: Tuesday, March 23,2010
SUBJECT: Schneider Residence
Ray:
Upon demolition of the front porch area that we intend to enclose with rated windows, PCI
discovered a rotten structural beam. The beam is located above the future location of the
double doors.
The beam was completely rotten due to poor flashing and waterproofing on the exposed side of
the beam. PCI, temporarily braced the roof and cut out the rotten section back to good wood
and successfully tied back into the existing structure. Please, take a look at your convenience
and let us know if you accept our method of repair.
I have attached photo of the damage; however,I am not sure how well they will transmit via
fax. Please lei me know if you would like to see color copies of the photos.
Thank you for the help on this project,and please call me with questions or concerns.
Regards,
craritant Cooper
Graham Cooper,Project Manager
31 Park of Commerce Way,Suite 1009Savannah,Georgia 31405.912.650,1850 phone99i 2.650.1850 fax
pc000erc pioneersavannah,com email•vwvw.pioneersavannah.com website
• '
'...Mar 23 2010 8 13AM , PIONEER No . 1795 P . 2
,.
C .
•
•
i
S ' h
f
F'•
sic
•• !
�`1w�i
• i
. .�
` y 4 "r + � 1 �}I ��'�'� i{ #7 � .� }yfr 1
N
" w ,__ i II
t „{tn
}
.x.14,
ti4
i ti i
5
•
,Ii
'. 4.it$141.' ,i i;‘,■,,;',■,..—.'."'*;'''''•
:. t .
'�S :. .L
f+ r
hy<
o
k ,_
•
•
I
• 4
{ k N•
{i'fi ' 11..53,4� '' .
.1,' t�r
c— r} }
•
•
sit
c . ,
CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 02-10-2010 PERMIT#: 100058
WORK DESCRIPTION CONVERT PORCH TO HEATED SPACE
WORK LOCATION 1101 STRAND 2
OWNER NAME S.I.&M.B.SCHNEIDER
ADDRESS PO BOX 2438
CITY,ST,ZIP TYBEE ISLAND GA 31328-2438
PHONE NUMBER 404-459-9747
CONTRACTOR NAME PIONEER CONSTRUCTION
ADDRESS 31 PARK OF COMMERCE WAY
CITY STATE ZIP SAVANNAH GA 31405
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $307.00
PROPERTY IDENTIFICATION#
PROJECT VALUATION $24,000.00
TOTAL BALANCE DUE: $307.00
It is understood that if this permit is granted the builder will at all times comply with the zoning,subdivision,flood control,building,fire,
soil and sedimentation,wetlands,marshlands protection and shore protection ordinances and codes whether local,state or federal,including
all environmental laws and regulations when applicable,subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
a Lot;jw,.....s 13 D...
Signature of Building Inspector or Authorized Agent:
P.O.Box 2749-403 Butler Avenue,Tybee Island,Georgia 31328
(912)786-4573-FAX(912)786-9539
www.cityoftybee.org
•
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
/68fr 44%
1O-ooS7(
Location: 3-i Y2 g PIN #
NAME ADDRESS TELEPHONE
Owne .77
tJ� �e.Je� -►� �le�etir�t Si-5r �V��-k� St s
Architect
or Engineer
Building
'1 Q°,tC°-e.2 Ck ?�, o ' l s q y�Yyt "J'fr b\L Contractor c,}
(Check all that apply) 3 4�. 01
❑ Repair Fl Residential Footprint Changes
)) Renovation ❑ Single Family Discovery
n Minor Addition n Duplex Demolition / `�
❑ Substantial Addition ❑ Multi-Family \� 011
❑ Other ❑ Commercial
Details of Project: -?,Ay e�i �eh .� _L 1� e�� --- I
j k� - ivClcyid at)s
Estimated Cost of Construction: $ z.4- k
Construction Type I (Enter appropriate number)
(1) Wood Frame (4) Masonry (6) Other (please specify)
(2) Wood & Masonry (5) Steel &Masonry
(3) Brick Veneer
Proposed use: czt,,
Remarks:
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following information based on the construction drawings and site plan:
#Units :- . s. - # Bathrooms
Lot Area Living space (total sq. ft.) Low
# Off-street parking spaces vZ e.
Trees located &listed on site plan
Access:
Driveway (ft.) With culvert? With swale?
Setbacks: Front Rear Sides (L) (R)
# Stories Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
A
During construction:
On-site restroom facilities will be provided through 7:ti«,i
On-site waste and debris containers will be provided by ?,o,vc C J
Construction debris will be disposed by Si r,, J by means of 3 or'p .
I understand that I must comply with zoning, flood damage control, building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as-built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: Z ( I Z.ato Signature of Applicant:,s �j�'__
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification NFIP Flood Zone
Approved rezoning/variance?
Street address and number: New Existing
Is it in compliance with City map?
If not, has street name and/or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals: Signature Date FEES
Zoning Administrator Permit I SC
Code Enforcement Officer Inspections 72.
Water/Sewer Water Tap
Storm/Drainage Sewer Stub
Inspections Aid to Const. 100
City Manager ` DV'Sp
TOTAL 30/,
DEFT OF
NATURAL 8CV k�
RLeoVRCES �
Ay
GEORGIA
Permit Acknowledgement of
Asbestos/Environmental Notification to Georgia EPD for
Projects Involving Demolition, Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant
permission to the owner, owner's representative, or permit holder to proceed with demolition,
wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project
Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with
the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the
rules. In most cases, the rules require both the owner and the involved contractors to assure the
portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos
Inspector for materials that contain asbestos; and the removal of the asbestos before renovation,
wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is
present in the building. Further guidance for regulatory compliance and contact telephone
numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and
Demolition. Other environmental issues such as asbestos removal techniques, lead abatement,
ground contamination, or unusual site conditions may have EPD regulations that could affect the
project.
, 4 lirOF 2 � '61
Undersi. -d Date
U
Printed Name
Office Use Only:
Project Address:
Permit Number:
REVIEW FOR CODE COMPLIANCE
I i Every effort has been made to identify
11 r-
code violations, no oversight by the ALL GOI�STCTION MUST COMFY IT!I `€�
reviewer shall be construed as authority Ls ? i�,', T°° `D
Y �� �l �A ,� TIC iR � :3 7
to violate, cancel, alter or set aside
any applicable CODE IIv 3
y pplicable codes or ordinances.The
review and permit should not be construed � A� STATE OF GEORGIA AMENDMENTS m o
. as.a warranty or aarantee. o a
`' Reviewed I3y _ m _ .mDate. ir c
Alt Electrical Installations must '�
'= (A comply with The National Electric ?;
w • Code `71Y1f-�- Edition and State a •
z 0 4 WINDOWS, DOORS.AND SKYLIGHTS of Georgia Amendments -1 fn
d ,SSTt' as Tales 602A1, 602A2,602A3, SECT.604 3 c at c
WINDOWS,GLASS DOORS AND SKYLIGHTS SHALL BE All HVAC In tali
E A s ations must comply
A_PPROVED AND INSTALLED TO COMPLY WITH ROTH With The International Mechanical
j ` POSITIVE AND NEGATIVE PMI:EEuites,
International Fuel Gas
z 0 CodeZEditidns and State 61pI°?a
' P
Georgia Amendments ya
ro 0
I. a
All lnsu�lations must :
. . comply. with.The-Georgia = 01-1 .•
•
State Energy Code
7-� Editions
. and State cf Georgia . .
Amendments
o r
LL'
MIllirill.11—Wr..-..'-•_°''' : T1 .
Z ?
I
�
I W i .
W° i < II Z Q E a= u j .—
o ao
I
. ^,�
/-
2 .) t.9 LID o Ll Iq << fit.' e�/ '.`�. ..
� o s
Z:B -8
. .
•
O
Jan . 28 . 2010 10: 04AM PIONEER No . 1712 P . 1
I
pcl PIONEER
CONSTRUCTION,INC.
•
Thursday, January 28,2010
City of Tybee Island
403 Butler Ave
Tybee Island, GA 31328
ATTENTION: Ray Hord
RE: Steve Schneider Residence
# 1 11 Street Unit A
Dear Ray:
I am in the process of putting together a scope of work for Mr. Schneider that includes
converting an existing screened in porch with new DP-50, Low-E windows. This build out
would include light interior finish work and light electrical.
I have attached a rough sketch that outlines the homeowner's intent. The scope will
include the following:
• Remove existing screens and non structural framing to allow for new windows
• Light framing of structural openings to make ready for new code compliant
windows and double door
• Removal of existing screened porch vinyl ceiling
• Relocation of existing light fixtures
• Relocation of existing ceiling fans
• Installation of exterior flood light fixtures for existing porch and new stair case
• Installation of hardi-backer board over existing deck boards in order for future tile
floor in newly enclosed porch
• Installation of new mini-split HVAC system for newly enclosed space
• Installation of new heart pine ceiling to match house interior
• installation of Drywall
• Paint of interior and exterior
Ray, thanks for your willingness in helping us get this project off of the ground. We are in
the process of building the new stairwell and should have access to the screened porch
early next week. If you went out today, you would not have access for an pre-
inspection. If you want to drop by early next week, you will be able to access the porch
via the new stairwell,
Graham Cooper,Project Manager
31 Park of Commerce Way,Suite 100• Savannah,Georgia 31405• 912.650.1850 phone• 912.650.1851
fax
gcooper@pioneersavannah.com email• www,pioneersovannah,com website
Jan . 28 . 2010 10 :28AM P10NFER No. 1713 P. 2
I pc. PIONEER
CONSTRUCTION,INC.
Thanks again for your help, and let me know'if you have any questions about this scope.
Regards,
Sincerely,
PION- R CONSTRUCTION, INC.
Graham a • -r, Project Manager
Graham Cooper,Project Manager
31 Perk of Commerce Way,Suite 100• Savannah,Georgia 31405•• 912.650.1850 phone• 912.650.1851
fax
acaooer@oioneersevannah.corn email• www.pioneersavannah.com website