Loading...
HomeMy Public PortalAbout10-0060 Lighthouse Pt Condo Assoc , y-�c�,� CITY OF TYBEE ISLAND BUILDING PERMIT DATE ISSUED: 02-12-2010 PERMIT#: 100060 WORK DESCRIPTION REPLACE DOOR WORK LOCATION 100 VAN HORN 21C OWNER NAME LIGHTHOUSE PT CONDO ASSOC ADDRESS PO BOX 16541 CITY,ST,ZIP SAVANNAH GA 31416-3241 PHONE NUMBER CONTRACTOR NAME MARIN ENTERPRISE LLC ADDRESS 3156 MIDLAND RD CITY STATE ZIP GUYTON GA 31312 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEES CHARGED $ 25.00 PROPERTY IDENTIFICATION# PROJECT VALUATION $750.00 TOTAL BALANCE DUE: $ 25.00 It is understood that if this permit is granted the builder will at all times comply with the zoning,subdivision,flood control,building,fire, soil and sedimentation,wetlands,marshlands protection and shore protection ordinances and codes whether local,state or federal,including all environmental laws and regulations when applicable,subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: 0.2 P.O.Box 2749-403 Butler Avenue,Tybee Island,Georgia 31328 (912)786-4573-FAX(912)786-9539 www.cityoftybee.org , \ City of T, ee Island • Community Develop -nt Dept. 11:"Inspection Report ���i, \ . j 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Cow (All INTERNATIONAL �_,�� Phone 912.786.4573 ext. 114 • Fax 912.786.9539 DE COUNCIL' MEMBER Permit No. 4.9 - (Z.: -._' Date Requested ✓ // f Owner's Name Z/7-1-0-/,--/-4.2_54.. , Date Needed 74 Gen. Contractor J/4 ,J /,-,J/ Subcontractor Contact Information /!//u:„J Project Address / 2O ' 4----;J -0l ;i Scope of Work i-- 1�Z / T)4 iwr Inspector -7/"/ Date of Inspection ?.' !(? / 1 _ I Inspection ,"ice „,,- -/ /- ,34/' Pass I Fail ® Fee J _ DP. ':-D-2-? 3'/445.' .3 0 ?k;Z:. /i/L,I ---) 1// —I—) Inspection Pass ® Fail ® Fee Inspection Pass . Fail ® Fee Inspection Pass 0 Fail 0 Fee Dianne Otto From: Dianne Otto Sent: Wednesday, June 29, 2011 12:13 PM To: 'EMARIN6444 @AOL.COM' Subject: 100 Van Horn#21C Attachments: S35C-411062911560.pdf Elkin, Attached is an inspection report for Lighthouse Point #21 C. This is from building permit 10-0060 and it was for replacement of a door. Please address the deficiencies and reschedule this inspection as soon as possible by either replying to this email or calling the phone number below. Thank you, Dianne K. Otto, CFM City of Tybee Island phone 912.786.4573 ext. 136 fax 912.786.9539 1 i4117 .:-..:: +— . . , c ' . , ,. _ .....,...., ,::::..:iy..., City of Tyliee Island • Community Devel int_flept,_ • t 't# -- Inspection R m.i . __- -- --- '.-...,.. ---- ir -: ' 403 Butler Ave. - P.O. Box 2749=..-Tyb.ee Island, GA 31328 Phone 912.786.4573-ea 14 - Fax 912.786.9539/ I .---7 I Permit No. z:: ..-.,x;Q ate Requested ,-_e, / /,;v./ -,'/L') /Zt;c7177 -'''- 1;)'.. - Owner's Name (1.... . ._ci . / , Date Needed .--/7 / 0 Gen. Contractor /,,,) Erj s Subcontractor Contact Information i zA Project Address _446) .164-1--/- /4 Zar,'J "2/ i _ ___I Scope of Work 4.)e,,e... 52 12:77c...,..)‘') ./40, 77,...:--4.., , 11 `4c1 Inspector - 9/41 Date of Inspection {...,.,, / - -- I . ..,...... .. '......'"'i ,. Inspection Pass Fail it .Fee • . . .. ---„,•e. 1.i, l\•)-CD--4 ,_ '---Pi•;--.<-,) (.. .---- 71.-)4::).----1(... '''-i 'Ir-E-- tlL ( _.,i.I\--,.,__ ----2.5j:_',CN.-...) ;,,_ 1 1 -- b( 5-,c-0.5, t-t-i) v/3 in -- , Inspection Pass El Fail 0 Fee ___ . • . t---- --C)-7 0 * .r' • c ' 1.---- ---.R. 'bP 4 '■2-4--A n''' C-1.'" i r . -.1..... „.. 1 ns pectio n _ Pass 0 Fail 0 Fee Inspection Pass 0 Fail Fee i 1 1 1 - --- —__-- — -- --- --- - — -- — -- — CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT ,F « f 00 (DO Location: 2 (C.- Zs�(„,1.' A_ PIN # NAME ADDRESS TELEPHONE Owner - as%t G. 2(6._ I t d..f- � P� Architect or Engineer Building 112.- Contractor P\ALA) (00— 2350 (Ch k all that apply) ❑✓Repair ❑ Residential Footprint Changes ❑ Renovation ❑ Single Family ❑ Discovery ❑ Minor Addition ❑ Duplex ❑ Demolition ❑ Substantial Addition ❑ Multi-Family ❑ Other ❑ Commercial Details of Project: (6-viz_ Estimated Cost of Construction: $ Construction Type (Enter appropriate number) (1) Wood Frame (4) Masonry (6) Other (please specify) (2) Wood& Masonry (5) Steel & Masonry (3) Brick Veneer Proposed use: Remarks: ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the following information based on the construction drawings and site plan: #Units #Bedrooms #Bathrooms Lot Area Living space (total sq. ft.) # Off-street parking spaces Trees located & listed on site plan Access: Driveway (ft.) With culvert? With swale? Setbacks: Front Rear Sides (L) (R) # Stories Height Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. During construction: On-site restroom facilities will be provided through On-site waste and debris containers will be provided by Construction debris will be disposed by by means of I understand that I must comply with zoning, flood damage control, building, fire, shore protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as-built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date: 21 I 240 Signature of Applicant: ■./ Note: A permit normally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification NFIP Flood Zone Approved rezoning/variance? Street address and number: New Existing Is it in compliance with City map? If not, has street name and/or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: Signature Date FEES Zoning Administrator Permit Code Enforcement Officer Inspections Water/Sewer Water Tap Storm/Drainage Sewer Stub Inspections Aid to Const. City Manager TOTAL 2 C. DOM OF r PUMICES ,)( .. GEORGIA Permit Acknowledgement of Asbestos/Environmental Notification to Georgia EPD for Projects Involving Demolition, Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. 21(Vg 0 Undersigned Date Printed Name Office Use Only: Project Address: Permit Number: