HomeMy Public PortalAboutFY23 CIRP BUDGET FINAL reduced sizeJULY 1, 2022 - JUNE 30, 2023
BUDGET SUPPLEMENT
FISCAL YEAR20232023
Metropolitan St. Louis Sewer DistrictMetropolitan St. Louis Sewer District
St. Louis, MissouriSt. Louis, Missouri
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
BUDGET SUPPLEMENT FOR FISCAL YEAR 2023
PREFACE
This annual Budget Supplement provides information about the Metropolitan St. Louis Sewer
District's intended Capital Improvement and Replacement Program during Fiscal Year 2023 (July 1, 2022 to
June 30, 2023). This document is divided into the following sections:
• Program Summary (includes a glossary of terms used in the Budget Supplement) • Wastewater Engineering Projects • Wastewater Construction Projects • Wastewater Continued Projects • Wastewater Contingency Projects • Wastewater Program • Stormwater Engineering Projects • Stormwater Construction Projects • Stormwater Continued Projects • Stormwater Contingency Projects • Stormwater Program • Appendix
The Wastewater Construction Projects and Stormwater Construction Projects sections list projects
that have scheduled construction starts during Fiscal Year 2023. The Wastewater Engineering Projects and
Stormwater Engineering Projects sections list projects that have scheduled engineering starts during Fiscal
Year 2023 (which includes design, planning, and data collection/system investigation services). Due to the
magnitude and complexity of these projects and the requirements for permitting and easement acquisition,
their construction is scheduled in future years. The Contingency Projects sections detail projects that are
currently scheduled for Fiscal Year 2024 but may be expedited to begin construction during Fiscal Year
2023, if revenue becomes available and project schedules allow. The Wastewater and Stormwater Program
sections summarize the capital program by fund.
For each new project identified for funding in Fiscal Year 2023, this document provides information
regarding the approximate project scope and estimated cost. For projects continued from previous fiscal
years, only the estimated construction cost and reason for continuance are provided. Specific information
regarding Continued Projects was included in previous Budget Supplement documents in the fiscal years in
which the projects were initially identified. Lastly, a listing of all Fiscal Year 2023 projects sorted by
municipality is provided in the Appendix.
On the Cover: MSD Project Clear (MSDPC) is two utilities in one - responsible for 9,000+ miles of public
wastewater and stormwater sewer systems in the St. Louis region. MSDPC is investing billions of dollars over a
generation to improve water quality and minimize wastewater and stormwater issues by maintaining regulatory
compliance, planning, designing, and building community rainscaping & system improvements, and an ambitious
program of maintenance and repair.
")
")
")
")")
")")
")
")
")
")
")")
")
")
")
")")
")
")")")
")
")
")
")
")
")
")
")")
")
")
")
")
")
")
")
")
")
!(
!(
!(!(
!(
!(!(!(
!(!(
!(
!(
!(
!(
!(!(!(
!(!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(!(
!(!(!(
!(
!(!(
!(
!(
!(
!(
!(
!(!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
M
S
D
B
o
u
n
d
a
r
y
St
.
L
o
u
i
s
C
o
u
n
t
y
B
o
u
n
d
a
r
y
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦ 44
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦ 55
§¨¦170
§¨¦255
113
132
166
114
128
117
133
122
167
116
170
136
120
134
112
118
119
124 123
129
165
127126
125
173
168
109 108
174
135
110
175
172171
169131
176
111
6
7
9
4 1
3
2
8
55
70
35
9089
33
41
62
71
91
4342
79
57
92
49
61
69
9340
97
34
12
39
67
78
94
80
99
68
95
44
75
50
32 37
74
96
4645
66
76
6465
56
81
31
77
53
73
98
8838
36
152
153
104
144
150
106
159
163
164
142
149
155
156
151
100
143
158
146
103
147157
154
115
121
14
5958
141
105
148
107
Map produced by MSD GIS Mapping, February 17, 2022
The Metropolitan St. Louis Sewer DistrictCapital Improvement and Replacement ProgramFiscal Year 2023
Legend
FISCAL YEAR 2023
!(Wastewater
!(Stormwater
FISCAL YEAR 2024
")Wastewater
")Stormwater
Combined Sewer Area
PAGE NO. SYSTEM51011131516171819202122232425262728293047485152546063728283848587101102130137138139140145160161162
MSD DISTRICT WIDE PROJECTS
FISCAL YEAR 2021
11 April 2022
Page 1 of 6
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY23
PAGE NUMBER PROJECT NAME
1 BC-01 PHASE III AND BC-02 PHASE II SANITARY RELIEF (I-170 TO
HEATHERWOOD DR)
2 BISSELL & LEMAY WWTF FLUIDIZED BED INCINERATORS
3 BISSELL & LEMAY WWTF FLUIDIZED BED INCINERATORS
4 CAULKS CREEK A PUMP STATION (P-750) IMPROVEMENTS
5 CCTV INSPECTION AND PHYSICAL INSPECTION OF SEWERS (2023)
6 CITYSHED MITIGATION PROGRAM DESIGN (CONTRACT B)
7 COLDWATER CREEK WWTF REPAIRS AND IMPROVEMENTS (2023)
8 CONSTRUCTION MANAGEMENT SERVICES - LOWER AND MIDDLE RDP
TUNNEL FACILITIES
9 CONSTRUCTION MANAGEMENT SERVICES - LOWER MERAMEC AND DEER
CREEK TUNNELS
10 CONSTRUCTION MANAGEMENT SERVICES - TANK/TREATMENT/PUMP
STATION FACILITIES
11 CRITICAL INFRASTRUCTURE ASSESSMENT AND ASSET INVESTIGATION (2023)
12 CSO - MARY AVENUE SOUTH OF MANCHESTER CSO INTERCEPTOR (I-
132)/OUTFALL (L-106) ELIMINATION PHASE II
13 FLOW METERING AND MONITORING (2022)
14 GASLIGHT SQUARE SEWER IMPROVEMENTS PHASE II
15 GENERAL SERVICES AGREEMENT - CONSTRUCTION MANAGEMENT (2022)
16 GENERAL SERVICES AGREEMENT - FACILITY & SEWER DESIGN (2020)
CONTRACT A
17 GENERAL SERVICES AGREEMENT - FACILITY & SEWER DESIGN (2022)
CONTRACT A
18 GENERAL SERVICES AGREEMENT - FACILITY & SEWER DESIGN (2022)
CONTRACT B
19 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (2022) CONTRACT A
20 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (2022) CONTRACT B
21 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (2022) CONTRACT C
22 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2021) CONTRACT
A
11 April 2022
Page 2 of 6
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY23
PAGE NUMBER PROJECT NAME
23 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2021) CONTRACT B
24 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2021) CONTRACT C
25 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2021) CONTRACT
D
26 GENERAL SERVICES AGREEMENT - SEWER AND CHANNEL DESIGN (2021)
CONTRACT A
27 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2022) CONTRACT A
28 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2022) CONTRACT B
29 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2022) CONTRACT C
30 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2022) CONTRACT D
31 GEYER SANITARY RELIEF (W. MONROE AVE TO W. ESSEX AVE)
32 GLEN ECHO SANITARY RELIEF (ENGELHOLM AVE TO HENDERSON AVE)
33 GRAND GLAIZE WWTF GRAND GLAIZE CREEK BANK STABILIZATION
34 GRAND GLAIZE WWTF REPAIRS AND IMPROVEMENTS (2023)
35 HAMPTON CREEK SANITARY RELIEF (DEER CREEK TRUNK TO OXFORD DR)
PHASE I
36 HARLEM - BADEN RELIEF PHASE IV (HEBERT) BUILDING DEMOLITION AND
DESIGN
37 HARLEM BADEN RELIEF PHASE IV (HEBERT) - TRUNK SEWER
REHABILITATION
38 JEFFERSON BARRACKS TUNNEL CONSOLIDATION SEWERS
39 LEMAY NO. 3 PUMP STATION AND FORCE MAIN
40 LEMAY WWTF REPAIRS AND IMPROVEMENTS (2023) (GRIT TANKS AND
SECONDARY CLARIFIER DUCT BANK)
41 LINDSAY LANE SANITARY RELIEF (LINDSAY LANE TO LINDBERGH BLVD)
42 LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
43 LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
44 LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS - BAUMGARTNER TO
FENTON WWTF TUNNEL
11 April 2022
Page 3 of 6
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY23
PAGE NUMBER PROJECT NAME
45 LOWER MERAMEC WWTF EXPANSION PHASE II
46 LOWER MERAMEC WWTF EXPANSION PHASE II
47 PUMP STATION REPLACEMENT PROJECTS (PHASE I)
48 RADAR RAINFALL DATA (2020)
49 RDP TRIBUTARIES & UPPER RDP CSO CONTROLS & LOWER MERAMEC
SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT)
50 S BRENTWOOD BLVD SANITARY RELIEF (DAYTONA DR TO WALINCA
TERRACE)
51 STREAM FLOW GAUGE OPERATION AND MAINTENANCE (USGS)
52 STREAM FLOW WATER QUALITY SAMPLING (2023)
53 WEBSTER GROVES TRUNK E SANITARY RELIEF (SKME-628)
54 WET WEATHER OPTIMIZATION STUDY
55 AMBLEWOOD SANITARY RELIEF (WATERFORD DR TO BIRCHBARK DR)
56 BADEN CITYSHED MITIGATION BASINS (CALVARY, FREDERICK, PARTRIDGE
AND TILLIE) - SEPARATION SEWERS
57 BANFF SANITARY RELIEF (CAITHNESS RD TO LANARK RD)
58 BISSELL & LEMAY WWTF FLUIDIZED BED INCINERATORS
59 BISSELL & LEMAY WWTF FLUIDIZED BED INCINERATORS
60 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT C
61 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT D
62 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT E
63 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT F
64 BISSELL POINT WWTF FINE SCREEN, CONCRETE AND GATE IMPROVEMENTS
65 BLACK CREEK - HADDINGTON COURT RELIEF SEWERS
66 CAULKS CREEK A PUMP STATION (P-750) IMPROVEMENTS
67 CAULKS CREEK FORCEMAIN (RIVER VALLEY RD TO L-52)
11 April 2022
Page 4 of 6
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY23
PAGE NUMBER PROJECT NAME
68 COLDWATER CREEK WWTF REPAIRS AND IMPROVEMENTS (2023)
69 CROSS TIMBERS #705 SANITARY REPLACEMENT
70 CSO VOLUME REDUCTION GREEN INFRASTRUCTURE
71 CSO VOLUME REDUCTION GREEN INFRASTRUCTURE - RIVER DES PERES
72 EASEMENT ACQUISITION FOR WASTEWATER PROJECTS (2023)
73 FABICK PUMP STATION (P-444) IMPROVEMENTS (SKME-404E)
74 FF-15 AND FF-16 SANITARY RELIEF PHASE II REHABILITATION
75 FLORISSANT/DUNN SANITARY RELIEF (ST. ANTHONY LN TO I-270)
76 GLENFIELD SANITARY RELIEF (WATSON WOODS CT TO S LINDBERGH BLVD)
77 GREENBRIAR #2 PUMP STATION (P-448) ELIMINATION
78 HARLEM - BADEN RELIEF PHASE IV (HEBERT) (GOODFELLOW TO HAMILTON)
79 HARLEM BADEN RELIEF PHASE IV (HEBERT) - SEWER REHABILITATION
80 HARLEM CITYSHED MITIGATION BASINS (ASHLAND AND ESSEX)
81 HATHAWAY DRIVE SANITARY RELIEF
82 INFRASTRUCTURE REPAIRS (FACILITIES) (2023)
83 INFRASTRUCTURE REPAIRS (REHABILITATION) (2023) CONTRACT A
84 INFRASTRUCTURE REPAIRS (REHABILITATION) (2023) CONTRACT B
85 INFRASTRUCTURE REPAIRS (REHABILITATION) (2023) CONTRACT C
86 INFRASTRUCTURE REPAIRS (REHABILITATION) (2023) CORPS CSO PROGRAM
87 INFRASTRUCTURE REPAIRS (WASTEWATER) (2023)
88 JEFFERSON BARRACKS TUNNEL CONSOLIDATION SEWERS
89 LAMBERT AIRPORT RESTRICTED ACCESS ASSETS INSPECTION AND REPAIR
90 LAMBERT AIRPORT RESTRICTED ACCESS ASSETS INSPECTION AND REPAIR
91 LEMAY 1 PUMP STATION (P-301) COOLING TOWER REPLACEMENT
92 LEMAY WWTF AERATION BLOWER AND POWER DISTRIBUTION
IMPROVEMENTS
11 April 2022
Page 5 of 6
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY23
PAGE NUMBER PROJECT NAME
93 LEMAY WWTF REPAIRS AND IMPROVEMENTS (2023) (GRIT TANKS AND
SECONDARY CLARIFIER DUCT BANK)
94 LINDSAY - ST. ALBERT PRIVATE I/I REDUCTION
95 LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS - BAUMGARTNER TO
FENTON WWTF TUNNEL
96 LOWER MERAMEC WWTF EXPANSION PHASE II
97 MC-02 WATSON TO EDGAR RD SANITARY RELIEF (SKME-580A)
98 NEWPORT LANDING PUMP STATION (P-480) ELIMINATION
99 NORTH FEE FEE CREEK PUBLIC I/I REDUCTION
100 PRICE TO PIONEER SANITARY RELIEF
101 PUMP STATION FALL PROTECTION UPGRADES - PHASE I
102 PUMP STATION MANLIFT REPLACEMENT
103 ROBYN HILLS NUMBER 1 PUMP STATION (P-417) REPLACEMENT
104 ROXBURGH DR SANITARY RELIEF
105 SAYLESVILLE SANITARY RELIEF (SAYLESVILLE DR TO S GREENTRAILS DR)
106 SAYLESVILLE SANITARY RELIEF (SAYLESVILLE DR TO S GREENTRAILS DR)
107 WHITE PLAINS SANITARY RELIEF (SALTBOX DR TO CEDAR CREEK RD)
137 GENERAL SERVICES AGREEMENT - STORMWATER DESIGN FOR ARPA GRANT
PROJECTS (2023) CONTRACT A
138 GENERAL SERVICES AGREEMENT - STORMWATER DESIGN FOR ARPA GRANT
PROJECTS (2023) CONTRACT B
139 GENERAL SERVICES AGREEMENT - STORMWATER DESIGN FOR ARPA GRANT
PROJECTS (2023) CONTRACT C
140 GENERAL SERVICES AGREEMENT - WATER QUALITY SUPPORT SERVICES
(2021)
141 GRAVOIS CREEK OMCI STORMWATER DESIGN (2023)
142 HALL STREET STORM SEWERS
143 HALLSTEAD STORM CHANNEL PHASE IV (MCBJ-230)
144 RIVER DES PERES CHANNEL REHABILITATION
11 April 2022
Page 6 of 6
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY23
PAGE NUMBER PROJECT NAME
145 STORMWATER ASSET INVESTIGATIONS (2022)
146 BALLMAN DRIVE 300 BLOCK STORM SEWER
147 BEAUCAIRE DRIVE - MARK DRIVE - MONACO DRIVE STORM SEWER
148 COLDWATER CREEK OMCI REIMBURSEMENTS PROGRAM
149 DEARBORN DR STORM SEWER
150 DEER CREEK OMCI REIMBURSEMENTS PROGRAM
151 DEER CREEK WATERSHED INITIATIVE
152 GRAND GLAIZE CREEK WATERSHED INITIATIVE
153 GRAVOIS CREEK OMCI REIMBURSEMENTS PROGRAM
154 LARIMORE STORM SEWER
155 LITZSINGER #10412 STORM SEWER IMPROVEMENTS
156 LONGFORD DRIVE 1851 STORM SEWER
157 MEADOW CREEK LN 508 STORM SEWER
158 NORTH NEW FLORISSANT - FOX RUN STORM SEWER
159 SEMINARY OMCI REIMBURSEMENTS PROGRAM
160 STORMWATER INFRASTRUCTURE REPAIRS (2023)
161 STORMWATER INFRASTRUCTURE REPAIRS (REHABILITATION) (2023)
162 STORMWATER QUALITY GREEN INFRASTRUCTURE - SMALL GRANT
RAINSCAPING PROGRAM
163 SUGAR CREEK OMCI REIMBURSEMENTS PROGRAM
164 UNIVERSITY CITY OMCI REIMBURSEMENTS PROGRAM
12 April 2022
Page 1 of 2
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX CONTINGENCY PROJECTS - FY24
PAGE NUMBER PROJECT NAME
108 BISSELL POINT WWTF FINE SCREEN, CONCRETE AND GATE IMPROVEMENTS
109 BISSELL POINT WWTF FINE SCREEN, CONCRETE AND GATE IMPROVEMENTS
110 BLACK CREEK - HADDINGTON COURT RELIEF SEWERS
111 CAULKS CREEK PUMP STATION B (P-751) RELOCATION
112 COLDWATER CREEK WWTF REPAIRS AND IMPROVEMENTS (2023)
113 CSO VOLUME REDUCTION GREEN INFRASTRUCTURE
114 CSO VOLUME REDUCTION GREEN INFRASTRUCTURE - RIVER DES PERES
115 FILLMORE PUMP STATION (P-308) REHABILITATION
116 FILLMORE PUMP STATION (P-308) REHABILITATION
117 FRIEDENS (PARTIAL) I/I REDUCTION (CHAIN OF ROCKS DR AND FONTAINE PL)
118 GC-06 GRAVOIS CREEK TO BRIARSTONE AND GATES SANITARY RELIEF
PHASE II
119 HARLEM BADEN RELIEF PHASE IV (HEBERT) - HAMILTON TO DARVER TRUNK
SEWER
120 HARLEM CITYSHED MITIGATION BASINS (ASHLAND AND ESSEX)
121 HARLEM CITYSHED MITIGATION BASINS (ASHLAND AND ESSEX) -
SEPARATION SEWERS
122 LEMAY WWTF REPAIRS AND IMPROVEMENTS (2023) (GRIT TANKS AND
SECONDARY CLARIFIER DUCT BANK)
123 LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS - BAUMGARTNER TO
FENTON WWTF TUNNEL
124 LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS - BAUMGARTNER TO
FENTON WWTF TUNNEL
125 LOWER MERAMEC WWTF EXPANSION PHASE II
126 LOWER MERAMEC WWTF EXPANSION PHASE II
127 LOWER MERAMEC WWTF EXPANSION PHASE II
128 MISSISSIPPI FLOODWALL ORS PUMP STATIONS - LADDER REPLACEMENTS
129 NEW ENGLAND TOWN CLIFF CAVE PUMP STATION (P-323) IMPROVEMENTS
130 SCADA SYSTEM UPGRADE
12 April 2022
Page 2 of 2
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX CONTINGENCY PROJECTS - FY24
PAGE NUMBER PROJECT NAME
131 SPIRIT OF ST. LOUIS 1 PUMP STATION (P-735) REPLACEMENT
132 SUTHERLAND LANSDOWNE COMBINED SEWER REPLACEMENT
133 UPPER BADEN SANITARY RELIEF (JENNINGS STATION RD TO OAKRIDGE
BLVD)
134 VALLEY SANITARY RELIEF PHASE III
135 VALLEY VIEW PUMP STATION (P-734) REPLACEMENT
136 WW-2 AND WW-3 WARSON WOODS SANITARY RELIEF
165 BALLAS RD. - BALWYCK LN. BANK STABILIZATION
166 CLAYTON CITY HALL STORM SEWER
167 DENNIS AND KAPPEL STORM SEWER
168 FAIRWAY CT 3901 BANK STABILIZATION
169 GLENMARY TO WHITE ROSE STORM IMPROVEMENTS
170 HALL STREET STORM SEWERS
171 HALLSTEAD STORM CHANNEL PHASE IV (MCBJ-230)
172 HALLSTEAD STORM CHANNEL PHASE IV (MCBJ-230)
173 HIGHGATE - ENFIELD STORM SEWER
174 OUTER LADUE AND CHIPPER STORM SEWER
175 SHERWOOD DR. #2790 STORM SEWER
176 WHITEHALL CT - PINE AVE STORM SEWER
11 April 2022
Page 1 of 1
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY - FY23
TYPE OF PROJECT NUMBER OF
PROJECTS
PROJECT COST
Wastewater Engineering 52 $53,515,000
Wastewater Construction 50 $330,576,000
Stormwater Engineering 9 $6,850,000
Stormwater Construction 19 $16,786,244
TOTAL:130 $407,727,244
Wastewater Continued 3 $9,100,000
Stormwater Continued 1 $200,000
TOTAL:4 $9,300,000
GRAND TOTAL:134 $417,027,244
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
1 of 7
The identification and prioritization of projects to be included in the Capital Improvement
and Replacement Program is a multi-step process, requiring monitoring and updating to ensure
that the highest priority problems within the District are addressed in a timely manner, given
funding limitations. These stages include: project identification, conceptual solution,
preliminary study, final design, and construction.
At each step in the process, the project scope is reevaluated to verify that it continues to
meet regulatory requirements and customers’ needs. The project cost is updated based on
available information, and the project’s priority is assessed with the goal that the highest priority
projects are funded first.
Project cost estimates used in the budget preparation process and shown in the Budget
Supplement are usually based on the preliminary study stage of the process. At this stage there is
typically a minimal amount of detailed information available regarding geotechnical conditions,
utility relocation requirements, easement requirements, and other site-specific issues that have
the potential to significantly affect the project’s construction cost. Preliminary study cost
estimates are intended to be within thirty percent of the design engineer’s final estimates.
Individual projects may vary to a greater degree than the average, due to unanticipated site-
specific conditions that impact the project cost.
New projects are identified on an ongoing basis to ensure that the District is in
compliance with the regulatory requirements of the United States Environmental Protection
Agency and Missouri Department of Natural Resources, to address customer stormwater or
wastewater problems, remedy deficiencies identified through planning studies and hydraulic
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
2 of 7
analysis of the system, and implement required collection system and wastewater treatment plant
repairs and upgrades.
Upon the initial identification of regulatory issues, localized problems, or system
deficiencies, a conceptual solution is developed, which includes a project scope, cost estimate,
and priority ranking of the project relative to similar projects. This solution and associated cost
estimate are general, based on a single site visit and a “table-top” analysis of the problem. The
project may then be incorporated into the Capital Improvement and Replacement Program in a
specific fiscal year, based on the availability of funds and priority of the project.
Before the year in which funding of the project is anticipated, a preliminary study is
performed. In this study, scope is reevaluated in greater detail to ensure that the conceptual
solution is still viable, given current conditions, regulatory requirements, and updated project
cost estimate and priority ranking. In performing this preliminary study, the District may make
multiple site visits to inspect the problem area and estimate alignment of the sewer or channel to
be constructed. Preliminary survey information may be obtained and a more detailed hydraulic
analysis performed than was done at the conceptual solution level. Preliminary studies are
typically performed by the Engineering Department. However, the District may use engineering
consultants to perform preliminary studies during periods of heavy workload, or for large,
complex projects such as new treatment plants, upgrades to existing treatment plants, tunnel
projects, or major sewer upgrades.
Upon completion of a preliminary study, the project’s priority ranking is reevaluated
relative to other, similar projects. A project may be rescheduled to a later fiscal year within the
Capital Improvement and Replacement Program, should its priority ranking be reduced due to
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
3 of 7
increased project cost estimate or modification of its scope.
The final design of a project is performed by either the District’s Engineering Department
staff or via engineering consultant services. As part of the final design process, topographic and
geotechnical information is collected, utility conflicts are identified, construction plans and
specifications are prepared, easement plats are drafted, and easements are obtained.
In FY 2023, 12 engineering budget items have been procured using the Watershed
Consultant approach, retaining firms for multi-year efforts on a related suite of projects, in order
to increase efficiency, expedite the program and meet Consent Decree requirements and
schedule. Following is a listing of the Watershed Consultant related engineering projects and
associated professional service firms:
Project
Number Project Name Page
Number Budget
Watershed Program Consultant - 11151 - Construction Management Services -
Tank/Treatment/Pump Station Facilities. Consultant: KAI 360 Construction Services, LLC
11151 CONSTRUCTION MANAGEMENT SERVICES - TANK/TREATMENT/PUMP STATION FACILITIES 10 7,500,000
Watershed Program Consultant - 11152 - Construction Management Services - Lower and
Middle RDP Tunnel Facilities. Consultant: Shannon & Wilson, Inc.
11152 CONSTRUCTION MANAGEMENT SERVICES - LOWER AND MIDDLE RDP TUNNEL FACILITIES 8 2,500,000
Watershed Program Consultant - 11826 - Construction Management Services - Lower
Meramec and Deer Creek Tunnels. Consultant: Black & Veatch Corporation
11826 CONSTRUCTION MANAGEMENT SERVICES - LOWER MERAMEC AND DEER CREEK TUNNELS 9 5,000,000
Watershed Program Design Consultant - 11109 - Lower & Middle RDP CSO Controls System
Improvements. Consultant: Jacobs Engineering Group, Inc.
11957 JEFFERSON BARRACKS TUNNEL CONSOLIDATION SEWERS 38 100,000
11817 LEMAY NO. 3 PUMP STATION AND FORCE MAIN 39 575,000
11109 LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 42 125,000
11109 LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 43 270,000
Watershed Program Design Consultant - 11153 - RDP Tributaries (Deer Creek) Controls
System Improvements. Consultant: HDR Engineering, Inc.
12140 CSO - MARY AVENUE SOUTH OF MANCHESTER CSO INTERCEPTOR (I-132)/OUTFALL (L-106)
ELIMINATION PHASE II 12 200,000
12334 HAMPTON CREEK SANITARY RELIEF (DEER CREEK TRUNK TO OXFORD DR) PHASE I 35 200,000
11746 LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS - BAUMGARTNER TO FENTON WWTF
TUNNEL 44 575,000
11153 RDP TRIBUTARIES & UPPER RDP CSO CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT) 49 600,000
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
4 of 7
For projects of significant scope and impact, coordination with property owners who will
benefit or who will be affected by the construction of the project is achieved at neighborhood
meetings hosted by the District. For smaller projects, property owners are individually contacted
during the design of the project.
Many projects require that new easements be acquired to enable the project to be
constructed. The time required to acquire these easements is lengthy and may result in delays in
the planned construction schedule. When necessary, the District may utilize its eminent domain
powers to condemn for easements in order to ensure that a project is constructed. Any required
condemnation proceedings are performed in full compliance with state and federal law. Some
projects may additionally require specific permitting from other government agencies, such as
the Missouri Department of Natural Resources or US Army Corps of Engineers, prior to bidding.
A project is advertised for public bidding a minimum of 30 days, followed by a formal
bid opening. Bids are evaluated to determine the lowest responsive, responsible bidder.
Appropriation and contract ordinances are submitted to the Board of Trustees for their approval.
Upon final approval, contracts are executed and notices to proceed are issued.
In addition to wastewater and stormwater projects, the District may construct sanitary
sewer sub-district projects at the request of property owners currently served by private systems
or individual septic tank systems. These sub-districts are financed by the benefiting property
owners, using special benefit assessments. The affected property owners initiate the projects by
submitting a petition to the District, which provides design and construction management
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
5 of 7
assistance. Because of the uncertainty of the viability and/or schedule of sub-district projects,
they are not always listed in the Budget Supplement.
Wastewater projects are funded via revenue from the wastewater user charge paid by
ratepayers. The user charge also supports the sale of revenue bonds to fund the wastewater
program. Generally, Fund 6660, the Sanitary Replacement Fund, is used to pay for capital
wastewater work, while Fund 1101, the General Fund, is used to pay for non-capital wastewater
related work. The allocation of a given project’s costs between these two funds is an accounting
function necessary to facilitate capitalization of District assets (adding the value of work
completed to the overall value of all physical assets owned by the District). Wastewater projects
may also be funded by various Operation, Maintenance, Construction and Improvement (OMCI)
funds, Construction Funds, Special Funds, or the Improvement Fund.
Stormwater projects may be funded via the Districtwide Stormwater Fund, the
Stormwater Regulatory Fund, the Improvement Fund, or from various Operation, Maintenance,
Construction, and Improvement (OMCI) funds. These OMCI funds are established in certain
areas of the District, are supported by property tax collection, and must be spent only within their
specific areas of tax collection.
The sections included in this Budget Supplement document are:
• Program Summary – summary of budget, and number and type of projects. Includes
general description of the capital program and budgeting process, and a glossary of often
used terms.
• Wastewater Engineering Projects – summary and details on wastewater engineering
consulting services and other professional services necessary to implement the
wastewater program.
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
6 of 7
• Wastewater Construction Projects – summary and details on wastewater construction
projects and other expenses such as property rights acquisition necessary to implement
the wastewater program.
• Wastewater Continued Projects – summary of wastewater projects continued from
previous fiscal years, due to difficulties in easement acquisition, permitting process or
coordination with other agencies, design revisions or status, or other special issues.
• Wastewater Contingency Projects – summary and details on wastewater projects
currently budgeted in the next fiscal year, but having the chance to be expedited into the
current fiscal year, if scheduling or budget allow.
• Wastewater Program – annual alphabetical listing of wastewater projects by fund,
including the type of service (task) budgeted.
• Stormwater Engineering Projects - summary and details on stormwater engineering
consulting services and other professional services necessary to implement the
stormwater program.
• Stormwater Construction Projects - summary and details on stormwater construction
projects and other expenses such as property rights acquisition necessary to implement
the stormwater program.
• Stormwater Continued Projects - summary of stormwater projects continued from
previous fiscal years, due to difficulties in easement acquisition, permitting process or
coordination with other agencies, design revisions or status, or other special issues.
• Stormwater Contingency Projects - summary and details on stormwater projects currently
budgeted in the next fiscal year, but having the chance to be expedited into the current
fiscal year, if scheduling or budget allow.
• Stormwater Program - annual alphabetical listing of stormwater projects by fund,
including the type of service (task) budgeted.
• Appendix – list of projects by municipality.
Please note that the detail sheets for each project in this document include locations and
quantities of work to be performed. These maps and quantities are approximate only, and final
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
7 of 7
location and extent of work may vary depending on final design and/or field conditions during
construction.
GLOSSARY
BIORETENTION A concave landscape feature which stores, filters, and infiltrates
stormwater runoff.
BIOSTABILIZATION A method of repairing eroding streams by utilizing the structural
properties of live plants to rebuild eroded streambanks and incised
channels.
BIOSWALE A sloped open drainage channel with landscape elements designed to
store, filter, and infiltrate stormwater runoff.
CD The Federal Consent Decree, entered on April 27, 2012 and all
appendices and all modifications or amendments thereto, between
MSD, United States of America, and the Missouri Coalition for the
Environment Foundation designed to eliminate or reduce overflows
from the Combined and Separate Sewer Systems in order to improve
water quality and protect human health and the environment.
CIPP Cured in Place Pipe, a construction method to rehabilitate a sewer pipe
by lining it with a new pipe. This work does not require excavating the
pipe and replacing it in total.
CIRP Capital Improvement and Replacement Program, the ongoing system
improvement efforts by MSD.
CMOM Capacity, Management, Operations, and Maintenance program.
COE United States Army Corps of Engineers.
COMBINED SEWER The portion of MSD's sewer system designed to convey municipal
sewage (i.e. domestic, commercial and industrial wastewaters) and
stormwater runoff through a single-pipe system to a wastewater
treatment facility and/or to a CSO outfall.
CONSENT DECREE See “CD”.
CSO Combined Sewer Overflow, any discharge from the combined sewer
system at a point prior to the headworks of a wastewater treatment
facility.
FORCE MAIN A pressurized sewer pipe that can carry wastewater. Sewer force mains
are necessary when topography, or other system characteristics, do not
allow wastewater to move through the line by the influence of gravity
alone. Force mains are the pipes that convey wastewater under pressure
through the work of pumps located in pump stations or lift stations.
GI Green Infrastructure, environmentally friendly and sustainable
stormwater management practices that reduce runoff by using
infiltration, such as bioretention and bioswales.
GRADE CONTROL
STRUCTURE
A structure constructed in a creek or stream to control erosion. The
structure allows water to pass to a lower elevation while directing the
energy and velocity of the water in a manner that minimizes erosion
that would otherwise change the shape of the stream.
GLOSSARY
I/I Inflow and Infiltration; inflow refers to direct connections of rainwater
sources to the sanitary sewer system; infiltration refers to groundwater
sources of flows into sewer pipes. Inflow sources can include roof
downspouts, yard and area drains, foundation drains, manhole covers,
cross connections from storm sewers, or inlets. Infiltration sources can
include defective building laterals, sewer pipes, pipe joints,
connections, or manhole walls.
INFILTRATION Infiltration refers to groundwater sources of flows into sewer pipes.
Infiltration sources can include defective building laterals, sewer pipes,
pipe joints, connections, or manhole walls.
INFLOW Inflow refers to direct connections of rainwater sources to the sanitary
sewer system. Inflow sources can include roof downspouts, yard and
area drains, foundation drains, manhole covers, cross connections from
storm sewers, or inlets.
LATERAL A sewer connecting a building with the publicly owned sanitary sewer
main.
LIFT STATION Lift stations are used for pumping wastewater or stormwater from a
point of lower elevation to a point of higher elevation. Lift stations
utilize pumps to lift the wastewater from the lower elevation to the
higher elevation. Wastewater then flows by gravity to the next location
in the system.
LMRDP Lower and Middle River Des Peres, generally the river from University
City south to the Mississippi River.
LTCP Long Term Control Plan, a long duration plan to manage/improve the
combined sewer system and abate combined sewer overflows, through
the identification of a capital improvement plan tailored to receiving
stream water quality and the community's financial capability.
MAIN A smaller public sewer collecting flows from buildings via lateral
connections.
MGD Million Gallons per Day, a measure of flow over time. 1 MGD is
equivalent to 700 gallons per minute of flow.
MSD Metropolitan St. Louis Sewer District, district formed in 1954 via vote
of the people, with responsibility for wastewater and stormwater
services in St. Louis City and most of St. Louis County.
OMCI Operation Maintenance Construction Improvement district, funds
generated by tax payments in certain districts can be used for capital
improvements in those districts. Funds can be used for capital projects
or maintenance.
OUTFALL The point of discharge to the environment from a constructed SSO or
CSO.
PRIVATE I/I REDUCTION Reduction of inflow and infiltration sources on private property, from
private sources, such as downspout and driveway drain connections to
the sanitary sewer system (inflow) or deteriorated service laterals or
broken connections (infiltration).
PUBLIC I/I REDUCTION Reduction of public inflow and infiltration sources such as cracked and
broken sewer pipes or deteriorated manholes.
GLOSSARY
PUMP STATION Pump stations are facilities which include pumps and ancillary
equipment, for pumping fluids from one place to another. A pump is a
mechanical device that converts mechanical energy to pressure, in order
to convey wastewater or stormwater. Pumping results in pressurized
sewer pipes that are called force mains.
RAIN GARDEN A landscaped shallow swale or depression that temporarily holds water
and reduces stormwater runoff as the water infiltrates into the soil. The
water is absorbed by plants and is filtered as it percolates through the
soil.
RAINSCAPING Any combination of plantings, water features, catch basins, permeable
pavement and other activities that manage stormwater as close as
possible to where it falls, rather than moving it someplace else.
RDP River Des Peres, a river in the central and south portions of the
metropolitan area, which was enlarged in the early 1900s to provide
conveyance to the Mississippi River of stormwater runoff in order to
reduce surface flooding.
RFP Request for Proposals.
RFQ Request for Qualifications.
SANITARY SEWER SYSTEM The portion of the sewer system designed to convey only sewage, and
not stormwater, from residences, commercial buildings, industrial
plants and institutions for treatment at a wastewater treatment facility
SKME Sverdrup Kwame Metcalf Eddy - a planning team that identified system
needs in the early 2000s.
SSO Sanitary Sewer Overflow, any overflow, spill, diversion, or release of
wastewater from or caused by MSD's sanitary sewer system. This CD
term shall include: (i) discharges to surface waters of the State or
United States from MSD's sanitary sewer system and (ii) any release of
wastewater from MSD's sanitary sewer system to public or private
property that does not reach waters of the United States or the State.
SSO MP Sanitary Sewer Overflow Control Master Plan, a capital improvement
plan which describes the results of system evaluations and the specific
measures that will result in the Elimination of all Constructed SSOs
Outfalls, all known SSOs, and Building Backups, and/or that are
necessary to ensure that there is adequate capacity in the Sanitary Sewer
System to collect, convey, and treat anticipated peak wet weather flows
under current and projected future conditions as defined in Paragraphs
21(e) and (g) of the CD.
SUBTRUNK A sewer that serves a smaller or sub-watershed area, which brings flow
to a trunk sewer.
TRUNK SEWER A major sewer which serves a large area. A trunk sewer typically is
centrally located within a watershed to which subtrunks and other
sewers are tributary.
USGS United States Geological Survey.
GLOSSARY
WASTEWATER Wastewater, also written as waste water, is any water that has been
adversely affected in quality by human influence. Wastewater can
originate from a combination of domestic, industrial, commercial or
agricultural activities, and from sewer inflow or infiltration.
WATERSHED An area of land which drains to a specific creek, river, or other body of
water.
WATERSHED CONSULTANT A consulting firm retained for a multi-year design effort on a related
suite of projects in a specific watershed.
WWTF Wastewater Treatment Facility, any facility, method or process which
removes, reduces or renders less obnoxious pollutants or water
contaminants released from any source.
WWTP Wastewater Treatment Plant, a municipal facility that removes, reduces
or renders less obnoxious pollutants or water contaminants from
wastewater before releasing it to the environment.
11 April 2022
Page 1 of 4
WASTEWATER ENGINEERING PROJECTS - FY23
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
12090 BC-01 PHASE III AND BC-02 PHASE II SANITARY
RELIEF (I-170 TO HEATHERWOOD DR)
$1,705,000 1
12565 BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
$1,000,000 2
12565 BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
$8,600,000 3
12248 CAULKS CREEK A PUMP STATION (P-750)
IMPROVEMENTS
$200,000 4
12804 CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS (2023)
$3,000,000 5
12694 CITYSHED MITIGATION PROGRAM DESIGN
(CONTRACT B)
$50,000 6
12552 COLDWATER CREEK WWTF REPAIRS AND
IMPROVEMENTS (2023)
$175,000 7
11152 CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL FACILITIES
$2,500,000 8
11826 CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK
TUNNELS
$5,000,000 9
11151 CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION FACILITIES
$7,500,000 10
12908 CRITICAL INFRASTRUCTURE ASSESSMENT
AND ASSET INVESTIGATION (2023)
$1,700,000 11
12140 CSO - MARY AVENUE SOUTH OF MANCHESTER
CSO INTERCEPTOR (I-132)/OUTFALL (L-106)
ELIMINATION PHASE II
$200,000 12
12801 FLOW METERING AND MONITORING (2022)$2,500,000 13
13516 GASLIGHT SQUARE SEWER IMPROVEMENTS
PHASE II
$1,500,000 14
12387 GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (2022)
$2,000,000 15
12397 GENERAL SERVICES AGREEMENT - FACILITY
& SEWER DESIGN (2020) CONTRACT A
$200,000 16
13098 GENERAL SERVICES AGREEMENT - FACILITY
& SEWER DESIGN (2022) CONTRACT A
$475,000 17
11 April 2022
Page 2 of 4
WASTEWATER ENGINEERING PROJECTS - FY23
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
13099 GENERAL SERVICES AGREEMENT - FACILITY
& SEWER DESIGN (2022) CONTRACT B
$450,000 18
13102 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2022) CONTRACT A
$85,000 19
13103 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2022) CONTRACT B
$85,000 20
13104 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2022) CONTRACT C
$85,000 21
13087 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2021) CONTRACT A
$75,000 22
13088 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2021) CONTRACT B
$75,000 23
13089 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2021) CONTRACT C
$75,000 24
13090 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2021) CONTRACT D
$75,000 25
12400 GENERAL SERVICES AGREEMENT - SEWER
AND CHANNEL DESIGN (2021) CONTRACT A
$200,000 26
13108 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT A
$62,500 27
13109 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT B
$62,500 28
13110 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT C
$62,500 29
13111 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT D
$62,500 30
12174 GEYER SANITARY RELIEF (W. MONROE AVE
TO W. ESSEX AVE)
$496,000 31
12176 GLEN ECHO SANITARY RELIEF (ENGELHOLM
AVE TO HENDERSON AVE)
$730,000 32
13630 GRAND GLAIZE WWTF GRAND GLAIZE CREEK
BANK STABILIZATION
$260,000 33
13221 GRAND GLAIZE WWTF REPAIRS AND
IMPROVEMENTS (2023)
$400,000 34
11 April 2022
Page 3 of 4
WASTEWATER ENGINEERING PROJECTS - FY23
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
12334 HAMPTON CREEK SANITARY RELIEF (DEER
CREEK TRUNK TO OXFORD DR) PHASE I
$200,000 35
10641 HARLEM - BADEN RELIEF PHASE IV (HEBERT)
BUILDING DEMOLITION AND DESIGN
$100,000 36
11800 HARLEM BADEN RELIEF PHASE IV (HEBERT) -
TRUNK SEWER REHABILITATION
$50,000 37
11957 JEFFERSON BARRACKS TUNNEL
CONSOLIDATION SEWERS
$100,000 38
11817 LEMAY NO. 3 PUMP STATION AND FORCE
MAIN
$575,000 39
13153 LEMAY WWTF REPAIRS AND IMPROVEMENTS
(2023) (GRIT TANKS AND SECONDARY
CLARIFIER DUCT BANK)
$400,000 40
13629 LINDSAY LANE SANITARY RELIEF (LINDSAY
LANE TO LINDBERGH BLVD)
$491,000 41
11109 LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
$125,000 42
11109 LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
$270,000 43
11746 LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO FENTON
WWTF TUNNEL
$575,000 44
12255 LOWER MERAMEC WWTF EXPANSION PHASE
II
$1,716,000 45
12255 LOWER MERAMEC WWTF EXPANSION PHASE
II
$2,000,000 46
11701 PUMP STATION REPLACEMENT PROJECTS
(PHASE I)
$50,000 47
12006 RADAR RAINFALL DATA (2020)$150,000 48
11153 RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
$600,000 49
12195 S BRENTWOOD BLVD SANITARY RELIEF
(DAYTONA DR TO WALINCA TERRACE)
$500,000 50
10766 STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
$605,000 51
11 April 2022
Page 4 of 4
WASTEWATER ENGINEERING PROJECTS - FY23
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
12806 STREAM FLOW WATER QUALITY SAMPLING
(2023)
$350,000 52
10794 WEBSTER GROVES TRUNK E SANITARY
RELIEF (SKME-628)
$1,512,000 53
13436 WET WEATHER OPTIMIZATION STUDY $1,500,000 54
TOTAL:$53,515,000
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BC-01 PHASE III AND BC-02 PHASE II SANITARYRELIEF (I-170 TO HEATHERWOOD DR)
Design Services
6660 - Sanitary
Replacement Fund
ELIMINATION OF CONSTRUCTED SSO OUTFALLS REQUIRED.
CONSTRUCT 12,915 FEET OF 8-INCH TO 30-INCH SANITARY SEWER.
ELIMINATE CONSTRUCTED SSO OUTFALLS BP-003, BP-004, BP-014,
AND BP-016.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPROPRIATION IN FY 28. TOTAL CONSTRUCTION BUDGET IS
$9,942,000.
§¨¦170
§¨¦170
LADUE
PR
I
C
E
O L D B O N H O M M E
DI
E
L
M
A
N
DELMAR
W
E
N
N
E
K
E
R
MC
K
N
I
G
H
T
BARNES
LE
P
E
R
E
CE
L
L
A
G L ENEAG L E S
BRAE
B
U
R
N
B
ERICK
RI
O
V
I
S
T
A
GANNON
S T A N D RE WS
GR
A
N
A
D
A
GR
A
Y
B
R
I
D
G
E
ST
ONEYSIDE
KE
N
T
BARBY
ENFIEL
D B A L S ON
L
A
Y
HE
A
T
H
E
R
H
I
L
L
DRO
M
A
R
A
P
R
IV
A
T
E
BO
N
A
I
R
E
FOR
D
Y
C
E
A
L
A
N
S
ON
SPOON
LO
U
W
E
N
AR
B
O
R
MANSFIELD
BE
R
K
L
E
Y
T
A
N
G
L
E
W
O
O
D
KINGS BURY
POINTER
B O N HILLS GROBY
WASHINGTON
BLACK CREEK
D
ELCREST
RY
E
SHERATON
RA
N
D
E
L
A
Y
VILLA
EDGEW O O D
LA DUE HILLS
WH
I
T
E
R
O
S
E
PRICEWO O DS
BRAZILLIAN
LADEL
B R I A R CLIFF
WATSONIALY
N
N
E
BE
A
U
W
O
O
D
PAXTON
NASSAU
LARKDALE
PR
I
V
A
T
E
PRIVATE
MC
K
N
I
G
H
T
VILLA
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12090
Wastewater
11
$1,705,000
Various
Lemay/RDP
Deer Creek
Capital
1
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL & LEMAY WWTF FLUIDIZED BEDINCINERATORS
Design Services
(Supplemental
Appropriation)
6660 - Sanitary
Replacement Fund
LONG TERM SOLUTION FOR SOLIDS HANDLING AT TREATMENT
FACILITIES IS NEEDED.
CONSTRUCT FLUIDIZED BED INCINERATORS AT THE BISSELL AND
LEMAY WASTEWATER TREATMENT FACILITIES, TO INCLUDE
REDUNDANT SLUDGE ACCEPTANCE SYSTEMS AND SOLIDS
HANDLING SYSTEM IMPROVEMENTS.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPROPRIATION IN FUTURE FISCAL YEARS. TOTAL CONSTRUCTION
BUDGET IS $575,000,000.
§¨¦55
§¨¦64
§¨¦44
§¨¦70
§¨¦55
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12565
Wastewater
11
$1,000,000
Various
Various
Various
Capital
2
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL & LEMAY WWTF FLUIDIZED BEDINCINERATORS
Engineering During
Construction Services
6660 - Sanitary
Replacement Fund
LONG TERM SOLUTION FOR SOLIDS HANDLING AT TREATMENT
FACILITIES IS NEEDED.
CONSTRUCT FLUIDIZED BED INCINERATORS AT THE BISSELL AND
LEMAY WASTEWATER TREATMENT FACILITIES, TO INCLUDE
REDUNDANT SLUDGE ACCEPTANCE SYSTEMS AND SOLIDS
HANDLING SYSTEM IMPROVEMENTS.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPROPRIATION IN FUTURE FISCAL YEARS. TOTAL CONSTRUCTION
BUDGET IS $575,000,000.
§¨¦55
§¨¦64
§¨¦44
§¨¦70
§¨¦55
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12565
Wastewater
11
$8,600,000
Various
Various
Various
Capital
3
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CAULKS CREEK A PUMP STATION (P-750)IMPROVEMENTS
Engineering During
Construction Services
6660 - Sanitary
Replacement Fund
EXISTING PUMP STATION IS DETERIORATING AND REQUIRES
IMPROVEMENT.
CONSTRUCT IMPROVEMENTS TO PUMP STATION P-750.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPROPRIATION IN FY 23. TOTAL BUDGET IS $8,200,000.
EDISON
CENTRAL MIDLAND
C R Y S T A L S P R I N G S
B R I G H T H URST
L
A
N
S
B
ROOKE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12248
Wastewater
11
$200,000
Chesterfield
Missouri
Caulks Creek
Capital
4
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CCTV INSPECTION AND PHYSICAL INSPECTION OFSEWERS (2023)
Vendor Services
1101 - General Fund
FIELD INVESTIGATION OF SEWERS IS NEEDED TO IDENTIFY
PROBLEMS AND QUANTIFY REQUIRED REPAIRS/IMPROVEMENTS AND
CLEANING.
PERFORM CCTV OR PHYSICAL INSPECTION AND CLEANING OF
SELECTED SEWERS. SERVICES MAY BE RENEWED THROUGH FY2025
BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12804
Wastewater
16
$3,000,000
Various
Various
Various
Asset Management
5
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CITYSHED MITIGATION PROGRAM DESIGN(CONTRACT B)
Professional Services
6660 - Sanitary
Replacement Fund
INADEQUATE CITYSHED COMBINED SEWER SYSTEM CAUSING
SURFACE FLOODING AND BUILDING BACKUPS.
DESIGN CITYSHED SYSTEM IMPROVEMENTS TO INCLUDE
INFRASTRUCTURE SUCH AS COMBINED SEWER CONSTRUCTION AND
REPLACEMENT, SOFT SEWER SEPARATION, AND STORM SEWER
CONSTRUCTION AND STORAGE.
CONSTRUCTION IMPLEMENTED IN PHASES UNDER VARIOUS
PROJECTS, INCLUDING 12740, 12741, 12702, AND 10756.
§¨¦70
§¨¦44
§¨¦55
§¨¦64
§¨¦170
§¨¦70
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12694
Wastewater
16
$50,000
St. Louis City
Various
Various
Asset Management
6
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
COLDWATER CREEK WWTF REPAIRS ANDIMPROVEMENTS (2023)
Engineering During
Construction Services
6660 - Sanitary
Replacement Fund
AERATION PIPING NEEDS TO BE REPLACED, AND BOSKERS SWITCH
TRACK NEEDS TO BE IMPROVED.
AERATION CONTROL BUILDING IMPROVEMENTS, INCLUDING
REPLACEMENT OF AERATION CONTROL PIPING AND
INSTRUMENTATION, AND INSTALLATION OF A PARALLEL BOSKER
SWITCH TRACK SYSTEM AND NEW BOSKER UNITS.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPROPRIATION IN FY 24. TOTAL BUDGET IS $7,500,000.
PRIV
A
T
E
TREES EDGE
B
E
H
LMANNME A DO W S
BEHLMANNFARMS
RICHMOND FOREST
R
O
BBINSWA Y
PRIVATE
P
R
I
V
A
T
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12552
Wastewater
11
$175,000
Unincorporated
Coldwater
Coldwater Creek
Capital
7
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CONSTRUCTION MANAGEMENT SERVICES -LOWER AND MIDDLE RDP TUNNEL FACILITIES
Professional Services
6660 - Sanitary
Replacement Fund
SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIA
TUNNEL CONSTRUCTION.
PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION
SERVICES FOR THE LMRDP CSO STORAGE TUNNEL (BROADWAY TO
RDP TUBES), AND THE JEFFERSON BARRACKS TUNNEL (LEMAY
WWTP TO MARTIGNEY PS).
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAY
INCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦55
§¨¦64
§¨¦270
§¨¦44
§¨¦255
§¨¦70
§¨¦170
§¨¦55
§¨¦255
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11152
Wastewater
16
$2,500,000
Various
Lemay/RDP
Various
Asset Management
8
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CONSTRUCTION MANAGEMENT SERVICES -LOWER MERAMEC AND DEER CREEK TUNNELS
Professional Services
6660 - Sanitary
Replacement Fund
SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIA
TUNNEL CONSTRUCTION.
PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION
SERVICES FOR THE DEER CREEK TUNNEL & TRUNK SEWER, MALINE
CREEK STORAGE FACILITY, RDP TRIBUTARIES CSO TUNNEL, UPPER
RDP CSO STORAGE TUNNEL, AND THE LOWER MERAMEC SYSTEM
BAUMGARTNER TO FENTON WWTF TUNNEL.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAY
INCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦270
§¨¦70§¨¦170
§¨¦255
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11826
Wastewater
16
$5,000,000
Various
Various
Various
Asset Management
9
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CONSTRUCTION MANAGEMENT SERVICES -TANK/TREATMENT/PUMP STATION FACILITIES
Professional Services
6660 - Sanitary
Replacement Fund
SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIA
THE CONSTRUCTION OF STORAGE TANKS AND PUMP STATIONS, AND
TREATMENT FACILITY IMPROVEMENTS.
PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION
SERVICES FOR TANK, TREATMENT, AND PUMP STATION PROJECTS
THROUGHOUT THE DISTRICT.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAY
INCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11151
Wastewater
16
$7,500,000
Various
Various
Various
Asset Management
10
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CRITICAL INFRASTRUCTURE ASSESSMENT ANDASSET INVESTIGATION (2023)
Vendor Services
1101 - General Fund
INVESTIGATION NEEDED TO DETERMINE SEWER CONDITIONS AND
SYSTEM DEFECTS TO PROVIDE THE BASIS FOR PREVENTATIVE
MAINTENANCE AND REHABILITATION ACTIVITIES.
PERFORM SERVICES SUCH AS PROJECT INSPECTION,
RECONNAISSANCE, INSPECTION PRIORITIZATION, PROJECT SET-UP,
FIELD VERIFICATION, MAP UPDATES, WORK ORDER MANAGEMENT,
AND CCTV VIDEO REVIEW. SERVICES MAY BE RENEWED THROUGH
FY2025 BASED ON PERFORMANCE.
THIS PROJECT WILL PROVIDE SUPPORT FOR THE OPERATIONS
DEPARTMENT, DESIGN AND PLANNING ACTIVITIES, AND UPDATES TO
ASSET INFORMATION PROGRAMS.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12908
Wastewater
16
$1,700,000
Various
Various
Various
Asset Management
11
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CSO - MARY AVENUE SOUTH OF MANCHESTERCSO INTERCEPTOR (I-132)/OUTFALL (L-106)ELIMINATION PHASE II
Design Services
(Supplemental
Appropriation)
6660 - Sanitary
Replacement Fund
REMOVAL OF I-132 AND L-106 REQUIRED BY THE LONG TERM
CONTROL PLAN.
CONSTRUCT 10,500 FEET OF 8-INCH TO 36-INCH SANITARY SEWER,
AND 3,600 FEET OF 12-INCH TO 36-INCH STORM SEWER. PERFORM
PUBLIC AND PRIVATE I/I REDUCTION TO FACILITATE COMBINED
SEWER SEPARATION. REMOVE INTERCEPTOR I-132 AND CSO
OUTFALL L-106.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPROPRIATION IN FY 26. TOTAL CONSTRUCTION BUDGET IS
$26,800,000.
PINE
MC
K
N
I
G
H
T
WHITE
LAWN
BR
E
N
T
W
O
O
D
SWAN
EULALIE
ROSALIE
HIGH
SCHOOL
MADGE
SA
L
E
M
ST
C
L
A
I
R
URBAN
Y O R K
CE
C
E
L
I
A
ROSE
R
O
CK
F
O
R
D
MAR
Y
PA
R
K
R
I
D
G
E
FLORENCE
BR
E
M
E
R
T
O
N
MORITZ
WRENWOOD
LOUIS
SONORA
PENDLETON
AN
N
A
L
E
E
HARRISON
EVANS
RE
M
I
N
G
T
O
N
RU
T
H
STRASSNER
MERRITT
HI
L
L
JOSEPH
LITZSINGER
PO
C
A
H
O
N
T
A
S
POWELL
MA
N
D
E
R
L
Y
KENTLAND
CO
L
L
I
E
R
BERRY
HE
L
E
N
WHITEHALL
SUTTON
RARITAN
HENRIETTA
B R I D G E P O R T
HILLDALE
MAGDALEN
GOLDEN GATE
CAN
A
R
Y
KENILWORTH
BOMPART
PA
T
T
O
N
R E DBIRD
YORKH I L L S
GENEVIEVE
WHITE
L I T Z SINGER
LITZSINGER
BR
E
M
E
R
T
O
N
SWAN
MARY
MORITZ
LAWN
BRIDGEPORT
M A N C H ES TE R RD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12140
Wastewater
11
$200,000
Brentwood
Lemay/RDP
Deer Creek
Capital
12
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FLOW METERING AND MONITORING (2022)
Prof/Vendor Services
(Supplemental
Appropriation)
1101 - General Fund
COMPUTER MODELING OF THE SEWER SYSTEM REQUIRES FLOW
DATA IN ORDER TO BE ACCURATELY CALIBRATED TO FIELD
CONDITIONS.
CONDUCT FLOW METERING AND MONITORING OF THE WASTEWATER
SYSTEM TO COLLECT AND ANALYZE DATA ON FLOWS AND SYSTEM
RESPONSE DURING WET WEATHER EVENTS. THIS INFORMATION
WILL BE USED TO CALIBRATE HYDRAULIC MODELS TO DETERMINE IF
PROJECTS ARE REQUIRED.
SERVICES MAY BE RENEWED THROUGH FY2026 BASED ON
PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12801
Wastewater
16
$2,500,000
Various
Various
Various
Asset Management
13
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GASLIGHT SQUARE SEWER IMPROVEMENTSPHASE II
Design Services
(Supplemental
Appropriation)
6660 - Sanitary
Replacement Fund
OVERCHARGED COMBINED SEWERS CAUSING WET WEATHER
BUILDING BACKUPS.
CONSTRUCT COMBINED SEWER IMPROVEMENTS IN THE GASLIGHT
SQUARE AREA.
OLIV
E
BO
Y
L
E
SAR
A
H
WHI
T
T
I
E
R
MCP
H
E
R
S
O
N
WES
T
M
I
N
S
T
E
R
WAS
H
I
N
G
T
O
N
LINDELL
DEL
M
A
R
MARYLAND
MCP
H
E
R
S
O
N
WES
T
M
I
N
S
T
E
R
MARYLAND
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13516
Wastewater
11
$1,500,000
St. Louis City
Bissell
Western Mill Creek
Capital
14
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT -CONSTRUCTION MANAGEMENT (2022)
General Services -
Construction
Inspection
6660 - Sanitary
Replacement Fund
CONSTRUCTION MANAGEMENT NEEDS TO SUPPORT CAPITAL
PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF
INTERNAL STAFF.
RETAIN CONSTRUCTION MANAGEMENT CONSULTANT FOR AS
NEEDED SERVICES. SERVICES MAY BE RENEWED THROUGH FY2023
BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12387
Wastewater
14
$2,000,000
Various
Various
Various
Asset Management
15
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - FACILITY &SEWER DESIGN (2020) CONTRACT A
GSA - Design
(Supplemental
Appropriation)
6660 - Sanitary
Replacement Fund
DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE
DISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF.
RETAIN DESIGN FIRM FOR AS NEEDED FACILITY & SEWER DESIGN
SERVICES. SERVICES MAY BE RENEWED THROUGH FY2023 BASED
ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12397
Wastewater
11
$200,000
Various
Various
Various
Asset Management
16
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - FACILITY &SEWER DESIGN (2022) CONTRACT A
GSA - Design
(Supplemental
Appropriation)
6660 - Sanitary
Replacement Fund
DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE
DISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF.
RETAIN DESIGN FIRM FOR AS NEEDED FACILITY & SEWER DESIGN
SERVICES. SERVICES MAY BE RENEWED THROUGH FY2023 BASED
ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13098
Wastewater
11
$475,000
Various
Various
Various
Asset Management
17
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - FACILITY &SEWER DESIGN (2022) CONTRACT B
GSA - Design
(Supplemental
Appropriation)
6660 - Sanitary
Replacement Fund
DESIGN TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE
DISTRICT WHEN NEEDS EXCEED THE CAPACITY OF INTERNAL STAFF.
RETAIN DESIGN FIRM FOR AS NEEDED CONDITION AND REMAINING
USEFUL LIFE ASSESSMENTS AND PRELIMINARY STUDY
PREPARATION IN SUPPORT OF ONGOING PLANNING EFFORTS.
SERVICES MAY BE RENEWED THROUGH FY2023 BASED ON
PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13099
Wastewater
11
$450,000
Various
Various
Various
Asset Management
18
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT -GEOTECHNICAL (2022) CONTRACT A
GSA - Geotechnical
(Supplemental
Appropriation)
6660 - Sanitary
Replacement Fund
GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITAL
PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF
INTERNAL STAFF.
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICES
MAY BE RENEWED THROUGH FY2023 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
A PORTION OF CONTRACT MAY BE FUNDED OUT OF FUND 5120 FOR
STORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13102
Wastewater
11
$85,000
Various
Various
Various
Asset Management
19
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT -GEOTECHNICAL (2022) CONTRACT B
GSA - Geotechnical
(Supplemental
Appropriation)
6660 - Sanitary
Replacement Fund
GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITAL
PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF
INTERNAL STAFF.
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICES
MAY BE RENEWED THROUGH FY2023 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
A PORTION OF CONTRACT MAY BE FUNDED OUT OF FUND 5120 FOR
STORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13103
Wastewater
11
$85,000
Various
Various
Various
Asset Management
20
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT -GEOTECHNICAL (2022) CONTRACT C
GSA - Geotechnical
(Supplemental
Appropriation)
6660 - Sanitary
Replacement Fund
GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITAL
PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF
INTERNAL STAFF.
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICES
MAY BE RENEWED THROUGH FY2023 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
A PORTION OF CONTRACT MAY BE FUNDED OUT OF FUND 5120 FOR
STORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13104
Wastewater
11
$85,000
Various
Various
Various
Asset Management
21
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - PROPERTYAPPRAISAL (2021) CONTRACT A
Appraisal Services
(Supplemental
Appropriation)
1101 - General Fund
APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'S
CAPITAL PROGRAM.
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THE
DISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH
FY2023 BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13087
Unallocated
12
$75,000
Various
Various
Various
Non-recurring
22
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - PROPERTYAPPRAISAL (2021) CONTRACT B
Appraisal Services
(Supplemental
Appropriation)
1101 - General Fund
APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'S
CAPITAL PROGRAM.
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THE
DISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH
FY2023 BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13088
Unallocated
12
$75,000
Various
Various
Various
Non-recurring
23
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - PROPERTYAPPRAISAL (2021) CONTRACT C
Appraisal Services
(Supplemental
Appropriation)
1101 - General Fund
APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'S
CAPITAL PROGRAM.
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THE
DISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH
FY2023 BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13089
Unallocated
12
$75,000
Various
Various
Various
Non-recurring
24
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - PROPERTYAPPRAISAL (2021) CONTRACT D
Appraisal Services
(Supplemental
Appropriation)
1101 - General Fund
APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'S
CAPITAL PROGRAM.
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THE
DISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH
FY2023 BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13090
Unallocated
12
$75,000
Various
Various
Various
Non-recurring
25
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - SEWER ANDCHANNEL DESIGN (2021) CONTRACT A
GSA - Design
(Supplemental
Appropriation)
6660 - Sanitary
Replacement Fund
DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE
DISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF.
RETAIN DESIGN FIRM FOR AS NEEDED SEWER AND CHANNEL
DESIGN. SERVICES MAY BE RENEWED THROUGH FY2023 BASED ON
PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
A PORTION OF CONTRACT WILL BE FUNDED OUT OF FUND 5120 FOR
STORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12400
Wastewater
11
$200,000
Various
Various
Various
Asset Management
26
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (2022) CONTRACT A
GSA - Survey
(Supplemental
Appropriation)
6660 - Sanitary
Replacement Fund
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT
THE DISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES.
SERVICES MAY BE RENEWED THROUGH FY2023 BASED ON
PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
A PORTION OF CONTRACT MAY BE FUNDED OUT OF FUND 5120 FOR
STORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13108
Wastewater
11
$62,500
Various
Various
Various
Asset Management
27
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (2022) CONTRACT B
GSA - Survey
(Supplemental
Appropriation)
6660 - Sanitary
Replacement Fund
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT
THE DISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES.
SERVICES MAY BE RENEWED THROUGH FY2023 BASED ON
PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
A PORTION OF CONTRACT MAY BE FUNDED OUT OF FUND 5120 FOR
STORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13109
Wastewater
11
$62,500
Various
Various
Various
Asset Management
28
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (2022) CONTRACT C
GSA - Survey
(Supplemental
Appropriation)
6660 - Sanitary
Replacement Fund
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT
THE DISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES.
SERVICES MAY BE RENEWED THROUGH FY2023 BASED ON
PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
A PORTION OF CONTRACT MAY BE FUNDED OUT OF FUND 5120 FOR
STORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13110
Wastewater
11
$62,500
Various
Various
Various
Asset Management
29
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (2022) CONTRACT D
GSA - Survey
(Supplemental
Appropriation)
6660 - Sanitary
Replacement Fund
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT
THE DISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES.
SERVICES MAY BE RENEWED THROUGH FY2023 BASED ON
PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
A PORTION OF CONTRACT MAY BE FUNDED OUT OF FUND 5120 FOR
STORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13111
Wastewater
11
$62,500
Various
Various
Various
Asset Management
30
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GEYER SANITARY RELIEF (W. MONROE AVE TO W.ESSEX AVE)
Design Services
6660 - Sanitary
Replacement Fund
OVERCHARGED SANITARY SEWERS IN THE GEYER LATERAL.
CONSTRUCT 3,400 FEET OF 18-INCH TO 21-INCH SANITARY SEWER.
ESSEX
ADAMS
CL
A
Y
GE
Y
E
R
TA
Y
L
O
R
NIRK
HA
R
R
I
S
O
N
UNION PA C I F I C
WAY
VA
N
B
U
R
E
N
CO
U
C
H
JEFFERSON
MONROE
AL
T
U
S
CENTRAL
FR
I
E
D
A
CR
E
S
T
JEWEL
ARGONNE
G ABRIEL
ANN
G O E T H E
EV
A
N
S
LARK
CHOPIN
MADISON
KNIERIM
BU
R
N
S
SI
M
M
O
N
S
CA
R
O
L
I
N
E
W I LCOX
BODLEY
DICKENS
CL
E
V
E
L
A
N
D
R
I
F
L
E
R
ANGE
PE
A
R
L
MOZA
R
T
CL
E
M
E
N
S
CLINTON
ELM T R E E
MERMOD
BEETHOVEN
PRIVATE
MCKINLEY
WASHINGTON
KIRKWOODMCCULLOUGHPU
L
L
M
A
N
CLAY JEWELJEWEL
WASHINGTON
MADISON
HA
R
R
I
S
O
N
BODLEY
PR
I
V
A
T
E
MONROE
VA
N
B
U
R
E
N
JEWEL
ARGONNE
CLINTON
U NIO N P A C I F I C
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12174
Wastewater
11
$496,000
Kirkwood
Meramec
Grand Glaize Creek
Capital
31
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GLEN ECHO SANITARY RELIEF (ENGELHOLM AVETO HENDERSON AVE)
Design Services
6660 - Sanitary
Replacement Fund
SANITARY SEWER SURCHARGING ALONG ENGELHOLM AVENUE AND
THROUGH GLEN ECHO COUNTRY CLUB.
CONSTRUCT 6,220 FEET OF 15-INCH TO 21-INCH SANITARY SEWER.
M
E
T
R
O
L
I
N
K
LUC
A
S
N
H
U
N
T
MAR
K
E
T
LIN
C
O
L
N
MYR
O
N
COL
O
N
I
A
L
EDIS
O
N
MAY
W
O
O
D
PRIVATE
KEM
P
67T
H
69T
H
HU
N
T
E
R
68T
H
MOU
N
T
LEXI
N
G
T
O
N
ST L
O
U
I
S
PE
N
N
S
Y
L
V
A
N
I
A
GRE
E
N
W
A
Y
SA
L
E
R
N
O
LER
O
Y
PAR
K
LESC
H
E
N
LIN
D
E
L
L
LEADALE
GAR
Y
MARILLAC
CLA
R
E
M
O
R
E
ROS
E
B
U
D
WES
T
FER
G
U
S
O
N
MAI
N
HILLSDALE
LUDWIG
MAUR
E
R
GREENDALE
GRA
N
D
LU
L
U
70TH VA
S
S
I
E
R
EN
G
E
L
H
O
L
M
EAST
CASTLEPARK
FERGUSON M
E
T
R
O
L
I
N
K
SA
L
E
R
N
O
MAR
K
E
T
ST C
H
A
R
L
E
S
R
O
C
K
R
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12176
Wastewater
11
$730,000
Various
Lemay/RDP
University City Branch
Capital
32
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GRAND GLAIZE WWTF GRAND GLAIZE CREEKBANK STABILIZATION
Design Services
6660 - Sanitary
Replacement Fund
EROSION THREATENING FLOODWALL PROTECTION OF GRAND
GLAIZE WWTF AND MAINTENANCE YARD.
CONSTRUCT 300 FEET OF 22 FOOT TALL MODULAR BLOCK WALL.
PRIVATE
GR
A
N
D
G
L
A
I
Z
E
BURL
I
N
G
T
O
N
N
O
R
T
H
E
R
N
S
A
N
T
A
F
E
WESTERMAN
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13630
Wastewater
11
$260,000
Valley Park
Meramec
Grand Glaize Creek
Capital
33
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GRAND GLAIZE WWTF REPAIRS ANDIMPROVEMENTS (2023)
Design Services
6660 - Sanitary
Replacement Fund
DETERIORATING CONCRETE IN THE AERATION BASIN, FINAL
CLARIFIER, AND CHLORINE CONTACT BASIN AREAS, AND CLARIFIER
COLLECTORS IN NEED OF REPLACEMENT.
REPAIR SPALLED AND CRACKED CONCRETE ON MULTIPLE PROCESS
TANKS AND STRUCTURES, DEMOLISH ABANDONED GATES WITHIN
AERATION BASIN GATES 1 TO 3, AND REPLACE FINAL CLARIFIER 2
AND 3 COLLECTORS.
TWIN LAKE
S
PRIVATE
U NI O N P A CIFIC
WESTERMAN
SPINDLE
AP
P
L
E
T
R
E
E
B U R LIN G TO N NORTHERNSANTAFE
GR
A
N
D
G
L
A
I
Z
E
U N I O N P A CIFIC
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13221
Wastewater
11
$400,000
Valley Park
Meramec
Grand Glaize Creek
Capital
34
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HAMPTON CREEK SANITARY RELIEF (DEER CREEKTRUNK TO OXFORD DR) PHASE I
Design Services
(Supplemental
Appropriation)
6660 - Sanitary
Replacement Fund
OVERCHARGED SEWERS. ELIMINATION OF CONSTRUCTED SSO
OUTFALL REQUIRED.
CONSTRUCT 7,500 FEET OF 12-INCH TO 72-INCH SANITARY SEWER.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPROPRIATION IN FY 26. TOTAL CONSTRUCTION BUDGET IS
$28,000,000.
§¨¦44
§¨¦64
§¨¦170
§¨¦44
§¨¦170
DALE
M
E
T
R
O
L
I
N
K
WISE
UNIO
N
P
A
C
I
F
I
C
FOLK
PINE
MARSHALL
YA
L
E
CLARK
McCAUSLAND
LA
C
L
E
D
E
S
T
A
T
I
O
N
TUXEDO
BELLEVUE
BRENTWOOD
ETHEL
WHITE
CLAYTON
BR
E
D
E
L
L
SU
T
T
O
N
ROSALIEEULALIE
ATALANTA
BOLAND
GL E N
LAWN
CLAYTONIA HOOVER
P ACIFIC
ZEPHYR
FOREST
LO
U
I
S
GAYOLA
SU
M
M
I
T
DEL
NO
R
TE
WI L L I A M S
HIGH
SCHOOL
SWAN
C A M B RID GE
SOUTH W E S T
FLORA
MADGE
SALEM
B
U
C
K
HICKS
MA
R
Y
G R E E N W OOD
BRUNO
M A N H A TTA N FYLER
BA
R
T
O
L
D
URBAN
ALICIA
WRENWOOD
CECELIA
ARTHUR
ELINOR
HA
N
L
E
Y
E A G E R
PLATEAU
ROSE
HANCOCKHO
L
L
A
N
D
FLORENCE
MA
R
T
I
N
I
OXFORD
PRIVATE
C O M M O N W EALTH
ELM
ARSENAL
MOORLANDS
RUSSEL
L
LY
L
E
NASHVILLE
S
U
S
S
E
X
ED
G
A
R
MC
C
U
T
C
H
E
O
N
ANNA
LINDBE R G H
SOUTH
WALTER
SARAHELLIS
MAPLE
HIAWATHASTRAS
S
N
E
R
LOHMEYER
BENNE
T
T
A R LI N G T O NCOL
LINS
RALPH
GARNER
HA Z E LME
L
V
I
N
LANHAM
S U N N E N
KUHLMAN
HI
L
L
VINE
MITCHELL
EAST
PO
R
T
E
R
HORNER
GARDEN
CO
L
L
I
E
R
WARNER
RI
C
H
E
R
T
HELEN
COMFORT
BRIDGEPORT
GE
R
H
A
R
D
OAKLAND
KU
H
S
ALABAMA
H
O
P
E
TH
R
U
S
H
YA
L
E
MARY
UNIONPACIFIC
ALICIA
BRUNO
CLARK
ELM
L I N D B ER G HSWAN
M A N C H ESTERRD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12334
Wastewater
11
$200,000
Various
Lemay/RDP
Deer Creek
Capital
35
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HARLEM - BADEN RELIEF PHASE IV (HEBERT)BUILDING DEMOLITION AND DESIGN
Engineering During
Construction Services
6660 - Sanitary
Replacement Fund
STREET FLOODING AND BUILDING BACKUPS DUE TO OVERCHARGED
COMBINED SEWERS.
CONSTRUCT STORMWATER DETENTION BASIN AND COLLECTION
SYSTEM TO ENABLE THE REMOVAL OF STORMWATER FLOWS FROM
THE OVERCHARGED COMBINED SEWER SYSTEM.
SUPPLEMENTAL APPROPRIATION TO THE DESIGN CONTRACT FOR
CONSTRUCTION PHASE SERVICES, AND DESIGN UPDATES DUE TO
CONSTRUCTION ISSUES.
KIE
N
L
E
N
TERM
I
N
A
L
MYR
O
N
LU
C
A
S
N
H
U
N
T
LOT
U
S
WELL
S
HAM
I
L
T
O
N
WA
B
A
D
A
67T
H
69T
H
68T
H
MAR
K
E
T
TERR
Y
STLOUIS
KENN
E
R
L
Y
HIGH
L
A
N
D
MAFF
I
T
T
MOUNT
EDM
U
N
D
VAL
L
E
SAL
Z
M
A
N
ERI
C
K
WELL
S
M
A
R
CRESCENT
PERR
Y
MAY
W
O
O
D
IRV
I
N
G
OGD
E
N
HOD
I
A
M
O
N
T
LESC
H
E
N
LU
L
U
PIN
E
G
R
O
V
E
GAR
Y
GLENMORE
RIDGE
CHE
R
R
Y
KEM
P
HOBART
WOODROW
PRI
V
A
T
E
OAK
D
A
L
E
JESS
E
J
A
C
K
S
O
N
ROS
E
B
U
D
AR
D
E
N
GR
I
M
S
H
A
W
MYRT
L
E
LUDWIG
WEL
L
S
T
O
N
ROO
S
E
V
E
L
T
MAUR
E
R
C
R
E
S
T
ON
DARDA
NELLA
AVO
N
D
A
L
E
NORFOLK SO UTHERN
VA
S
S
I
E
R
LOR
R
A
I
N
E
AUD
R
E
Y
IS A B ELLA
THEO
D
O
S
I
A
LATT
A
GREER
NAYL
O
R
F R A N CIS
MOL
L
GRE
E
RPRIVATE
MAR
K
E
T
ST L
O
U
I
S
IRV
I
N
G
OGD
E
N
OA
K
D
A
L
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10641
Wastewater
11
$100,000
St. Louis City
Bissell
Harlem
Capital
36
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HARLEM BADEN RELIEF PHASE IV (HEBERT) -TRUNK SEWER REHABILITATION
Engineering During
Construction Services
6660 - Sanitary
Replacement Fund
BUILDING BACKUPS AND FLOODING DUE TO OVERCHARGED
COMBINED SEWERS.
CONSTRUCT 109,900 SQUARE FEET OF SHOTCRETE LINER, 1,240
FEET OF CIPP LINING, AND 6,400 SQUARE FEET OF SPOT REPAIRS,
ALONG 7,000 FEET OF 8 TO 12 FOOT DIAMETER SEWER.
THIS PROJECT IS BEING CONSTRUCTED BY THE CORPS OF
ENGINEERS UNDER A COOPERATIVE AGREEMENT WITH THE
DISTRICT.
KIE
N
L
E
N
TERMINA
L
CLA
R
A
GOO
D
F
E
L
L
O
W
BEL
T
STLOUIS
LOT
U
S
MYRON
TERR
Y
GRE
E
R
BUR
D
MAFF
I
T
T
LABA
D
I
E
WEL
L
S
ROO
S
E
V
E
L
T
HOD
I
A
M
O
N
T
ELWA
R
D
EDM
U
N
D
F
E
R
RIS
VAL
L
E
ERI
C
K
WELL
S
M
A
R
SEM
P
L
E
CRESCENT
PERR
Y
HERBERT
HAM
I
L
T
O
N
IRV
I
N
G
DAR
B
Y
WAB
A
D
A
THE
O
D
O
S
I
A
RID
G
E
HIGH
L
A
N
D
KENN
E
R
L
Y
CHE
R
R
Y
COT
E
B
R
I
L
L
I
A
N
T
E
67T
H
M
C
A
R
T
H
UR
PRI
V
A
T
E
OAK
D
A
L
E
OVE
R
L
E
A
ROS
E
B
U
D
AR
D
E
N
SELBER
MYRT
L
E
D
R
E
S
S
ELL
AS
H
L
A
N
D
DARDANELLA
LOR
R
A
I
N
E
ST
I
L
L
W
E
L
L
MOUNT
PINEGROVE
LESCHEN
WEL
L
S
T
O
N
ALLEY
SIE
M
E
R
S
EVANSTON
NAYL
O
R
JAM
E
S
A
H
A
R
V
E
Y
ELM
B
A
N
K
CHE
V
R
O
L
E
T
HIGH
L
A
N
D
MAFF
I
T
T
ST LOUIS
WAB
A
D
A
ST L
O
U
I
S
OA
K
D
A
L
E
HAM
I
L
T
O
N
GREE
R
KENN
E
R
L
Y
PRIV
A
T
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11800
Wastewater
11
$50,000
Various
Bissell
Bissell
Capital
37
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
JEFFERSON BARRACKS TUNNEL CONSOLIDATIONSEWERS
Engineering During
Construction Services
6660 - Sanitary
Replacement Fund
INADEQUATE CAPACITY TO TRANSPORT SANITARY FLOWS FROM
THE MARTIGNEY CREEK SERVICE AREA TO THE TREATMENT PLANT.
CONSTRUCT 5,700 FEET OF 8-INCH TO 36-INCH SANITARY SEWER,
AND REHABILITATE 2,800 FEET OF 30-INCH TO 36-INCH SANITARY
SEWER, TO CONVEY FLOW TO THE NEW JEFFERSON BARRACKS
TUNNEL.
§¨¦255
UNIONPACIFIC
RIVER
K
O
C
H
RIPA
K I N SWOOD
GREGG
BU
C
K
L
E
Y
CCC
GRANTLIN
D
TEL F O R D
ARLEE
SHERMAN
FAIN
CL
I
F
F
SHE R I D A N
R
E
A
V
I
S
B
A
R
R
A
C
K
S
JO
P
L
I
N
LI
N
N
RINGER
LU
N
A
GARKLA
R
K
CLA
G
E
R
OUTE R
RAINBOW
FOR
D
E
R
P
R
I
V
ATE
W EMBLEY
SEDAN BOUNDA R Y
MILISSA
JEF
F
E
R
S
O
N
I
A
N
HA L SEY
FIRST
NEBRASKA
PEC
A
N
GOLDENVAL L E Y
CHEVR O N
LAU
R
A
COOKE
HANCOCK
CYEME
A
D
O
W
J
E
FFERSON
OLE
D
E
L
BA
N
I
S
T
E
R
LAR
E
D
O
BERTRA
N
D
LI
S
I
E
U
X
KA
S
K
E
TOULON
MOR
R
I
S
REE
S
AN
C
E
L
L
C
C
C
PRIVATE
TELEGRAPHRD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11957
Wastewater
11
$100,000
Unincorporated
Lemay/RDP
River Des Peres
Capital
38
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY NO. 3 PUMP STATION AND FORCE MAIN
Design Services
(Supplemental
Appropriation)
6660 - Sanitary
Replacement Fund
JEFFERSON BARRACKS TUNNEL PROJECT REQUIRES A NEW PUMP
STATION TO CONVEY FLOWS TO THE LEMAY TREATMENT PLANT.
CONSTRUCT REPLACEMENT FOR THE EXISTING LEMAY NO. 3 PUMP
STATION AND FORCE MAIN AND AMEREN CUSTOMER SUBSTATION.
DEMOLISH EXISTING LEMAY PUMP STATION (P-303), MARTIGNEY
PUMP STATION (P-306), AND JEFFERSON BARRACKS PUMP STATION
(P-305).
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPROPRIATION IN FY 25. TOTAL CONSTRUCTION BUDGET IS
$48,600,000.
P
R
I
V
A
T
E
UNIO
N
P
A
C
I
F
I
C
UNIO
N
P
A
C
I
F
I
C
P
R
I
V
A
T
E
UNIO
N
P
A
C
I
F
I
C
UNIO
N
P
A
C
I
F
I
C
UNIO
N
P
A
C
I
F
I
C
UNIONPACIFIC
P
R
I
VATE
UNIO
N
P
A
C
I
F
I
C
UNIO
N
P
A
C
I
F
I
C
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11817
Wastewater
11
$575,000
Unincorporated
Lemay/RDP
River Des Peres
Non-recurring
39
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY WWTF REPAIRS AND IMPROVEMENTS(2023) (GRIT TANKS AND SECONDARY CLARIFIERDUCT BANK)
Engineering During
Construction Services
6660 - Sanitary
Replacement Fund
AGING AND DETERIORATED FACILITIES AND MECHANICAL
EQUIPMENT REQUIRE REPAIR AND REPLACEMENT.
CONSTRUCT CONCRETE REPAIRS, REPLACE SECONDARY CLARIFIER
DUCT BANK, AND RENEW 4 GRIT TANKS.
PROJECT RECEIVES PARTIAL FUNDING/SUPPL. APPROPRIATION IN
FY 24. TOTAL CONSTRUCTION BUDGET IS $7,550,000. SPLIT FUNDED
BETWEEN FUNDS 4102 AND 6660.
ETTA
H
O
F
F
M
E
I
S
T
E
R
HO
R
N
VELMA
MIL
I
T
A
R
Y
P
RIV
A
T
E
UNIO
N
P
A
C
I
F
I
C
WEI
S
S
MANN
LAG
R
O
HOLDEN
G
O
E
T
Z
CARTWRIGHT
GENTR
Y
JO
P
L
I
N
PE
R
R
I
N
RU
B
Y
WAL
L
E
R
FRA
N
K
E
UNIONPACIFIC
UNIONPACIFIC
UNIO
N
P
A
C
I
F
I
C
HOLDEN
P
R
I
V
A
T
E
P R I V ATE
WEI
S
S
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13153
Wastewater
11
$400,000
Unincorporated
Lemay/RDP
Lemay Creek
Capital
40
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LINDSAY LANE SANITARY RELIEF (LINDSAY LANETO LINDBERGH BLVD)
Design Services
6660 - Sanitary
Replacement Fund
SURCHARGING MAINS AND BUILDING BACKUPS.
CONSTRUCT 3,200 FEET OF 12-INCH TO 24-INCH SANITARY SEWER.
§¨¦270
§¨¦170
§¨¦270
PER S HALL
LIN
D
S
A
Y
VAIL
E
HU
M
E
S
ST ANTHONY
CENTRAL
KEE
V
E
N
N
E
W
H
A
L
L
S
F
E
R
R
Y
WASHIN
G
T
O
N
DERHAKE
DUNN
CH
A
R
B
O
N
I
E
R
MU
L
L
A
N
P
H
Y
LAF
A
Y
E
T
T
E
5TH
UTZ
W A TERFORD
ST CATHERINE
GR
A
H
A
M
FLORDAWN
HO
L
I
D
A
Y
BOO
N
E
94 T H
KINGSFORD
TAH
O
E
JE
N
K
E
E
C
O
A
CHWAY
EST
E
S
FEE
F
E
E
WIE
T
H
A
U
P
T
FO
R
D
TES
O
N
LATTY
WR
E
N
HA
N
L
E
Y
LOE
K
E
S
COACHLIGHT
KOS
T
K
A
MAPLE
FLORA
AVON
BARTO
MO
U
L
E
CL
O
V
E
R
DO
V
E BALTIC
STLOUIS
LILA
C
TAY
L
O
R
P R IVATE
AQ
U
E
D
U
C
T
90TH
SWA
N
MAT L O C K
STCHARLES
TROTTER
SA
D
D
L
E
EL
M
G
R
O
V
E
KA
Y
ST
J
E
A
N
C
H
U
R
C
HIL
L
CAPRI
VAG
O
W
E
L
L
I
N
G
T
O
N
FEE
F
E
E
H
I
L
L
S
RUT
H
T
HU
N
D
E
R
BIRD
STCIN
Z U RIC H
RIVERWOODESTATES
J
A
N
A
BE
L
L
A
R
M
I
N
E
BLU
E
B
I
R
D
AL
M
A
AVI
O
N
BA
R
W
I
C
K
ALT
A
V
I
A
THR
U
S
H
6TH
G
R
A
V
E
L
L
E
HIG
H
S
U
N
BO
N
A
I
R
E
PO
L
S
O
N
DUCHESNE
BO
R
D
E
N
KO
C
H
LU
N
D
Y
P R I V A T E
PRI V A TE
P R I V A T E
UTZ
DUNN
LINDB
E
R
G
H
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13629
Wastewater
11
$491,000
Florissant
Coldwater
Coldwater Creek
Capital
41
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER & MIDDLE RDP CSO CONTROLS SYSTEMIMPROVEMENTS (WATERSHED CONSULTANT)
Professional Services
1101 - General Fund
MITIGATION OF CSO FLOWS INTO THE RIVER DES PERES IS
REQUIRED BY CONSENT DECREE, NECESSITATING CONSTRUCTION
OF A DEEP STORAGE TUNNEL SYSTEM.
DESIGN OF 47,400 FEET OF CSO STORAGE TUNNEL, CONSOLIDATION
SEWERS, AND DEWATERING PUMP STATIONS. THIS PROJECT ALSO
INCLUDES MANAGEMENT SERVICES, FIELD INVESTIGATIONS AND
PRELIMINARY STUDIES.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAY
INCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦55
§¨¦270
§¨¦44
§¨¦70
§¨¦64
§¨¦170
§¨¦255
§¨¦70
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11109
Wastewater
16
$125,000
Various
Lemay/RDP
Various
Asset Management
42
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER & MIDDLE RDP CSO CONTROLS SYSTEMIMPROVEMENTS (WATERSHED CONSULTANT)
Professional Services
6660 - Sanitary
Replacement Fund
MITIGATION OF CSO FLOWS INTO THE RIVER DES PERES IS
REQUIRED BY CONSENT DECREE, NECESSITATING CONSTRUCTION
OF A DEEP STORAGE TUNNEL SYSTEM.
DESIGN OF 47,400 FEET OF CSO STORAGE TUNNEL, CONSOLIDATION
SEWERS, AND DEWATERING PUMP STATIONS. THIS PROJECT ALSO
INCLUDES MANAGEMENT SERVICES, FIELD INVESTIGATIONS AND
PRELIMINARY STUDIES.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAY
INCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦55
§¨¦270
§¨¦44
§¨¦70
§¨¦64
§¨¦170
§¨¦255
§¨¦70
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11109
Wastewater
16
$270,000
Various
Lemay/RDP
Various
Asset Management
43
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER MERAMEC RIVER SYSTEMIMPROVEMENTS - BAUMGARTNER TO FENTONWWTF TUNNEL
Engineering During
Construction Services
6660 - Sanitary
Replacement Fund
THE FENTON WWTF IS AN INTERIM FACILITY AND ITS ELIMINATION IS
PART OF THE EAST WEST GATEWAY SECTION 208 REGIONAL WATER
QUALITY MANAGEMENT PLAN.
CONSTRUCT 36,000 FEET OF 8-FOOT DIAMETER DEEP TUNNEL TO
CONVEY WASTEWATER FROM THE FENTON WWTF TO THE
BAUMGARTNER TUNNEL, TO ENABLE TREATMENT OF FLOWS AT THE
LOWER MERAMEC WWTF.
PROJECT ELIMINATES PUMP STATIONS P-446 AND P-483. P-489 TO BE
ELIMINATED BY SEPARATE PROJECT #10869. TOTAL CONSTRUCTION
BUDGET IS $180,000,000.
§¨¦55
§¨¦270
§¨¦55
KERT
H
MA
T
T
I
S
G R A V OIS
WEL
L
S
KELL
E
R
MERAMEC BOTT O M
AMB
S
KENNE
R
L
Y
T
H
E
I
S
S
EA
S
T
CONCORD
AL
L
E
N
ALSW
E
L
L
S C H U E S SLER
MENTZHILL
RI N G ER
B A U ER
BU T L E R HILL
GREENTON
S
USONHILLS
PO I N T E
CARIBEE
HAWKINS
GE
R
A
L
D
KE
M
P
F
H
A
G
E
M
A
N
N
OLSEN
GREGORY
DIER
S
P
R
I
VATE
MAIN
RI VERCURVE
VALMEYER
TESCORD
M A N G O
W
A
T
S
O
N
GATESBURY
DANTONAIRE
GRIFF
I
N
A C O RN
LANGTREE
VALLEYSIDE
FUCH
SFI
J
I
B AHNFYRE
FERN B
E
A
C
H
ED
L
O
U
CLAYR
I
D
G
E
S
T
A
R
L
I
T
ATLNTIC
LA
R
K
I
N
LITTLEROCK
TIOGA
COYL
E
TOWNE SOUTH
PRIVA
T
E
PRIVATE
AMBS
BAUER
PR
I
V
A
T
E
P
R
I
V
A
T
E
T E S S O N FERRYRD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11746
Wastewater
11
$575,000
Various
Meramec
Meramec Tributary Areas
Capital
44
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER MERAMEC WWTF EXPANSION PHASE II
Engineering During
Construction Services
6660 - Sanitary
Replacement Fund
ADDITIONAL FLOW TO THE LOWER MERAMEC WWTF DUE TO
ELIMINATION OF THE FENTON WWTF, AND POTENTIAL FUTURE
NUTRIENT REMOVAL PERMIT REQUIREMENTS.
EXPAND THE EXISTING WWTF TO INCREASE CAPACITY FOR
ADDITIONAL FLOW, AND UPGRADE THE FACILITY TO ENABLE
ACCOMMODATION OF POTENTIAL NUTRIENT REMOVAL
REQUIREMENTS.
TOTAL CONSTRUCTION BUDGET IS $117,000,000, INCLUDING ASSET
RENEWAL OF DETERIORATING ITEMS AT THE PLANT FOR $27,700,000,
WHICH WAS ALSO BID WITH 12255.
F
I
N
E
PR
I
V
A
T
E
PI
N
E
T
O
P
WILLIAMSON
BECKER
K
I
N
G
S
R
I
D
G
E
M
ANOR
S A G EBROOK
S I L V E R PIN E
P
I
N
E
T
O
P §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12255
Wastewater
11
$1,716,000
Unincorporated
Meramec
Mississippi River Tributary Areas
Capital
45
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER MERAMEC WWTF EXPANSION PHASE II
Construction
Management Services
During Construction
6660 - Sanitary
Replacement Fund
ADDITIONAL FLOW TO THE LOWER MERAMEC WWTF DUE TO
ELIMINATION OF THE FENTON WWTF, AND POTENTIAL FUTURE
NUTRIENT REMOVAL PERMIT REQUIREMENTS.
EXPAND THE EXISTING WWTF TO INCREASE CAPACITY FOR
ADDITIONAL FLOW, AND UPGRADE THE FACILITY TO ENABLE
ACCOMMODATION OF POTENTIAL NUTRIENT REMOVAL
REQUIREMENTS.
TOTAL CONSTRUCTION BUDGET IS $117,000,000, INCLUDING ASSET
RENEWAL OF DETERIORATING ITEMS AT THE PLANT FOR $27,700,000,
WHICH WAS ALSO BID WITH 12255.
F
I
N
E
PR
I
V
A
T
E
PI
N
E
T
O
P
WILLIAMSON
BECKER
K
I
N
G
S
R
I
D
G
E
M
ANOR
S A G EBROOK
S I L V E R PIN E
P
I
N
E
T
O
P §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12255
Wastewater
14
$2,000,000
Unincorporated
Meramec
Mississippi River Tributary Areas
Capital
46
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
PUMP STATION REPLACEMENT PROJECTS (PHASEI)
Engineering During
Construction Services
6660 - Sanitary
Replacement Fund
DETERIORATING PUMP STATIONS THROUGHOUT THE DISTRICT
REQUIRE REPLACEMENT/REHABILITATION.
DESIGN REPLACEMENT OF PUMP STATIONS P-702 (EARTH CITY) AND
P-708 (EXPRESSWAY). PROVIDE REQUIRED ENGINEERING DURING
CONSTRUCTION SERVICES.
PROJECT INCLUDED DESIGN OF REPLACEMENT FOR PUMP
STATIONS P-702 AND P-708. P-708 TO BE CONSTRUCTED UNDER
PROJECT 12153, P-702 UNDER PROJECT 13599.
R
A
M
S
LAKEFRONT
E
A
R
T
H
C
I
T
Y
A
M
E
R
I
C
A
N
E
A
G
L
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11701
Wastewater
11
$50,000
Various
Missouri
Missouri River Tributary Areas
Capital
47
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
RADAR RAINFALL DATA (2020)
Prof/Vendor Services
(Supplemental
Appropriation)
1101 - General Fund
PIPE FLOWS FROM INFLOW AND INFILTRATION DUE TO RAIN EVENTS
ARE NEEDED TO PROPERLY CALIBRATE HYDRAULIC SYSTEM
MODELS.
INTEGRATE EXISTING RAIN GAUGE NETWORK WITH RADAR IMAGING,
FOR USE IN CONJUNCTION WITH FLOW METERING,
INFLOW/INFILTRATION STUDIES, AND HYDRAULIC MODEL
CALIBRATIONS. SERVICES MAY BE RENEWED THROUGH FY2024
BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12006
Wastewater
16
$150,000
Various
Various
Various
Asset Management
48
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
RDP TRIBUTARIES & UPPER RDP CSO CONTROLS& LOWER MERAMEC SYSTEM IMPROVEMENTS(WATERSHED CONSULTANT)
Professional Services
1101 - General Fund
MAJOR WASTEWATER SYSTEM CONTROLS ARE REQUIRED TO
OBTAIN CONSENT DECREE COMPLIANCE.
PERFORM AS NEEDED PROGRAM MANAGEMENT, PLANNING,
ANALYSIS, AND DESIGN SERVICES FOR MAJOR WASTEWATER
SYSTEM CONTROLS TO MEET CONSENT DECREE REQUIREMENTS.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAY
INCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦270
§¨¦70
§¨¦170
§¨¦255
§¨¦64
§¨¦70
§¨¦55
§¨¦255
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11153
Wastewater
16
$600,000
Various
Various
Various
Asset Management
49
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
S BRENTWOOD BLVD SANITARY RELIEF (DAYTONADR TO WALINCA TERRACE)
Design Services
6660 - Sanitary
Replacement Fund
OVERCHARGED SANITARY SEWERS. CONSTRUCTED SSO OUTFALL
BP-623 REQUIRES REMOVAL.
CONSTRUCT 2,800 FEET OF 8-INCH TO 24-INCH SANITARY SEWER,
AND ELIMINATE CONSTRUCTED SSO OUTFALL BP-623.
§¨¦170
§¨¦170
F
R
A
N
C
I
S
M
E
T
R
O
L
I
N
K
BRE
N
T
W
O
O
D
DAVIS ME
R
A
M
E
C
WATKINS
DAYTONA
VENETIAN
ORLANDO
ROSILINE
H A L I F A X
WALINCA
ROXBURGH
COLMAR
FORESTPARK
C O R P ORATE
P
A
R
K
S
U
D
B
U
R
Y
EDINBURGH
METRO L I N K
M
E
T
R
O
L
I
N
K
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12195
Wastewater
11
$500,000
Clayton
Lemay/RDP
Deer Creek
Capital
50
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
STREAM FLOW GAUGE OPERATION ANDMAINTENANCE (USGS)
Prof/Vendor Services
(Supplemental
Appropriation)
1101 - General Fund
DATA IS REQUIRED TO DETERMINE URBAN RAINFALL/RUNOFF
RESPONSE OF WATERSHEDS AND IS UTILIZED FOR WATER
QUANTITY AND QUALITY EVALUATION OF STREAMS.
CONTINUE THE STREAM GAUGE DATA COLLECTION PROGRAM IN
CONJUNCTION WITH WASTEWATER AND STORMWATER PLANNING
AND DESIGN EFFORTS, AND TO SUPPORT REPORTING WHICH IS
REQUIRED PURSUANT TO THE CONSENT DECREE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10766
Unallocated
16
$605,000
Various
Various
Various
Asset Management
51
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
STREAM FLOW WATER QUALITY SAMPLING (2023)
Vendor Services
1101 - General Fund
STREAM SAMPLING IS REQUIRED TO DOCUMENT WATER QUALITY
CHANGES FROM IMPLEMENTATION OF THE CSO LTCP, SSO
ELIMINATIONS, & STORMWATER MANAGEMENT PROGRAMS.
PERFORM SAMPLING AND ANALYSIS OF STREAM WATER QUALITY
WITHIN MSD'S SERVICE AREA. SERVICES MAY BE RENEWED
THROUGH FY2025 BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12806
Unallocated
16
$350,000
Various
Various
Various
Asset Management
52
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WEBSTER GROVES TRUNK E SANITARY RELIEF(SKME-628)
Design Services
6660 - Sanitary
Replacement Fund
BUILDING BACKUPS DUE TO OVERCHARGED AND DETERIORATED
SANITARY SEWERS. ELIMINATION OF CONSTRUCTED SSO OUTFALLS
REQUIRED.
CONSTRUCT 6,750 FEET OF 12-INCH TO 54-INCH DIAMETER
SANITARY SEWER, AND REHABILITATE 5,400 FEET OF 8-INCH TO
42-INCH SEWER AND 29 MANHOLES. ELIMINATE CONSTRUCTED SSO
OUTFALLS BP-194 AND BP-578.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPROPRIATION IN FY 26. TOTAL CONSTRUCTION BUDGET IS
$8,760,000.
§¨¦44
U N I O N P A C I F I C
LOCKWOOD
KIRKHAM
GR
A
Y
GO
R
E
LEE
OLD WARSON
EL
M
BO
M
P
A
R
T
SA
P
P
I
N
G
T
O
N
ED
G
A
R
MA
P
L
E
OD
A
Y
BE
L
L
SE
L
M
A
NEWPORT
BISMARK
BROWNELL
FOOTE
GL E N
ED
W
I
N
EUCLID
LITHIA
BE
N
N
E
T
T
PL
A
N
T
BACON
JO
Y
BR
E
N
T
W
O
O
D
HUDSON
CLARK
MADGE
ANDREW
JACKSON
JE
F
F
E
R
S
O
N
SY
L
V
E
S
T
E
R
OA
K
GI
L
B
E
R
T
CORNELL
TUXEDO
P
A
R
K
H
I
L
L
MA
R
Y
AU
S
T
I
N
FAIRVI EW
ESSEX
MC
K
I
N
L
E
Y
P
A
R
K
L
A
N
D
MADISON
IOLA
NORTH
RIDGE
RO
C
K
H
I
L
L
RENDERER
PAPIN
KO
R
T
W
R
I
G
H
T
FLORENCE
DWYER
WILDDEE R
ORCHARD
FOREST
OAKWOOD
D E S PERES
WAYMIRE
LAFAYETTE
HILLARD
ATALANTA
AL
M
A
ROCKMAN
C O P P E R H I LL
JOANNA
R ID G E LI
NE
D
E
VON
M
A
N
I
T
O
U
VICTORIA
B A K ER
WARWICK
GARDEN
LEONARD
OA
K
S
FOX
BA
R
R
O
N
GLENMOOR
MARSHALL
HU
L
L
F
A
I
R
D
A
L
E
WINGFIELD
MCDONALD
MERRITT
MA
N
D
E
R
L
Y
HA
R
T
SWON
G R E E NVIEW
CO
L
L
I
E
R
ALGO
N
Q
U
I
N
CEDAR
BE
R
R
Y
BELLEVIEW
SUMMIT
PL
Y
M
O
U
T
H
HO
C
H
RARIT
A
N
ALLISON
NOLAN
FRISCO
RUSSELL
GLEN
LOCKWOOD
UNIO N P A C I F I C
ALGONQUIN
RO
C
K
H
I
L
L
CEDAR
PARK
GLE
N
G
O
R
E
IO
L
A
JACKSON
PA
R
K
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10794
Wastewater
11
$1,512,000
Webster Groves
Lemay/RDP
Deer Creek
Capital
53
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WET WEATHER OPTIMIZATION STUDY
Pre-Design Services
1101 - General Fund
ACTIVE CONTROLS ON TUNNELS AND TANKS CAN IMPROVE WATER
QUALITY BY INCREASING THE LEVEL OF SERVICE OF EXISTING
INFRASTRUCTURE AND PLANNED IMPROVEMENTS.
PERFORM WET WEATHER OPTIMIZATION STUDY TO INCREASE THE
LEVEL OF SERVICE OF EXISTING AND PLANNED INFRASTRUCTURE.
INCLUDES MODELING AND ALTERNATIVES ANALYSIS, AND SUPPORT
FOR ESTABLISHING A SENSOR NETWORK AND SCADA FOR ACTIVE
CONTROLS.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13436
Wastewater
11
$1,500,000
Various
Various
Various
Non-recurring
54
2023
11 April 2022
Page 1 of 4
WASTEWATER CONSTRUCTION PROJECTS - FY23
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
12077 AMBLEWOOD SANITARY RELIEF
(WATERFORD DR TO BIRCHBARK DR)
$2,453,000 55
12847 BADEN CITYSHED MITIGATION BASINS
(CALVARY, FREDERICK, PARTRIDGE AND
TILLIE) - SEPARATION SEWERS
$2,400,000 56
12085 BANFF SANITARY RELIEF (CAITHNESS RD TO
LANARK RD)
$167,000 57
12565 BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
$101,000,000 58
12565 BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
$2,000,000 59
13033 BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT C
$2,663,000 60
12586 BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT D
$3,594,000 61
12587 BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT E
$4,251,000 62
13124 BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT F
$2,360,000 63
12548 BISSELL POINT WWTF FINE SCREEN,
CONCRETE AND GATE IMPROVEMENTS
$18,000,000 64
11847 BLACK CREEK - HADDINGTON COURT RELIEF
SEWERS
$13,000,000 65
12248 CAULKS CREEK A PUMP STATION (P-750)
IMPROVEMENTS
$3,200,000 66
11790 CAULKS CREEK FORCEMAIN (RIVER VALLEY
RD TO L-52)
$2,500,000 67
12552 COLDWATER CREEK WWTF REPAIRS AND
IMPROVEMENTS (2023)
$5,000,000 68
13163 CROSS TIMBERS #705 SANITARY
REPLACEMENT
$425,000 69
11146 CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
$5,000,000 70
13078 CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE - RIVER DES PERES
$3,000,000 71
11 April 2022
Page 2 of 4
WASTEWATER CONSTRUCTION PROJECTS - FY23
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
12820 EASEMENT ACQUISITION FOR WASTEWATER
PROJECTS (2023)
$3,500,000 72
11888 FABICK PUMP STATION (P-444)
IMPROVEMENTS (SKME-404E)
$460,000 73
12171 FF-15 AND FF-16 SANITARY RELIEF PHASE II
REHABILITATION
$2,650,000 74
12178 FLORISSANT/DUNN SANITARY RELIEF (ST.
ANTHONY LN TO I-270)
$4,910,000 75
12264 GLENFIELD SANITARY RELIEF (WATSON
WOODS CT TO S LINDBERGH BLVD)
$1,130,000 76
12291 GREENBRIAR #2 PUMP STATION (P-448)
ELIMINATION
$425,000 77
11769 HARLEM - BADEN RELIEF PHASE IV (HEBERT)
(GOODFELLOW TO HAMILTON)
$1,279,000 78
13548 HARLEM BADEN RELIEF PHASE IV (HEBERT) -
SEWER REHABILITATION
$2,000,000 79
13231 HARLEM CITYSHED MITIGATION BASINS
(ASHLAND AND ESSEX)
$4,000,000 80
13432 HATHAWAY DRIVE SANITARY RELIEF $902,000 81
12997 INFRASTRUCTURE REPAIRS (FACILITIES)
(2023)
$3,000,000 82
13018 INFRASTRUCTURE REPAIRS
(REHABILITATION) (2023) CONTRACT A
$2,500,000 83
13019 INFRASTRUCTURE REPAIRS
(REHABILITATION) (2023) CONTRACT B
$2,500,000 84
13720 INFRASTRUCTURE REPAIRS
(REHABILITATION) (2023) CONTRACT C
$3,310,000 85
13731 INFRASTRUCTURE REPAIRS
(REHABILITATION) (2023) CORPS CSO
PROGRAM
$2,000,000 86
12989 INFRASTRUCTURE REPAIRS (WASTEWATER)
(2023)
$9,000,000 87
11957 JEFFERSON BARRACKS TUNNEL
CONSOLIDATION SEWERS
$3,400,000 88
11 April 2022
Page 3 of 4
WASTEWATER CONSTRUCTION PROJECTS - FY23
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
13747 LAMBERT AIRPORT RESTRICTED ACCESS
ASSETS INSPECTION AND REPAIR
$2,000,000 89
13747 LAMBERT AIRPORT RESTRICTED ACCESS
ASSETS INSPECTION AND REPAIR
$500,000 90
13596 LEMAY 1 PUMP STATION (P-301) COOLING
TOWER REPLACEMENT
$1,130,000 91
13676 LEMAY WWTF AERATION BLOWER AND
POWER DISTRIBUTION IMPROVEMENTS
$900,000 92
13153 LEMAY WWTF REPAIRS AND IMPROVEMENTS
(2023) (GRIT TANKS AND SECONDARY
CLARIFIER DUCT BANK)
$4,000,000 93
12330 LINDSAY - ST. ALBERT PRIVATE I/I
REDUCTION
$500,000 94
11746 LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO FENTON
WWTF TUNNEL
$48,000,000 95
12255 LOWER MERAMEC WWTF EXPANSION PHASE
II
$30,000,000 96
10024 MC-02 WATSON TO EDGAR RD SANITARY
RELIEF (SKME-580A)
$5,954,000 97
12357 NEWPORT LANDING PUMP STATION (P-480)
ELIMINATION
$626,000 98
12433 NORTH FEE FEE CREEK PUBLIC I/I REDUCTION $6,000,000 99
12368 PRICE TO PIONEER SANITARY RELIEF $2,507,000 100
13680 PUMP STATION FALL PROTECTION UPGRADES
- PHASE I
$500,000 101
13566 PUMP STATION MANLIFT REPLACEMENT $4,000,000 102
12189 ROBYN HILLS NUMBER 1 PUMP STATION (P-
417) REPLACEMENT
$780,000 103
13662 ROXBURGH DR SANITARY RELIEF $400,000 104
12200 SAYLESVILLE SANITARY RELIEF
(SAYLESVILLE DR TO S GREENTRAILS DR)
$150,000 105
11 April 2022
Page 4 of 4
WASTEWATER CONSTRUCTION PROJECTS - FY23
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
12200 SAYLESVILLE SANITARY RELIEF
(SAYLESVILLE DR TO S GREENTRAILS DR)
$2,850,000 106
12280 WHITE PLAINS SANITARY RELIEF (SALTBOX
DR TO CEDAR CREEK RD)
$1,800,000 107
TOTAL:$330,576,000
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
AMBLEWOOD SANITARY RELIEF (WATERFORD DRTO BIRCHBARK DR)
Construction
6660 - Sanitary
Replacement Fund
BUILDING BACKUPS ALONG THE PADDOCK CREEK LATERAL IN THE
VICINITY OF AMBLEWOOD DRIVE.
CONSTRUCT 2,400 FEET OF 10-INCH TO 24-INCH SANITARY SEWER.
SA
D
D
L
E
ST
E
E
D
BIRCHBARK
PARKER SPUR N
E
W
H
A
L
L
S
F
E
R
R
Y
LI
V
E
R
P
O
O
L
HARNESS
A M BLEWOOD
MILLSTONE
AINT
R
E
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12077
Wastewater
15
$2,453,000
Florissant
Coldwater
Coldwater Creek
Capital
55
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BADEN CITYSHED MITIGATION BASINS (CALVARY,FREDERICK, PARTRIDGE AND TILLIE) -SEPARATION SEWERS
Construction
(Supplemental
Appropriation)
6660 - Sanitary
Replacement Fund
BUILDING BACKUPS, STRUCTURE AND STREET FLOODING.
CONSTRUCT 11,000 FEET OF STORM SEWER FOR SOFT SEPARATION.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPROPRIATION IN FY 23. TOTAL CONSTRUCTION BUDGET IS
$6,400,000.
§¨¦70
§¨¦70
H
A
L
L
LUCASNHUNT
NORFOLKSOUTHERN
UNION
SWITZER
GOO
D
F
E
L
L
O
W
MC L ARAN
M
E
T
R
O
L
I
N
K
PAR
K
LEE
JAN
E
T
HEL
E
N
ST CYR
WREN
HORD
MIM
I
K
A
J E N NIN G S S T A T I O N
KIE
N
L
E
N
LILLIAN
SHREV E
THRUS
H
MYRO
N
CAR
T
E
R
HAM
I
L
T
O
N
LI
L
A
C
C
H
U
R
C
H
NEWBY
W OODSTOCK COZENS
T E R M IN A L
ST L
O
U
I
S
FERG
U
S
O
N
E
A
S
T
EDIS
O
N
B R O WN
HI
L
L
S
BEL
T
CARRI
E
T
H
E
K
L
A
M
A
R
Y
H
A
R
N
E
Y
P A U L
MAR
K
E
T
SUN
B
U
R
Y
R
O
S
A
LIE
EUC
L
I
D
POPE
BEG
G
D
UENKE
GER
A
L
D
I
N
E
APR
I
C
O
T
NELSON
EXUMA
DAR
B
Y
OR
I
O
L
E
LANG
K
I
R
K
NEMNICH
S N O W
HA
L
E
Y
70T
H
RAVINIA
E
L
L
I
S
O
N
GILMO
R
E
FONTAINE
EMMA
ALB
I
A
BADEN
T IFFIN
BOYCE
EDNA
A
S
T
R
A
M A Y
LAUR
A
COLLETT
PRIV
A
T
E
LEBON
CASTRO
MEAD
SCRANTON
WA
C
O
GIMBL
I
N
ROLAND
ELW
A
R
D
SA
N
D
I
E
G
O
ELKAN SOLWAY
BLASE
EDM
U
N
D
VAL
L
E
A
D
L
E
R
FIR
H
O
L
B
O
R
N
THATC
H
E
R
HIGH RIDGE
SA
L
E
R
N
O
ETO
N
WILBER
TBAHAMA
HOWELL
RA
M
P
I
7
0
J
E
N
D
A
L
E
ADAMS
M
E
T
R
O
L
I
N
K
NEMNICH
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12847
Wastewater
15
$2,400,000
St. Louis City
Bissell
Baden
Capital
56
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BANFF SANITARY RELIEF (CAITHNESS RD TOLANARK RD)
Construction
6660 - Sanitary
Replacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 342 FEET OF 12-INCH SANITARY SEWER.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 13031.
CAMERON
TAY
P R E S L E Y
LANARK
CAITHNESS
C R A W F O R D
ESTRIDGE
LANCASHIRE
B
A
L
M
O
R
A
L
BANFF MIDLOT
H
I
A
N
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12085
Wastewater
15
$167,000
Unincorporated
Bissell
Bissell
Capital
57
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL & LEMAY WWTF FLUIDIZED BEDINCINERATORS
Construction,
Design-Build
6660 - Sanitary
Replacement Fund
LONG TERM SOLUTION FOR SOLIDS HANDLING AT TREATMENT
FACILITIES IS NEEDED.
CONSTRUCT FLUIDIZED BED INCINERATORS AT THE BISSELL AND
LEMAY WASTEWATER TREATMENT FACILITIES, TO INCLUDE
REDUNDANT SLUDGE ACCEPTANCE SYSTEMS AND SOLIDS
HANDLING SYSTEM IMPROVEMENTS.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPROPRIATION IN FUTURE FISCAL YEARS. TOTAL CONSTRUCTION
BUDGET IS $575,000,000.
§¨¦55
§¨¦64
§¨¦44
§¨¦70
§¨¦55
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12565
Wastewater
15
$101,000,000
Various
Various
Various
Capital
58
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL & LEMAY WWTF FLUIDIZED BEDINCINERATORS
Construction,
Proposer Stipend
6660 - Sanitary
Replacement Fund
LONG TERM SOLUTION FOR SOLIDS HANDLING AT TREATMENT
FACILITIES IS NEEDED.
CONSTRUCT FLUIDIZED BED INCINERATORS AT THE BISSELL AND
LEMAY WASTEWATER TREATMENT FACILITIES, TO INCLUDE
REDUNDANT SLUDGE ACCEPTANCE SYSTEMS AND SOLIDS
HANDLING SYSTEM IMPROVEMENTS.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPROPRIATION IN FUTURE FISCAL YEARS. TOTAL CONSTRUCTION
BUDGET IS $575,000,000.
§¨¦55
§¨¦64
§¨¦44
§¨¦70
§¨¦55
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12565
Wastewater
15
$2,000,000
Various
Various
Various
Capital
59
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2023) CONTRACT C
Construction
6660 - Sanitary
Replacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE 41,900 FEET OF THE PUBLIC SEWER SYSTEM USING
THE CURED IN PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 12143.
§¨¦64
§¨¦70
§¨¦270
§¨¦44 §¨¦55
§¨¦170§¨¦270
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13033
Wastewater
15
$2,663,000
Various
Various
Various
Capital
60
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2023) CONTRACT D
Construction
6660 - Sanitary
Replacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE 54,900 FEET OF THE PUBLIC SEWER SYSTEM USING
THE CURED IN PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 12088, 12094,
12169, 12338, 12274, AND 12307.
§¨¦44
§¨¦270
§¨¦270
S
MO141
HWY
M A N C H E S T E R R D
E M O 3 0 H W Y
S
K
I
R
K
W
O
O
D
R
D
WATSON RD
S
LINDBERGH
BLVD
MANCHESTER RD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12586
Wastewater
15
$3,594,000
Various
Various
Various
Capital
61
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2023) CONTRACT E
Construction
6660 - Sanitary
Replacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE 47,900 FEET OF THE PUBLIC SEWER SYSTEM USING
THE CURED IN PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECT 12350, 12167,
12258, AND 12277.
§¨¦44
§¨¦64
§¨¦270
§¨¦255
§¨¦170
§¨¦255
§¨¦270 §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12587
Wastewater
15
$4,251,000
Various
Various
Various
Capital
62
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2023) CONTRACT F
Construction
6660 - Sanitary
Replacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED
IN PLACE PIPE METHOD, TO REDUCE PUBLIC I/I.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 12326 AND 12330.
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦70
§¨¦270
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13124
Wastewater
15
$2,360,000
Various
Various
Various
Capital
63
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL POINT WWTF FINE SCREEN, CONCRETEAND GATE IMPROVEMENTS
Construction
6660 - Sanitary
Replacement Fund
COMMINUTOR, CONCRETE AND SLUICE GATE DETERIORATION DUE
TO AGING INFRASTRUCTURE.
INSTALL FINE SCREENS TO REPLACE FAILING COMMINUTORS,
REPAIR SLUICE GATES AND COMPONENTS, AND CONCRETE.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPROPRIATION IN FY 24. TOTAL CONSTRUCTION BUDGET IS
$32,090,000.
H
A
L
L
2
N
D
FERRY
PRARI
E
GRAND
MAY
TERMINAL
N
O
R
F
O
L
K
S
O
U
T
H
E
R
N
B
U
R
LIN
G
T
O
N
N
O
R
T
H
E
R
N
S
A
N
T
A
F
E
DESOT
O
B
E
N
E
D
I
C
T
GANO
GRAND
TERMINAL
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12548
Wastewater
15
$18,000,000
St. Louis City
Bissell
Bissell
Capital
64
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BLACK CREEK - HADDINGTON COURT RELIEFSEWERS
Construction
6660 - Sanitary
Replacement Fund
WET WEATHER BUILDING BACKUPS, OVERCHARGED SEWERS, AND
CONSTRUCTED SANITARY SEWER OVERFLOWS.
CONSTRUCT 7,955 FEET OF 8-INCH TO 42-INCH SANITARY SEWER,
AND ELIMINATE CONSTRUCTED SSO OUTFALLS BP-013, BP-017, AND
BP-151.
BP-583 WILL ALSO BE ABLE TO BE REMOVED UPON COMPLETION OF
THE DEER CREEK TUNNEL PROJECT. TOTAL CONSTRUCTION
BUDGET IS $22,000,000.
§¨¦170
PR
I
C
E
DELMAR
CLAYTON
GA
Y
LADUE
LA
Y
BR
E
N
T
W
O
O
D
MC
K
N
I
G
H
T
GANNON
ME
R
A
M
E
C
FORSYT
H
DAVIS
LAFON
F
R
A
N
C
I
S
MARYLAND
M
E
T
R
O
L
I
N
K
TOPTON
LOUWEN
FOREST PARK
CE
N
T
R
A
L
H
U
N
T
E
R
RI
O
V
I
S
T
A
T E A S D ALE
SHAW PA R K
P
OLO
BARBY
WA
R
D
E
R
EA
S
T
P R I V A T E
DRO
M
A
R
A
LA
N
G
T
O
N
LITTLE
WATKINS
BE
R
K
L
E
Y
ST A NDREWS
BONHOMME
O
L
E
T
A
POINTER
KINGSBURY
WASHINGTON
DAYTONA
BLACK CREEK
D
E
LCREST
HAL I F A X
NORTH
N
SOUTH
DO
N
N
E
SHERATON
EDGEW O O D
EXMOOR
RIDGEWOOD
VENETIAN
LO
R
E
N
Z
O
PERSHING
ORLANDO
AMES
ROSILINE
SUNNINGDALE CHERRY HILL
PAXTON
UNIVERSITY
PARK
S
I
D
E
WALINCA
ROXBURGH
BURROUGHS
LAYTON
CHER EL
WESTMORELAND
P
RI
V
A
T
E
PRIVATE
KINGSBURY
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11847
Wastewater
15
$13,000,000
Ladue
Lemay/RDP
Black Creek
Capital
65
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CAULKS CREEK A PUMP STATION (P-750)IMPROVEMENTS
Construction
(Supplemental
Appropriation)
6660 - Sanitary
Replacement Fund
EXISTING PUMP STATION IS DETERIORATING AND REQUIRES
IMPROVEMENT.
CONSTRUCT IMPROVEMENTS TO PUMP STATION P-750.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPROPRIATION IN FY 23. TOTAL BUDGET IS $8,200,000.
EDISON
CENTRAL MIDLAND
C R Y S T A L S P R I N G S
B R I G H T H URST
L
A
N
S
B
ROOKE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12248
Wastewater
15
$3,200,000
Chesterfield
Missouri
Caulks Creek
Capital
66
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CAULKS CREEK FORCEMAIN (RIVER VALLEY RDTO L-52)
Construction
(Supplemental
Appropriation)
6660 - Sanitary
Replacement Fund
EXISTING FORCEMAIN IS UNDERSIZED AND OVER THIRTY YEARS
OLD.
CONSTRUCT 17,000 FEET OF 30-INCH FORCEMAIN AND 1,000 FEET
OF 36-INCH SANITARY SEWER.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPRPRIATION IN FY 23. TOTAL CONSTRUCTION BUDGET IS
$18,200,000.
RI
V
E
R
V
A
L
L
E
Y
CE
N
T
R
A
L
M
I
D
L
A
N
D
HO
G
H
O
L
L
O
W
W A T E R W O R K S
JOHN
PELLET
PRIV
A
T
E
RIDGE C R E S T
RID GE T R A I L
LAKE
RIV E R B E N D
SUNB RID G E
WATER W
O
R
K
S RID G E M E A D O W
RI D GE C R E S T
HE N NING
C O L I S E U M
PRIVATE
O LIVE BLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11790
Wastewater
15
$2,500,000
Maryland Heights
Missouri
Missouri River Tributary Areas
Capital
67
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
COLDWATER CREEK WWTF REPAIRS ANDIMPROVEMENTS (2023)
Construction
6660 - Sanitary
Replacement Fund
AERATION PIPING NEEDS TO BE REPLACED, AND BOSKERS SWITCH
TRACK NEEDS TO BE IMPROVED.
AERATION CONTROL BUILDING IMPROVEMENTS, INCLUDING
REPLACEMENT OF AERATION CONTROL PIPING AND
INSTRUMENTATION, AND INSTALLATION OF A PARALLEL BOSKER
SWITCH TRACK SYSTEM AND NEW BOSKER UNITS.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPROPRIATION IN FY 24. TOTAL BUDGET IS $7,500,000.
PRIV
A
T
E
TREES EDGE
B
E
H
LMANNME A DO W S
BEHLMANNFARMS
RICHMOND FOREST
R
O
BBINSWA Y
PRIVATE
P
R
I
V
A
T
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12552
Wastewater
15
$5,000,000
Unincorporated
Coldwater
Coldwater Creek
Capital
68
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CROSS TIMBERS #705 SANITARY REPLACEMENT
Construction
6660 - Sanitary
Replacement Fund
BROKEN AND SEPARATED PIPE.
CONSTRUCT 410 FEET OF 8-INCH DIAMETER SANITARY SEWERS, 515
FEET OF 2-INCH DIAMETER FORCE MAIN, AND FOUR (4) GRINDER
PUMP SYSTEMS.
C
A
N
D
I
S
H
CE
D
A
R
S
P
R
I
N
G
S
WOODLAKE
ASPEN R I D G E
WAL
N
U
T
C
R
E
E
K
CROSS TIMBERS
C E D A R FIELD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13163
Wastewater
15
$425,000
Town and Country
Missouri
Creve Coeur Creek
Capital
69
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CSO VOLUME REDUCTION GREENINFRASTRUCTURE
Construction
1101 - General Fund
CONTROL AND REDUCTION OF COMBINED SEWER OVERFLOWS AS
REQUIRED BY THE CONSENT DECREE.
INSTALLATION OF GREEN SOURCE CONTROL DEVICES TO REDUCE
STORMWATER VOLUMES ENTERING THE COMBINED SEWER SYSTEM
IN THE MISSISSIPPI WATERSHED.
THIS PROJECT TO BE IMPLEMENTED IN COOPERATION WITH THE
CITY OF ST. LOUIS AND OTHER AGENCIES. MAY INCLUDE CAPITAL
AND NON-CAPITAL SERVICES.
§¨¦55
§¨¦70
§¨¦64
§¨¦44
§¨¦170
§¨¦70
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11146
Wastewater
15
$5,000,000
Various
Bissell
Mississippi River Tributary Areas
Non-recurring
70
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CSO VOLUME REDUCTION GREENINFRASTRUCTURE - RIVER DES PERES
Construction
1101 - General Fund
CONTROL AND REDUCTION OF COMBINED SEWER OVERFLOWS AS
REQUIRED BY THE CONSENT DECREE.
INSTALLATION OF GREEN SOURCE CONTROL DEVICES TO REDUCE
STORMWATER VOLUMES ENTERING THE COMBINED SEWER SYSTEM
IN THE RIVER DES PERES WATERSHED.
THIS PROJECT TO BE IMPLEMENTED IN COOPERATION WITH THE
CITY OF ST. LOUIS AND OTHER AGENCIES. MAY INCLUDE CAPITAL
AND NON-CAPITAL SERVICES.
§¨¦70
§¨¦64
§¨¦44
§¨¦55
§¨¦170
§¨¦70
§¨¦64 §¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13078
Wastewater
15
$3,000,000
Various
Lemay/RDP
River Des Peres
Non-recurring
71
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
EASEMENT ACQUISITION FOR WASTEWATERPROJECTS (2023)
Property Rights
Acquisition
6660 - Sanitary
Replacement Fund
IMPLEMENTATION OF THE CAPITAL IMPROVEMENT AND
REPLACEMENT PROGRAM AND CONSENT DECREE, REQUIRE
PROPERTY RIGHTS ACQUISITION FOR EASEMENTS AND
PURCHASES.
PROVIDE EASEMENT ACQUISITION FUNDING FOR CAPITAL
IMPROVEMENT AND REPLACEMENT PROGRAM WASTEWATER
PROJECTS.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12820
Wastewater
13
$3,500,000
Various
Various
Various
Asset Management
72
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FABICK PUMP STATION (P-444) IMPROVEMENTS(SKME-404E)
Construction
6660 - Sanitary
Replacement Fund
NO PUMP OR POWER REDUNDANCY AT PUMP STATION.
CONSTRUCT MODIFICATIONS TO THE FABICK PUMP STATION TO
MEET CURRENT STANDARDS.
FA
B
I
C
K
AXMINISTER
PREMIER
HE
A
D
L
A
N
D
FABRICATOR
WO R L D W I D E
MA
N
U
F
A
C
T
U
R
E
R
S
MA
Y
F
L
O
W
E
R
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11888
Wastewater
15
$460,000
Fenton
Meramec
Fenton Creek
Capital
73
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FF-15 AND FF-16 SANITARY RELIEF PHASE IIREHABILITATION
Construction
6660 - Sanitary
Replacement Fund
SEWER IN POOR STRUCTURAL CONDITION REQIRES
REHABILITATION.
REHABILITATE 4,500 FEET OF 18-INCH TO 30-INCH DIAMETER SEWER.
REHABILITATE 10 MANHOLES.
ME
T
R
O
DE
L
O
R
D
MI
L
L
W
E
L
L
CE
N
T
R
A
L
M
I
D
L
A
N
D
ED
G
E
W
O
R
T
H
WE
L
D
O
N
SC
H
U
E
T
Z
N
O
R
F
O
L
K
S
O
U
T
H
E
R
N
HARDING
DE
L
O
R
D
HA
R
D
I
N
G
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12171
Wastewater
15
$2,650,000
Maryland Heights
Missouri
Fee Fee Creek
Capital
74
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FLORISSANT/DUNN SANITARY RELIEF (ST.ANTHONY LN TO I-270)
Construction
6660 - Sanitary
Replacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 6,170 FEET OF 8-INCH TO 24-INCH SANITARY SEWER.
§¨¦270
DUNN
PERSHALL
STANTHONY
JEAN
EL
M
DERHAKE
MAPLE
GA
H
A
N
W
A
S
H
I
N
G
T
O
N
VALLE Y
ST DANIEL
ST
M
A
R
K
D
U
C
H
E
S
N
E
L
O
C
U
S
T
ST
BERNADETTE
CL
O
V
E
R
S T L U K E
DE
S
M
E
T
S T N I C H O L A S
ST
M
A
T
T
H
E
W
ST PA
T
R
I
C
K
SPRING
D
U
B
O
U
R
G
STEUGENE
S T E D WA R D
ST GRE
G
O
R
Y
S
T
J
O
A
N
BR
A
C
K
L
E
I
G
H
C
A
STELLO
CH
A
T
E
A
U
SANTACRUZ
ST JAMES
LA
H
A
V
R
E
R
EIGHL E Y
S
T
J
U
D
I
T
H
CLAIRE
S T COR N E L I U S S T M A R T H A
ST FLORENT
S
T
R
I
C
H
A
R
D
ST THOMAS
ST R
O
S
E
WILLOW
MEADOW
DERHAKE §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12178
Wastewater
15
$4,910,000
Florissant
Coldwater
Coldwater Creek
Capital
75
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GLENFIELD SANITARY RELIEF (WATSON WOODSCT TO S LINDBERGH BLVD)
Construction
6660 - Sanitary
Replacement Fund
OVERCHARGED SANITARY SEWERS.
CONSTRUCT 2,400 FEET OF 8-INCH TO 12-INCH SANITARY SEWER.
W
O
O
D
F
O
X
W
O
O
D
P
A
R
K
E
G
G
E
L
I
N
G
WATSON EDDIE N PARK
R
Y
E
G
A
T
E
S
U
N
S
E
T
W
O
O
D
S
COURT
S
L
I
N
D
B
E
R
G
H
B
L
V
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12264
Wastewater
15
$1,130,000
Sunset Hills
Lemay/RDP
Gravois Creek
Capital
76
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GREENBRIAR #2 PUMP STATION (P-448)ELIMINATION
Construction
6660 - Sanitary
Replacement Fund
PUMP STATION P-448 NEEDS TO BE REPLACED.
CONSTRUCT 1,080 FEET OF 8-INCH SANITARY SEWER.
DECOMMISSION AND ABANDON EXISTING PUMP STATION P-448 AND
ASSOCIATED FORCEMAIN.
BA
R
R
E
T
T
S
T
A
T
I
O
N
OZARK
U N I O N P A C I F I C
GREENBRIAR ESTATES
COZYHILL
TABLEROCK
KI
R
K
W
O
O
D
U N I O N P A C I F I C
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12291
Wastewater
15
$425,000
Des Peres
Meramec
Grand Glaize Creek
Capital
77
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HARLEM - BADEN RELIEF PHASE IV (HEBERT)(GOODFELLOW TO HAMILTON)
Construction
(Supplemental
Appropriation)
6660 - Sanitary
Replacement Fund
STREET FLOODING AND BUILDING BACKUPS DUE TO OVERCHARGED
COMBINED SEWERS.
CONSTRUCT 7,200 FEET OF 12-INCH TO 48-INCH SEWER, AND 3,000
FEET OF SEWER LINING.
THIS SUPPLEMENTAL APPROPRIATION PROVIDES THE LOCAL MATCH
REQUIRED BY THE CORPS OF ENGINEERS FOR THEM TO COMPLETE
CONSTRUCTION OF THIS PROJECT.
TERR
Y
ST LO
U
I
S
MAFFITT
ROO
S
E
V
E
L
T
GOO
D
F
E
L
L
O
W
KENN
E
R
L
Y
LABA
D
I
E
GRE
E
R
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11769
Wastewater
15
$1,279,000
St. Louis City
Bissell
Harlem
Capital
78
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HARLEM BADEN RELIEF PHASE IV (HEBERT) -SEWER REHABILITATION
Construction
6660 - Sanitary
Replacement Fund
BUILDING BACKUPS AND FLOODING DUE TO OVERCHARGED
COMBINED SEWERS CONTRIBUTING TO COMBINED SEWER
OVERFLOWS.
REHABILITATE 26,000 FEET OF THE PUBLIC SEWER SYSTEM USING
THE CURED IN PLACE METHOD.
THIS PROJECT WILL BE CONSTRUCTED BY THE CORPS OF
ENGINEERS UNDER A COOPERATIVE AGREEMENT WITH THE
DISTRICT.
TERM
I
N
A
L
KIE
N
L
E
N
LU
C
A
S
N
H
U
N
T
67T
H
MYRON68T
H
MOU
N
T
EDMUND
69T
H
SAL
Z
M
A
N
WELL
S
M
A
R
CRESCENT
PRIVA
T
E
VAL
L
E
OGD
E
N
LESC
H
E
N
LIN
D
E
L
L
MAR
K
E
T
GRE
E
R
ROS
E
B
U
D
WEL
L
S
T
O
N
KEN
N
E
R
L
Y
ROC
K
B
R
O
O
K
AR
D
E
N
ALLE
Y
BAIL
E
Y
ISAB
E
L
L
A
LEXI
N
G
T
O
N
LATT
A
CR
E
S
C
E
N
T
MAR
K
E
T
GRE
E
R
WEL
L
S
T
O
N
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13548
Wastewater
15
$2,000,000
Various
Bissell
Various
Capital
79
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HARLEM CITYSHED MITIGATION BASINS(ASHLAND AND ESSEX)
Construction
6660 - Sanitary
Replacement Fund
BUILDING BACKUPS AND STREET FLOODING.
CONSTRUCT 2 STORMWATER DETENTION BASINS, AND 2 RAIN
GARDENS.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPROPRIATION IN FY 24. TOTAL BUDGET IS $5,500,000.
§¨¦70
§¨¦70
UNI
O
N
LEE
TERMINAL
BEL
T
SHR
E
V
E
EUC
L
I
D
GRE
E
R
LABA
D
I
E
SEM
P
L
E
ARL
I
N
G
T
O
N
COR
A
BRO
W
N
WAB
A
D
A
ST L
O
U
I
S
TERR
Y
PENR
O
S
E
GER
A
L
D
I
N
E
MAFF
I
T
T
PALM
BIRC H E R
ASHL
A
N
D
KOSS
U
T
H
LOTU
S
FARL
I
N
NOR
W
O
O
D
CART
E
R
BUR
D
NORT
H
L
A
N
D
LEXI
N
G
T
O
N
MAR
C
U
S
ABN
E
R
AND
E
R
S
O
N
HIGH
L
A
N
D
ELMB
A
N
K
HER
B
E
R
T
CUPP
L
E
S
NEW
S
T
E
A
D
COTE
B
R
I
L
L
I
A
N
T
E
CALV
I
N
BESS
I
E
PAR
I
S
MAR
G
A
R
E
T
T
A
WEL
L
S
HAMM
E
T
T
DRY
D
E
N
SAN
F
R
A
N
C
I
S
C
O
SACR
A
M
E
N
T
O
KENNERLY
AUB
E
R
T
TAY
L
O
R
PATT
O
N
THEO
D
O
S
I
A
ACADEM
Y
SIE
M
E
R
S
CLA
R
A
WILL
I
A
M
BAY
A
R
D
WAL
T
O
N
SEX
A
U
E
R
GRO
V
E
R
CHE
S
T
E
R
TERR
Y
MAR
C
U
S
PALM
PALM
BRO
W
N
COR
A
LEXI
N
G
T
O
N
HIGH
L
A
N
D
LEXI
N
G
T
O
N
EUCLI
D
WAB
A
D
A
GRE
E
R
COTE
B
R
I
L
L
I
A
N
T
E
NOR
T
H
L
A
N
D
LABA
D
I
E
TERMINA
L
PALMASHLAND
GRE
E
R
TERMINAL
MAFF
I
T
T
TERMINAL
LOTU
S
ASHL
A
N
D
COR
A
EUC
L
I
D
FARL
I
N
N O R W O O D
MAFF
I
T
T
NATURALBRIDGERD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13231
Wastewater
15
$4,000,000
Various
Bissell
Harlem
Capital
80
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HATHAWAY DRIVE SANITARY RELIEF
Construction
6660 - Sanitary
Replacement Fund
OVERCHARGED MAIN.
CONSTRUCT 1,042 FEET OF 10-INCH SANITARY SEWER, AND
PERFORM PRIVATE I/I REDUCTION AT 6 PROPERTIES.
PUBLIC I/I REDUCTION TO BE ACCOMPLISHED VIA WORK ORDER ON
FUTURE IR REHABILITATION PROJECT.
ED
N
A
LO
N
G
R
I
D
G
E
H
ATHAWAY
B
A
G
L
E
Y
DUENKE
AUBURN
JENNIN
G
S
S
T
A
T
I
O
N
EDGEW
A
T
E
R
G
A
R
W
O
O
D
CATAL
I
N
A
BLUEGR
A
S
S
DICKERS
O
N
KIMBALL
HAMLET
LA RUE
L
E
W
I
S
N
C
L
A
R
K
B
L
V
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13432
Wastewater
15
$902,000
Jennings
Bissell
Maline Creek
Capital
81
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
INFRASTRUCTURE REPAIRS (FACILITIES) (2023)
Work Order Repair
Costs (Capital)
6660 - Sanitary
Replacement Fund
FACILITIES HAVE NEEDS FOR REPAIRS OR IMPROVEMENTS THAT
POSE MAJOR OPERATIONAL DIFFICULTY, EXPENSE, OR RISK TO WAIT
FOR CAPITAL PROJECT DELIVERY.
CONSTRUCT REPAIR, REPLACEMENT, OR IMPROVEMENT PROJECTS
TO ADDRESS NEEDS AT FACILITIES SUCH AS TREATMENT PLANTS,
PUMP STATIONS, AND OTHER DISTRICT INFRASTRUCTURE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12997
Wastewater
17
$3,000,000
Various
Various
Various
Asset Management
82
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
INFRASTRUCTURE REPAIRS (REHABILITATION)(2023) CONTRACT A
Construction
6660 - Sanitary
Replacement Fund
DETERIORATED AND DAMAGED SEWER LINES CAUSE PIPE
COLLAPSES, BLOCKED MAINS, AND BUILDING BACKUPS.
CONSTRUCT CURED-IN-PLACE PIPE INSTALLATION FOR SYSTEM
REHABILITATION AND REPAIR, AS NEEDS ARE IDENTIFIED BY SEWER
CLEANING AND INSPECTION EFFORTS.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13018
Wastewater
15
$2,500,000
Various
Various
Various
Capital
83
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
INFRASTRUCTURE REPAIRS (REHABILITATION)(2023) CONTRACT B
Construction
6660 - Sanitary
Replacement Fund
DETERIORATED AND DAMAGED SEWER LINES CAUSE PIPE
COLLAPSES, BLOCKED MAINS, AND BUILDING BACKUPS.
CONSTRUCT CURED-IN-PLACE PIPE INSTALLATION FOR SYSTEM
REHABILITATION AND REPAIR, AS NEEDS ARE IDENTIFIED BY SEWER
CLEANING AND INSPECTION EFFORTS.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13019
Wastewater
15
$2,500,000
Various
Various
Various
Capital
84
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
INFRASTRUCTURE REPAIRS (REHABILITATION)(2023) CONTRACT C
Construction
6660 - Sanitary
Replacement Fund
6 DETERIORATED MISSISSIPPI RIVER OUTFALLS (POPLAR, BREMEN,
BARTON, FERRY, TRUDEAU, AND CHAMBERS) REQUIRE
REHABILITATION.
CONSTRUCT GEOPOLYMER LINING REHABILITATION AT 6 MISSISSIPPI
RIVER OUTFALLS.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13720
Wastewater
15
$3,310,000
St. Louis City
Bissell
Various
Capital
85
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
INFRASTRUCTURE REPAIRS (REHABILITATION)(2023) CORPS CSO PROGRAM
Construction
6660 - Sanitary
Replacement Fund
THE FEDERAL INFRASTRUCRE INVESTMENT AND JOBS ACT HAS
PROVIDED FUNDING FOR NEEDED SEWER REHABILITATION IN THE
COMBINED SEWER AREA.
REHABILITATE SEWERS IN THE COMBINED SEWER AREA THROUGH A
COOPERATIVE AGREEMENT WITH THE CORPS OF ENGINEERS.
THIS APPROPRIATION PROVIDES THE REQUIRED LOCAL MATCH TO
THE CORPS OF ENGINEERS FOR A $6,000,000 REHABILITATION
PROJECT IN THE COMBINED SEWER AREA.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13731
Wastewater
15
$2,000,000
Various
Various
Various
Capital
86
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
INFRASTRUCTURE REPAIRS (WASTEWATER) (2023)
Work Order Repair
Costs (Capital)
6660 - Sanitary
Replacement Fund
AGING AND DETERIORATING WASTEWATER INFRASTRUCTURE IS IN
NEED OF REPAIR AND/OR REPLACEMENT.
CONSTRUCT REPAIR OR REPLACEMENT OF WASTEWATER
INFRASTRUCTURE DISTRICTWIDE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12989
Wastewater
17
$9,000,000
Various
Various
Various
Asset Management
87
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
JEFFERSON BARRACKS TUNNEL CONSOLIDATIONSEWERS
Construction
6660 - Sanitary
Replacement Fund
INADEQUATE CAPACITY TO TRANSPORT SANITARY FLOWS FROM
THE MARTIGNEY CREEK SERVICE AREA TO THE TREATMENT PLANT.
CONSTRUCT 5,700 FEET OF 8-INCH TO 36-INCH SANITARY SEWER,
AND REHABILITATE 2,800 FEET OF 30-INCH TO 36-INCH SANITARY
SEWER, TO CONVEY FLOW TO THE NEW JEFFERSON BARRACKS
TUNNEL.
§¨¦255
UNIONPACIFIC
RIVER
K
O
C
H
RIPA
K I N SWOOD
GREGG
BU
C
K
L
E
Y
CCC
GRANTLIN
D
TEL F O R D
ARLEE
SHERMAN
FAIN
CL
I
F
F
SHE R I D A N
R
E
A
V
I
S
B
A
R
R
A
C
K
S
JO
P
L
I
N
LI
N
N
RINGER
LU
N
A
GARKLA
R
K
CLA
G
E
R
OUTE R
RAINBOW
FOR
D
E
R
P
R
I
V
ATE
W EMBLEY
SEDAN BOUNDA R Y
MILISSA
JEF
F
E
R
S
O
N
I
A
N
HA L SEY
FIRST
NEBRASKA
PEC
A
N
GOLDENVAL L E Y
CHEVR O N
LAU
R
A
COOKE
HANCOCK
CYEME
A
D
O
W
J
E
FFERSON
OLE
D
E
L
BA
N
I
S
T
E
R
LAR
E
D
O
BERTRA
N
D
LI
S
I
E
U
X
KA
S
K
E
TOULON
MOR
R
I
S
REE
S
AN
C
E
L
L
C
C
C
PRIVATE
TELEGRAPHRD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11957
Wastewater
15
$3,400,000
Unincorporated
Lemay/RDP
River Des Peres
Capital
88
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LAMBERT AIRPORT RESTRICTED ACCESS ASSETSINSPECTION AND REPAIR
Construction
6660 - Sanitary
Replacement Fund
PUBLIC SANITARY AND STORM SEWERS WITHIN THE FAA
RESTRICTED ACCESS AND SECURITY REQUIREMENTS AREA OF THE
AIRPORT ARE IN NEED OF INSPECTION AND REPAIR.
PERFORM CCTV INSPECTION, REPAIR AND CIPP REHABILITATION OF
48,000 FEET OF SANITARY SEWER AND 26,000 FEET OF STORM
SEWER.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPRPRIATION IN FUTURE FISCAL YEARS. TOTAL CONSTRUCTION
BUDGET IS $12,500,000.
§¨¦70
§¨¦170
§¨¦170
AD
I
E
ASHBY
METRO LINK
FROST
WR
I
G
H
T
HA
N
L
E
Y
LO
N
G
GUTHRIE
HIG
H
NORFOLK SOUTHERN
JA
N
E
EV
A
A C C E S S
CY
P
R
E
S
S
F E E F EE
EDMUNDSON
WO
O
D
S
O
N
LATTYMI
S
S
O
U
R
I
B
O
T
T
O
M
BY A S S EE
GIST
BA N K S
AIRCARG O
HE
L
E
N
BRO
W
N
EM
I
N
E
N
C
E
P RIVATE
HAROLD
ST
L
E
O
S T HENRY
HUNTER
IVAN
PEAR TREE
BATAAN
NAVAID
CA
M
JO
TIPTON
LEITH
GEN A I R E
AN
G
L
U
M
S
T
P
HILIP
SPR
I
N
G
CALVERT
WINN
LILLYJ E A N MACON
ANN MAR
KIN
G
B
E
E
LIVINGSTON
CR
I
L
L
Y
JUNE
FEE
F
E
E
FEEFEE NAVAID
PRIVA T E
N LINDBERGHBLVD
ST
C
H
A
R
L
E
S
R
O
C
K
R
D
NATURALBRIDGERD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13747
Wastewater
15
$2,000,000
Unincorporated
Coldwater
Coldwater Creek
Capital
89
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LAMBERT AIRPORT RESTRICTED ACCESS ASSETSINSPECTION AND REPAIR
Construction
5120 - Districtwide
Stormwater Fund
PUBLIC SANITARY AND STORM SEWERS WITHIN THE FAA
RESTRICTED ACCESS AND SECURITY REQUIREMENTS AREA OF THE
AIRPORT ARE IN NEED OF INSPECTION AND REPAIR.
PERFORM CCTV INSPECTION, REPAIR AND CIPP REHABILITATION OF
48,000 FEET OF SANITARY SEWER AND 26,000 FEET OF STORM
SEWER.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPRPRIATION IN FUTURE FISCAL YEARS. TOTAL CONSTRUCTION
BUDGET IS $12,500,000.
§¨¦70
§¨¦170
§¨¦170
AD
I
E
ASHBY
METRO LINK
FROST
WR
I
G
H
T
HA
N
L
E
Y
LO
N
G
GUTHRIE
HIG
H
NORFOLK SOUTHERN
JA
N
E
EV
A
A C C E S S
CY
P
R
E
S
S
F E E F EE
EDMUNDSON
WO
O
D
S
O
N
LATTYMI
S
S
O
U
R
I
B
O
T
T
O
M
BY A S S EE
GIST
BA N K S
AIRCARG O
HE
L
E
N
BRO
W
N
EM
I
N
E
N
C
E
P RIVATE
HAROLD
ST
L
E
O
S T HENRY
HUNTER
IVAN
PEAR TREE
BATAAN
NAVAID
CA
M
JO
TIPTON
LEITH
GEN A I R E
AN
G
L
U
M
S
T
P
HILIP
SPR
I
N
G
CALVERT
WINN
LILLYJ E A N MACON
ANN MAR
KIN
G
B
E
E
LIVINGSTON
CR
I
L
L
Y
JUNE
FEE
F
E
E
FEEFEE NAVAID
PRIVA T E
N LINDBERGHBLVD
ST
C
H
A
R
L
E
S
R
O
C
K
R
D
NATURALBRIDGERD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13747
Wastewater
15
$500,000
Unincorporated
Coldwater
Coldwater Creek
Capital
90
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY 1 PUMP STATION (P-301) COOLING TOWERREPLACEMENT
Construction
6660 - Sanitary
Replacement Fund
COOLING TOWERS, AND RELATED PIPING AND VALVES ARE OVER 30
YEARS OLD AND AT THE END OF THEIR USEFUL LIFE.
REMOVE AND REPLACE EXISTING COOLING TOWERS, PIPING, AND
VALVES
MA
R
C
E
A
U
HU
R
C
K
CA
T
A
L
A
N
MINN
E
S
O
T
A
ES
P
E
N
S
C
H
I
E
D
VIRG
I
N
I
A
PEN
N
S
Y
L
V
A
N
I
A
AD
E
L
I
A
NEL
L
I
E
MICH
I
G
A
N
MICH
I
G
A
N
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13596
Wastewater
15
$1,130,000
St. Louis City
Lemay/RDP
Lemay Creek
Capital
91
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY WWTF AERATION BLOWER AND POWERDISTRIBUTION IMPROVEMENTS
Construction
6660 - Sanitary
Replacement Fund
AERATION BLOWER DETERIORATION AND POWER DISTRIBUTION
ISSUES.
REPLACE AERATION BLOWER MOTORS, DRIVES, AND CONTROLS,
AND MAKE IMPROVEMENTS TO LEMAY SUBSTATION RELAYS AND
POWER DISTRIBUTION SYSTEM.
ETTA
H
O
F
F
M
E
I
S
T
E
R
VELMA
HO
R
N
MIL
I
T
A
R
Y
WEI
S
S
P
RIV
A
T
E
MANN
UNIO
N
P
A
C
I
F
I
C
LAG
R
O
HOLDEN
G
O
E
T
Z
CARTWRIGHT
JO
P
L
I
N
GENTR
Y
PE
R
R
I
N
RU
B
Y
WAL
L
E
R
FRA
N
K
E
UNIONPACIFIC
PRIVATE
UNIO
N
P
A
C
I
F
I
C
HOLDEN UNIONPACIFIC
P R I V ATE
WEI
S
S
UNIO
N
P
A
C
I
F
I
C
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13676
Wastewater
15
$900,000
Unincorporated
Lemay/RDP
Martigney Creek
Capital
92
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY WWTF REPAIRS AND IMPROVEMENTS(2023) (GRIT TANKS AND SECONDARY CLARIFIERDUCT BANK)
Construction
4102 - Improvement
Fund
AGING AND DETERIORATED FACILITIES AND MECHANICAL
EQUIPMENT REQUIRE REPAIR AND REPLACEMENT.
CONSTRUCT CONCRETE REPAIRS, REPLACE SECONDARY CLARIFIER
DUCT BANK, AND RENEW 4 GRIT TANKS.
PROJECT RECEIVES PARTIAL FUNDING/SUPPL. APPROPRIATION IN
FY 24. TOTAL CONSTRUCTION BUDGET IS $7,550,000. SPLIT FUNDED
BETWEEN FUNDS 4102 AND 6660.
ETTA
H
O
F
F
M
E
I
S
T
E
R
HO
R
N
VELMA
MIL
I
T
A
R
Y
P
RIV
A
T
E
UNIO
N
P
A
C
I
F
I
C
WEI
S
S
MANN
LAG
R
O
HOLDEN
G
O
E
T
Z
CARTWRIGHT
GENTR
Y
JO
P
L
I
N
PE
R
R
I
N
RU
B
Y
WAL
L
E
R
FRA
N
K
E
UNIONPACIFIC
UNIONPACIFIC
UNIO
N
P
A
C
I
F
I
C
HOLDEN
P
R
I
V
A
T
E
P R I V ATE
WEI
S
S
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13153
Wastewater
15
$4,000,000
Unincorporated
Lemay/RDP
Lemay Creek
Capital
93
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LINDSAY - ST. ALBERT PRIVATE I/I REDUCTION
Construction
6660 - Sanitary
Replacement Fund
EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS.
CONSTRUCT 870 FEET OF 8-INCH TO 12-INCH SANITARY SEWER, AND
PERFORM PRIVATE I/I REDUCTION AT 27 PROPERTIES.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 13124. INCLUDES
PRIVATE I/I REDUCTION FROM PROJECT 12210.
KE
E
V
E
N
LIN
D
S
A
Y
PAU
L
LA
F
A
Y
E
T
T
E
CH
A
R
B
O
N
I
E
R
WASHIN
G
T
O
N
DUNN
GR
A
H
A
M
CLA
R
K
BOO
N
E
HU
M
E
S
ST M
A
R
I
E
CO
A
C
H
W
A
Y
S T A N T H O N Y
FL
O
RDAWN
EST
E
S
TAH
O
E
WR
E
N
YAQUI
LOE
K
E
S
CAS
T
E
L
L
O
RUE
S
T
D
E
N
I
S
AUB
U
C
H
O
N
KO
S
T
K
A
ST J
O
S
E
P
H
MAPLE
LAY
V
E
N
JE
N
K
E
E
MU
L
L
A
N
P
H
Y
AS
P
E
N
F
L
O
RLAND
LIL
A
C
TAY
L
O
R
STCHARLES
EL
M
G
R
O
V
E
MANRESA
KA
Y
STJEAN
QU
E
E
N
A
N
N
CARLA
LYN
N
H
A
V
E
N
RU
T
H
ST
C
I
N
CAM
P
I
O
N
COACHLIGHT
D E R H A KE
BEL
L
A
R
M
I
N
E
SUNS
E
T
RYA
N
TRINIT YAL
M
A
ALB
E
R
T
PALM
NAO
M
I
CA
N
D
L
E
L
I
G
H
T
TA
M
M
A
R O S E T T A
DE
L
R
E
Y
LO Y OLA
MER
C
U
R
Y
ST MAURICE
SIELOFF
ST REGIS
SALLY
S
T
E
D
I
T
H
F
L
O
R
V
A
L
BABLER
FO X TRAIL
RON
D
A
GER A LD
MERR
I
A V ANT
BR
U
C
E
P R IVATE
JEA
N
E
T
T
E
CRO
S
B
Y
B
E
L
L
M
LOU
I
S
E
WESCOTT
D U N N
LIN D B E R GH
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12330
Wastewater
15
$500,000
Florissant
Coldwater
Coldwater Creek
Capital
94
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER MERAMEC RIVER SYSTEMIMPROVEMENTS - BAUMGARTNER TO FENTONWWTF TUNNEL
Construction
(Supplemental
Appropriation)
6660 - Sanitary
Replacement Fund
THE FENTON WWTF IS AN INTERIM FACILITY AND ITS ELIMINATION IS
PART OF THE EAST WEST GATEWAY SECTION 208 REGIONAL WATER
QUALITY MANAGEMENT PLAN.
CONSTRUCT 36,000 FEET OF 8-FOOT DIAMETER DEEP TUNNEL TO
CONVEY WASTEWATER FROM THE FENTON WWTF TO THE
BAUMGARTNER TUNNEL, TO ENABLE TREATMENT OF FLOWS AT THE
LOWER MERAMEC WWTF.
PROJECT ELIMINATES PUMP STATIONS P-446 AND P-483. P-489 TO BE
ELIMINATED BY SEPARATE PROJECT #10869. TOTAL CONSTRUCTION
BUDGET IS $180,000,000.
§¨¦55
§¨¦270
§¨¦55
KERT
H
MA
T
T
I
S
G R A V OIS
WEL
L
S
KELL
E
R
MERAMEC BOTT O M
AMB
S
KENNE
R
L
Y
T
H
E
I
S
S
EA
S
T
CONCORD
AL
L
E
N
ALSW
E
L
L
S C H U E S SLER
MENTZHILL
RI N G ER
B A U ER
BU T L E R HILL
GREENTON
S
USONHILLS
PO I N T E
CARIBEE
HAWKINS
GE
R
A
L
D
KE
M
P
F
H
A
G
E
M
A
N
N
OLSEN
GREGORY
DIER
S
P
R
I
VATE
MAIN
RI VERCURVE
VALMEYER
TESCORD
M A N G O
W
A
T
S
O
N
GATESBURY
DANTONAIRE
GRIFF
I
N
A C O RN
LANGTREE
VALLEYSIDE
FUCH
SFI
J
I
B AHNFYRE
FERN B
E
A
C
H
ED
L
O
U
CLAYR
I
D
G
E
S
T
A
R
L
I
T
ATLNTIC
LA
R
K
I
N
LITTLEROCK
TIOGA
COYL
E
TOWNE SOUTH
PRIVA
T
E
PRIVATE
AMBS
BAUER
PR
I
V
A
T
E
P
R
I
V
A
T
E
T E S S O N FERRYRD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11746
Wastewater
15
$48,000,000
Various
Meramec
Meramec Tributary Areas
Capital
95
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER MERAMEC WWTF EXPANSION PHASE II
Construction
(Supplemental
Appropriation)
6660 - Sanitary
Replacement Fund
ADDITIONAL FLOW TO THE LOWER MERAMEC WWTF DUE TO
ELIMINATION OF THE FENTON WWTF, AND POTENTIAL FUTURE
NUTRIENT REMOVAL PERMIT REQUIREMENTS.
EXPAND THE EXISTING WWTF TO INCREASE CAPACITY FOR
ADDITIONAL FLOW, AND UPGRADE THE FACILITY TO ENABLE
ACCOMMODATION OF POTENTIAL NUTRIENT REMOVAL
REQUIREMENTS.
TOTAL CONSTRUCTION BUDGET IS $117,000,000, INCLUDING ASSET
RENEWAL OF DETERIORATING ITEMS AT THE PLANT FOR $27,700,000,
WHICH WAS ALSO BID WITH 12255.
F
I
N
E
PR
I
V
A
T
E
PI
N
E
T
O
P
WILLIAMSON
BECKER
K
I
N
G
S
R
I
D
G
E
M
ANOR
S A G EBROOK
S I L V E R PIN E
P
I
N
E
T
O
P §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12255
Wastewater
15
$30,000,000
Unincorporated
Meramec
Mississippi River Tributary Areas
Capital
96
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MC-02 WATSON TO EDGAR RD SANITARY RELIEF(SKME-580A)
Construction
(Supplemental
Appropriation)
6660 - Sanitary
Replacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 9,050 FEET OF 8-INCH TO 36-INCH SANITARY SEWER,
AND ELIMINATE CONSTRUCTED SSO OUTFALL BP-557.
SUPPLEMENTAL APPROPRIATION IN FY 23. TOTAL BUDGET IS
$11,954,000, INCLUDING A $2M DEVELOPER REIMBURSEMENT TO
CONSTRUCT PART OF THE PROJECT.
ED
G
A
R
LA
C
L
E
D
E
S
T
A
T
I
O
N
IM
S
E
FLORENCE
RAVENSRIDGE
FIELDSTON
PRIVATE
BUSCH
PE
M
B
R
O
K
E
LACLEDE G R O V E S
CU
L
V
E
R
H
I
L
L
HURSTGREEN
O L D W E S T B URY
KIRKY
CANON
VILLAWOOD
RADNOR
VI
C
A
R
OAK KNOLL MANOR
LORD S HILL
CHA T WELL
CHESTNUTHILLS
ST JAMES
C R A T H E S
O A K KNOLL MANOR
WAT
S
O
N
R
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10024
Wastewater
15
$5,954,000
Various
Lemay/RDP
Mackenzie Creek
Capital
97
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
NEWPORT LANDING PUMP STATION (P-480)ELIMINATION
Construction
6660 - Sanitary
Replacement Fund
PUMP STATION P-480 NEEDS TO BE REPLACED OR ELIMINATED.
CONSTRUCT 1,555 FEET OF 8-INCH SANITARY SEWER.
DECOMMISSION AND ABANDON EXISTING PUMP STATION P-480 AND
ASSOCIATED FORCEMAIN.
SPRI
N
G
L
I
L
Y
H E R ITAGEVALLEY
N O C H E
WINTERCHASE
SUMMERPOINT
NO
C
H
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12357
Wastewater
15
$626,000
Unincorporated
Meramec
Fenton Creek
Capital
98
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
NORTH FEE FEE CREEK PUBLIC I/I REDUCTION
Construction
6660 - Sanitary
Replacement Fund
EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS.
REHABILITATE 90,000 FEET OF THE PUBLIC SEWER SYSTEM USING
THE CURED IN PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECT 12361.
§¨¦70
§¨¦270
§¨¦70
§¨¦270
FEEFEE
ADIE
MCKE
L
V
E
Y
RIDER
R
U
L
E
AVERY
SM
I
L
E
Y
PRIVATE
LINK
GIST
C R E V E C O E U R M I L L
AMELING
INTERSTAT
E
TERRYHAAS
EARTHCITY
WE
L
D
O
N
PARI
S
H
SC
H
U
E
T
Z
M
E
T
R
O
FA
L
C
O
N
B
E
N
E
DETTA
GARDEN
MA
R
I
N
E
W E S F ORD FOXWOOD
BOEN
K
E
R
MARS
M
AJELLA
LA
K
E
MARK TWA I N
RA
Y
M
O
N
D
C
A
S
I
N
O
C
E
N
T
E
R
DA X
DO
D
D
R
I
D
G
E
MORRO
W
DE RUNTZ
REDC O A T WARNEN
LON G
IVAN
GL E N O AK
P
HELPS
LU
D
L
O
W
LOCK
E
LEIGH
LONGMONT
W I L W O OD
BRO
U
S
T
E
R
TAYLOR
INVER
N
E
S
S
EASY
DA
L
E
Y
DEP A U L
PL
U
M
MELO
D
Y
BRIT T A N Y
MILL W E LL
C
H
A
P
A
R
R
A
L
BOBBETT
R
U
L
E
ADIE
PRIVATE
FEEF E E
P
R
I
V
A
T
E
P
R
I
V
A
T
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12433
Wastewater
15
$6,000,000
Various
Missouri
Fee Fee Creek
Capital
99
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
PRICE TO PIONEER SANITARY RELIEF
Construction
(Supplemental
Appropriation)
6660 - Sanitary
Replacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 5,665 FEET OF 8-INCH TO 24-INCH SANITARY SEWER.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPROPRIATION IN FY 23. TOTAL CONSTRUCTION BUDGET IS
$6,507,000.
DI
E
L
M
A
N
MEEKS
M
E
S
A
UNION PACIFI
C
PAGE
LA JOLLA
CROC
K
E
T
T
INDIA N M E A D O WS
HURON
PIONEER
G R A NDVIEW
C O D Y
WA
L
T
E
R
S
RIDDLE
WI
S
H
A
R
T
DIELMANROCKISLANDINDUSTRIAL
MO
H
A
V
E
EL
M
R
I
D
G
E
WI
B
R
A
C
H
T
O
T
T
A
W
A
Y
U
C
C
A
NORFOLK
SOUTHERN
KI
N
A
R
K
PRICE
CHICAGO HE I G H TSWE
R
R
E
M
E
Y
E
R
ZI
M
M
E
R
M
A
N
DIELMAN
INDUS T R IA L
LOTSIE
NATALIE
MEEKS §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12368
Wastewater
15
$2,507,000
Olivette
Lemay/RDP
University City Branch
Capital
100
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
PUMP STATION FALL PROTECTION UPGRADES -PHASE I
Construction
6660 - Sanitary
Replacement Fund
EXISTING SUBMERSIBLE PUMP STATIONS NEED UPGRADING TO
MEET CURRENT INDUSTRY STANDARDS FOR FALL PROTECTION.
CONSTRUCT INTEGRATED FALL PROTECTION GRATING AND HATCH
MODIFICATIONS WHERE NECESSARY OVER EXISTING WET WELLS,
AND INSTALL SAFETY POST ANCHOR PLATES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13680
Wastewater
15
$500,000
Various
Various
Various
Capital
101
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
PUMP STATION MANLIFT REPLACEMENT
Construction
6660 - Sanitary
Replacement Fund
STATE INSPECTION VIOLATIONS AND DETERIORATING EQUIPMENT.
REPLACE MANLIFTS IN VARIOUS PUMP STATIONS.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13566
Wastewater
15
$4,000,000
Various
Various
Various
Capital
102
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
ROBYN HILLS NUMBER 1 PUMP STATION (P-417)REPLACEMENT
Construction
6660 - Sanitary
Replacement Fund
PUMP STATION P-417 NEEDS REPLACEMENT TO MEET CURRENT
SERVICE LEVEL DEMANDS.
REPLACE PUMP STATION P-417.
MATTHEWS
CIN E M A
WATSO
N
P
R
I
V
A
T
E
F O X BRIDGE
S
L
I
N
D
B
E
R
G
H
B
L
V
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12189
Wastewater
15
$780,000
Sunset Hills
Lemay/RDP
Gravois Creek
Capital
103
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
ROXBURGH DR SANITARY RELIEF
Construction
6660 - Sanitary
Replacement Fund
OVERCHARGED SEWER AND BUILDING BACKUPS.
CONSTRUCT 530 FEET OF 21-24 INCH SANITARY SEWER, AND
ELIMINATE CONSTRUCTED SSO BP-018.
§¨¦170
F
R
A
N
C
I
S
CLAYTO
N
H A L I F A X
C O L M A R M
E
T
R
O
L
I
N
K
BR
E
N
T
W
O
O
D
S
U
D
B
U
R
Y
LA
N
G
T
O
N
W H I T B URN
R O X B U R G H
WE
N
N
E
K
E
R
LO
U
W
E
N
E D I N B U R G H
H
A
D
D
I
N
G
T
O
N
F
R
A
N
C
I
S
M
E
T
R
O
L
I
N
K
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13662
Wastewater
15
$400,000
Clayton
Lemay/RDP
Deer Creek
Capital
104
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SAYLESVILLE SANITARY RELIEF (SAYLESVILLE DRTO S GREENTRAILS DR)
Construction
5120 - Districtwide
Stormwater Fund
OVERCHARGED SANITARY SEWERS.
CONSTRUCT 3,920 FEET OF 18-INCH SANITARY SEWER, AND 280
LINEAR FEET OF 8 TO 12 FEET HIGH HEAVY STONE REVETMENT
BANK STABILIZATION.
STORMWATER FUNDING IS FOR PROJECT 11416, BOXFORD COURT
BANK STABILIZATION, WHICH IS TO BE CONSTRUCTED WITH THIS
PROJECT, AS BOTH ARE IN THE SAME AREA.
LAD
U
E
TRAIL T O P
C
R
O
S
S
T
R
AILS
SAYL
E
S
V
I
L
L
E
P
A
R
LIAMENT
GREENTRAILS
SEABROOK
WE S T M A NOR
A G U S T A
C A M B E R RA
PENSH
U
R
S
T
N
E
W
B
E
D
F
O
RDREELFO
O
T
L
A
K
E
WETHERSFI
E
L
D
T
E
R
R
A
C
E
LA
D
U
E
G
L
E
N
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12200
Wastewater
15
$150,000
Chesterfield
Missouri
Creve Coeur Creek
Capital
105
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SAYLESVILLE SANITARY RELIEF (SAYLESVILLE DRTO S GREENTRAILS DR)
Construction
6660 - Sanitary
Replacement Fund
OVERCHARGED SANITARY SEWERS.
CONSTRUCT 3,920 FEET OF 18-INCH SANITARY SEWER, AND 280
LINEAR FEET OF 8 TO 12 FEET HIGH HEAVY STONE REVETMENT
BANK STABILIZATION.
STORMWATER FUNDING IS FOR PROJECT 11416, BOXFORD COURT
BANK STABILIZATION, WHICH IS TO BE CONSTRUCTED WITH THIS
PROJECT, AS BOTH ARE IN THE SAME AREA.
LAD
U
E
TRAIL T O P
C
R
O
S
S
T
R
AILS
SAYL
E
S
V
I
L
L
E
P
A
R
LIAMENT
GREENTRAILS
SEABROOK
WE S T M A NOR
A G U S T A
C A M B E R RA
PENSH
U
R
S
T
N
E
W
B
E
D
F
O
RDREELFO
O
T
L
A
K
E
WETHERSFI
E
L
D
T
E
R
R
A
C
E
LA
D
U
E
G
L
E
N
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12200
Wastewater
15
$2,850,000
Chesterfield
Missouri
Creve Coeur Creek
Capital
106
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WHITE PLAINS SANITARY RELIEF (SALTBOX DR TOCEDAR CREEK RD)
Construction
6660 - Sanitary
Replacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 2,785 FEET OF 8-INCH TO 15-INCH SANITARY SEWER.
§¨¦64§¨¦64
L
U
R
A
Y
R
U
T
L
A
N
D
S TILLHOUSECREEK
A
P
PALAC
HIA
N
K
E
N
N
E
B
E
C
NORTH OUT
E
R
F
O
R
T
Y
SA
L
T
B
O
X
SPRI N G R U N
B E A VERCREEK
P
O
C
O
N
O
TIMBE R L A K E M A N O R
PR
I
V
A
T
E
PR
I
V
A
T
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12280
Wastewater
15
$1,800,000
Chesterfield
Missouri
Creve Coeur Creek
Capital
107
2023
11 April 2022
Page 1 of 1
WASTEWATER CONTINUED PROJECTS - FY23
PROJECT
NUMBER
PROJECT NAME REASON PROJECT CONTINUED COST
ESTIMATE
13599 EARTH CITY UPS PUMP
STATION (P-702)
REPLACEMENT PHASE II
PROJECT CONTINUED DUE TO REQUIRED REBID.
ANTICIPATE BOARD INTRODUCTION IN AUGUST 2022.
$1,800,000
11796 HARLEM BADEN RELIEF
PHASE IV (HEBERT) -
HAMILTON TO DARVER
TRUNK SEWER
PROJECT CONTINUED DUE TO COORDINATION WITH
PROPERTY OWNERS. ANTICIPATE BOARD INTRODUCTION
IN SEPTEMBER 2022.
$6,000,000
11678 WEBSTER GROVES TRUNK
E SANITARY
REHABILITATION AND I/I
REDUCTION PHASE IV
PART 3
PROJECT CONTINUED DUE TO COORDINATION WITH
PROPERTY OWNERS. ANTICIPATE BOARD INTRODUCTION
IN FEBRUARY 2023.
$1,300,000
TOTAL: $9,100,000
11 April 2022
Page 1 of 2
WASTEWATER CONTINGENCY PROJECTS - FY24
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
12548 BISSELL POINT WWTF FINE SCREEN,
CONCRETE AND GATE IMPROVEMENTS
$14,090,000 108
12548 BISSELL POINT WWTF FINE SCREEN,
CONCRETE AND GATE IMPROVEMENTS
$150,000 109
11847 BLACK CREEK - HADDINGTON COURT RELIEF
SEWERS
$9,000,000 110
12114 CAULKS CREEK PUMP STATION B (P-751)
RELOCATION
$5,000,000 111
12552 COLDWATER CREEK WWTF REPAIRS AND
IMPROVEMENTS (2023)
$2,500,000 112
11146 CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
$5,000,000 113
13078 CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE - RIVER DES PERES
$3,000,000 114
13046 FILLMORE PUMP STATION (P-308)
REHABILITATION
$100,000 115
13046 FILLMORE PUMP STATION (P-308)
REHABILITATION
$1,800,000 116
12185 FRIEDENS (PARTIAL) I/I REDUCTION (CHAIN
OF ROCKS DR AND FONTAINE PL)
$1,750,000 117
12157 GC-06 GRAVOIS CREEK TO BRIARSTONE AND
GATES SANITARY RELIEF PHASE II
$3,758,000 118
11796 HARLEM BADEN RELIEF PHASE IV (HEBERT) -
HAMILTON TO DARVER TRUNK SEWER
$3,300,000 119
13231 HARLEM CITYSHED MITIGATION BASINS
(ASHLAND AND ESSEX)
$1,500,000 120
12942 HARLEM CITYSHED MITIGATION BASINS
(ASHLAND AND ESSEX) - SEPARATION
SEWERS
$4,800,000 121
13153 LEMAY WWTF REPAIRS AND IMPROVEMENTS
(2023) (GRIT TANKS AND SECONDARY
CLARIFIER DUCT BANK)
$3,550,000 122
11746 LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO FENTON
WWTF TUNNEL
$52,000,000 123
11746 LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO FENTON
WWTF TUNNEL
$750,000 124
11 April 2022
Page 2 of 2
WASTEWATER CONTINGENCY PROJECTS - FY24
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
12255 LOWER MERAMEC WWTF EXPANSION PHASE
II
$1,716,000 125
12255 LOWER MERAMEC WWTF EXPANSION PHASE
II
$1,800,000 126
12255 LOWER MERAMEC WWTF EXPANSION PHASE
II
$29,300,000 127
13679 MISSISSIPPI FLOODWALL ORS PUMP STATIONS
- LADDER REPLACEMENTS
$1,200,000 128
10715 NEW ENGLAND TOWN CLIFF CAVE PUMP
STATION (P-323) IMPROVEMENTS
$4,000,000 129
13467 SCADA SYSTEM UPGRADE $5,000,000 130
12206 SPIRIT OF ST. LOUIS 1 PUMP STATION (P-735)
REPLACEMENT
$1,085,000 131
13665 SUTHERLAND LANSDOWNE COMBINED
SEWER REPLACEMENT
$1,215,000 132
12241 UPPER BADEN SANITARY RELIEF (JENNINGS
STATION RD TO OAKRIDGE BLVD)
$2,974,000 133
13444 VALLEY SANITARY RELIEF PHASE III $4,000,000 134
12262 VALLEY VIEW PUMP STATION (P-734)
REPLACEMENT
$600,000 135
12302 WW-2 AND WW-3 WARSON WOODS SANITARY
RELIEF
$5,000,000 136
TOTAL:$169,938,000
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL POINT WWTF FINE SCREEN, CONCRETEAND GATE IMPROVEMENTS
Construction
(Supplemental
Appropriation)
6660 - Sanitary
Replacement Fund
COMMINUTOR, CONCRETE AND SLUICE GATE DETERIORATION DUE
TO AGING INFRASTRUCTURE.
INSTALL FINE SCREENS TO REPLACE FAILING COMMINUTORS,
REPAIR SLUICE GATES AND COMPONENTS, AND CONCRETE.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPROPRIATION IN FY 24. TOTAL CONSTRUCTION BUDGET IS
$32,090,000.
H
A
L
L
2
N
D
FERRY
PRARI
E
GRAND
MAY
TERMINAL
N
O
R
F
O
L
K
S
O
U
T
H
E
R
N
B
U
R
LIN
G
T
O
N
N
O
R
T
H
E
R
N
S
A
N
T
A
F
E
DESOT
O
B
E
N
E
D
I
C
T
GANO
GRAND
TERMINAL
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12548
Wastewater
15
$14,090,000
St. Louis City
Bissell
Bissell
Capital
108
2024
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL POINT WWTF FINE SCREEN, CONCRETEAND GATE IMPROVEMENTS
Engineering During
Construction Services
6660 - Sanitary
Replacement Fund
COMMINUTOR, CONCRETE AND SLUICE GATE DETERIORATION DUE
TO AGING INFRASTRUCTURE.
INSTALL FINE SCREENS TO REPLACE FAILING COMMINUTORS,
REPAIR SLUICE GATES AND COMPONENTS, AND CONCRETE.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPROPRIATION IN FY 24. TOTAL CONSTRUCTION BUDGET IS
$32,090,000.
H
A
L
L
2
N
D
FERRY
PRARI
E
GRAND
MAY
TERMINAL
N
O
R
F
O
L
K
S
O
U
T
H
E
R
N
B
U
R
LIN
G
T
O
N
N
O
R
T
H
E
R
N
S
A
N
T
A
F
E
DESOT
O
B
E
N
E
D
I
C
T
GANO
GRAND
TERMINAL
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12548
Wastewater
11
$150,000
St. Louis City
Bissell
Bissell
Capital
109
2024
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BLACK CREEK - HADDINGTON COURT RELIEFSEWERS
Construction
(Supplemental
Appropriation)
6660 - Sanitary
Replacement Fund
WET WEATHER BUILDING BACKUPS, OVERCHARGED SEWERS, AND
CONSTRUCTED SANITARY SEWER OVERFLOWS.
CONSTRUCT 7,955 FEET OF 8-INCH TO 42-INCH SANITARY SEWER,
AND ELIMINATE CONSTRUCTED SSO OUTFALLS BP-013, BP-017, AND
BP-151.
BP-583 WILL ALSO BE ABLE TO BE REMOVED UPON COMPLETION OF
THE DEER CREEK TUNNEL PROJECT. TOTAL CONSTRUCTION
BUDGET IS $22,000,000.
§¨¦170
PR
I
C
E
DELMAR
CLAYTON
GA
Y
LADUE
LA
Y
BR
E
N
T
W
O
O
D
MC
K
N
I
G
H
T
GANNON
ME
R
A
M
E
C
FORSYT
H
DAVIS
LAFON
F
R
A
N
C
I
S
MARYLAND
M
E
T
R
O
L
I
N
K
TOPTON
LOUWEN
FOREST PARK
CE
N
T
R
A
L
H
U
N
T
E
R
RI
O
V
I
S
T
A
T E A S D ALE
SHAW PA R K
P
OLO
BARBY
WA
R
D
E
R
EA
S
T
P R I V A T E
DRO
M
A
R
A
LA
N
G
T
O
N
LITTLE
WATKINS
BE
R
K
L
E
Y
ST A NDREWS
BONHOMME
O
L
E
T
A
POINTER
KINGSBURY
WASHINGTON
DAYTONA
BLACK CREEK
D
E
LCREST
HAL I F A X
NORTH
N
SOUTH
DO
N
N
E
SHERATON
EDGEW O O D
EXMOOR
RIDGEWOOD
VENETIAN
LO
R
E
N
Z
O
PERSHING
ORLANDO
AMES
ROSILINE
SUNNINGDALE CHERRY HILL
PAXTON
UNIVERSITY
PARK
S
I
D
E
WALINCA
ROXBURGH
BURROUGHS
LAYTON
CHER EL
WESTMORELAND
P
RI
V
A
T
E
PRIVATE
KINGSBURY
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11847
Wastewater
15
$9,000,000
Ladue
Lemay/RDP
Black Creek
Capital
110
2024
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CAULKS CREEK PUMP STATION B (P-751)RELOCATION
Construction
6660 - Sanitary
Replacement Fund
PUMP STATION AT MAXIMUM CAPACITY, ACCESS IMPACTED BY
FLOODING, UTILITY COMPLICATIONS, AND NO ROOM ON SITE FOR
NEEDED EMERGENCY STORAGE.
RECONSTRUCT PUMP STATION AT NEW LOCATION.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLMENTAL
APPROPRIATION IN FY 25. TOTAL CONSTRUCTION BUDGET IS
$8,200,000.
§¨¦64
§¨¦64CENTRALMIDLAND
ALR
I
C
K
DORESAY
OLDCHESTERFIELD
BIG
E
L
O
W
GRI
M
S
T
O
N
E
GILE
A
D
CENTRAL MIDLAN D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12114
Wastewater
15
$5,000,000
Chesterfield
Missouri
Caulks Creek
Capital
111
2024
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
COLDWATER CREEK WWTF REPAIRS ANDIMPROVEMENTS (2023)
Construction
(Supplemental
Appropriation)
6660 - Sanitary
Replacement Fund
AERATION PIPING NEEDS TO BE REPLACED, AND BOSKERS SWITCH
TRACK NEEDS TO BE IMPROVED.
AERATION CONTROL BUILDING IMPROVEMENTS, INCLUDING
REPLACEMENT OF AERATION CONTROL PIPING AND
INSTRUMENTATION, AND INSTALLATION OF A PARALLEL BOSKER
SWITCH TRACK SYSTEM AND NEW BOSKER UNITS.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPROPRIATION IN FY 24. TOTAL BUDGET IS $7,500,000.
PRIV
A
T
E
TREES EDGE
B
E
H
LMANNME A DO W S
BEHLMANNFARMS
RICHMOND FOREST
R
O
BBINSWA Y
PRIVATE
P
R
I
V
A
T
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12552
Wastewater
15
$2,500,000
Unincorporated
Coldwater
Coldwater Creek
Capital
112
2024
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CSO VOLUME REDUCTION GREENINFRASTRUCTURE
Construction
1101 - General Fund
CONTROL AND REDUCTION OF COMBINED SEWER OVERFLOWS AS
REQUIRED BY THE CONSENT DECREE.
INSTALLATION OF GREEN SOURCE CONTROL DEVICES TO REDUCE
STORMWATER VOLUMES ENTERING THE COMBINED SEWER SYSTEM
IN THE MISSISSIPPI WATERSHED.
THIS PROJECT TO BE IMPLEMENTED IN COOPERATION WITH THE
CITY OF ST. LOUIS AND OTHER AGENCIES. MAY INCLUDE CAPITAL
AND NON-CAPITAL SERVICES.
§¨¦55
§¨¦70
§¨¦64
§¨¦44
§¨¦170
§¨¦70
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11146
Wastewater
15
$5,000,000
Various
Bissell
Mississippi River Tributary Areas
Non-recurring
113
2024
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CSO VOLUME REDUCTION GREENINFRASTRUCTURE - RIVER DES PERES
Construction
1101 - General Fund
CONTROL AND REDUCTION OF COMBINED SEWER OVERFLOWS AS
REQUIRED BY THE CONSENT DECREE.
INSTALLATION OF GREEN SOURCE CONTROL DEVICES TO REDUCE
STORMWATER VOLUMES ENTERING THE COMBINED SEWER SYSTEM
IN THE RIVER DES PERES WATERSHED.
THIS PROJECT TO BE IMPLEMENTED IN COOPERATION WITH THE
CITY OF ST. LOUIS AND OTHER AGENCIES. MAY INCLUDE CAPITAL
AND NON-CAPITAL SERVICES.
§¨¦70
§¨¦64
§¨¦44
§¨¦55
§¨¦170
§¨¦70
§¨¦64 §¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13078
Wastewater
15
$3,000,000
Various
Lemay/RDP
River Des Peres
Non-recurring
114
2024
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FILLMORE PUMP STATION (P-308) REHABILITATION
Engineering During
Construction Services
6660 - Sanitary
Replacement Fund
AGING PUMP STATION IN NEED OF ASSET RENEWAL.
REHABILITATE THE MECHANICAL AND ELECTRICAL SYSTEMS, AND
THE BUILDING ENVELOPE.
EL
W
O
O
D
FIL
L
M
O
R
E
PENN
S
Y
L
V
A
N
I
A
UNIO
N
P
A
C
I
F
I
C
IRO
N
MINN
E
S
O
T
A
BO
W
E
N
DOV
E
R
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13046
Wastewater
11
$100,000
St. Louis City
Lemay/RDP
Mississippi River Tributary Areas
Capital
115
2024
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FILLMORE PUMP STATION (P-308) REHABILITATION
Construction
6660 - Sanitary
Replacement Fund
AGING PUMP STATION IN NEED OF ASSET RENEWAL.
REHABILITATE THE MECHANICAL AND ELECTRICAL SYSTEMS, AND
THE BUILDING ENVELOPE.
EL
W
O
O
D
FIL
L
M
O
R
E
PENN
S
Y
L
V
A
N
I
A
UNIO
N
P
A
C
I
F
I
C
IRO
N
MINN
E
S
O
T
A
BO
W
E
N
DOV
E
R
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13046
Wastewater
15
$1,800,000
St. Louis City
Lemay/RDP
Mississippi River Tributary Areas
Capital
116
2024
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FRIEDENS (PARTIAL) I/I REDUCTION (CHAIN OFROCKS DR AND FONTAINE PL)
Construction
6660 - Sanitary
Replacement Fund
EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS.
CONSTRUCT 3,000 FEET OF 8-INCH TO 12-INCH STORM SEWER.
PROJECT DESIGN CONCEPT WAS CHANGED AFTER PRELIMINARY
CONSTRUCTABILITY REVIEW FROM I/I REDUCTION TO SANITARY
RELIEF SEWER CONSTRUCTION.
MARIAS
CHAIN OF ROCKS
RAFORD RIVER RUN
RIVER TRAIL
HA
L
L
MAKALU
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12185
Wastewater
15
$1,750,000
Bellefontaine Neighbors
Bissell
Maline Creek
Capital
117
2024
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GC-06 GRAVOIS CREEK TO BRIARSTONE ANDGATES SANITARY RELIEF PHASE II
Construction
6660 - Sanitary
Replacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCTED SSO OUTFALL BP-382 REQUIRES REMOVAL.
CONSTRUCT 4,700 FEET OF 8-INCH TO 18-INCH SANITARY SEWER,
AND ELIMINATE CONSTRUCTED SSO OUTFALL BP-382.
DENNY
SA
P
P
I
N
G
T
O
N
EM
I
L
TEALRIDGE
LARKRIDGE
CARAVAN
FANTASY
BADGLEY
HA
Z
E
L
R
I
D
G
E
WESTMINSTER
PA
R
K
L
I
N
D
A
L
E
P
P
O
GO
L
T
E
R
M
A
N
C
O
VERLY
F
O
X
GLEN
HEDGEFIELD
BE
I
R
U
T
WE
R
K
D
A
L
E
C
A
S
T
A
N
E
T
LE
M
O
N
A
C
O
HEDG
E
B
R
O
O
K
T
A
F
F
Y
GRAVOI
S
R
D
S
L
I
N
D
B
E
R
G
H
B
L
V
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12157
Wastewater
15
$3,758,000
Various
Lemay/RDP
Gravois Creek
Capital
118
2024
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HARLEM BADEN RELIEF PHASE IV (HEBERT) -HAMILTON TO DARVER TRUNK SEWER
Construction
(Supplemental
Appropriation)
6660 - Sanitary
Replacement Fund
BUILDING BACKUPS AND FLOODING DUE TO OVERCHARGED
COMBINED SEWERS.
CONSTRUCT 3,660 FEET OF 12-INCH TO 108-INCH STORM AND
COMBINED SEWERS, AND 900 FEET OF PIPE IN TUNNEL.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPROPRIATION IN FY 24. TOTAL CONSTRUCTION BUDGET IS
$9,300,000.
KIE
N
L
E
N
TERMINAL
S T L O UIS
DAR
V
E
R
HAM
I
L
T
O
N
EDM
U
N
D
PRIVA
T
E
CRE
S
C
E
N
T
GRE
E
R
IDAD
A
L
E
BAIL
E
Y
AUD
R
E
Y
IRV
I
N
G
JAMESAHARVEY
STO
R
E
Y
ST L
O
U
I
S
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11796
Wastewater
15
$3,300,000
Various
Bissell
Bissell
Capital
119
2024
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HARLEM CITYSHED MITIGATION BASINS(ASHLAND AND ESSEX)
Construction
(Supplemental
Appropriation)
6660 - Sanitary
Replacement Fund
BUILDING BACKUPS AND STREET FLOODING.
CONSTRUCT 2 STORMWATER DETENTION BASINS, AND 2 RAIN
GARDENS.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPROPRIATION IN FY 24. TOTAL BUDGET IS $5,500,000.
§¨¦70
§¨¦70
UNI
O
N
LEE
TERMINAL
BEL
T
SHR
E
V
E
EUC
L
I
D
GRE
E
R
LABA
D
I
E
SEM
P
L
E
ARL
I
N
G
T
O
N
COR
A
BRO
W
N
WAB
A
D
A
ST L
O
U
I
S
TERR
Y
PENR
O
S
E
GER
A
L
D
I
N
E
MAFF
I
T
T
PALM
BIRC H E R
ASHL
A
N
D
KOSS
U
T
H
LOTU
S
FARL
I
N
NOR
W
O
O
D
CART
E
R
BUR
D
NORT
H
L
A
N
D
LEXI
N
G
T
O
N
MAR
C
U
S
ABN
E
R
AND
E
R
S
O
N
HIGH
L
A
N
D
ELMB
A
N
K
HER
B
E
R
T
CUPP
L
E
S
NEW
S
T
E
A
D
COTE
B
R
I
L
L
I
A
N
T
E
CALV
I
N
BESS
I
E
PAR
I
S
MAR
G
A
R
E
T
T
A
WEL
L
S
HAMM
E
T
T
DRY
D
E
N
SAN
F
R
A
N
C
I
S
C
O
SACR
A
M
E
N
T
O
KENNERLY
AUB
E
R
T
TAY
L
O
R
PATT
O
N
THEO
D
O
S
I
A
ACADEM
Y
SIE
M
E
R
S
CLA
R
A
WILL
I
A
M
BAY
A
R
D
WAL
T
O
N
SEX
A
U
E
R
GRO
V
E
R
CHE
S
T
E
R
TERR
Y
MAR
C
U
S
PALM
PALM
BRO
W
N
COR
A
LEXI
N
G
T
O
N
HIGH
L
A
N
D
LEXI
N
G
T
O
N
EUCLI
D
WAB
A
D
A
GRE
E
R
COTE
B
R
I
L
L
I
A
N
T
E
NOR
T
H
L
A
N
D
LABA
D
I
E
TERMINA
L
PALMASHLAND
GRE
E
R
TERMINAL
MAFF
I
T
T
TERMINAL
LOTU
S
ASHL
A
N
D
COR
A
EUC
L
I
D
FARL
I
N
N O R W O O D
MAFF
I
T
T
NATURALBRIDGERD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13231
Wastewater
15
$1,500,000
Various
Bissell
Harlem
Capital
120
2024
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HARLEM CITYSHED MITIGATION BASINS(ASHLAND AND ESSEX) - SEPARATION SEWERS
Construction
6660 - Sanitary
Replacement Fund
BUILDING BACKUPS AND STREET FLOODING.
CONSTRUCT 16,320 OF STORM SEWER FOR SOFT SEPARATION.
§¨¦70
§¨¦70
UNI
O
N
BEL
T
ST L
O
U
I
S
LEE
SHR
E
V
E
SEM
P
L
E
MAR
C
U
S
GRE
E
R
EUC
L
I
D
ARL
I
N
G
T
O
N
WAB
A
D
A
COR
A
BRO
W
N
LABA
D
I
E
TERR
Y
TERMINAL
PENR
O
S
E
GER
A
L
D
I
N
E
TAY
L
O
R
PALM
BUR
D
BIRC H E R
MAFF
I
T
T
LOTU
S
FARL
I
N
ASH
L
A
N
D
KOSS
U
T
H
NOR
W
O
O
D
NORT
H
L
A
N
D
LEXI
N
G
T
O
N
CART
E
R
ABN
E
R
HIGH
L
A
N
D
ELMB
A
N
K
ELW
A
R
D
HER
B
E
R
T
AND
E
R
S
O
N
CUPP
L
E
S
CALV
I
N
BESS
I
E
MAR
G
A
R
E
T
T
A
H
O
O
K
E
COTE
B
R
I
L
L
I
A
N
T
E
SAN
F
R
A
N
C
I
S
C
O
AUB
E
R
T
SACR
A
M
E
N
T
O
PATT
O
N
T
H
E
O
D
O
R
E
THEO
D
O
S
I
A
SIE
M
E
R
S
CLA
R
A
BAY
A
R
D
WAL
T
O
N
LEXI
N
G
T
O
N
NOR
T
H
L
A
N
D
TERMINA
L
EUC
L
I
D
LEXIN
G
T
O
N
N O R W O O D
MAFF
I
T
T
WAB
A
D
A
MARGARETTA
PALM
LABADIE
COR
A
PALM
MAR
C
U
S
MAFF
I
T
T
GRE
E
R
BRO
W
N
COR
A
MAFFITT
PALM
FARL
I
N
LOTU
S
TERMINAL
ASHL
A
N
D
NATURALBRIDGERD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12942
Wastewater
15
$4,800,000
Various
Bissell
Harlem
Capital
121
2024
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY WWTF REPAIRS AND IMPROVEMENTS(2023) (GRIT TANKS AND SECONDARY CLARIFIERDUCT BANK)
Construction
(Supplemental
Appropriation)
6660 - Sanitary
Replacement Fund
AGING AND DETERIORATED FACILITIES AND MECHANICAL
EQUIPMENT REQUIRE REPAIR AND REPLACEMENT.
CONSTRUCT CONCRETE REPAIRS, REPLACE SECONDARY CLARIFIER
DUCT BANK, AND RENEW 4 GRIT TANKS.
PROJECT RECEIVES PARTIAL FUNDING/SUPPL. APPROPRIATION IN
FY 24. TOTAL CONSTRUCTION BUDGET IS $7,550,000. SPLIT FUNDED
BETWEEN FUNDS 4102 AND 6660.
ETTA
H
O
F
F
M
E
I
S
T
E
R
HO
R
N
VELMA
MIL
I
T
A
R
Y
P
RIV
A
T
E
UNIO
N
P
A
C
I
F
I
C
WEI
S
S
MANN
LAG
R
O
HOLDEN
G
O
E
T
Z
CARTWRIGHT
GENTR
Y
JO
P
L
I
N
PE
R
R
I
N
RU
B
Y
WAL
L
E
R
FRA
N
K
E
UNIONPACIFIC
UNIONPACIFIC
UNIO
N
P
A
C
I
F
I
C
HOLDEN
P
R
I
V
A
T
E
P R I V ATE
WEI
S
S
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13153
Wastewater
15
$3,550,000
Unincorporated
Lemay/RDP
Lemay Creek
Capital
122
2024
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER MERAMEC RIVER SYSTEMIMPROVEMENTS - BAUMGARTNER TO FENTONWWTF TUNNEL
Construction
(Supplemental
Appropriation)
6660 - Sanitary
Replacement Fund
THE FENTON WWTF IS AN INTERIM FACILITY AND ITS ELIMINATION IS
PART OF THE EAST WEST GATEWAY SECTION 208 REGIONAL WATER
QUALITY MANAGEMENT PLAN.
CONSTRUCT 36,000 FEET OF 8-FOOT DIAMETER DEEP TUNNEL TO
CONVEY WASTEWATER FROM THE FENTON WWTF TO THE
BAUMGARTNER TUNNEL, TO ENABLE TREATMENT OF FLOWS AT THE
LOWER MERAMEC WWTF.
PROJECT ELIMINATES PUMP STATIONS P-446 AND P-483. P-489 TO BE
ELIMINATED BY SEPARATE PROJECT #10869. TOTAL CONSTRUCTION
BUDGET IS $180,000,000.
§¨¦55
§¨¦270
§¨¦55
KERT
H
MA
T
T
I
S
G R A V OIS
WEL
L
S
KELL
E
R
MERAMEC BOTT O M
AMB
S
KENNE
R
L
Y
T
H
E
I
S
S
EA
S
T
CONCORD
AL
L
E
N
ALSW
E
L
L
S C H U E S SLER
MENTZHILL
RI N G ER
B A U ER
BU T L E R HILL
GREENTON
S
USONHILLS
PO I N T E
CARIBEE
HAWKINS
GE
R
A
L
D
KE
M
P
F
H
A
G
E
M
A
N
N
OLSEN
GREGORY
DIER
S
P
R
I
VATE
MAIN
RI VERCURVE
VALMEYER
TESCORD
M A N G O
W
A
T
S
O
N
GATESBURY
DANTONAIRE
GRIFF
I
N
A C O RN
LANGTREE
VALLEYSIDE
FUCH
SFI
J
I
B AHNFYRE
FERN B
E
A
C
H
ED
L
O
U
CLAYR
I
D
G
E
S
T
A
R
L
I
T
ATLNTIC
LA
R
K
I
N
LITTLEROCK
TIOGA
COYL
E
TOWNE SOUTH
PRIVA
T
E
PRIVATE
AMBS
BAUER
PR
I
V
A
T
E
P
R
I
V
A
T
E
T E S S O N FERRYRD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11746
Wastewater
15
$52,000,000
Various
Meramec
Meramec Tributary Areas
Capital
123
2024
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER MERAMEC RIVER SYSTEMIMPROVEMENTS - BAUMGARTNER TO FENTONWWTF TUNNEL
Engineering During
Construction Services
6660 - Sanitary
Replacement Fund
THE FENTON WWTF IS AN INTERIM FACILITY AND ITS ELIMINATION IS
PART OF THE EAST WEST GATEWAY SECTION 208 REGIONAL WATER
QUALITY MANAGEMENT PLAN.
CONSTRUCT 36,000 FEET OF 8-FOOT DIAMETER DEEP TUNNEL TO
CONVEY WASTEWATER FROM THE FENTON WWTF TO THE
BAUMGARTNER TUNNEL, TO ENABLE TREATMENT OF FLOWS AT THE
LOWER MERAMEC WWTF.
PROJECT ELIMINATES PUMP STATIONS P-446 AND P-483. P-489 TO BE
ELIMINATED BY SEPARATE PROJECT #10869. TOTAL CONSTRUCTION
BUDGET IS $180,000,000.
§¨¦55
§¨¦270
§¨¦55
KERT
H
MA
T
T
I
S
G R A V OIS
WEL
L
S
KELL
E
R
MERAMEC BOTT O M
AMB
S
KENNE
R
L
Y
T
H
E
I
S
S
EA
S
T
CONCORD
AL
L
E
N
ALSW
E
L
L
S C H U E S SLER
MENTZHILL
RI N G ER
B A U ER
BU T L E R HILL
GREENTON
S
USONHILLS
PO I N T E
CARIBEE
HAWKINS
GE
R
A
L
D
KE
M
P
F
H
A
G
E
M
A
N
N
OLSEN
GREGORY
DIER
S
P
R
I
VATE
MAIN
RI VERCURVE
VALMEYER
TESCORD
M A N G O
W
A
T
S
O
N
GATESBURY
DANTONAIRE
GRIFF
I
N
A C O RN
LANGTREE
VALLEYSIDE
FUCH
SFI
J
I
B AHNFYRE
FERN B
E
A
C
H
ED
L
O
U
CLAYR
I
D
G
E
S
T
A
R
L
I
T
ATLNTIC
LA
R
K
I
N
LITTLEROCK
TIOGA
COYL
E
TOWNE SOUTH
PRIVA
T
E
PRIVATE
AMBS
BAUER
PR
I
V
A
T
E
P
R
I
V
A
T
E
T E S S O N FERRYRD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11746
Wastewater
11
$750,000
Various
Meramec
Meramec Tributary Areas
Capital
124
2024
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER MERAMEC WWTF EXPANSION PHASE II
Engineering During
Construction Services
6660 - Sanitary
Replacement Fund
ADDITIONAL FLOW TO THE LOWER MERAMEC WWTF DUE TO
ELIMINATION OF THE FENTON WWTF, AND POTENTIAL FUTURE
NUTRIENT REMOVAL PERMIT REQUIREMENTS.
EXPAND THE EXISTING WWTF TO INCREASE CAPACITY FOR
ADDITIONAL FLOW, AND UPGRADE THE FACILITY TO ENABLE
ACCOMMODATION OF POTENTIAL NUTRIENT REMOVAL
REQUIREMENTS.
TOTAL CONSTRUCTION BUDGET IS $117,000,000, INCLUDING ASSET
RENEWAL OF DETERIORATING ITEMS AT THE PLANT FOR $27,700,000,
WHICH WAS ALSO BID WITH 12255.
F
I
N
E
PR
I
V
A
T
E
PI
N
E
T
O
P
WILLIAMSON
BECKER
K
I
N
G
S
R
I
D
G
E
M
ANOR
S A G EBROOK
S I L V E R PIN E
P
I
N
E
T
O
P §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12255
Wastewater
11
$1,716,000
Unincorporated
Meramec
Mississippi River Tributary Areas
Capital
125
2024
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER MERAMEC WWTF EXPANSION PHASE II
Construction
Management Services
During Construction
6660 - Sanitary
Replacement Fund
ADDITIONAL FLOW TO THE LOWER MERAMEC WWTF DUE TO
ELIMINATION OF THE FENTON WWTF, AND POTENTIAL FUTURE
NUTRIENT REMOVAL PERMIT REQUIREMENTS.
EXPAND THE EXISTING WWTF TO INCREASE CAPACITY FOR
ADDITIONAL FLOW, AND UPGRADE THE FACILITY TO ENABLE
ACCOMMODATION OF POTENTIAL NUTRIENT REMOVAL
REQUIREMENTS.
TOTAL CONSTRUCTION BUDGET IS $117,000,000, INCLUDING ASSET
RENEWAL OF DETERIORATING ITEMS AT THE PLANT FOR $27,700,000,
WHICH WAS ALSO BID WITH 12255.
F
I
N
E
PR
I
V
A
T
E
PI
N
E
T
O
P
WILLIAMSON
BECKER
K
I
N
G
S
R
I
D
G
E
M
ANOR
S A G EBROOK
S I L V E R PIN E
P
I
N
E
T
O
P §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12255
Wastewater
14
$1,800,000
Unincorporated
Meramec
Mississippi River Tributary Areas
Capital
126
2024
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER MERAMEC WWTF EXPANSION PHASE II
Construction
(Supplemental
Appropriation)
6660 - Sanitary
Replacement Fund
ADDITIONAL FLOW TO THE LOWER MERAMEC WWTF DUE TO
ELIMINATION OF THE FENTON WWTF, AND POTENTIAL FUTURE
NUTRIENT REMOVAL PERMIT REQUIREMENTS.
EXPAND THE EXISTING WWTF TO INCREASE CAPACITY FOR
ADDITIONAL FLOW, AND UPGRADE THE FACILITY TO ENABLE
ACCOMMODATION OF POTENTIAL NUTRIENT REMOVAL
REQUIREMENTS.
TOTAL CONSTRUCTION BUDGET IS $117,000,000, INCLUDING ASSET
RENEWAL OF DETERIORATING ITEMS AT THE PLANT FOR $27,700,000,
WHICH WAS ALSO BID WITH 12255.
F
I
N
E
PR
I
V
A
T
E
PI
N
E
T
O
P
WILLIAMSON
BECKER
K
I
N
G
S
R
I
D
G
E
M
ANOR
S A G EBROOK
S I L V E R PIN E
P
I
N
E
T
O
P §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12255
Wastewater
15
$29,300,000
Unincorporated
Meramec
Mississippi River Tributary Areas
Capital
127
2024
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MISSISSIPPI FLOODWALL ORS PUMP STATIONS -LADDER REPLACEMENTS
Construction
6660 - Sanitary
Replacement Fund
AGING AND DETERIORATED LADDERS INSIDE AND OUTSIDE OF PUMP
STATIONS ALONG THE MISSISSIPPI FLOODWALL PUMP STATION
SYSTEM.
REPLACE FIXED STEEL LADDERS INSIDE AND OUTSIDE OF PUMP
STATIONS.
§¨¦70
§¨¦44
§¨¦55
§¨¦64
§¨¦170
§¨¦70
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13679
Wastewater
15
$1,200,000
St. Louis City
Bissell
Various
Capital
128
2024
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
NEW ENGLAND TOWN CLIFF CAVE PUMP STATION(P-323) IMPROVEMENTS
Construction
6660 - Sanitary
Replacement Fund
PUMP STATION IS AT THE END OF ITS LIFE CYCLE. DETERIORATED
SANITARY AND STORM SEWERS.
CONSTRUCT 3,500 FEET OF 8-INCH TO 12-INCH SANITARY SEWER,
1,600 FEET OF 6-INCH FORCEMAIN, AND REPLACE SANITARY PUMP
STATION P-323.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPROPRIATION IN FY 25. TOTAL CONSTRUCTION BUDGET IS
$5,600,000.
BUSSE
N
BLUFFC
L
IF
F
C
A
VE
CH
A
T
P
O
R
T
HEMPLINE
DOBER
HUNTSPORT
GLENRICH
W I N C A N T O N
ENGLAND
T
O
W
N PIERPORT
ST
E
E
L
E
R
I
D
G
E
PI
E
R
W
O
O
D
AS
H
T
O
N
C
I
R
C
L
E
HALYARD
ROCK HARBOR
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10715
Wastewater
15
$4,000,000
Unincorporated
Lemay/RDP
Martigney Creek
Capital
129
2024
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SCADA SYSTEM UPGRADE
Construction
6660 - Sanitary
Replacement Fund
MONITORING AND AUTOMATION CAPABILITIES NEEDED TO OPTIMIZE
THE USE OF AVAILABLE INFRASTRUCTURE, AND INCREASE LEVEL OF
SERVICE.
CONSTRUCT SUPERVISORY CONTROL AND DATA ACQUISITION
(SCADA) IMPROVEMENTS TO ALLOW FOR ACTIVE CONTROLS TO
MANAGE WET WEATHER FLOWS.
SUPPLEMENTAL APPROPRIATION IN FY 24. TOTAL CONSTRUCTION
BUDGET IS $8,000,000.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13467
Wastewater
15
$5,000,000
Various
Various
Various
Capital
130
2024
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SPIRIT OF ST. LOUIS 1 PUMP STATION (P-735)REPLACEMENT
Construction
6660 - Sanitary
Replacement Fund
DETERIORATED PUMP STATION REQUIRES REPAIR OR REPLACMENT.
REPLACE PUMP STATION P-735.
EDISON
S
P
I
R
I
T
O
F
S
T
L
O
U
I
S
S
P
I
R
I
T
O
F
S
T
L
O
U
I
S
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12206
Wastewater
15
$1,085,000
Chesterfield
Missouri
Missouri River Tributary Areas
Capital
131
2024
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SUTHERLAND LANSDOWNE COMBINED SEWERREPLACEMENT
Construction
6660 - Sanitary
Replacement Fund
SEWER BLOCKAGE AND DEFECTIVE LATERAL CONNECTIONS.
REPLACE 470 FEET OF 10-INCH AND 310 FEET OF 15-INCH COMBINED
SEWERS.
SU
L
P
H
U
R
JA
N
U
A
R
Y
DEVONSHIRE
WINONA
BANCROFT
ELLENWOOD
SUTHERLAND
MURDOCH
LANSD O W NE
SUTHERLAND
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13665
Wastewater
15
$1,215,000
St. Louis City
Lemay/RDP
Southwestern
Capital
132
2024
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
UPPER BADEN SANITARY RELIEF (JENNINGSSTATION RD TO OAKRIDGE BLVD)
Construction
6660 - Sanitary
Replacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCTED SSO OUTFALL BP-001 REQUIRES REMOVAL.
CONSTRUCT 4,100 FEET OF 15-INCH TO 27-INCH SANITARY SEWER,
AND ELIMINATE CONSTRUCTED SSO OUTFALL BP-001.
§¨¦70
LILLI
A
N
KENWO O D
JUNE
BE
G
G
BEUL
A
H
EDGE
W
O
O
D
HAT
Z
ROX
I
E
THEO
D
O
R
E
MATHEW
STIVERS
ROH
N
DAIBER
NEL
S
O
N
DAW
S
O
N
DONALD
SEA
T
T
L
E
RAVE
N
W
O
O
D
FLE
T
C
H
E
R
K
E
N
E
W
A
H
UPS
H
A
W
COL
L
E
G
E
B
A
R
R
MARYELL
E
N
JOR
D
A
N
OAK
R
I
D
G
E
MUR
R
A
Y
OAKW
O
O
D
K
A
H
N
S
M
O
T
T
E
BAR
K
E
N
PINE
R
I
D
G
E
MEL
W
O
O
D
STRATFORD
DUCKWORT H
MIN O M A
PRIV
A
T
E
BEG
G
FLE
T
C
H
E
R
ROH
N
ROHN
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12241
Wastewater
15
$2,974,000
Northwoods
Bissell
Bissell
Capital
133
2024
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
VALLEY SANITARY RELIEF PHASE III
Construction
6660 - Sanitary
Replacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 6,960 FEET OF 8-INCH TO 15-INCH SANITARY SEWER.
KETTINGTON
LERING
CAMARG
O
W HITBY
DEL EBRO
TREVI
NOTTINGHAM
LENN
O
X
BEDFO R D
W
ESTPAR
GO
L
F
V
I
E
W
BL
U
E
H
I
L
L
AN
D
A
N
T
E
TROWBRIDGE
CH
A
R
B
R
A
Y
GREENB ANK
FOREST CLUB
C LA R K S O N FARM
MO R ENA
CHAROLAIS
LA
U
R
E
N
W
O
O
D
HIGHGROVE
EA
G
L
E
S
L
A
N
D
I
N
G
SP
O
R
T
S
M
E
N
H
I
L
L
CL
A
R
K
S
O
N
R
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13444
Wastewater
15
$4,000,000
Various
Missouri
Caulks Creek
Capital
134
2024
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
VALLEY VIEW PUMP STATION (P-734)REPLACEMENT
Construction
6660 - Sanitary
Replacement Fund
PUMP STATION P-734 NEEDS REPLACEMENT TO MEET CURRENT
SERVICE LEVEL DEMANDS.
REPLACE PUMP STATION P-734, AND 430 FEET OF FORCE MAIN.
VA
L
L
E
Y
HERWORTH
SU
N
M
E
A
D
O
W
SUNDANCECREEK
VALLE
Y
O
A
K
S
E
S
T
A
T
E
S
V
A
L
L
E
Y
E
S
T
A
T
E
S
WIN
D
H
A
V
E
N
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12262
Wastewater
15
$600,000
Wildwood
Missouri
Caulks Creek
Capital
135
2024
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WW-2 AND WW-3 WARSON WOODS SANITARYRELIEF
Construction
6660 - Sanitary
Replacement Fund
OVERCHARGED SANITARY SEWERS. CONSTRUCTED SSO OUTFALLS
BP-156, BP-158, AND BP-501 REQUIRE REMOVAL.
CONSTRUCT 10,600 FEET OF 8-INCH TO 24-INCH SANITARY SEWER.
ELIMINATE CONSTRUCTED SSO OUTFALLS BP-156, BP-158, AND
BP-501.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPROPRIATION IN FY 25. TOTAL CONSTRUCTION BUDGET IS
$9,785,000.
WO
O
D
L
A
W
N
KIRKHAM
OLD WARSON
WO
O
D
OD
A
Y
LEE
BROWNELL
BE
N
N
E
T
T
DI
C
K
S
O
N
B
E
R
R
Y
BISMARK
HUDSON
ANDREW
GI
L
B
E
R
T
M E D I N A
FOOTE
QUAN
NORTH
MARK
RENDERER
MC
K
I
N
L
E
Y
KO
R
T
W
R
I
G
H
T
BACON
F L A N D E R S
WILD DEER
EDLIN
S
L
O
C
U
M
BE A UCAIRE
C O P P E R H I L L
JOANNA
IOLA
R I DGELINE
CHELSEA
P
R
IVATE HIGHHAMP T O N
ROLFE
M
A
N
I
T
O
U
JULIAN
B
L
O
S
S
O
M
T
A
V
A
L
O
N
VICTORIA
WARWICK
ID
L
E
W
I
L
D
WAT E R B URY
BA
R
R
O
N
OA
K
GLENMOOR
M ONACO
ALEXANDRA
FREDE
RICK
MONIER
F
A
I
R
D
A
L
E
WINGFIELDGLENBROOK
MUECK
G R E E NVIEW
SEEKAMP
SOUTHRIDGE
M
I
N
M
A
R
BEAUFORD
W ARSON
NANCY CAROL
BERRYWOO D
G L E N V I S T A
MA
R
T
H
A
J A M AICA
N
ORMAN
HA
M
M
E
L
KE
N
M
O
R
E
ALFRED
H OLLIS T ON
OA
K
L
E
A
F
NOLAN
KINSELLA
ALDEN
LEWISTON
DE
N
V
E
R
B E R R Y R O A D
LE
O
N
A
R
D
A
S
C
O
T
CHELSEA
FLANDE R S
VICTORIA
IO
L
A
M A N C H E S T E R R D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12302
Wastewater
15
$5,000,000
Various
Lemay/RDP
Deer Creek
Capital
136
2024
11 April 2022
Page 1 of 7
WASTEWATER PROJECTS - FY23
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
1101 - GENERAL FUND
12804 Vendor
Services
CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS (2023)
Various $3,000,000
12908 Vendor
Services
CRITICAL INFRASTRUCTURE ASSESSMENT
AND ASSET INVESTIGATION (2023)
Various $1,700,000
11146 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
Various $5,000,000
13078 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE - RIVER DES PERES
Various $3,000,000
12801 Prof/Vendor
Services
(Supplemental
Appropriation)
FLOW METERING AND MONITORING (2022) Various $2,500,000
13087 Appraisal
Services
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2021) CONTRACT A
Various $75,000
13088 Appraisal
Services
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2021) CONTRACT B
Various $75,000
13089 Appraisal
Services
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2021) CONTRACT C
Various $75,000
13090 Appraisal
Services
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2021) CONTRACT D
Various $75,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $125,000
12006 Prof/Vendor
Services
(Supplemental
Appropriation)
RADAR RAINFALL DATA (2020)Various $150,000
11153 Professional
Services
RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $600,000
10766 Prof/Vendor
Services
(Supplemental
Appropriation)
STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
Various $605,000
12806 Vendor
Services
STREAM FLOW WATER QUALITY
SAMPLING (2023)
Various $350,000
11 April 2022
Page 2 of 7
WASTEWATER PROJECTS - FY23
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
13436 Pre-Design
Services
WET WEATHER OPTIMIZATION STUDY Various $1,500,000
FUND TOTAL: $18,830,000
4102 - IMPROVEMENT FUND
13153 Construction LEMAY WWTF REPAIRS AND
IMPROVEMENTS (2023) (GRIT TANKS AND
SECONDARY CLARIFIER DUCT BANK)
Unincorporated $4,000,000
FUND TOTAL: $4,000,000
5120 - DISTRICTWIDE STORMWATER FUND
13747 Construction LAMBERT AIRPORT RESTRICTED ACCESS
ASSETS INSPECTION AND REPAIR
Unincorporated $500,000
12200 Construction SAYLESVILLE SANITARY RELIEF
(SAYLESVILLE DR TO S GREENTRAILS DR)
Chesterfield $150,000
FUND TOTAL: $650,000
6660 - SANITARY REPLACEMENT FUND
12077 Construction AMBLEWOOD SANITARY RELIEF
(WATERFORD DR TO BIRCHBARK DR)
Florissant $2,453,000
12847 Construction
(Supplemental
Appropriation)
BADEN CITYSHED MITIGATION BASINS
(CALVARY, FREDERICK, PARTRIDGE AND
TILLIE) - SEPARATION SEWERS
St. Louis City $2,400,000
12085 Construction BANFF SANITARY RELIEF (CAITHNESS RD
TO LANARK RD)
Unincorporated $167,000
12090 Design Services BC-01 PHASE III AND BC-02 PHASE II
SANITARY RELIEF (I-170 TO
HEATHERWOOD DR)
Various $1,705,000
12565 Design Services
(Supplemental
Appropriation)
BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
Various $1,000,000
12565 Construction,
Design-Build
BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
Various $101,000,000
12565 Construction,
Proposer
Stipend
BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
Various $2,000,000
12565 Engineering
During
Construction
Services
BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
Various $8,600,000
13033 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT C
Various $2,663,000
11 April 2022
Page 3 of 7
WASTEWATER PROJECTS - FY23
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12586 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT D
Various $3,594,000
12587 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT E
Various $4,251,000
13124 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT F
Various $2,360,000
12548 Construction BISSELL POINT WWTF FINE SCREEN,
CONCRETE AND GATE IMPROVEMENTS
St. Louis City $18,000,000
11847 Construction BLACK CREEK - HADDINGTON COURT
RELIEF SEWERS
Ladue $13,000,000
12248 Engineering
During
Construction
Services
CAULKS CREEK A PUMP STATION (P-750)
IMPROVEMENTS
Chesterfield $200,000
12248 Construction
(Supplemental
Appropriation)
CAULKS CREEK A PUMP STATION (P-750)
IMPROVEMENTS
Chesterfield $3,200,000
11790 Construction
(Supplemental
Appropriation)
CAULKS CREEK FORCEMAIN (RIVER
VALLEY RD TO L-52)
Maryland Heights $2,500,000
12694 Professional
Services
CITYSHED MITIGATION PROGRAM DESIGN
(CONTRACT B)
St. Louis City $50,000
12552 Engineering
During
Construction
Services
COLDWATER CREEK WWTF REPAIRS AND
IMPROVEMENTS (2023)
Unincorporated $175,000
12552 Construction COLDWATER CREEK WWTF REPAIRS AND
IMPROVEMENTS (2023)
Unincorporated $5,000,000
11152 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL
FACILITIES
Various $2,500,000
11826 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK
TUNNELS
Various $5,000,000
11151 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION
FACILITIES
Various $7,500,000
13163 Construction CROSS TIMBERS #705 SANITARY
REPLACEMENT
Town And Country $425,000
12140 Design Services
(Supplemental
Appropriation)
CSO - MARY AVENUE SOUTH OF
MANCHESTER CSO INTERCEPTOR (I-
132)/OUTFALL (L-106) ELIMINATION PHASE
II
Brentwood $200,000
13599 Construction EARTH CITY UPS PUMP STATION (P-702)
REPLACEMENT PHASE II
Unincorporated $1,800,000
11 April 2022
Page 4 of 7
WASTEWATER PROJECTS - FY23
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12820 Property Rights
Acquisition
EASEMENT ACQUISITION FOR
WASTEWATER PROJECTS (2023)
Various $3,500,000
11888 Construction FABICK PUMP STATION (P-444)
IMPROVEMENTS (SKME-404E)
Fenton $460,000
12171 Construction FF-15 AND FF-16 SANITARY RELIEF PHASE II
REHABILITATION
Maryland Heights $2,650,000
12178 Construction FLORISSANT/DUNN SANITARY RELIEF (ST.
ANTHONY LN TO I-270)
Florissant $4,910,000
13516 Design Services
(Supplemental
Appropriation)
GASLIGHT SQUARE SEWER
IMPROVEMENTS PHASE II
St. Louis City $1,500,000
12387 General
Services -
Construction
Inspection
GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (2022)
Various $2,000,000
12397 GSA - Design
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2020)
CONTRACT A
Various $200,000
13098 GSA - Design
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2022)
CONTRACT A
Various $475,000
13099 GSA - Design
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2022)
CONTRACT B
Various $450,000
13102 GSA -
Geotechnical
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2022) CONTRACT A
Various $85,000
13103 GSA -
Geotechnical
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2022) CONTRACT B
Various $85,000
13104 GSA -
Geotechnical
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2022) CONTRACT C
Various $85,000
12400 GSA - Design
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT - SEWER
AND CHANNEL DESIGN (2021) CONTRACT A
Various $200,000
13108 GSA - Survey
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT A
Various $62,500
13109 GSA - Survey
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT B
Various $62,500
13110 GSA - Survey
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT C
Various $62,500
11 April 2022
Page 5 of 7
WASTEWATER PROJECTS - FY23
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
13111 GSA - Survey
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT D
Various $62,500
12174 Design Services GEYER SANITARY RELIEF (W. MONROE AVE
TO W. ESSEX AVE)
Kirkwood $496,000
12176 Design Services GLEN ECHO SANITARY RELIEF
(ENGELHOLM AVE TO HENDERSON AVE)
Various $730,000
12264 Construction GLENFIELD SANITARY RELIEF (WATSON
WOODS CT TO S LINDBERGH BLVD)
Sunset Hills $1,130,000
13630 Design Services GRAND GLAIZE WWTF GRAND GLAIZE
CREEK BANK STABILIZATION
Valley Park $260,000
13221 Design Services GRAND GLAIZE WWTF REPAIRS AND
IMPROVEMENTS (2023)
Valley Park $400,000
12291 Construction GREENBRIAR #2 PUMP STATION (P-448)
ELIMINATION
Des Peres $425,000
12334 Design Services
(Supplemental
Appropriation)
HAMPTON CREEK SANITARY RELIEF (DEER
CREEK TRUNK TO OXFORD DR) PHASE I
Various $200,000
11769 Construction
(Supplemental
Appropriation)
HARLEM - BADEN RELIEF PHASE IV
(HEBERT) (GOODFELLOW TO HAMILTON)
St. Louis City $1,279,000
10641 Engineering
During
Construction
Services
HARLEM - BADEN RELIEF PHASE IV
(HEBERT) BUILDING DEMOLITION AND
DESIGN
St. Louis City $100,000
11796 Construction HARLEM BADEN RELIEF PHASE IV
(HEBERT) - HAMILTON TO DARVER TRUNK
SEWER
Various $6,000,000
13548 Construction HARLEM BADEN RELIEF PHASE IV
(HEBERT) - SEWER REHABILITATION
Various $2,000,000
11800 Engineering
During
Construction
Services
HARLEM BADEN RELIEF PHASE IV
(HEBERT) - TRUNK SEWER
REHABILITATION
Various $50,000
13231 Construction HARLEM CITYSHED MITIGATION BASINS
(ASHLAND AND ESSEX)
Various $4,000,000
13432 Construction HATHAWAY DRIVE SANITARY RELIEF Jennings $902,000
12997 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS (FACILITIES)
(2023)
Various $3,000,000
13018 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2023) CONTRACT A
Various $2,500,000
13019 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2023) CONTRACT B
Various $2,500,000
13720 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2023) CONTRACT C
St. Louis City $3,310,000
11 April 2022
Page 6 of 7
WASTEWATER PROJECTS - FY23
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
13731 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2023) CORPS CSO
PROGRAM
Various $2,000,000
12989 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS
(WASTEWATER) (2023)
Various $9,000,000
11957 Engineering
During
Construction
Services
JEFFERSON BARRACKS TUNNEL
CONSOLIDATION SEWERS
Unincorporated $100,000
11957 Construction JEFFERSON BARRACKS TUNNEL
CONSOLIDATION SEWERS
Unincorporated $3,400,000
13747 Construction LAMBERT AIRPORT RESTRICTED ACCESS
ASSETS INSPECTION AND REPAIR
Unincorporated $2,000,000
13596 Construction LEMAY 1 PUMP STATION (P-301) COOLING
TOWER REPLACEMENT
St. Louis City $1,130,000
11817 Design Services
(Supplemental
Appropriation)
LEMAY NO. 3 PUMP STATION AND FORCE
MAIN
Unincorporated $575,000
13676 Construction LEMAY WWTF AERATION BLOWER AND
POWER DISTRIBUTION IMPROVEMENTS
Unincorporated $900,000
13153 Engineering
During
Construction
Services
LEMAY WWTF REPAIRS AND
IMPROVEMENTS (2023) (GRIT TANKS AND
SECONDARY CLARIFIER DUCT BANK)
Unincorporated $400,000
12330 Construction LINDSAY - ST. ALBERT PRIVATE I/I
REDUCTION
Florissant $500,000
13629 Design Services LINDSAY LANE SANITARY RELIEF
(LINDSAY LANE TO LINDBERGH BLVD)
Florissant $491,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $270,000
11746 Construction
(Supplemental
Appropriation)
LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO
FENTON WWTF TUNNEL
Various $48,000,000
11746 Engineering
During
Construction
Services
LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO
FENTON WWTF TUNNEL
Various $575,000
12255 Engineering
During
Construction
Services
LOWER MERAMEC WWTF EXPANSION
PHASE II
Unincorporated $1,716,000
12255 Construction
Management
Services During
Construction
LOWER MERAMEC WWTF EXPANSION
PHASE II
Unincorporated $2,000,000
11 April 2022
Page 7 of 7
WASTEWATER PROJECTS - FY23
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12255 Construction
(Supplemental
Appropriation)
LOWER MERAMEC WWTF EXPANSION
PHASE II
Unincorporated $30,000,000
10024 Construction
(Supplemental
Appropriation)
MC-02 WATSON TO EDGAR RD SANITARY
RELIEF (SKME-580A)
Various $5,954,000
12357 Construction NEWPORT LANDING PUMP STATION (P-480)
ELIMINATION
Unincorporated $626,000
12433 Construction NORTH FEE FEE CREEK PUBLIC I/I
REDUCTION
Various $6,000,000
12368 Construction
(Supplemental
Appropriation)
PRICE TO PIONEER SANITARY RELIEF Olivette $2,507,000
13680 Construction PUMP STATION FALL PROTECTION
UPGRADES - PHASE I
Various $500,000
13566 Construction PUMP STATION MANLIFT REPLACEMENT Various $4,000,000
11701 Engineering
During
Construction
Services
PUMP STATION REPLACEMENT PROJECTS
(PHASE I)
Various $50,000
12189 Construction ROBYN HILLS NUMBER 1 PUMP STATION (P-
417) REPLACEMENT
Sunset Hills $780,000
13662 Construction ROXBURGH DR SANITARY RELIEF Clayton $400,000
12195 Design Services S BRENTWOOD BLVD SANITARY RELIEF
(DAYTONA DR TO WALINCA TERRACE)
Clayton $500,000
12200 Construction SAYLESVILLE SANITARY RELIEF
(SAYLESVILLE DR TO S GREENTRAILS DR)
Chesterfield $2,850,000
11678 Construction,
Phase III
WEBSTER GROVES TRUNK E SANITARY
REHABILITATION AND I/I REDUCTION
PHASE IV
Webster Groves $1,300,000
10794 Design Services WEBSTER GROVES TRUNK E SANITARY
RELIEF (SKME-628)
Webster Groves $1,512,000
12280 Construction WHITE PLAINS SANITARY RELIEF
(SALTBOX DR TO CEDAR CREEK RD)
Chesterfield $1,800,000
FUND TOTAL: $369,711,000
GRAND TOTAL:$393,191,000
11 April 2022
Page 1 of 7
WASTEWATER PROJECTS - FY24
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
1101 - GENERAL FUND
11144 Professional
Services
BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $650,000
12804 Prof/Vendor
Services
(Supplemental
Appropriation)
CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS (2023)
Various $3,000,000
12908 Prof/Vendor
Services
(Supplemental
Appropriation)
CRITICAL INFRASTRUCTURE ASSESSMENT
AND ASSET INVESTIGATION (2023)
Various $1,700,000
11146 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
Various $5,000,000
13078 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE - RIVER DES PERES
Various $3,000,000
12801 Prof/Vendor
Services
(Supplemental
Appropriation)
FLOW METERING AND MONITORING (2022) Various $2,500,000
13091 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2024) CONTRACT A
Various $75,000
13092 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2024) CONTRACT B
Various $75,000
13093 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2024) CONTRACT C
Various $75,000
13094 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2024) CONTRACT D
Various $75,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $200,000
12006 Prof/Vendor
Services
(Supplemental
Appropriation)
RADAR RAINFALL DATA (2020)Various $150,000
11153 Professional
Services
RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $600,000
10766 Prof/Vendor
Services
(Supplemental
Appropriation)
STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
Various $605,000
11 April 2022
Page 2 of 7
WASTEWATER PROJECTS - FY24
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12806 Prof/Vendor
Services
(Supplemental
Appropriation)
STREAM FLOW WATER QUALITY
SAMPLING (2023)
Various $350,000
FUND TOTAL: $18,055,000
5120 - DISTRICTWIDE STORMWATER FUND
13747 Construction LAMBERT AIRPORT RESTRICTED ACCESS
ASSETS INSPECTION AND REPAIR
Unincorporated $500,000
FUND TOTAL: $500,000
6660 - SANITARY REPLACEMENT FUND
12079 Construction ARV ELLEN SANITARY RELIEF (TESSON
CREEK ESTATES DR TO MADAFORD LN)
Unincorporated $600,000
12088 Construction BAXTER - MERAMEC BOTTOMS - VALLEY
PARK PRIVATE I/I REDUCTION
Ballwin $336,000
12565 Engineering
During
Construction
Services
BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
Various $15,600,000
12565 Construction,
Design-Build
(Supplemental
Appropriation)
BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
Various $171,000,000
12548 Construction
(Supplemental
Appropriation)
BISSELL POINT WWTF FINE SCREEN,
CONCRETE AND GATE IMPROVEMENTS
St. Louis City $14,090,000
12548 Engineering
During
Construction
Services
BISSELL POINT WWTF FINE SCREEN,
CONCRETE AND GATE IMPROVEMENTS
St. Louis City $150,000
12566 Design Services
(Supplemental
Appropriation)
BISSELL POINT WWTF TRICKLING FILTER
MEDIA REPLACEMENT
St. Louis City $150,000
11847 Construction
(Supplemental
Appropriation)
BLACK CREEK - HADDINGTON COURT
RELIEF SEWERS
Ladue $9,000,000
13439 Design Services BONFILS PUMP STATION (P-784)
REHABILITATION
Unincorporated $500,000
12108 Construction BURNING TREE INFRASTRUCTURE REPAIR
(N. WATERFORD DR TO FOX RUN DR)
Florissant $448,000
12114 Construction CAULKS CREEK PUMP STATION B (P-751)
RELOCATION
Chesterfield $5,000,000
12122 Construction CLARK AVE SANITARY RELIEF (LACLEDE
STA RD TO YEATMAN AVE)
Webster Groves $1,607,000
11 April 2022
Page 3 of 7
WASTEWATER PROJECTS - FY24
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12552 Construction
(Supplemental
Appropriation)
COLDWATER CREEK WWTF REPAIRS AND
IMPROVEMENTS (2023)
Unincorporated $2,500,000
12550 Design Services COLDWATER CREEK WWTF REPLACEMENT
SLUDGE FORCEMAIN
Various $1,700,000
11152 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL
FACILITIES
Various $500,000
11826 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK
TUNNELS
Various $4,500,000
11151 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION
FACILITIES
Various $4,500,000
12129 Design Services CONWAY MEADOWS SANITARY RELIEF
(CONWAY RD TO I-64)
Chesterfield $111,000
12130 Construction CONWAY ROAD SANITARY RELIEF
(CONWAY LN TO DWYER AVE)
Ladue $512,000
12134 Design Services COWMIRE CREEK SANITARY
REPLACEMENT I-70 CROSSING (ST.
CHARLES ROCK RD TO MARK TWAIN LN)
Bridgeton $115,000
12139 Construction CSO - BRENTWOOD AND RED BUD AVE CSO
INTERCEPTOR (I-118)/OUTFALL (L-111)
ELIMINATION AND SEWER SEPARATION
Richmond Heights $10,000,000
12139 Engineering
During
Construction
Services
CSO - BRENTWOOD AND RED BUD AVE CSO
INTERCEPTOR (I-118)/OUTFALL (L-111)
ELIMINATION AND SEWER SEPARATION
Richmond Heights $250,000
12326 Construction DANIEL BOONE - LAWNVIEW CREEK I/I
REDUCTION
Unincorporated $392,000
12821 Property Rights
Acquisition
EASEMENT ACQUISITION FOR
WASTEWATER PROJECTS (2024)
Various $5,800,000
12159 Construction EDMUNDSON SANITARY RELIEF (EDMUND
AVE TO BATAAN DR)
Woodson Terrace $2,203,000
11737 Engineering
During
Construction
Services
ELTORA WET WEATHER STORAGE
FACILITY
Pagedale $1,200,000
11737 Construction,
Design-Build
ELTORA WET WEATHER STORAGE
FACILITY
Pagedale $6,000,000
12170 Design Services FENTON WASTEWATER TREATMENT
FACILITY ELIMINATION
Fenton $2,324,000
13046 Engineering
During
Construction
Services
FILLMORE PUMP STATION (P-308)
REHABILITATION
St. Louis City $100,000
13046 Construction FILLMORE PUMP STATION (P-308)
REHABILITATION
St. Louis City $1,800,000
11 April 2022
Page 4 of 7
WASTEWATER PROJECTS - FY24
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12185 Construction FRIEDENS (PARTIAL) I/I REDUCTION (CHAIN
OF ROCKS DR AND FONTAINE PL)
Bellefontaine
Neighbors
$1,750,000
12157 Construction GC-06 GRAVOIS CREEK TO BRIARSTONE
AND GATES SANITARY RELIEF PHASE II
Various $3,758,000
13534 General
Services -
Construction
Inspection
GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (2024)
Various $2,000,000
13100 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2024)
CONTRACT A
Various $450,000
13101 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2024)
CONTRACT B
Various $250,000
13105 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2024) CONTRACT A
Various $85,000
13106 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2024) CONTRACT B
Various $85,000
13107 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2024) CONTRACT C
Various $85,000
13095 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT - SEWER
AND CHANNEL DESIGN (2024) CONTRACT A
Various $200,000
13113 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2024) CONTRACT A
Various $50,000
13114 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2024) CONTRACT B
Various $50,000
13115 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2024) CONTRACT C
Various $50,000
13116 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2024) CONTRACT D
Various $50,000
13117 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2024) CONTRACT E
Various $50,000
13221 Construction GRAND GLAIZE WWTF REPAIRS AND
IMPROVEMENTS (2023)
Valley Park $2,000,000
12815 Construction GRAVIOS CREEK SANITARY TRUNK
RELOCATION AND STREAM STABILIZATION
(AFFTON ATHLETIC COMPLEX TO GREEN
PK IND DR)
Unincorporated $2,042,000
11796 Construction
(Supplemental
Appropriation)
HARLEM BADEN RELIEF PHASE IV
(HEBERT) - HAMILTON TO DARVER TRUNK
SEWER
Various $3,300,000
11799 Design Services HARLEM BADEN RELIEF PHASE IV
(HEBERT) - SEWER SEPARATION CHERRY
TO 68TH STREET
Various $1,000,000
12695 Professional
Services
HARLEM BADEN RELIEF SYSTEM
IMPROVEMENT DESIGN (CONTRACT A)
St. Louis City $250,000
11 April 2022
Page 5 of 7
WASTEWATER PROJECTS - FY24
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
13231 Construction
(Supplemental
Appropriation)
HARLEM CITYSHED MITIGATION BASINS
(ASHLAND AND ESSEX)
Various $1,500,000
12942 Construction HARLEM CITYSHED MITIGATION BASINS
(ASHLAND AND ESSEX) - SEPARATION
SEWERS
Various $4,800,000
12299 Construction HAWTHORNE ESTATES SANITARY RELIEF
(RANCH LN TO CLAYTON HILLS LN)
Town And Country $1,633,000
12998 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS (FACILITIES)
(2024)
Various $3,000,000
13020 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2024) CONTRACT A
Various $4,000,000
13021 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2024) CONTRACT B
Various $4,000,000
13774 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2024) CORPS CSO
PROGRAM
Various $1,000,000
12990 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS
(WASTEWATER) (2024)
Various $7,000,000
13227 Construction L51 PUMP STATION FORCEMAIN
IMPROVEMENTS
Various $4,000,000
13747 Construction LAMBERT AIRPORT RESTRICTED ACCESS
ASSETS INSPECTION AND REPAIR
Unincorporated $2,000,000
11817 Construction LEMAY NO. 3 PUMP STATION AND FORCE
MAIN
Unincorporated $26,000,000
11817 Engineering
During
Construction
Services
LEMAY NO. 3 PUMP STATION AND FORCE
MAIN
Unincorporated $450,000
13735 Construction LEMAY PUBLIC I/I REDUCTION (2024)
CONTRACT A
Webster Groves $2,110,000
13153 Construction
(Supplemental
Appropriation)
LEMAY WWTF REPAIRS AND
IMPROVEMENTS (2023) (GRIT TANKS AND
SECONDARY CLARIFIER DUCT BANK)
Unincorporated $3,550,000
11943 Construction LINDBERGH SANITARY RELIEF
(MEADOWSIDE DR TO N LINDBERGH BLVD)
Unincorporated $1,221,000
11820 Design Services
(Supplemental
Appropriation)
LMRDP CSO STORAGE TUNNEL
(BROADWAY TO RDP TUBES)
St. Louis City $2,000,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $270,000
11746 Construction
(Supplemental
Appropriation)
LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO
FENTON WWTF TUNNEL
Various $52,000,000
11 April 2022
Page 6 of 7
WASTEWATER PROJECTS - FY24
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11746 Engineering
During
Construction
Services
LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO
FENTON WWTF TUNNEL
Various $750,000
12255 Engineering
During
Construction
Services
LOWER MERAMEC WWTF EXPANSION
PHASE II
Unincorporated $1,716,000
12255 Construction
Management
Services During
Construction
LOWER MERAMEC WWTF EXPANSION
PHASE II
Unincorporated $1,800,000
12255 Construction
(Supplemental
Appropriation)
LOWER MERAMEC WWTF EXPANSION
PHASE II
Unincorporated $29,300,000
13442 Design Services MANORS OF CLARKSON PUMP STATION (P-
727) REHABILITATION
Clarkson Valley $100,000
12346 Construction MCCUTCHEON RD AND THORNDELL
SANITARY RELIEF
Richmond Heights $2,305,000
13679 Construction MISSISSIPPI FLOODWALL ORS PUMP
STATIONS - LADDER REPLACEMENTS
St. Louis City $1,200,000
12483 Design Services
(Supplemental
Appropriation)
MISSISSIPPI FLOODWALL ORS PUMP
STATIONS REHABILITATION
St. Louis City $1,200,000
13515 Construction N CLAY 728 SANITARY RELOCATION Kirkwood $785,000
10715 Construction NEW ENGLAND TOWN CLIFF CAVE PUMP
STATION (P-323) IMPROVEMENTS
Unincorporated $4,000,000
12360 Construction NORMANDIE SANITARY RELIEF (PAGE AVE
TO SAINT CHARLES ROCK ROAD)
Unincorporated $5,000,000
12699 Professional
Services
PUMP STATION REPAIR AND
IMPROVEMENT DESIGN (CONTRACT C)
Various $50,000
13467 Construction SCADA SYSTEM UPGRADE Various $5,000,000
12202 Construction SMITH CREEK LADUE ROAD SANITARY
RELIEF (ROYAL MANOR DR TO HEWLETT
CT)
Creve Coeur $1,979,000
12204 Design Services SOUTH COUNTY RELIEF PUMP STATION (P-
419) IMPROVEMENTS
Unincorporated $500,000
12206 Construction SPIRIT OF ST. LOUIS 1 PUMP STATION (P-
735) REPLACEMENT
Chesterfield $1,085,000
13623 Construction SPOEDE ROAD SANITARY SEWER
IMPROVEMENTS
Creve Coeur $667,000
12214 Construction ST. JOACHIM'S SANITARY RELIEF (ST.
GENEVIEVE LN TO LYNROS DR)
St. Ann $3,222,000
12217 Construction ST. MATTHIAS SANITARY RELIEF (ST.
SHAWN LN TO STONEHARD DR)
St. Ann $2,253,000
12219 Design Services STRASSNER AVE SANITARY RELIEF (BLACK
CREEK TRUNK TO SWALLOW DR)
Brentwood $667,000
11 April 2022
Page 7 of 7
WASTEWATER PROJECTS - FY24
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12220 Design Services SUB-TRUNK #11 SANITARY RELIEF
(BELGROVE DR TO LOTHIAN CIR)
Unincorporated $78,000
12224 Construction SUNSET COUNTRY CLUB PUMP STATION (P-
408) REPLACEMENT AND STORAGE
Sunset Hills $1,000,000
13665 Construction SUTHERLAND LANSDOWNE COMBINED
SEWER REPLACEMENT
St. Louis City $1,215,000
12231 Construction TM-01 TWO MILE CREEK OUTFALL
SANITARY RELIEF
Various $10,000,000
12241 Construction UPPER BADEN SANITARY RELIEF
(JENNINGS STATION RD TO OAKRIDGE
BLVD)
Northwoods $2,974,000
12242 Construction UPPER FISHPOT EAST SANITARY RELIEF
(FIELD AVE TO WOLFF LN)
Ellisville $1,980,000
12249 Engineering
During
Construction
Services
UPPER MATTESE TRUNK SANITARY RELIEF
(THEISS RD TO LIBERTY TRAIL RD)
Unincorporated $130,000
12249 Construction UPPER MATTESE TRUNK SANITARY RELIEF
(THEISS RD TO LIBERTY TRAIL RD)
Unincorporated $6,000,000
13444 Construction VALLEY SANITARY RELIEF PHASE III Various $4,000,000
12262 Construction VALLEY VIEW PUMP STATION (P-734)
REPLACEMENT
Wildwood $600,000
12270 Design Services WATKINS CREEK SANITARY RELIEF
(KENRAN INDUSTRIAL BLVD TO FARM
POND CT)
Unincorporated $2,080,000
12279 Construction WESTON PLACE PUMP STATION (P-771)
IMPROVEMENTS
Town And Country $1,207,000
12132 Construction WESTWOOD COUNTRY CLUB SANITARY
RELIEF (DEER CREEK TO WESTWOOD CT)
Westwood $2,834,000
12288 Construction WILTON PUMP STATION (P-412)
REPLACEMENT AND STORAGE
Kirkwood $935,000
12300 Construction WOODSON SANITARY RELIEF (FLORA AVE
TO LACKLAND RD)
Overland $2,155,000
12302 Construction WW-2 AND WW-3 WARSON WOODS
SANITARY RELIEF
Various $5,000,000
FUND TOTAL: $506,794,000
GRAND TOTAL:$525,349,000
11 April 2022
Page 1 of 7
WASTEWATER PROJECTS - FY25
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
1101 - GENERAL FUND
11144 Professional
Services
BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $650,000
12804 Prof/Vendor
Services
(Supplemental
Appropriation)
CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS (2023)
Various $3,000,000
12908 Prof/Vendor
Services
(Supplemental
Appropriation)
CRITICAL INFRASTRUCTURE ASSESSMENT
AND ASSET INVESTIGATION (2023)
Various $1,700,000
11146 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
Various $5,000,000
13078 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE - RIVER DES PERES
Various $3,000,000
12801 Prof/Vendor
Services
(Supplemental
Appropriation)
FLOW METERING AND MONITORING (2022) Various $2,500,000
13091 Appraisal
Services
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2024) CONTRACT A
Various $75,000
13092 Appraisal
Services
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2024) CONTRACT B
Various $75,000
13093 Appraisal
Services
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2024) CONTRACT C
Various $75,000
13094 Appraisal
Services
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2024) CONTRACT D
Various $75,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $210,000
12816 Vendor
Services
RADAR RAINFALL DATA (2025)Various $150,000
11153 Professional
Services
RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $600,000
11 April 2022
Page 2 of 7
WASTEWATER PROJECTS - FY25
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
10766 Prof/Vendor
Services
(Supplemental
Appropriation)
STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
Various $605,000
12806 Prof/Vendor
Services
(Supplemental
Appropriation)
STREAM FLOW WATER QUALITY
SAMPLING (2023)
Various $350,000
FUND TOTAL: $18,065,000
5120 - DISTRICTWIDE STORMWATER FUND
13747 Construction LAMBERT AIRPORT RESTRICTED ACCESS
ASSETS INSPECTION AND REPAIR
Unincorporated $500,000
FUND TOTAL: $500,000
6660 - SANITARY REPLACEMENT FUND
12076 Design Services AFFTON I/I REDUCTION (WANDA, LEONA
CROSBY, AND POEPPING TESSON)
Unincorporated $414,000
13052 Design Services BADEN SANITARY PUMP STATION (P-118)
REHABILITATION
St. Louis City $100,000
12565 Engineering
During
Construction
Services
BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
Various $15,000,000
12565 Construction,
Design-Build
(Supplemental
Appropriation)
BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
Various $174,000,000
13691 Construction BISSELL POINT WWTF TRICKLING FILTER
MEDIA REPLACEMENT PHASE II
St. Louis City $9,000,000
12567 Design Services BISSELL POINT WWTF TRICKLING FILTER
PUMP REPLACEMENT
St. Louis City $1,100,000
12114 Construction
(Supplemental
Appropriation)
CAULKS CREEK PUMP STATION B (P-751)
RELOCATION
Chesterfield $3,200,000
12117 Design Services CELLA SANITARY RELIEF (ROLLING ROCK
LN TO CLAYTON RD)
Ladue $540,000
12851 Design Services CHATHAM MANOR PUMP STATION (P-520)
ELIMINATION
Unincorporated $250,000
13441 Design Services CHRISTOPHER HILLS PUMP STATION (P-468)
REHABILITATION
Unincorporated $100,000
13239 Design Services COLDWATER CREEK WWTF DEMOLITION
ABANDONED GRIT AND PRIMARY
CLARIFIERS TANKS
Unincorporated $100,000
11 April 2022
Page 3 of 7
WASTEWATER PROJECTS - FY25
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11152 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL
FACILITIES
Various $50,000
11826 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK
TUNNELS
Various $3,500,000
11151 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION
FACILITIES
Various $4,000,000
12864 Design Services COYLE COURT PUMP STATION (P-445)
ELIMINATION
Unincorporated $189,000
12139 Construction
(Supplemental
Appropriation)
CSO - BRENTWOOD AND RED BUD AVE CSO
INTERCEPTOR (I-118)/OUTFALL (L-111)
ELIMINATION AND SEWER SEPARATION
Richmond Heights $6,000,000
12140 Construction CSO - MARY AVENUE SOUTH OF
MANCHESTER CSO INTERCEPTOR (I-
132)/OUTFALL (L-106) ELIMINATION PHASE
II
Brentwood $16,000,000
12140 Engineering
During
Construction
Services
CSO - MARY AVENUE SOUTH OF
MANCHESTER CSO INTERCEPTOR (I-
132)/OUTFALL (L-106) ELIMINATION PHASE
II
Brentwood $375,000
12141 Construction CSO - SHREWSBURY AVE CSO
INTERCEPTOR (I-293)/OUTFALL (L-166)
SEWER SEPARATION
Shrewsbury $2,000,000
11833 Design Services DELCREST SANITARY RELIEF Various $394,000
12822 Property Rights
Acquisition
EASEMENT ACQUISITION FOR
WASTEWATER PROJECTS (2025)
Various $6,000,000
11737 Construction,
Design-Build
(Supplemental
Appropriation)
ELTORA WET WEATHER STORAGE
FACILITY
Pagedale $4,447,000
12845 Design Services FRIENDSHIP VILLAGE PUMP STATION (P-
516) ELIMINATION
Sunset Hills $540,000
13633 Design Services GASCONADE PUMP STATION (P-115)
REHABILITATION
St. Louis City $500,000
13516 Construction GASLIGHT SQUARE SEWER
IMPROVEMENTS PHASE II
St. Louis City $9,000,000
13534 General
Services -
Construction
Inspection
GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (2024)
Various $1,100,000
13100 GSA - Design
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2024)
CONTRACT A
Various $450,000
13101 GSA - Design
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2024)
CONTRACT B
Various $250,000
11 April 2022
Page 4 of 7
WASTEWATER PROJECTS - FY25
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
13105 GSA -
Geotechnical
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2024) CONTRACT A
Various $85,000
13106 GSA -
Geotechnical
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2024) CONTRACT B
Various $85,000
13107 GSA -
Geotechnical
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2024) CONTRACT C
Various $85,000
13095 GSA - Design
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT - SEWER
AND CHANNEL DESIGN (2024) CONTRACT A
Various $200,000
13113 GSA - Survey
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2024) CONTRACT A
Various $50,000
13114 GSA - Survey
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2024) CONTRACT B
Various $50,000
13115 GSA - Survey
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2024) CONTRACT C
Various $50,000
13116 GSA - Survey
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2024) CONTRACT D
Various $50,000
13117 GSA - Survey
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2024) CONTRACT E
Various $50,000
12174 Construction GEYER SANITARY RELIEF (W. MONROE AVE
TO W. ESSEX AVE)
Kirkwood $2,480,000
12176 Construction GLEN ECHO SANITARY RELIEF
(ENGELHOLM AVE TO HENDERSON AVE)
Various $4,340,000
12246 Design Services GRAND GLAIZE WET WEATHER PUMP
STATION
Valley Park $671,000
13240 Design Services GRAND GLAIZE WWTF GENERATOR AND
SWITCHGEAR REPLACEMENT
Valley Park $250,000
13630 Construction GRAND GLAIZE WWTF GRAND GLAIZE
CREEK BANK STABILIZATION
Valley Park $1,100,000
12334 Construction HAMPTON CREEK SANITARY RELIEF (DEER
CREEK TRUNK TO OXFORD DR) PHASE I
Various $17,000,000
12334 Engineering
During
Construction
Services
HAMPTON CREEK SANITARY RELIEF (DEER
CREEK TRUNK TO OXFORD DR) PHASE I
Various $375,000
13053 Design Services HARLEM LIFT PUMP STATION (P-104)
REHABILITATION
St. Louis City $100,000
11 April 2022
Page 5 of 7
WASTEWATER PROJECTS - FY25
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
13337 Design Services HARMONY-ACORN SEWER SEPARATION
AND I/I REDUCTION PHASE II
Unincorporated $250,000
12999 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS (FACILITIES)
(2025)
Various $3,000,000
13022 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2025) CONTRACT A
Various $5,000,000
13023 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2025) CONTRACT B
Various $5,000,000
13778 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2025) CORPS CSO
PROGRAM
Various $1,000,000
12991 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS
(WASTEWATER) (2025)
Various $8,000,000
13227 Construction
(Supplemental
Appropriation)
L51 PUMP STATION FORCEMAIN
IMPROVEMENTS
Various $2,871,000
13747 Construction LAMBERT AIRPORT RESTRICTED ACCESS
ASSETS INSPECTION AND REPAIR
Unincorporated $2,000,000
11817 Construction
(Supplemental
Appropriation)
LEMAY NO. 3 PUMP STATION AND FORCE
MAIN
Unincorporated $22,600,000
12589 Design Services LEMAY PUBLIC I/I REDUCTION (2026)
CONTRACT A
Various $100,000
11820 Design Services
(Supplemental
Appropriation)
LMRDP CSO STORAGE TUNNEL
(BROADWAY TO RDP TUBES)
St. Louis City $1,000,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $270,000
12850 Design Services MERAMEC BLUFFS (RIVER RIDGE P-501,
PINE TREE ESTATES P-466, AND SUNSET
RIDGE P-504) PUMP STATION ELIMINATIONS
Unincorporated $300,000
12483 Design Services
(Supplemental
Appropriation)
MISSISSIPPI FLOODWALL ORS PUMP
STATIONS REHABILITATION
St. Louis City $1,200,000
12486 Construction,
Design-Build
MISSISSIPPI FLOODWALL ORS PUMP
STATIONS REHABILITATION PHASE IV
St. Louis City $5,000,000
12556 Design Services MISSOURI RIVER WWTF ENGINE
GENERATOR REPLACEMENT
Maryland Heights $1,200,000
13438 Design Services MISSOURI RIVER WWTF PHOSPHORUS
REMOVAL FOR STRUVITE CONTROL
Maryland Heights $1,500,000
12355 Construction MULBERRY CREEK SANITARY RELIEF
(HARWICH DR TO S LINDBERGH BLVD)
Crestwood $3,325,000
10715 Construction
(Supplemental
Appropriation)
NEW ENGLAND TOWN CLIFF CAVE PUMP
STATION (P-323) IMPROVEMENTS
Unincorporated $1,600,000
11 April 2022
Page 6 of 7
WASTEWATER PROJECTS - FY25
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12356 Design Services NEW ENGLAND VILLAGE 2 PUMP STATION
(P-496) IMPROVEMENTS
Unincorporated $195,000
12360 Construction
(Supplemental
Appropriation)
NORMANDIE SANITARY RELIEF (PAGE AVE
TO SAINT CHARLES ROCK ROAD)
Unincorporated $4,059,000
12460 Construction OAKLAND COMBINED SEWER DETENTION
AND STORAGE (CLAYTON AVE AND
OAKLAND AVE)
St. Louis City $1,000,000
13406 Design Services ROYAL ARMS CT SANITARY RELIEF Unincorporated $100,000
12195 Construction S BRENTWOOD BLVD SANITARY RELIEF
(DAYTONA DR TO WALINCA TERRACE)
Clayton $4,750,000
12198 Design Services SALZMAN SANITARY RELIEF (PAGE AVE TO
SALZMAN AVE)
Wellston $210,000
13467 Construction
(Supplemental
Appropriation)
SCADA SYSTEM UPGRADE Various $3,000,000
12628 Construction SPIRIT 2 FORCEMAIN IMPROVEMENTS (P-
736 TO P-750)
Chesterfield $12,000,000
12628 Engineering
During
Construction
Services
SPIRIT 2 FORCEMAIN IMPROVEMENTS (P-
736 TO P-750)
Chesterfield $500,000
12218 Construction STONINGTON PLACE SANITARY RELIEF
(CLAYTON RD TO GEORGIAN ACRES ST)
Frontenac $300,000
13339 Design Services SUN VALLEY SANITARY RELIEF Unincorporated $350,000
12231 Construction
(Supplemental
Appropriation)
TM-01 TWO MILE CREEK OUTFALL
SANITARY RELIEF
Various $6,725,000
13215 Design Services TOWER GROVE MANCHESTER TUNNEL AND
COLLECTOR SEWERS
St. Louis City $8,925,000
11992 Construction UNIVERSITY CITY SANITARY STORAGE
FACILITY
University City $50,000,000
12249 Construction
(Supplemental
Appropriation)
UPPER MATTESE TRUNK SANITARY RELIEF
(THEISS RD TO LIBERTY TRAIL RD)
Unincorporated $3,540,000
12440 Design Services
(Supplemental
Appropriation)
UPPER RDP (UNIVERSITY CITY) CSO
STORAGE TUNNEL
University City $4,000,000
12266 Design Services WARSON TERRACE SANITARY RELIEF
(FOXBORO RD TO CONWAY RD)
Ladue $70,000
12271 Construction WATKINS-SPANISH SANITARY RELIEF
(MALAGA ST TO TRAMPE AVE)
Unincorporated $1,927,000
10794 Construction WEBSTER GROVES TRUNK E SANITARY
RELIEF (SKME-628)
Webster Groves $5,000,000
12375 Design Services WHITE PLAINS SANITARY RELIEF (CEDAR
CREEK RD TO E CHESTERFIELD PKY)
Various $335,000
11 April 2022
Page 7 of 7
WASTEWATER PROJECTS - FY25
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12302 Construction
(Supplemental
Appropriation)
WW-2 AND WW-3 WARSON WOODS
SANITARY RELIEF
Various $4,785,000
13536 Design Services WWTF NUTRIENT REMOVAL - PHOSPHORUS Various $2,260,000
FUND TOTAL: $464,867,000
GRAND TOTAL:$483,432,000
11 April 2022
Page 1 of 6
WASTEWATER PROJECTS - FY26
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
1101 - GENERAL FUND
11144 Professional
Services
BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $650,000
12805 Vendor
Services
CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS (2026)
Various $3,000,000
12909 Vendor
Services
CRITICAL INFRASTRUCTURE ASSESSMENT
AND ASSET INVESTIGATION (2026)
Various $1,700,000
11146 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
Various $5,000,000
12801 Prof/Vendor
Services
(Supplemental
Appropriation)
FLOW METERING AND MONITORING (2022) Various $2,500,000
13743 GSA - (Design)
Operating
Funds
GENERAL SERVICES AGREEMENT -
LANDSCAPE DESIGN (2026)
Various $200,000
13091 Appraisal
Services
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2024) CONTRACT A
Various $75,000
13092 Appraisal
Services
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2024) CONTRACT B
Various $75,000
13093 Appraisal
Services
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2024) CONTRACT C
Various $75,000
13094 Appraisal
Services
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2024) CONTRACT D
Various $75,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $220,000
12816 Prof/Vendor
Services
(Supplemental
Appropriation)
RADAR RAINFALL DATA (2025)Various $150,000
11153 Professional
Services
RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $600,000
11 April 2022
Page 2 of 6
WASTEWATER PROJECTS - FY26
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
10766 Prof/Vendor
Services
(Supplemental
Appropriation)
STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
Various $605,000
12807 Vendor
Services
STREAM FLOW WATER QUALITY
SAMPLING (2026)
Various $350,000
FUND TOTAL: $15,275,000
5120 - DISTRICTWIDE STORMWATER FUND
13747 Construction LAMBERT AIRPORT RESTRICTED ACCESS
ASSETS INSPECTION AND REPAIR
Unincorporated $500,000
FUND TOTAL: $500,000
6660 - SANITARY REPLACEMENT FUND
12074 Design Services ADAMS SANITARY RELIEF (BARRETT
STATION RD TO W. MONROE AVE)
Various $2,160,000
12565 Construction,
Design-Build
(Supplemental
Appropriation)
BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
Various $110,000,000
12565 Engineering
During
Construction
Services
BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
Various $9,000,000
13309 Design Services BISSELL POINT WWTF FINAL CLARIFIER
TANK REHABILITATION
St. Louis City And
County
$860,000
12568 Design Services BISSELL POINT WWTF INFLUENT PUMP
STATION IMPROVEMENTS
St. Louis City $240,000
13308 Design Services BISSELL POINT WWTF PRELIMINARY AND
PRIMARY CONCRETE PRESERVATION
St. Louis City $500,000
13691 Construction
(Supplemental
Appropriation)
BISSELL POINT WWTF TRICKLING FILTER
MEDIA REPLACEMENT PHASE II
St. Louis City $6,000,000
13439 Construction BONFILS PUMP STATION (P-784)
REHABILITATION
Unincorporated $1,500,000
12123 Design Services CLAYTON ROAD SANITARY RELIEF
(WESTWOOD DR TO CROMWELL DR)
Clayton $180,000
13707 Design Services COLDWATER CREEK WWTF
ADMINISTRATION BUILDING
IMPROVEMENTS
Unincorporated $700,000
13239 Construction COLDWATER CREEK WWTF DEMOLITION
ABANDONED GRIT AND PRIMARY
CLARIFIERS TANKS
Unincorporated $400,000
12550 Construction COLDWATER CREEK WWTF REPLACEMENT
SLUDGE FORCEMAIN
Various $4,000,000
11 April 2022
Page 3 of 6
WASTEWATER PROJECTS - FY26
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12549 Design Services COLDWATER CREEK WWTF WAREHOUSE
STORAGE PROJECT
Unincorporated $175,000
13560 Design Services COLDWATER SANITARY RELIEF SECTION B,
C, & D - SECTION B REHABILITATION PHASE
II
Various $400,000
11151 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION
FACILITIES
Various $4,000,000
12129 Construction CONWAY MEADOWS SANITARY RELIEF
(CONWAY RD TO I-64)
Chesterfield $444,000
12134 Construction COWMIRE CREEK SANITARY
REPLACEMENT I-70 CROSSING (ST.
CHARLES ROCK RD TO MARK TWAIN LN)
Bridgeton $426,000
12629 Design Services CREVE COEUR CREEK (L-52) FORCEMAIN
REHABILITATION (P-718 TO MO RIVER
WWTF)
Maryland Heights $500,000
12431 Design Services CSO - LACLEDE STATION RD AND RANKEN
AVE (I-181/L-131) CSO ELIMINATION
Richmond Heights $179,000
12140 Construction
(Supplemental
Appropriation)
CSO - MARY AVENUE SOUTH OF
MANCHESTER CSO INTERCEPTOR (I-
132)/OUTFALL (L-106) ELIMINATION PHASE
II
Brentwood $10,800,000
12144 Design Services
(Supplemental
Appropriation)
DARTMOUTH AVENUE SEWER SEPARATION University City $218,000
13520 Construction EARLSFIELD SANITARY RELIEF AND
KINGSTON PUMP STATION (P-326)
ELIMINATION
Unincorporated $250,000
12823 Property Rights
Acquisition
EASEMENT ACQUISITION FOR
WASTEWATER PROJECTS (2026)
Various $2,000,000
12168 Design Services FENTON CREEK SANITARY RELIEF
(REMINGTON OAKS TER TO DELEON CT)
Unincorporated $186,000
12170 Construction FENTON WASTEWATER TREATMENT
FACILITY ELIMINATION
Fenton $10,000,000
12182 Construction FOX BRIDGE PUMP STATION (P-484)
STORAGE
Sunset Hills $295,000
13633 Construction GASCONADE PUMP STATION (P-115)
REHABILITATION
St. Louis City $2,000,000
13516 Construction
(Supplemental
Appropriation)
GASLIGHT SQUARE SEWER
IMPROVEMENTS PHASE II
St. Louis City $5,500,000
13057 General
Services -
Construction
Inspection
GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (2026)
Various $1,700,000
13692 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2026)
CONTRACT A
Various $475,000
11 April 2022
Page 4 of 6
WASTEWATER PROJECTS - FY26
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
13693 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2026)
CONTRACT B
Various $250,000
13766 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2026) CONTRACT A
Various $85,000
13767 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2026) CONTRACT B
Various $85,000
13768 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2026) CONTRACT C
Various $85,000
13748 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT - SEWER
AND CHANNEL DESIGN (2026) CONTRACT A
Various $200,000
13754 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2026) CONTRACT A
Various $50,000
13755 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2026) CONTRACT B
Various $50,000
13756 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2026) CONTRACT C
Various $50,000
13757 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2026) CONTRACT D
Various $50,000
13758 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2026) CONTRACT E
Various $50,000
13412 Design Services GRAND GLAIZE WWTF BISULFITE STORAGE
AND CHEMICAL FEED FACILITY
Valley Park $460,000
13443 Design Services GRAND GLAIZE WWTF BOSKER SPARE UNIT Valley Park $200,000
13465 Design Services GRAND GLAIZE WWTF GRIT SYSTEM AND
WASHER COMPACTOR REPLACEMENT
Valley Park $486,000
12261 Design Services GRAVOIS CREEK WATERSHED
DOWNSTREAM SANITARY STORAGE
FACILITY
Unincorporated $5,000,000
12292 Design Services GREENTON WAY TO OAKLAWN DR
SANITARY RELIEF
Unincorporated $211,000
12294 Design Services GREGORY COURT SANITARY RELIEF
(TESSON FERRY RD TO SAPPINGTON RD)
St. Louis County $406,000
12334 Construction
(Supplemental
Appropriation)
HAMPTON CREEK SANITARY RELIEF (DEER
CREEK TRUNK TO OXFORD DR) PHASE I
Various $11,000,000
12369 Design Services HAMPTON CREEK SANITARY RELIEF (DEER
CREEK TRUNK TO OXFORD DR) PHASE II
Richmond Heights $3,696,000
11797 Construction HARLEM BADEN RELIEF PHASE IV
(HEBERT) - DARVER TO 69TH STREET
TRUNK SEWER
Various $5,000,000
11798 Construction HARLEM BADEN RELIEF PHASE IV
(HEBERT) - HODIAMONT TO CHERRY
TRUNK SEWER B
Various $6,000,000
11 April 2022
Page 5 of 6
WASTEWATER PROJECTS - FY26
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12846 Construction HEIMOS PUMP STATION (P-503) FORCEMAIN
REPLACEMENT
Unincorporated $1,177,000
13000 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS (FACILITIES)
(2026)
Various $3,000,000
13024 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2026) CONTRACT A
Various $5,000,000
13025 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2026) CONTRACT B
Various $5,000,000
13779 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2026) CORPS CSO
PROGRAM
Various $1,000,000
12992 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS
(WASTEWATER) (2026)
Various $8,000,000
12313 Design Services JEFFERSON BARRACKS CREEK SANITARY
RELIEF (N. KINSWOOD LN TO S. FRANRU
LN)
Unincorporated $575,000
13047 Design Services KIEFER CREEK PUMP STATION (P-473)
REHABILITATION
Unincorporated $1,000,000
12323 Design Services LAKE FOREST DR SEWER SEPARATION Richmond Heights $572,000
13747 Construction LAMBERT AIRPORT RESTRICTED ACCESS
ASSETS INSPECTION AND REPAIR
Unincorporated $2,000,000
12589 Construction LEMAY PUBLIC I/I REDUCTION (2026)
CONTRACT A
Various $3,340,000
13629 Construction LINDSAY LANE SANITARY RELIEF
(LINDSAY LANE TO LINDBERGH BLVD)
Florissant $2,679,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $270,000
12251 Design Services MACKENZIE CREEK WATERSHED
DOWNSTREAM SANITARY STORAGE
FACILITY
Unincorporated $1,300,000
13442 Construction MANORS OF CLARKSON PUMP STATION (P-
727) REHABILITATION
Clarkson Valley $400,000
12340 Design Services MARCO PUMP STATION (P-406)
REPLACEMENT
Kirkwood $195,000
12344 Design Services MARTIGNEY SANITARY RELIEF (KOCH RD
TO WOOD HILL DR)
Unincorporated $1,340,000
13048 Design Services MASTER LIFT 1 PUMP STATION (P-717)
REHABILITATION
Creve Coeur $1,000,000
10869 Construction MERAMEC BOTTOMS PUMP STATION (P-489)
INTERCEPTOR SEWER
Unincorporated $1,940,000
12486 Construction,
Design-Build
(Supplemental
Appropriation)
MISSISSIPPI FLOODWALL ORS PUMP
STATIONS REHABILITATION PHASE IV
St. Louis City $3,000,000
11 April 2022
Page 6 of 6
WASTEWATER PROJECTS - FY26
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
13400 Design Services MISSOURI RIVER WWTF FLOOD
PROTECTION AND ACCESS IMPROVEMENTS
Maryland Heights $400,000
13338 Design Services OLDE ENGLISH SANITARY RELIEF Unincorporated $1,200,000
12365 Design Services OLIVETTA STREET SEWER SEPARATION University City $560,000
12367 Design Services PIONEER TO FAIRVIEW SANITARY RELIEF Overland $210,000
13681 Design Services PUMP STATION FALL PROTECTION
UPGRADES - PHASE II
Various $450,000
12441 Design Services
(Supplemental
Appropriation)
RDP TRIBUTARIES (DEER CREEK) CSO
TUNNEL
Various $4,000,000
13440 Design Services RIDER TRAIL NORTH PUMP STATION (P-703)
REHABILITATION
Unincorporated $100,000
12199 Design Services SAPPINGTON SANITARY RELIEF (LIBERTY
TRAIL DR TO OLEANDER DR)
St. Louis City And
County
$223,000
12204 Construction SOUTH COUNTY RELIEF PUMP STATION (P-
419) IMPROVEMENTS
Unincorporated $2,500,000
12628 Construction
(Supplemental
Appropriation)
SPIRIT 2 FORCEMAIN IMPROVEMENTS (P-
736 TO P-750)
Chesterfield $7,500,000
12219 Construction STRASSNER AVE SANITARY RELIEF (BLACK
CREEK TRUNK TO SWALLOW DR)
Brentwood $2,670,000
12220 Construction SUB-TRUNK #11 SANITARY RELIEF
(BELGROVE DR TO LOTHIAN CIR)
Unincorporated $313,000
13215 Design Services
(Supplemental
Appropriation)
TOWER GROVE MANCHESTER TUNNEL AND
COLLECTOR SEWERS
St. Louis City $4,463,000
11992 Construction
(Supplemental
Appropriation)
UNIVERSITY CITY SANITARY STORAGE
FACILITY
University City $50,000,000
12440 Design Services
(Supplemental
Appropriation)
UPPER RDP (UNIVERSITY CITY) CSO
STORAGE TUNNEL
University City $4,000,000
13049 Design Services UPTON PUMP STATION (P-309)
REHABILITATION
St. Louis City $500,000
12252 Design Services UR-11 BALSON AVENUE SANITARY RELIEF University City $1,000,000
10794 Construction
(Supplemental
Appropriation)
WEBSTER GROVES TRUNK E SANITARY
RELIEF (SKME-628)
Webster Groves $3,760,000
12303 Design Services WYDOWN BLVD AND WESTWOOD DR
SANITARY RELIEF
Clayton $97,000
FUND TOTAL: $335,236,000
GRAND TOTAL:$351,011,000
11 April 2022
Page 1 of 6
WASTEWATER PROJECTS - FY27
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
1101 - GENERAL FUND
12805 Prof/Vendor
Services
(Supplemental
Appropriation)
CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS (2026)
Various $3,000,000
12909 Prof/Vendor
Services
(Supplemental
Appropriation)
CRITICAL INFRASTRUCTURE ASSESSMENT
AND ASSET INVESTIGATION (2026)
Various $1,700,000
11146 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
Various $5,000,000
12802 Vendor
Services
FLOW METERING AND MONITORING (2027) Various $2,500,000
13743 GSA - Design
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT -
LANDSCAPE DESIGN (2026)
Various $200,000
13696 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2027) CONTRACT A
Various $75,000
13697 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2027) CONTRACT B
Various $75,000
13698 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2027) CONTRACT C
Various $75,000
13699 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2027) CONTRACT D
Various $75,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $230,000
12816 Prof/Vendor
Services
(Supplemental
Appropriation)
RADAR RAINFALL DATA (2025)Various $150,000
11153 Professional
Services
RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $600,000
10766 Prof/Vendor
Services
(Supplemental
Appropriation)
STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
Various $605,000
12807 Prof/Vendor
Services
(Supplemental
Appropriation)
STREAM FLOW WATER QUALITY
SAMPLING (2026)
Various $350,000
FUND TOTAL: $14,635,000
5120 - DISTRICTWIDE STORMWATER FUND
11 April 2022
Page 2 of 6
WASTEWATER PROJECTS - FY27
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
13747 Construction LAMBERT AIRPORT RESTRICTED ACCESS
ASSETS INSPECTION AND REPAIR
Unincorporated $500,000
FUND TOTAL: $500,000
6660 - SANITARY REPLACEMENT FUND
13051 Design Services ALSWELL PUMP STATION (P-422)
REHABILITATION
Sunset Hills $150,000
13050 Design Services ANITA LANE PUMP STATION (P-464)
REHABILITATION
Unincorporated $100,000
12083 Design Services BADEN CREEK SANITARY RELIEF
(KENWOOD DR)
Northwoods $890,000
13052 Construction BADEN SANITARY PUMP STATION (P-118)
REHABILITATION
St. Louis City $400,000
12084 Construction BALLAS MEADOWS PUMP STATION (P-712)
ELIMINATION
Des Peres $169,000
12090 Construction BC-01 PHASE III AND BC-02 PHASE II
SANITARY RELIEF (I-170 TO
HEATHERWOOD DR)
Various $6,000,000
12565 Construction,
Design-Build
(Supplemental
Appropriation)
BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
Various $19,000,000
12568 Construction BISSELL POINT WWTF INFLUENT PUMP
STATION IMPROVEMENTS
St. Louis City $960,000
12562 Design Services BISSELL POINT WWTF OFFICE OF
ENVIRONMENTAL COMPLIANCE BUILDING
MODIFICATIONS
St. Louis City $640,000
12567 Engineering
During
Construction
Services
BISSELL POINT WWTF TRICKLING FILTER
PUMP REPLACEMENT
St. Louis City $600,000
12567 Construction BISSELL POINT WWTF TRICKLING FILTER
PUMP REPLACEMENT
St. Louis City $8,000,000
12117 Construction CELLA SANITARY RELIEF (ROLLING ROCK
LN TO CLAYTON RD)
Ladue $2,085,000
12851 Construction CHATHAM MANOR PUMP STATION (P-520)
ELIMINATION
Unincorporated $930,000
13441 Construction CHRISTOPHER HILLS PUMP STATION (P-468)
REHABILITATION
Unincorporated $550,000
12124 Design Services CLAYTONIA CREEK SANITARY RELIEF
(HAMPTON CREEK TRUNK SEWER TO
CLAYTON ROAD)
Richmond Heights $2,240,000
13707 Construction COLDWATER CREEK WWTF
ADMINISTRATION BUILDING
IMPROVEMENTS
Unincorporated $2,600,000
11 April 2022
Page 3 of 6
WASTEWATER PROJECTS - FY27
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12550 Construction
(Supplemental
Appropriation)
COLDWATER CREEK WWTF REPLACEMENT
SLUDGE FORCEMAIN
Various $2,800,000
12549 Construction COLDWATER CREEK WWTF WAREHOUSE
STORAGE PROJECT
Unincorporated $925,000
13560 Construction COLDWATER SANITARY RELIEF SECTION B,
C, & D - SECTION B REHABILITATION PHASE
II
Various $8,000,000
11727 Design Services COLLINGWOOD DRIVE SEWER SEPARATION Olivette $115,000
11826 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK
TUNNELS
Various $4,500,000
12864 Construction COYLE COURT PUMP STATION (P-445)
ELIMINATION
Unincorporated $1,401,000
12824 Property Rights
Acquisition
EASEMENT ACQUISITION FOR
WASTEWATER PROJECTS (2027)
Various $5,500,000
12162 Design Services ELNORE SANITARY RELIEF (ROANNA LN TO
ELNORE DR)
Sunset Hills $206,000
12170 Construction
(Supplemental
Appropriation)
FENTON WASTEWATER TREATMENT
FACILITY ELIMINATION
Fenton $7,200,000
12845 Construction FRIENDSHIP VILLAGE PUMP STATION (P-
516) ELIMINATION
Sunset Hills $2,760,000
13057 General
Services -
Construction
Inspection
GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (2026)
Various $2,750,000
13692 GSA - Design
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2026)
CONTRACT A
Various $475,000
13693 GSA - Design
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2026)
CONTRACT B
Various $250,000
13766 GSA -
Geotechnical
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2026) CONTRACT A
Various $85,000
13767 GSA -
Geotechnical
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2026) CONTRACT B
Various $85,000
13768 GSA -
Geotechnical
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2026) CONTRACT C
Various $85,000
13748 GSA - Design
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT - SEWER
AND CHANNEL DESIGN (2026) CONTRACT A
Various $200,000
11 April 2022
Page 4 of 6
WASTEWATER PROJECTS - FY27
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
13754 GSA - Survey
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2026) CONTRACT A
Various $50,000
13755 GSA - Survey
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2026) CONTRACT B
Various $50,000
13756 GSA - Survey
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2026) CONTRACT C
Various $50,000
13757 GSA - Survey
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2026) CONTRACT D
Various $50,000
13758 GSA - Survey
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2026) CONTRACT E
Various $50,000
12267 Design Services GLENWAY DR SANITARY RELIEF
(MANCHESTER RD TO BELSON CT)
Glendale $480,000
12246 Construction GRAND GLAIZE WET WEATHER PUMP
STATION
Valley Park $2,235,000
13240 Construction GRAND GLAIZE WWTF GENERATOR AND
SWITCHGEAR REPLACEMENT
Valley Park $900,000
12261 Land Purchase GRAVOIS CREEK WATERSHED
DOWNSTREAM SANITARY STORAGE
FACILITY
Unincorporated $4,000,000
11797 Construction
(Supplemental
Appropriation)
HARLEM BADEN RELIEF PHASE IV
(HEBERT) - DARVER TO 69TH STREET
TRUNK SEWER
Various $3,000,000
11798 Construction
(Supplemental
Appropriation)
HARLEM BADEN RELIEF PHASE IV
(HEBERT) - HODIAMONT TO CHERRY
TRUNK SEWER B
Various $4,200,000
11799 Construction HARLEM BADEN RELIEF PHASE IV
(HEBERT) - SEWER SEPARATION CHERRY
TO 68TH STREET
Various $3,850,000
13053 Construction HARLEM LIFT PUMP STATION (P-104)
REHABILITATION
St. Louis City $400,000
13337 Construction HARMONY-ACORN SEWER SEPARATION
AND I/I REDUCTION PHASE II
Unincorporated $2,000,000
13001 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS (FACILITIES)
(2027)
Various $3,000,000
13026 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2027) CONTRACT A
Various $5,000,000
13027 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2027) CONTRACT B
Various $5,000,000
13780 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2027) CORPS CSO
PROGRAM
Various $1,000,000
11 April 2022
Page 5 of 6
WASTEWATER PROJECTS - FY27
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12993 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS
(WASTEWATER) (2027)
Various $8,500,000
12315 Design Services KEHRS MILL PUMP STATIONS NO. 1 AND 2
(P-752 AND P-770) ELIMINATION
Clarkson Valley $183,000
12321 Design Services LADUE HILLS DRIVE SANITARY SEWERS Olivette $30,000
13747 Construction LAMBERT AIRPORT RESTRICTED ACCESS
ASSETS INSPECTION AND REPAIR
Unincorporated $2,000,000
11820 Engineering
During
Construction
Services
LMRDP CSO STORAGE TUNNEL
(BROADWAY TO RDP TUBES)
St. Louis City $1,300,000
11820 Construction LMRDP CSO STORAGE TUNNEL
(BROADWAY TO RDP TUBES)
St. Louis City $72,000,000
12857 Design Services LMRDP CSO STORAGE TUNNEL
CONSOLIDATION SEWERS - CLIFTON
HEIGHTS SUBSYSTEM TO SULPHUR I/O
STRUCTURE (I-073B/L-054)
St. Louis City $30,000
12619 Design Services LMRDP CSO STORAGE TUNNEL
CONSOLIDATION SEWERS I/O STRUCTURES
- AL CLARE (I-032/L-181) TO HAMBURG (I-
013/L-020)
Unincorporated $30,000
11958 Design Services
(Supplemental
Appropriation)
LMRDP CSO STORAGE TUNNEL
CONSOLIDATION SEWERS I/O STRUCTURES
- FIELDS (I-019/L-011) AND GERMANIA (I-
012/L-014) TO LOUIS (I-007/L-012)
St. Louis City $30,000
12743 Design Services LMRDP CSO STORAGE TUNNEL
CONSOLIDATION SEWERS I/O STRUCTURES
- PARKWOOD (I-022/L-016) TO ROCK CREEK
(I-027/L-015 & STOLLE (I-010/L-019) TO
GRAVOIS (I-028/L-021)
St. Louis City $30,000
11959 Design Services
(Supplemental
Appropriation)
LMRDP CSO STORAGE TUNNEL
CONSOLIDATION SEWERS I/O STRUCTURES
- PERNOD (I-056/L-031) TO MARDEL (I-054/L-
030)
St. Louis City $30,000
11816 Design Services
(Supplemental
Appropriation)
LMRDP TUNNEL DEWATERING PUMP
STATION
Unincorporated $650,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $270,000
12251 Land Purchase MACKENZIE CREEK WATERSHED
DOWNSTREAM SANITARY STORAGE
FACILITY
Unincorporated $3,000,000
12340 Construction MARCO PUMP STATION (P-406)
REPLACEMENT
Kirkwood $650,000
11 April 2022
Page 6 of 6
WASTEWATER PROJECTS - FY27
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12850 Construction MERAMEC BLUFFS (RIVER RIDGE P-501,
PINE TREE ESTATES P-466, AND SUNSET
RIDGE P-504) PUMP STATION ELIMINATIONS
Unincorporated $1,200,000
12483 Design Services
(Supplemental
Appropriation)
MISSISSIPPI FLOODWALL ORS PUMP
STATIONS REHABILITATION
St. Louis City $1,200,000
12556 Construction MISSOURI RIVER WWTF ENGINE
GENERATOR REPLACEMENT
Maryland Heights $5,000,000
12356 Construction NEW ENGLAND VILLAGE 2 PUMP STATION
(P-496) IMPROVEMENTS
Unincorporated $650,000
12358 Design Services NEWPORT LANDING SANITARY RELIEF
(OAKLEAF COVE CT TO SUMMERLAKE
ESTATES)
Unincorporated $120,000
13681 Construction PUMP STATION FALL PROTECTION
UPGRADES - PHASE II
Various $4,800,000
12441 Design Services
(Supplemental
Appropriation)
RDP TRIBUTARIES (DEER CREEK) CSO
TUNNEL
Various $4,000,000
13406 Construction ROYAL ARMS CT SANITARY RELIEF Unincorporated $500,000
12373 Design Services S LINDBERGH BLVD SANITARY RELIEF
(CLERMONT LN TO LADUE RD)
Various $140,000
12198 Construction SALZMAN SANITARY RELIEF (PAGE AVE TO
SALZMAN AVE)
Wellston $835,000
13339 Construction SUN VALLEY SANITARY RELIEF Unincorporated $1,300,000
12225 Design Services SUNSET SANITARY RELIEF (CAROLYNNE
DR TO SUNSET DR)
St. Louis City And
County
$240,000
13215 Design Services
(Supplemental
Appropriation)
TOWER GROVE MANCHESTER TUNNEL AND
COLLECTOR SEWERS
St. Louis City $4,462,000
12440 Design Services
(Supplemental
Appropriation)
UPPER RDP (UNIVERSITY CITY) CSO
STORAGE TUNNEL
University City $4,000,000
12266 Construction WARSON TERRACE SANITARY RELIEF
(FOXBORO RD TO CONWAY RD)
Ladue $280,000
12270 Construction WATKINS CREEK SANITARY RELIEF
(KENRAN INDUSTRIAL BLVD TO FARM
POND CT)
Unincorporated $5,000,000
11692 Design Services WOODLAWN SANITARY RELIEF Kirkwood $565,000
FUND TOTAL: $240,991,000
GRAND TOTAL:$256,126,000
11 April 2022
Page 1 of 1
STORMWATER ENGINEERING PROJECTS - FY23
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
13710 GENERAL SERVICES AGREEMENT -
STORMWATER DESIGN FOR ARPA GRANT
PROJECTS (2023) CONTRACT A
$1,300,000 137
13711 GENERAL SERVICES AGREEMENT -
STORMWATER DESIGN FOR ARPA GRANT
PROJECTS (2023) CONTRACT B
$1,300,000 138
13712 GENERAL SERVICES AGREEMENT -
STORMWATER DESIGN FOR ARPA GRANT
PROJECTS (2023) CONTRACT C
$1,300,000 139
12842 GENERAL SERVICES AGREEMENT - WATER
QUALITY SUPPORT SERVICES (2021)
$150,000 140
13714 GRAVOIS CREEK OMCI STORMWATER DESIGN
(2023)
$300,000 141
10070 HALL STREET STORM SEWERS $600,000 142
10067 HALLSTEAD STORM CHANNEL PHASE IV
(MCBJ-230)
$100,000 143
13577 RIVER DES PERES CHANNEL REHABILITATION $1,000,000 144
13595 STORMWATER ASSET INVESTIGATIONS (2022)$800,000 145
TOTAL:$6,850,000
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - STORMWATERDESIGN FOR ARPA GRANT PROJECTS (2023)CONTRACT A
GSA - (Design) CIRP
Funds
5120 - Districtwide
Stormwater Fund
STORMWATER PROBLEMS THROUGHOUT THE DISTRICT IMPACTING
WATER QUALITY.
PROVIDE STORMWATER DESIGN SERVICES FOR ARPA GRANT
FUNDED PROJECTS.
PROJECT DEPENDENT ON RECEIPT OF ARPA GRANT FUNDING.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13710
Stormwater
11
$1,300,000
Various
Various
Various
Asset Management
137
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - STORMWATERDESIGN FOR ARPA GRANT PROJECTS (2023)CONTRACT B
GSA - (Design) CIRP
Funds
5120 - Districtwide
Stormwater Fund
STORMWATER PROBLEMS THROUGHOUT THE DISTRICT IMPACTING
WATER QUALITY.
PROVIDE STORMWATER DESIGN SERVICES FOR ARPA GRANT
FUNDED PROJECTS.
PROJECT DEPENDENT ON RECEIPT OF ARPA GRANT FUNDING.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13711
Stormwater
11
$1,300,000
Various
Various
Various
Asset Management
138
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - STORMWATERDESIGN FOR ARPA GRANT PROJECTS (2023)CONTRACT C
GSA - (Design) CIRP
Funds
5120 - Districtwide
Stormwater Fund
STORMWATER PROBLEMS THROUGHOUT THE DISTRICT IMPACTING
WATER QUALITY.
PROVIDE STORMWATER DESIGN SERVICES FOR ARPA GRANT
FUNDED PROJECTS.
PROJECT DEPENDENT ON RECEIPT OF ARPA GRANT FUNDING.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13712
Stormwater
11
$1,300,000
Various
Various
Various
Asset Management
139
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - WATERQUALITY SUPPORT SERVICES (2021)
GSA - Planning
(Supplemental
Appropriation)
5110 - Stormwater
Regulatory Fund
WATER QUALITY EXPERTISE IS NEEDED TO SUPPORT THE
DISTRICT'S REGULATORY AND LEGAL EFFORTS.
RETAIN ENGINEERING FIRM FOR AS NEEDED WATER QUALITY
SUPPORT SERVICES. SERVICES MAY BE RENEWED THROUGH
FY2023 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12842
Stormwater
11
$150,000
Various
Various
Various
Asset Management
140
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GRAVOIS CREEK OMCI STORMWATER DESIGN(2023)
Professional Services
5571 - Gravois Creek
OMCI Fund
EROSION AND FLOODING ISSUES IN THE GRAVOIS WATERSHED.
DESIGN STORMWATER IMPROVEMENTS IN THE GRAVOIS CREEK
WATERSHED.
§¨¦270
§¨¦55
§¨¦44
§¨¦55
G R A V OIS R DWATSONRD
LEMA
Y
F
E
R
R
Y
R
D
T ESS O N FERRYRD
MAN C H E S T E R R D
C H I P P E WA BLVD
E M O 3 0 H W Y
S
K
I
R
K
W
O
O
D
R
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13714
Stormwater
16
$300,000
Various
Lemay/RDP
Gravois Creek
Asset Management
141
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HALL STREET STORM SEWERS
Design Services
(Supplemental
Appropriation)
5120 - Districtwide
Stormwater Fund
STREET FLOODING ALONG HALL STREET FROM ADELAIDE TO
RIVERVIEW DRIVE.
CONSTRUCT 5,500 FEET OF 12-INCH TO 66-INCH STORM SEWER, 523
FEET OF 72-INCH TUNNEL, AND 16,800 FEET OF DRAINAGE DITCH
ALONG HALL STREET.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPROPRIATION IN FY 25. TOTAL CONSTRUCTION BUDGET IS
$10,920,000.
§¨¦70
§¨¦70
H
A
L
L
UNION
SWITZER
PAR
K
LEE
T E R MIN
A
L
MCLARA
N
ERA
WREN
MIM
I
K
A
SHREV E
THRUS
H
CART
E
R
BEACO
N
C
H
U
R
C
H
NE
W
B
Y
ROB
I
N
TAR
A
COZENS
J E N N I N G S S T A T I O N
RUSKI
N
EMER
S
O
N
CARRI
E
B
U
R
L
I
N
G
T
O
N
N
O
R
T
H
E
R
N
S
ANTA
FE
ADELA
I
D
E
PENR
O
S
E
H
A
R
N
E
Y
S
H
A
N
N
O
N
TAYLO
R
FLO
Y
R
O
S
A
L
I
E
M
C
KIS
S
O
C
K
EUCLI
D
HORNSB
Y
CALVA
R
Y
GERALDINE
WALL
B
U
L
W
E
R
ELIAS
O RIO L E
M E L V I NHORD
P
R
A
N
G
E
FONTAINE
O R A N
ASTO
RIA
SELLS
LEBON
LO
W
E
L
L
FARL
I
N HARRI
S
QUEEN
S
WESC
O
T
T
ATHLO
N
E
ACAC
I
A
AUBER
T
CATALI
N
A
RAFORD
RIVERVIEWDR
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10070
Stormwater
11
$600,000
St. Louis City
Bissell
Various
Capital
142
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HALLSTEAD STORM CHANNEL PHASE IV(MCBJ-230)
Design Services
(Supplemental
Appropriation)
5120 - Districtwide
Stormwater Fund
DAMAGE TO PROPERTY DUE TO EROSION.
CONSTRUCT 1,220 FEET OF 45-FOOT WIDE BY 12-FOOT HIGH
VERTICAL WALL CHANNEL, FROM VORHOFF DRIVE SOUTH TO
HUDSON DRIVE.
HUDSON
HALLW
O
O
D
VORHOF
C
A
N
F
I
E
L
D
E
D
G
E
F
I
E
L
D
IBIS
KIPP
FOSS
M
U
R
A
T
C
H
I
C
K
E
R
I
N
G
GREEN SLOPE
R
O
T
H
W
E
L
L
L
A
N
D
S
E
E
R
OLD MANOR
HUDSON
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10067
Stormwater
11
$100,000
Unincorporated
Bissell
Blackjack Creek
Non-recurring
143
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
RIVER DES PERES CHANNEL REHABILITATION
Design Services
5120 - Districtwide
Stormwater Fund
AREAS OF THE RDP CHANNEL ARE DETERIORATING.
REHABILITATE DETERIORATED SECTIONS OF THE RDP CHANNEL.
PROJECT IS DEPENDENT ON POTENTIAL ARPA GRANT FUNDING
THROUGH THE STATE OF MISSOURI.
§¨¦44
§¨¦55
§¨¦55
G R A V OISRD
CHIPPEWA BLVD
W A TSONRD
M A N C H E S T E R R D
T ESSONFERRYRD
LEMAYFERR Y R D
CHIPPEWABLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13577
Stormwater
11
$1,000,000
St. Louis City
Lemay/RDP
River Des Peres
Capital
144
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
STORMWATER ASSET INVESTIGATIONS (2022)
Prof/Vendor Services
(Supplemental
Appropriation)
5120 - Districtwide
Stormwater Fund
ACCURATE MAPPING INFORMATION IS NEEDED TO BETTER ANALYZE
THE STORMWATER NETWORK AND ESTIMATE FUTURE
MAINTENANCE AND CAPITAL IMPROVEMENT NEEDS.
VENDOR FIELD INVESTIGATION SERVICES TO UPDATE DISTRICT'S
STORMWATER ASSET INFORMATION. SERVICES MAY BE RENEWED
THROUGH FY2024 BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13595
Stormwater
16
$800,000
Various
Various
Various
Asset Management
145
2023
11 April 2022
Page 1 of 2
STORMWATER CONSTRUCTION PROJECTS - FY23
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11286 BALLMAN DRIVE 300 BLOCK STORM SEWER $600,000 146
12469 BEAUCAIRE DRIVE - MARK DRIVE - MONACO
DRIVE STORM SEWER
$325,000 147
13488 COLDWATER CREEK OMCI REIMBURSEMENTS
PROGRAM
$1,076,519 148
11205 DEARBORN DR STORM SEWER $320,000 149
13487 DEER CREEK OMCI REIMBURSEMENTS
PROGRAM
$1,958,164 150
11065 DEER CREEK WATERSHED INITIATIVE $100,000 151
13705 GRAND GLAIZE CREEK WATERSHED
INITIATIVE
$200,000 152
13678 GRAVOIS CREEK OMCI REIMBURSEMENTS
PROGRAM
$742,722 153
11530 LARIMORE STORM SEWER $2,600,000 154
12900 LITZSINGER #10412 STORM SEWER
IMPROVEMENTS
$115,000 155
11277 LONGFORD DRIVE 1851 STORM SEWER $95,000 156
11972 MEADOW CREEK LN 508 STORM SEWER $85,000 157
11325 NORTH NEW FLORISSANT - FOX RUN STORM
SEWER
$600,000 158
13491 SEMINARY OMCI REIMBURSEMENTS
PROGRAM
$124,292 159
13006 STORMWATER INFRASTRUCTURE REPAIRS
(2023)
$4,000,000 160
13128 STORMWATER INFRASTRUCTURE REPAIRS
(REHABILITATION) (2023)
$3,000,000 161
13352 STORMWATER QUALITY GREEN
INFRASTRUCTURE - SMALL GRANT
RAINSCAPING PROGRAM
$200,000 162
11 April 2022
Page 2 of 2
STORMWATER CONSTRUCTION PROJECTS - FY23
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
13490 SUGAR CREEK OMCI REIMBURSEMENTS
PROGRAM
$149,498 163
13489 UNIVERSITY CITY OMCI REIMBURSEMENTS
PROGRAM
$495,049 164
TOTAL:$16,786,244
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BALLMAN DRIVE 300 BLOCK STORM SEWER
Construction
5576 - Maline Creek
OMCI Fund
YARD FLOODING BETWEEN MILLMAN DRIVE AND BALLMAN DRIVE.
CONSTRUCT 670 FEET OF 18-INCH TO 24-INCH STORM SEWER.
AM
E
S
E
L
I
Z
A
B
E
T
H
LAUREL
T
E
S
T
O
N
ROYAL
MI
L
L
M
A
N
SU
P
E
R
I
O
R
BA
L
L
M
A
N
HIGH
H
A
R
T
N
E
T
T
MI
L
L
M
A
N
M
I
L
L
M
A
N
ROYAL
BA
L
L
M
A
N
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11286
Stormwater
15
$600,000
Ferguson
Bissell
Maline Creek
Capital
146
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BEAUCAIRE DRIVE - MARK DRIVE - MONACODRIVE STORM SEWER
Construction
5566 - Deer Creek
OMCI Fund
YARD FLOODING.
CONSTRUCT 305 FEET OF 12-INCH STORM SEWER.
MARK
WO
O
D
L
A
W
N
GASCONY
DO
R
A
L
BEAU
C
A
I
R
E
MO
N
A
C
O
FLANDERS
MI
C
H
E
L
E
G E DERS
RUE
RENEE
MEADOW CREEKREAUVILLE
DAUPHINE
MONACO
GASCONY
FLANDERS
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12469
Stormwater
15
$325,000
Warson Woods
Lemay/RDP
Deer Creek
Capital
147
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
COLDWATER CREEK OMCI REIMBURSEMENTSPROGRAM
Construction, Phase II
5564 - Coldwater
Creek OMCI Fund
STORMWATER ISSUES IN THE COLDWATER CREEK OMCI TAXING
SUBDISTRICT.
OFFER STORMWATER GRANTS TO MUNICIPALITIES WITHIN THE
COLDWATER CREEK OMCI.
THIS PROGRAM WILL OFFER GRANT REIMBURSEMENTS TO
MUNICIPALITIES TO PROMOTE RESOLUTION OF STORMWATER
ISSUES.
§¨¦70
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13488
Stormwater
15
$1,076,519
Various
Coldwater
Coldwater Creek
Non-recurring
148
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DEARBORN DR STORM SEWER
Construction
5566 - Deer Creek
OMCI Fund
YARD FLOODING AND EROSION.
CONSTRUCT 355 FEET OF 15-INCH TO 24-INCH STORM SEWER.
AN
D
R
E
W
RE
N
D
E
R
E
R
DE
A
R
B
O
R
N
WARS
O
N
W
O
O
D
S
FO
R
E
S
T
V
I
E
W
EDLIN
ROLFE
D U N W O O D Y
TIMBERLANE
BRICK
E
N
RIDGE LINE
G A R L A N D
BROOKHURST
W
A
R
S
O
N
W
O
O
D
S
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11205
Stormwater
15
$320,000
Warson Woods
Lemay/RDP
Deer Creek
Non-recurring
149
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DEER CREEK OMCI REIMBURSEMENTS PROGRAM
Construction, Phase II
5566 - Deer Creek
OMCI Fund
STORMWATER ISSUES IN THE DEER CREEK OMCI TAXING
SUBDISTRICT.
OFFER STORMWATER GRANTS TO MUNICIPALITIES WITHIN THE
DEER CREEK OMCI.
THIS PROGRAM WILL OFFER GRANT REIMBURSEMENTS TO
MUNICIPALITIES TO PROMOTE RESOLUTION OF STORMWATER
ISSUES.
§¨¦270
§¨¦64
§¨¦170
§¨¦64
§¨¦170
OLIVE BLVD
M A N C H E S T E R R D
S
L
I
N
D
B
E
R
G
H
B
L
V
D
WATS O N R D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13487
Stormwater
15
$1,958,164
Various
Lemay/RDP
Deer Creek
Non-recurring
150
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DEER CREEK WATERSHED INITIATIVE
Construction
5566 - Deer Creek
OMCI Fund
MISSOURI BOTANICAL GARDEN HAS REQUESTED PARTNERING COST
SHARE FOR THE DEER CREEK WATERSHED INITIATIVE, WHICH IS
SUPPORTED BY A 319 GRANT FROM MDNR.
GREEN INFRASTRUCTURE CONSTRUCTION TO BE COST SHARED BY
MSD.
§¨¦270
§¨¦64
§¨¦170§¨¦64
OLIVE BLVD
S
L
I
N
D
B
E
R
G
H
B
L
V
D
W ATSO N R D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11065
Stormwater
15
$100,000
Various
Lemay/RDP
Deer Creek
Non-recurring
151
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GRAND GLAIZE CREEK WATERSHED INITIATIVE
Construction
5110 - Stormwater
Regulatory Fund
NUTRIENT AND SEDIMENT ISSUES IN SIMPSON LAKE FROM GRAND
GLAIZE CREEK.
IMPLEMENT VARIOUS GREEN INFRASTRUCTURE, BANK
STABILIZATION, AND SEPTIC TANK PROJECTS TO REDUCE NUTRIENT
AND SEDIMENT LOADS AT SIMPSON LAKE.
§¨¦44
§¨¦64
§¨¦270
§¨¦44
S
M
O
1
4
1
H
W
Y
N
MO141HWY
S
L
I
N
D
B
E
R
G
H
B
L
V
D
S
K
I
R
K
W
O
O
D
R
D
MANCHEST E R R D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13705
Stormwater
15
$200,000
Various
Meramec
Grand Glaize Creek
Non-recurring
152
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GRAVOIS CREEK OMCI REIMBURSEMENTSPROGRAM
Construction, Phase II
5571 - Gravois Creek
OMCI Fund
STORMWATER ISSUES IN THE GRAVOIS CREEK OMCI TAXING
SUBDISTRICT.
OFFER STORMWATER GRANTS TO MUNICIPALITIES WITHIN THE
GRAVOIS CREEK OMCI.
THIS PROGRAM WILL OFFER GRANT REIMBURSEMENTS TO
MUNICIPALITIES TO PROMOTE RESOLUTION OF STORMWATER
ISSUES.
§¨¦270
§¨¦55
§¨¦44
§¨¦55
G R A V OIS R DWATSONRD
LEMA
Y
F
E
R
R
Y
R
D
T ESS O N FERRYRD
MAN C H E S T E R R D
C H I P P E WA BLVD
E M O 3 0 H W Y
S
K
I
R
K
W
O
O
D
R
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13678
Stormwater
15
$742,722
Various
Lemay/RDP
Gravois Creek
Non-recurring
153
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LARIMORE STORM SEWER
Construction
5120 - Districtwide
Stormwater Fund
FREQUENT ROADWAY, STRUCTURE, AND YARD FLOODING.
CONSTRUCT 4,880 FEET OF 12-INCH TO 54-INCH STORM SEWER.
LA
V
I
D
A
MAPLE
COVE
LAREDO
FARMVIEW
REALE
REDMAN
NORTHDALE
WALKER
LAKEVIEW MA
D
R
I
D
BROA D H E A D
LAREDO
LAKEVIEW
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11530
Stormwater
15
$2,600,000
Unincorporated
Bissell
Spanish Lake
Capital
154
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LITZSINGER #10412 STORM SEWERIMPROVEMENTS
Construction
5566 - Deer Creek
OMCI Fund
YARD FLOODING.
CONSTRUCT 250 FEET OF 12-INCH TO 18-INCH STORM SEWER.
LITZSINGER
PRIVATE
HU
N
T
L
E
I
G
H
W
O
O
D
S
FR
O
N
T
E
N
A
C
W
O
O
D
S
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12900
Stormwater
15
$115,000
Frontenac
Lemay/RDP
Deer Creek
Capital
155
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LONGFORD DRIVE 1851 STORM SEWER
Construction
5576 - Maline Creek
OMCI Fund
YARD FLOODING.
CONSTRUCT 134 FEET OF 12-INCH TO 24-INCH STORM SEWER.
EXUMA
W
I
N
K
L
E
R
G
L
E
N
O
W
E
N
KAPPEL
KILREA
LONGFORD
ANDROS
P
R
I
V
A
T
E
LANECOURT
B
A
L
B
O
A
S
A
M
A
N
A
T
U
L
L
A
M
O
O
R
C
U
L
E
B
R
A
M
A
N
A
G
U
A
N E M NICH
L
I
F
F
O
R
D
BALBOA
NEMNICH
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11277
Stormwater
15
$95,000
Unincorporated
Bissell
Maline Creek
Capital
156
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MEADOW CREEK LN 508 STORM SEWER
Construction
5566 - Deer Creek
OMCI Fund
YARD FLOODING.
CONSTRUCT 200 FEET OF 12-INCH STORM SEWER.
WO
O
D
L
A
W
N
FLANDERS
DO
R
A
L
BEAUCAIRE
MI
C
H
E
L
E
GEDERS
FR
ONTENAY
GRAY BARN
A
S
C
O
T
MEADOW CREEK
D
I
C
K
S
O
N
MA
R
I
E
D
A
L
E
GEDERSON
MIDDLETON
R E A U VIL L E
FLANDE R S
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11972
Stormwater
15
$85,000
Warson Woods
Lemay/RDP
Deer Creek
Capital
157
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
NORTH NEW FLORISSANT - FOX RUN STORMSEWER
Construction
5564 - Coldwater
Creek OMCI Fund
BACKYARD FLOODING AT SIX RESIDENCES.
CONSTRUCT 1,230 FEET OF 12-INCH TO 36-INCH STORM SEWER.
FOX RUN
PEPPERHILL
BLU
E
F
I
E
L
D
WILLOWBROOK
SPRINGVALLEY
OLD YORK
F
L
O
R
V
A
L
BLUEFI
E
L
DLINDB
E
R
G
H
LIN D B E R G H
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11325
Stormwater
15
$600,000
Florissant
Coldwater
Coldwater Creek
Non-recurring
158
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SEMINARY OMCI REIMBURSEMENTS PROGRAM
Construction, Phase II
5593 - Sem Br Of
River Des Peres OMCI
Fund
STORMWATER ISSUES IN THE SEMINARY OMCI TAXING SUBDISTRICT.
OFFER STORMWATER GRANTS TO MUNICIPALITIES WITHIN THE
SEMINARY OMCI.
THIS PROGRAM WILL OFFER GRANT REIMBURSEMENTS TO
MUNICIPALITIES TO PROMOTE RESOLUTION OF STORMWATER
ISSUES.
§¨¦44EL
M
MA
C
K
E
N
Z
I
E
HEEGE
WEIL
WEBER
LA
C
L
E
D
E
S
T
A
T
I
O
N
GR
A
Y
RO
C
K
H
I
L
L
LOCKWOOD
ED
G
A
R
GO
R
E
P
A
R
D
E
E
VA
L
C
O
U
R
GLENDALE
LANSDOWNE
GRANT
CHESHIRE
RIV
E
R
D
E
S
P
E
R
E
S
UNION P A CI F I C
MA
P
L
E
MURDOCH
EL
T
O
N
TULIP
LI
L
A
C
MA
T
H
I
L
D
A
I
V
Y
JACKSON
STAELYOLDWATSON
SELMA
GRAMO N D
BURLINGTON N O RTHERNSANTAFE
BANCROFT
M
C
C
A
U
S
L
A
N
D
PL
A
N
T
KI
T
JO
Y
VAUK
LUCIA
DA
N
A
VA
S
E
L
VITA
ROSE
JE
F
F
E
R
S
O
N
O A K
GE
N
E
S
T
A
WE
L
L
S
SUN
R
A
Y
P RIVATE
AC
O
R
N
TU R F
S U T HERLAND
FLORENCE
R
A
D
I
O
CO
L
L
E
E
N
PI
L
O
T
SOUTHSIDE
F O R E S T
LA
N
V
A
L
E
ED
E
N
CLARA
HEATHER
EL
G
I
N
S A V I O
BRUNSWICK
AL
M
A
NE
I
E
R
KI
D
D
E
R
PH
I
L
O
YALE
FLAMINGO
BU
L
L
R
U
N
FER
N
A
L
D
DO B B I N
JO
E
L
IDAMOR
L A K E
BR
I
D
L
E
HAZEL
HOSMER
BUSCH
TY
L
E
R
CH
I
V
V
I
S
ME
N
O
L
A
LO
C
K
S
L
E
Y
BU
R
N
T
O
A
K
LA
C
E
Y
NO
R
M
A
L
L
O
U
KIRKY
EWERS
RA
B
E
T
H
WEIL
EL
M
SE
L
M
A
V
A
SEL
G
R
A
N
T
WATSON RD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13491
Stormwater
15
$124,292
Various
Lemay/RDP
Seminary Branch
Non-recurring
159
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
STORMWATER INFRASTRUCTURE REPAIRS (2023)
Work Order Repair
Costs (Capital)
5120 - Districtwide
Stormwater Fund
AGING AND DETERIORATING STORMWATER INFRASTRUCTURE IS IN
NEED OF REPAIR AND REPLACEMENT.
CONSTRUCT REPAIR OR REPLACEMENT OF STORMWATER
INFRASTRUCTURE THROUGHOUT THE DISTRICT.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13006
Stormwater
17
$4,000,000
Various
Various
Various
Asset Management
160
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
STORMWATER INFRASTRUCTURE REPAIRS(REHABILITATION) (2023)
Construction
5120 - Districtwide
Stormwater Fund
DETERIORATED AND DAMAGED STORMWATER SEWER LINES CAUSE
PIPE COLLAPSES, BLOCKED SEWERS, AND STREET AND YARD
FLOODING.
CONSTRUCT CURED-IN-PLACE PIPE INSTALLATION FOR
STORMWATER SYSTEM REHABILITATION AND REPAIR, AS NEEDS ARE
IDENTIFIED BY SEWER CLEANING AND INSPECTION EFFORTS.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13128
Stormwater
15
$3,000,000
Various
Various
Various
Capital
161
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
STORMWATER QUALITY GREEN INFRASTRUCTURE- SMALL GRANT RAINSCAPING PROGRAM
Construction
5110 - Stormwater
Regulatory Fund
PUBLIC PARTICIPATION RAINSCAPING NEEDED TO ADDRESS WATER
QUALITY OF STORMWATER RUNOFF.
SMALL GRANT PROGRAM TO FUND CONSTRUCTION AND
ENCOURAGE THE USE OF RAINSCAPING TECHNIQUES BY
INDIVIDUAL LANDOWNERS.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13352
Stormwater
15
$200,000
Various
Various
Various
Non-recurring
162
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SUGAR CREEK OMCI REIMBURSEMENTSPROGRAM
Construction, Phase II
5583 - Sugar Creek
OMCI Fund
STORMWATER ISSUES IN THE SUGAR CREEK OMCI TAXING
SUBDISTRICT.
OFFER STORMWATER GRANTS TO MUNICIPALITIES WITHIN THE
SUGAR CREEK OMCI.
THIS PROGRAM WILL OFFER GRANT REIMBURSEMENTS TO
MUNICIPALITIES TO PROMOTE RESOLUTION OF STORMWATER
ISSUES.
§¨¦270
GE
Y
E
R
BA
L
L
A
S
ADAMS
U N I O N P A C I F I C CL
A
Y
ESSEX
DE
S
P
E
R
E
S
D O U G H E R T Y F E R R Y
TA
Y
L
O
R
HA
R
R
I
S
O
N
CO
U
C
H
C R A I G
ANN
ROSE HILL
WOODBINE
NIRK
BURLINGTON NORTHERN SAN T A F E
B
A
R
R
E
T
T
S
T
ATION
B OAZ
RU
T
H
B
O
P
P
LARK
EV
A
N
S
ED
N
A
WAY
PEEKESI
M
M
O
N
S
WILSON
L E M P
LEE
M A R S H A L L
VA
N
B
U
R
E
N
HIG
H
L
A
N
D
P I N G R Y
SARAH
THORNHILL
I
R
I
S
MONROE
WO
O
D
G
A
T
E
FR
I
E
D
A
NA
N
A
BA
C
H
TA
L
L
I
E
RA Y N E R
LINWOOD
J E WEL
SPINDLE
S
TGILES
ARGONNE
G A BRIEL
GRAND
KIRKSHIRE
JANET
WESTVIEW
GR
U
P
P
SARALA
L
I
N
D
EMA
N
FO
L
G
E
R
OGE
PAMELA
KNIERIM
BONR O Y A L
FRANCES
PRIVATE
WINSLOW
NICHOLAS
WINDSOR
MOZA
R
T
LYNKIRK
CLINTON
JEWEL
PRIVATE
BALLAS
U N I O N P A C I F I C
CL
A
Y
HA
R
R
I
S
O
N
PRIVATE TA
Y
L
O
R
JEWEL
TA
Y
L
O
R
M A NCHESTER RD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13490
Stormwater
15
$149,498
Various
Meramec
Sugar Creek
Non-recurring
163
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
UNIVERSITY CITY OMCI REIMBURSEMENTSPROGRAM
Construction, Phase II
5584 - University City
OMCI Fund
STORMWATER ISSUES IN THE UNIVERSITY CITY OMCI TAXING
SUBDISTRICT.
OFFER STORMWATER GRANTS TO MUNICIPALITIES WITHIN THE
UNIVERSITY CITY OMCI.
THIS PROGRAM WILL OFFER GRANT REIMBURSEMENTS TO
MUNICIPALITIES TO PROMOTE RESOLUTION OF STORMWATER
ISSUES.
§¨¦170
§¨¦64
§¨¦70
§¨¦170OLIVE BLVD
N
LINDBERGH
BLVD
ST
C
H
A
R
L
E
S
R
O
C
K
R
D
S
L
I
N
D
B
E
R
G
H
B
L
V
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13489
Stormwater
15
$495,049
Various
Lemay/RDP
University City Branch
Non-recurring
164
2023
11 April 2022
Page 1 of 1
STORMWATER CONTINUED PROJECTS - FY23
PROJECT
NUMBER
PROJECT NAME REASON PROJECT CONTINUED COST
ESTIMATE
10880 SIMS AVE STORM BUYOUT PROJECT CONTINUED DUE TO COORDINATION WITH
PROPERTY OWNERS. ANTICIPATE BOARD INTRODUCTION
IN APRIL 2023.
$200,000
TOTAL: $200,000
11 April 2022
Page 1 of 1
STORMWATER CONTINGENCY PROJECTS - FY24
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11176 BALLAS RD. - BALWYCK LN. BANK
STABILIZATION
$322,000 165
13285 CLAYTON CITY HALL STORM SEWER $1,590,000 166
10394 DENNIS AND KAPPEL STORM SEWER $334,000 167
10895 FAIRWAY CT 3901 BANK STABILIZATION $487,000 168
11314 GLENMARY TO WHITE ROSE STORM
IMPROVEMENTS
$380,000 169
10070 HALL STREET STORM SEWERS $7,000,000 170
10067 HALLSTEAD STORM CHANNEL PHASE IV
(MCBJ-230)
$100,000 171
10067 HALLSTEAD STORM CHANNEL PHASE IV
(MCBJ-230)
$4,200,000 172
11471 HIGHGATE - ENFIELD STORM SEWER $520,000 173
11034 OUTER LADUE AND CHIPPER STORM SEWER $434,000 174
11133 SHERWOOD DR. #2790 STORM SEWER $176,000 175
11161 WHITEHALL CT - PINE AVE STORM SEWER $270,000 176
TOTAL:$15,813,000
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BALLAS RD. - BALWYCK LN. BANK STABILIZATION
Construction
5566 - Deer Creek
OMCI Fund
CREEK EROSION.
CONSTRUCT 520 FEET OF COMPOSITE BANK REVETMENT AND ONE
GRADE CONTROL STRUCTURE.
BA
L
L
A
S
RANCH
BALWYCK
HAWTHORNE
HARFLO
RO
T
H
BA
L
L
A
S
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11176
Stormwater
15
$322,000
Des Peres
Lemay/RDP
Two Mile Creek
Non-recurring
165
2024
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CLAYTON CITY HALL STORM SEWER
Construction
5563 - Clayton Central
OMCI Fund
STORM SEWER SURCHARGING AND FLOODING OF A CITY OF
CLAYTON PARKING GARAGE BELOW GRADE LEVEL.
CONSTRUCT 360 FEET OF 12-INCH TO 36-INCH STORM SEWER.
PROJECT MAY BE CONSTRUCTED BY THE CITY OF CLAYTON UNDER
A FUNDING AGREEMENT WITH THE DISTRICT, DUE TO THE IMPACT
ON CITY FACILITIES.
HA
N
L
E
Y
FORSYTH
CE
N
T
R
A
L
MARYLAND
BE
M
I
S
T
O
N
CARONDELET
LI
N
D
E
N
LY
L
E
WESTMORELAND
LY
L
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13285
Stormwater
15
$1,590,000
Clayton
Lemay/RDP
Deer Creek
Capital
166
2024
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DENNIS AND KAPPEL STORM SEWER
Construction
5576 - Maline Creek
OMCI Fund
STRUCTURE AND YARD FLOODING.
CONSTRUCT 970 FEET OF 15-INCH TO 27-INCH STORM SEWER.
V
I
C
K
I
E
L
O
R
N
A
KAPPEL
D
E
N
N
I
S
FIR
M
E
D
F
O
R
D
W
E
S
T
D
E
L
L
E
A
S
T
D
E
L
L
P
E
R
C
H
N
E
W
T
O
N
V
E
N
I
C
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10394
Stormwater
15
$334,000
Unincorporated
Bissell
Maline Creek
Capital
167
2024
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FAIRWAY CT 3901 BANK STABILIZATION
Construction
5564 - Coldwater
Creek OMCI Fund
CREEK BANK EROSION THREATENING HOME, DRIVEWAY, AND SHED.
CONSTRUCT 320 FEET OF 11 TO 15 FOOT HIGH HEAVY STONE
REVETMENT BANK STABILIZATION.
SI
M
S
WR
I
G
H
T
STEPHENS
FA
I
R
W
A
Y
LIVINGSTON
IN
D
U
S
T
R
I
A
L
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10895
Stormwater
15
$487,000
St. Ann
Coldwater
Coldwater Creek
Non-recurring
168
2024
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GLENMARY TO WHITE ROSE STORMIMPROVEMENTS
Construction
5584 - University City
OMCI Fund
EROSION AND FLOODING DUE TO INADEQUATE STORM SYSTEM.
CONSTRUCT 755 FEET OF 24-INCH TO 36-INCH STORM SEWER
OLD BONHOMME
B
O
N
H
I
L
L
S
GL
E
N
M
A
R
Y
HILLNDALE
SL
E
E
P
Y
H
O
L
L
O
W
FAIRW
INDS
WA
Y
F
I
E
L
D
AYLESBURY
H
I
G
H
G
A
T
E
VI
L
L
A
P
L
A
C
E
CH
A
R
B
E
A
CA
N
D
L
E
L
I
G
H
T
ELKINGTON
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11314
Stormwater
15
$380,000
Olivette
Lemay/RDP
University City Branch
Capital
169
2024
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HALL STREET STORM SEWERS
Construction
5120 - Districtwide
Stormwater Fund
STREET FLOODING ALONG HALL STREET FROM ADELAIDE TO
RIVERVIEW DRIVE.
CONSTRUCT 5,500 FEET OF 12-INCH TO 66-INCH STORM SEWER, 523
FEET OF 72-INCH TUNNEL, AND 16,800 FEET OF DRAINAGE DITCH
ALONG HALL STREET.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL
APPROPRIATION IN FY 25. TOTAL CONSTRUCTION BUDGET IS
$10,920,000.
§¨¦70
§¨¦70
H
A
L
L
UNION
SWITZER
PAR
K
LEE
T E R MIN
A
L
MCLARA
N
ERA
WREN
MIM
I
K
A
SHREV E
THRUS
H
CART
E
R
BEACO
N
C
H
U
R
C
H
NE
W
B
Y
ROB
I
N
TAR
A
COZENS
J E N N I N G S S T A T I O N
RUSKI
N
EMER
S
O
N
CARRI
E
B
U
R
L
I
N
G
T
O
N
N
O
R
T
H
E
R
N
S
ANTA
FE
ADELA
I
D
E
PENR
O
S
E
H
A
R
N
E
Y
S
H
A
N
N
O
N
TAYLO
R
FLO
Y
R
O
S
A
L
I
E
M
C
KIS
S
O
C
K
EUCLI
D
HORNSB
Y
CALVA
R
Y
GERALDINE
WALL
B
U
L
W
E
R
ELIAS
O RIO L E
M E L V I NHORD
P
R
A
N
G
E
FONTAINE
O R A N
ASTO
RIA
SELLS
LEBON
LO
W
E
L
L
FARL
I
N HARRI
S
QUEEN
S
WESC
O
T
T
ATHLO
N
E
ACAC
I
A
AUBER
T
CATALI
N
A
RAFORD
RIVERVIEWDR
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10070
Stormwater
15
$7,000,000
St. Louis City
Bissell
Various
Capital
170
2024
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HALLSTEAD STORM CHANNEL PHASE IV(MCBJ-230)
Engineering During
Construction Services
5120 - Districtwide
Stormwater Fund
DAMAGE TO PROPERTY DUE TO EROSION.
CONSTRUCT 1,220 FEET OF 45-FOOT WIDE BY 12-FOOT HIGH
VERTICAL WALL CHANNEL, FROM VORHOFF DRIVE SOUTH TO
HUDSON DRIVE.
HUDSON
HALLW
O
O
D
VORHOF
C
A
N
F
I
E
L
D
E
D
G
E
F
I
E
L
D
IBIS
KIPP
FOSS
M
U
R
A
T
C
H
I
C
K
E
R
I
N
G
GREEN SLOPE
R
O
T
H
W
E
L
L
L
A
N
D
S
E
E
R
OLD MANOR
HUDSON
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10067
Stormwater
11
$100,000
Unincorporated
Bissell
Blackjack Creek
Non-recurring
171
2024
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HALLSTEAD STORM CHANNEL PHASE IV(MCBJ-230)
Construction
5120 - Districtwide
Stormwater Fund
DAMAGE TO PROPERTY DUE TO EROSION.
CONSTRUCT 1,220 FEET OF 45-FOOT WIDE BY 12-FOOT HIGH
VERTICAL WALL CHANNEL, FROM VORHOFF DRIVE SOUTH TO
HUDSON DRIVE.
HUDSON
HALLW
O
O
D
VORHOF
C
A
N
F
I
E
L
D
E
D
G
E
F
I
E
L
D
IBIS
KIPP
FOSS
M
U
R
A
T
C
H
I
C
K
E
R
I
N
G
GREEN SLOPE
R
O
T
H
W
E
L
L
L
A
N
D
S
E
E
R
OLD MANOR
HUDSON
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10067
Stormwater
15
$4,200,000
Unincorporated
Bissell
Blackjack Creek
Non-recurring
172
2024
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HIGHGATE - ENFIELD STORM SEWER
Construction
5566 - Deer Creek
OMCI Fund
YARD AND STREET FLOODING AND EROSION BETWEEN HIGHGATE
ROAD AND ENFIELD ROAD.
CONSTRUCT 945 FEET OF 12-INCH TO 24-INCH STORM SEWER
ENFIELD
BO
N
A
I
R
E
HI
G
H
G
A
T
E
CR
O
S
S
W
I
N
D
S
BEVERL Y
PRICE
R
Y
E
LADEL
LARKDALE
AMES
LADUE HILLS
PRICEMONT
GR
A
Y
B
R
I
D
G
E
RIO
VISTA
GRANADA
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11471
Stormwater
15
$520,000
Olivette
Lemay/RDP
Black Creek
Capital
173
2024
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
OUTER LADUE AND CHIPPER STORM SEWER
Construction
5566 - Deer Creek
OMCI Fund
YARD FLOODING AND BASEMENT FLOODING.
CONSTRUCT 1,125 FEET OF 12-INCH TO 30-INCH STORM SEWER, AND
5 RAIN GARDENS.
CHIPPER
GEYER
OUTER LADUE
HERMITAGE HILL
ST
E
E
P
L
E
C
H
A
S
E
GEYER DOWNS
H E R M IT A G E HILL
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11034
Stormwater
15
$434,000
Frontenac
Lemay/RDP
Two Mile Creek
Capital
174
2024
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SHERWOOD DR. #2790 STORM SEWER
Construction
5564 - Coldwater
Creek OMCI Fund
YARD FLOODING.
CONSTRUCT 480 FEET OF 12-INCH TO 15-INCH STORM SEWER.
RAD
C
L
I
F
F
E
SHE
R
W
O
O
D
WIE
T
H
A
U
P
T
GR
A
N
T
S
RA
N
C
H
O
KNO
L
L
W
O
O
D
DAWNVIE W
S H ADOWCREEK
C
H
A
R
V
E
L
ELKSFORTH
DAWNVIEW
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11133
Stormwater
15
$176,000
Unincorporated
Coldwater
Coldwater Creek
Capital
175
2024
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WHITEHALL CT - PINE AVE STORM SEWER
Construction
5566 - Deer Creek
OMCI Fund
YARD FLOODING.
CONSTRUCT 510 FEET OF 12-INCH TO 18-INCH STORM SEWER
PINE
WHITE
ST
C
L
A
I
R
PA
R
K
R
I
D
G
E
SONORA
SWA
N
HA
T
T
O
N
LAWN
KE
M
P
T
O
N
MORITZ
WHITEHALL
YOR
K
H
I
L
L
S
MI
D
D
L
E
S
E
X
BLU
E
J
A
Y
SOUTHCOTE
YO R K SHIRE
LANE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11161
Stormwater
15
$270,000
Brentwood
Lemay/RDP
Deer Creek
Capital
176
2024
11 April 2022
Page 1 of 3
STORMWATER PROJECTS - FY23
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
5110 - STORMWATER REGULATORY FUND
12842 GSA - Planning
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT - WATER
QUALITY SUPPORT SERVICES (2021)
Various $150,000
13705 Construction GRAND GLAIZE CREEK WATERSHED
INITIATIVE
Various $200,000
13352 Construction STORMWATER QUALITY GREEN
INFRASTRUCTURE - SMALL GRANT
RAINSCAPING PROGRAM
Various $200,000
FUND TOTAL: $550,000
5120 - DISTRICTWIDE STORMWATER FUND
13710 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT -
STORMWATER DESIGN FOR ARPA GRANT
PROJECTS (2023) CONTRACT A
Various $1,300,000
13711 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT -
STORMWATER DESIGN FOR ARPA GRANT
PROJECTS (2023) CONTRACT B
Various $1,300,000
13712 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT -
STORMWATER DESIGN FOR ARPA GRANT
PROJECTS (2023) CONTRACT C
Various $1,300,000
10070 Design Services
(Supplemental
Appropriation)
HALL STREET STORM SEWERS St. Louis City $600,000
10067 Design Services
(Supplemental
Appropriation)
HALLSTEAD STORM CHANNEL PHASE IV
(MCBJ-230)
Unincorporated $100,000
11530 Construction LARIMORE STORM SEWER Unincorporated $2,600,000
13577 Design Services RIVER DES PERES CHANNEL
REHABILITATION
St. Louis City $1,000,000
13595 Prof/Vendor
Services
(Supplemental
Appropriation)
STORMWATER ASSET INVESTIGATIONS
(2022)
Various $800,000
13006 Work Order
Repair Costs
(Capital)
STORMWATER INFRASTRUCTURE REPAIRS
(2023)
Various $4,000,000
13128 Construction STORMWATER INFRASTRUCTURE REPAIRS
(REHABILITATION) (2023)
Various $3,000,000
FUND TOTAL: $16,000,000
5564 - COLDWATER CREEK OMCI FUND
11 April 2022
Page 2 of 3
STORMWATER PROJECTS - FY23
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
13488 Construction,
Phase II
COLDWATER CREEK OMCI
REIMBURSEMENTS PROGRAM
Various $1,076,519
11325 Construction NORTH NEW FLORISSANT - FOX RUN
STORM SEWER
Florissant $600,000
FUND TOTAL: $1,676,519
5566 - DEER CREEK OMCI FUND
12469 Construction BEAUCAIRE DRIVE - MARK DRIVE -
MONACO DRIVE STORM SEWER
Warson Woods $325,000
11205 Construction DEARBORN DR STORM SEWER Warson Woods $320,000
13487 Construction,
Phase II
DEER CREEK OMCI REIMBURSEMENTS
PROGRAM
Various $1,958,164
11065 Construction DEER CREEK WATERSHED INITIATIVE Various $100,000
12900 Construction LITZSINGER #10412 STORM SEWER
IMPROVEMENTS
Frontenac $115,000
11972 Construction MEADOW CREEK LN 508 STORM SEWER Warson Woods $85,000
FUND TOTAL: $2,903,164
5571 - GRAVOIS CREEK OMCI FUND
13678 Construction,
Phase II
GRAVOIS CREEK OMCI REIMBURSEMENTS
PROGRAM
Various $742,722
13714 Professional
Services
GRAVOIS CREEK OMCI STORMWATER
DESIGN (2023)
Various $300,000
FUND TOTAL: $1,042,722
5576 - MALINE CREEK OMCI FUND
11286 Construction BALLMAN DRIVE 300 BLOCK STORM
SEWER
Ferguson $600,000
11277 Construction LONGFORD DRIVE 1851 STORM SEWER Unincorporated $95,000
FUND TOTAL: $695,000
5583 - SUGAR CREEK OMCI FUND
13490 Construction,
Phase II
SUGAR CREEK OMCI REIMBURSEMENTS
PROGRAM
Various $149,498
FUND TOTAL: $149,498
5584 - UNIVERSITY CITY OMCI FUND
11 April 2022
Page 3 of 3
STORMWATER PROJECTS - FY23
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
10880 Land Purchase SIMS AVE STORM BUYOUT Overland $200,000
13489 Construction,
Phase II
UNIVERSITY CITY OMCI REIMBURSEMENTS
PROGRAM
Various $495,049
FUND TOTAL: $695,049
5593 - SEM BR OF RIVER DES PERES OMCI FUND
13491 Construction,
Phase II
SEMINARY OMCI REIMBURSEMENTS
PROGRAM
Various $124,292
FUND TOTAL: $124,292
GRAND TOTAL:$23,836,244
11 April 2022
Page 1 of 3
STORMWATER PROJECTS - FY24
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
5110 - STORMWATER REGULATORY FUND
13299 GSA -
(Planning)
Operating Fund
GENERAL SERVICES AGREEMENT - WATER
QUALITY SUPPORT SERVICES (2024)
Various $150,000
13352 Construction STORMWATER QUALITY GREEN
INFRASTRUCTURE - SMALL GRANT
RAINSCAPING PROGRAM
Various $200,000
FUND TOTAL: $350,000
5120 - DISTRICTWIDE STORMWATER FUND
11259 Construction CEDARHURST DRIVE CREEK BANK
STABILIZATION
Unincorporated $1,375,000
10070 Construction HALL STREET STORM SEWERS St. Louis City $7,000,000
10067 Engineering
During
Construction
Services
HALLSTEAD STORM CHANNEL PHASE IV
(MCBJ-230)
Unincorporated $100,000
10067 Construction HALLSTEAD STORM CHANNEL PHASE IV
(MCBJ-230)
Unincorporated $4,200,000
13595 Prof/Vendor
Services
(Supplemental
Appropriation)
STORMWATER ASSET INVESTIGATIONS
(2022)
Various $800,000
13007 Work Order
Repair Costs
(Capital)
STORMWATER INFRASTRUCTURE REPAIRS
(2024)
Various $5,000,000
13129 Construction STORMWATER INFRASTRUCTURE REPAIRS
(REHABILITATION) (2024)
Various $4,000,000
FUND TOTAL: $22,475,000
5563 - CLAYTON CENTRAL OMCI FUND
13285 Construction CLAYTON CITY HALL STORM SEWER Clayton $1,590,000
FUND TOTAL: $1,590,000
5564 - COLDWATER CREEK OMCI FUND
13488 Construction,
Phase II
COLDWATER CREEK OMCI
REIMBURSEMENTS PROGRAM
Various $1,076,519
10895 Construction FAIRWAY CT 3901 BANK STABILIZATION St. Ann $487,000
11133 Construction SHERWOOD DR. #2790 STORM SEWER Unincorporated $176,000
11 April 2022
Page 2 of 3
STORMWATER PROJECTS - FY24
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
FUND TOTAL: $1,739,519
5566 - DEER CREEK OMCI FUND
11176 Construction BALLAS RD. - BALWYCK LN. BANK
STABILIZATION
Des Peres $322,000
12703 Construction DANIEL ROAD STORM SEWER RELIEF Ladue $600,000
13487 Construction,
Phase II
DEER CREEK OMCI REIMBURSEMENTS
PROGRAM
Various $1,958,164
10587 Construction EAST ESSEX AVE 802 - 804 STORM SEWER Glendale $290,000
11226 Construction FIRETHORN DR 2050 STORM
IMPROVEMENTS
Frontenac $450,000
11471 Construction HIGHGATE - ENFIELD STORM SEWER Olivette $520,000
11034 Construction OUTER LADUE AND CHIPPER STORM
SEWER
Frontenac $434,000
10310 Construction QUAILWAYS DR. #8 CHANNEL
IMPROVEMENTS
Creve Coeur $564,000
11161 Construction WHITEHALL CT - PINE AVE STORM SEWER Brentwood $270,000
FUND TOTAL: $5,408,164
5571 - GRAVOIS CREEK OMCI FUND
13678 Construction,
Phase II
GRAVOIS CREEK OMCI REIMBURSEMENTS
PROGRAM
Various $742,722
FUND TOTAL: $742,722
5576 - MALINE CREEK OMCI FUND
10394 Construction DENNIS AND KAPPEL STORM SEWER Unincorporated $334,000
FUND TOTAL: $334,000
5583 - SUGAR CREEK OMCI FUND
13490 Construction,
Phase II
SUGAR CREEK OMCI REIMBURSEMENTS
PROGRAM
Various $149,498
FUND TOTAL: $149,498
5584 - UNIVERSITY CITY OMCI FUND
11314 Construction GLENMARY TO WHITE ROSE STORM
IMPROVEMENTS
Olivette $380,000
11 April 2022
Page 3 of 3
STORMWATER PROJECTS - FY24
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11313 Construction TRENTON AVE 9400 BLOCK CHANNEL
IMPROVEMENTS
Overland $295,000
13489 Construction,
Phase II
UNIVERSITY CITY OMCI REIMBURSEMENTS
PROGRAM
Various $495,049
FUND TOTAL: $1,170,049
5593 - SEM BR OF RIVER DES PERES OMCI FUND
13491 Construction,
Phase II
SEMINARY OMCI REIMBURSEMENTS
PROGRAM
Various $124,292
FUND TOTAL: $124,292
GRAND TOTAL:$34,083,244
11 April 2022
Page 1 of 2
STORMWATER PROJECTS - FY25
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
4102 - IMPROVEMENT FUND
13703 Construction MARKET STREET PERMEABLE PAVEMENT
AND RAIN GARDEN IMPROVEMENTS
St. Louis City $500,000
FUND TOTAL: $500,000
5110 - STORMWATER REGULATORY FUND
13299 GSA - Planning
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT - WATER
QUALITY SUPPORT SERVICES (2024)
Various $150,000
13352 Construction STORMWATER QUALITY GREEN
INFRASTRUCTURE - SMALL GRANT
RAINSCAPING PROGRAM
Various $200,000
FUND TOTAL: $350,000
5120 - DISTRICTWIDE STORMWATER FUND
10070 Construction
(Supplemental
Appropriation)
HALL STREET STORM SEWERS St. Louis City $3,920,000
13577 Construction RIVER DES PERES CHANNEL
REHABILITATION
St. Louis City $6,100,000
13008 Work Order
Repair Costs
(Capital)
STORMWATER INFRASTRUCTURE REPAIRS
(2025)
Various $5,000,000
13130 Construction STORMWATER INFRASTRUCTURE REPAIRS
(REHABILITATION) (2025)
Various $4,000,000
FUND TOTAL: $19,020,000
5571 - GRAVOIS CREEK OMCI FUND
12655 Construction BIG BEND 10014 STORM IMPROVEMENTS Crestwood $515,000
13457 Construction SANDERS DRIVE 1009 STORM SEWER Crestwood $445,000
FUND TOTAL: $960,000
5576 - MALINE CREEK OMCI FUND
11185 Construction KATHLYN AND LEITH STORM SEWERS Berkeley $78,000
11296 Construction NEWELL AND NOAH DRIVE STORM SEWER Ferguson $101,000
11294 Construction TIFFIN AVE TO WESLEY AVE STORM
IMPROVEMENTS
Ferguson $90,000
11 April 2022
Page 2 of 2
STORMWATER PROJECTS - FY25
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
FUND TOTAL: $269,000
5583 - SUGAR CREEK OMCI FUND
11332 Construction CULLODEN ROAD 819 - 827 STORM SEWER Kirkwood $111,000
10872 Construction NORTH GEYER AND VILLA GARDEN STORM
SEWER
Kirkwood $260,000
FUND TOTAL: $371,000
GRAND TOTAL:$21,470,000
11 April 2022
Page 1 of 1
STORMWATER PROJECTS - FY26
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
5110 - STORMWATER REGULATORY FUND
13299 GSA - Planning
(Supplemental
Appropriation)
GENERAL SERVICES AGREEMENT - WATER
QUALITY SUPPORT SERVICES (2024)
Various $150,000
13352 Construction STORMWATER QUALITY GREEN
INFRASTRUCTURE - SMALL GRANT
RAINSCAPING PROGRAM
Various $200,000
FUND TOTAL: $350,000
5120 - DISTRICTWIDE STORMWATER FUND
13009 Work Order
Repair Costs
(Capital)
STORMWATER INFRASTRUCTURE REPAIRS
(2026)
Various $5,000,000
13131 Construction STORMWATER INFRASTRUCTURE REPAIRS
(REHABILITATION) (2026)
Various $4,000,000
FUND TOTAL: $9,000,000
5564 - COLDWATER CREEK OMCI FUND
12745 Construction N WATERFORD 2735 STORM
IMPROVEMENTS
Florissant $84,000
FUND TOTAL: $84,000
5565 - CREVE COEUR FRONTENAC OMCI FUND
12940 Construction CLERBROOK LANE STORM SEWER (LADUE
1608.03)
Ladue $200,000
FUND TOTAL: $200,000
5566 - DEER CREEK OMCI FUND
11168 Construction BRIARBROOK TRAIL STORM SEWER Des Peres $212,800
12940 Construction CLERBROOK LANE STORM SEWER (LADUE
1608.03)
Ladue $30,000
11164 Construction LAWNWOOD DR. #1442 STORM SEWER Des Peres $92,000
FUND TOTAL: $334,800
GRAND TOTAL:$9,968,800
11 April 2022
Page 1 of 1
STORMWATER PROJECTS - FY27
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
5110 - STORMWATER REGULATORY FUND
13744 GSA -
(Planning)
Operating Fund
GENERAL SERVICES AGREEMENT - WATER
QUALITY SUPPORT SERVICES (2027)
Various $150,000
13352 Construction STORMWATER QUALITY GREEN
INFRASTRUCTURE - SMALL GRANT
RAINSCAPING PROGRAM
Various $200,000
FUND TOTAL: $350,000
5120 - DISTRICTWIDE STORMWATER FUND
13010 Work Order
Repair Costs
(Capital)
STORMWATER INFRASTRUCTURE REPAIRS
(2027)
Various $5,000,000
13132 Construction STORMWATER INFRASTRUCTURE REPAIRS
(REHABILITATION) (2027)
Various $4,000,000
FUND TOTAL: $9,000,000
GRAND TOTAL:$9,350,000
11 April 2022
Page 1 of 11
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY23
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
12140 CSO - MARY AVENUE SOUTH OF MANCHESTER
CSO INTERCEPTOR (I-132)/OUTFALL (L-106)
ELIMINATION PHASE II
WASTEWATER BRENTWOOD 12
12200 SAYLESVILLE SANITARY RELIEF
(SAYLESVILLE DR TO S GREENTRAILS DR)
WASTEWATER CHESTERFIELD 105
12200 SAYLESVILLE SANITARY RELIEF
(SAYLESVILLE DR TO S GREENTRAILS DR)
WASTEWATER CHESTERFIELD 106
12248 CAULKS CREEK A PUMP STATION (P-750)
IMPROVEMENTS
WASTEWATER CHESTERFIELD 4
12248 CAULKS CREEK A PUMP STATION (P-750)
IMPROVEMENTS
WASTEWATER CHESTERFIELD 66
12280 WHITE PLAINS SANITARY RELIEF (SALTBOX DR
TO CEDAR CREEK RD)
WASTEWATER CHESTERFIELD 107
12195 S BRENTWOOD BLVD SANITARY RELIEF
(DAYTONA DR TO WALINCA TERRACE)
WASTEWATER CLAYTON 50
13662 ROXBURGH DR SANITARY RELIEF WASTEWATER CLAYTON 104
12291 GREENBRIAR #2 PUMP STATION (P-448)
ELIMINATION
WASTEWATER DES PERES 77
11888 FABICK PUMP STATION (P-444) IMPROVEMENTS
(SKME-404E)
WASTEWATER FENTON 73
11286 BALLMAN DRIVE 300 BLOCK STORM SEWER STORMWATER FERGUSON 146
11325 NORTH NEW FLORISSANT - FOX RUN STORM
SEWER
STORMWATER FLORISSANT 158
12077 AMBLEWOOD SANITARY RELIEF (WATERFORD
DR TO BIRCHBARK DR)
WASTEWATER FLORISSANT 55
12178 FLORISSANT/DUNN SANITARY RELIEF (ST.
ANTHONY LN TO I-270)
WASTEWATER FLORISSANT 75
11 April 2022
Page 2 of 11
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY23
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
12330 LINDSAY - ST. ALBERT PRIVATE I/I REDUCTION WASTEWATER FLORISSANT 94
13629 LINDSAY LANE SANITARY RELIEF (LINDSAY
LANE TO LINDBERGH BLVD)
WASTEWATER FLORISSANT 41
12900 LITZSINGER #10412 STORM SEWER
IMPROVEMENTS
STORMWATER FRONTENAC 155
13432 HATHAWAY DRIVE SANITARY RELIEF WASTEWATER JENNINGS 81
12174 GEYER SANITARY RELIEF (W. MONROE AVE TO
W. ESSEX AVE)
WASTEWATER KIRKWOOD 31
11847 BLACK CREEK - HADDINGTON COURT RELIEF
SEWERS
WASTEWATER LADUE 65
11790 CAULKS CREEK FORCEMAIN (RIVER VALLEY
RD TO L-52)
WASTEWATER MARYLAND
HEIGHTS
67
12171 FF-15 AND FF-16 SANITARY RELIEF PHASE II
REHABILITATION
WASTEWATER MARYLAND
HEIGHTS
74
12368 PRICE TO PIONEER SANITARY RELIEF WASTEWATER OLIVETTE 100
10070 HALL STREET STORM SEWERS STORMWATER ST. LOUIS CITY 142
10641 HARLEM - BADEN RELIEF PHASE IV (HEBERT)
BUILDING DEMOLITION AND DESIGN
WASTEWATER ST. LOUIS CITY 36
11769 HARLEM - BADEN RELIEF PHASE IV (HEBERT)
(GOODFELLOW TO HAMILTON)
WASTEWATER ST. LOUIS CITY 78
12548 BISSELL POINT WWTF FINE SCREEN,
CONCRETE AND GATE IMPROVEMENTS
WASTEWATER ST. LOUIS CITY 64
11 April 2022
Page 3 of 11
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY23
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
12694 CITYSHED MITIGATION PROGRAM DESIGN
(CONTRACT B)
WASTEWATER ST. LOUIS CITY 6
12847 BADEN CITYSHED MITIGATION BASINS
(CALVARY, FREDERICK, PARTRIDGE AND
TILLIE) - SEPARATION SEWERS
WASTEWATER ST. LOUIS CITY 56
13516 GASLIGHT SQUARE SEWER IMPROVEMENTS
PHASE II
WASTEWATER ST. LOUIS CITY 14
13577 RIVER DES PERES CHANNEL REHABILITATION STORMWATER ST. LOUIS CITY 144
13596 LEMAY 1 PUMP STATION (P-301) COOLING
TOWER REPLACEMENT
WASTEWATER ST. LOUIS CITY 91
13720 INFRASTRUCTURE REPAIRS (REHABILITATION)
(2023) CONTRACT C
WASTEWATER ST. LOUIS CITY 85
12189 ROBYN HILLS NUMBER 1 PUMP STATION (P-417)
REPLACEMENT
WASTEWATER SUNSET HILLS 103
12264 GLENFIELD SANITARY RELIEF (WATSON
WOODS CT TO S LINDBERGH BLVD)
WASTEWATER SUNSET HILLS 76
13163 CROSS TIMBERS #705 SANITARY
REPLACEMENT
WASTEWATER TOWN AND
COUNTRY
69
10067 HALLSTEAD STORM CHANNEL PHASE IV
(MCBJ-230)
STORMWATER UNINCORPORAT
ED
143
11277 LONGFORD DRIVE 1851 STORM SEWER STORMWATER UNINCORPORAT
ED
156
11530 LARIMORE STORM SEWER STORMWATER UNINCORPORAT
ED
154
11817 LEMAY NO. 3 PUMP STATION AND FORCE MAIN WASTEWATER UNINCORPORAT
ED
39
11 April 2022
Page 4 of 11
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY23
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11957 JEFFERSON BARRACKS TUNNEL
CONSOLIDATION SEWERS
WASTEWATER UNINCORPORAT
ED
38
11957 JEFFERSON BARRACKS TUNNEL
CONSOLIDATION SEWERS
WASTEWATER UNINCORPORAT
ED
88
12085 BANFF SANITARY RELIEF (CAITHNESS RD TO
LANARK RD)
WASTEWATER UNINCORPORAT
ED
57
12255 LOWER MERAMEC WWTF EXPANSION PHASE II WASTEWATER UNINCORPORAT
ED
45
12255 LOWER MERAMEC WWTF EXPANSION PHASE II WASTEWATER UNINCORPORAT
ED
46
12255 LOWER MERAMEC WWTF EXPANSION PHASE II WASTEWATER UNINCORPORAT
ED
96
12357 NEWPORT LANDING PUMP STATION (P-480)
ELIMINATION
WASTEWATER UNINCORPORAT
ED
98
12552 COLDWATER CREEK WWTF REPAIRS AND
IMPROVEMENTS (2023)
WASTEWATER UNINCORPORAT
ED
7
12552 COLDWATER CREEK WWTF REPAIRS AND
IMPROVEMENTS (2023)
WASTEWATER UNINCORPORAT
ED
68
13153 LEMAY WWTF REPAIRS AND IMPROVEMENTS
(2023) (GRIT TANKS AND SECONDARY
CLARIFIER DUCT BANK)
WASTEWATER UNINCORPORAT
ED
40
13153 LEMAY WWTF REPAIRS AND IMPROVEMENTS
(2023) (GRIT TANKS AND SECONDARY
CLARIFIER DUCT BANK)
WASTEWATER UNINCORPORAT
ED
93
11 April 2022
Page 5 of 11
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY23
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
13676 LEMAY WWTF AERATION BLOWER AND
POWER DISTRIBUTION IMPROVEMENTS
WASTEWATER UNINCORPORAT
ED
92
13747 LAMBERT AIRPORT RESTRICTED ACCESS
ASSETS INSPECTION AND REPAIR
WASTEWATER UNINCORPORAT
ED
89
13747 LAMBERT AIRPORT RESTRICTED ACCESS
ASSETS INSPECTION AND REPAIR
WASTEWATER UNINCORPORAT
ED
90
13221 GRAND GLAIZE WWTF REPAIRS AND
IMPROVEMENTS (2023)
WASTEWATER VALLEY PARK 34
13630 GRAND GLAIZE WWTF GRAND GLAIZE CREEK
BANK STABILIZATION
WASTEWATER VALLEY PARK 33
10024 MC-02 WATSON TO EDGAR RD SANITARY
RELIEF (SKME-580A)
WASTEWATER VARIOUS 97
10766 STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
UNALLOCATED VARIOUS 51
11065 DEER CREEK WATERSHED INITIATIVE STORMWATER VARIOUS 151
11109 LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
WASTEWATER VARIOUS 42
11109 LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
WASTEWATER VARIOUS 43
11146 CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
WASTEWATER VARIOUS 70
11151 CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION FACILITIES
WASTEWATER VARIOUS 10
11152 CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL FACILITIES
WASTEWATER VARIOUS 8
11 April 2022
Page 6 of 11
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY23
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11153 RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
WASTEWATER VARIOUS 49
11701 PUMP STATION REPLACEMENT PROJECTS
(PHASE I)
WASTEWATER VARIOUS 47
11746 LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO FENTON
WWTF TUNNEL
WASTEWATER VARIOUS 44
11746 LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO FENTON
WWTF TUNNEL
WASTEWATER VARIOUS 95
11800 HARLEM BADEN RELIEF PHASE IV (HEBERT) -
TRUNK SEWER REHABILITATION
WASTEWATER VARIOUS 37
11826 CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK TUNNELS
WASTEWATER VARIOUS 9
12006 RADAR RAINFALL DATA (2020)WASTEWATER VARIOUS 48
12090 BC-01 PHASE III AND BC-02 PHASE II SANITARY
RELIEF (I-170 TO HEATHERWOOD DR)
WASTEWATER VARIOUS 1
12176 GLEN ECHO SANITARY RELIEF (ENGELHOLM
AVE TO HENDERSON AVE)
WASTEWATER VARIOUS 32
12334 HAMPTON CREEK SANITARY RELIEF (DEER
CREEK TRUNK TO OXFORD DR) PHASE I
WASTEWATER VARIOUS 35
12387 GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (2022)
WASTEWATER VARIOUS 15
12397 GENERAL SERVICES AGREEMENT - FACILITY &
SEWER DESIGN (2020) CONTRACT A
WASTEWATER VARIOUS 16
12400 GENERAL SERVICES AGREEMENT - SEWER AND
CHANNEL DESIGN (2021) CONTRACT A
WASTEWATER VARIOUS 26
12433 NORTH FEE FEE CREEK PUBLIC I/I REDUCTION WASTEWATER VARIOUS 99
11 April 2022
Page 7 of 11
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY23
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
12565 BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
WASTEWATER VARIOUS 2
12565 BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
WASTEWATER VARIOUS 3
12565 BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
WASTEWATER VARIOUS 58
12565 BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
WASTEWATER VARIOUS 59
12586 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2023) CONTRACT D
WASTEWATER VARIOUS 61
12587 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2023) CONTRACT E
WASTEWATER VARIOUS 62
12801 FLOW METERING AND MONITORING (2022) WASTEWATER VARIOUS 13
12804 CCTV INSPECTION AND PHYSICAL INSPECTION
OF SEWERS (2023)
WASTEWATER VARIOUS 5
12806 STREAM FLOW WATER QUALITY SAMPLING
(2023)
UNALLOCATED VARIOUS 52
12820 EASEMENT ACQUISITION FOR WASTEWATER
PROJECTS (2023)
WASTEWATER VARIOUS 72
12842 GENERAL SERVICES AGREEMENT - WATER
QUALITY SUPPORT SERVICES (2021)
STORMWATER VARIOUS 140
12908 CRITICAL INFRASTRUCTURE ASSESSMENT AND
ASSET INVESTIGATION (2023)
WASTEWATER VARIOUS 11
12989 INFRASTRUCTURE REPAIRS (WASTEWATER)
(2023)
WASTEWATER VARIOUS 87
12997 INFRASTRUCTURE REPAIRS (FACILITIES) (2023) WASTEWATER VARIOUS 82
11 April 2022
Page 8 of 11
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY23
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
13006 STORMWATER INFRASTRUCTURE REPAIRS
(2023)
STORMWATER VARIOUS 160
13018 INFRASTRUCTURE REPAIRS (REHABILITATION)
(2023) CONTRACT A
WASTEWATER VARIOUS 83
13019 INFRASTRUCTURE REPAIRS (REHABILITATION)
(2023) CONTRACT B
WASTEWATER VARIOUS 84
13033 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2023) CONTRACT C
WASTEWATER VARIOUS 60
13078 CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE - RIVER DES PERES
WASTEWATER VARIOUS 71
13087 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2021) CONTRACT A
UNALLOCATED VARIOUS 22
13088 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2021) CONTRACT B
UNALLOCATED VARIOUS 23
13089 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2021) CONTRACT C
UNALLOCATED VARIOUS 24
13090 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2021) CONTRACT D
UNALLOCATED VARIOUS 25
13098 GENERAL SERVICES AGREEMENT - FACILITY &
SEWER DESIGN (2022) CONTRACT A
WASTEWATER VARIOUS 17
13099 GENERAL SERVICES AGREEMENT - FACILITY &
SEWER DESIGN (2022) CONTRACT B
WASTEWATER VARIOUS 18
13102 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2022) CONTRACT A
WASTEWATER VARIOUS 19
13103 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2022) CONTRACT B
WASTEWATER VARIOUS 20
13104 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2022) CONTRACT C
WASTEWATER VARIOUS 21
11 April 2022
Page 9 of 11
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY23
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
13108 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT A
WASTEWATER VARIOUS 27
13109 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT B
WASTEWATER VARIOUS 28
13110 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT C
WASTEWATER VARIOUS 29
13111 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT D
WASTEWATER VARIOUS 30
13124 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2023) CONTRACT F
WASTEWATER VARIOUS 63
13128 STORMWATER INFRASTRUCTURE REPAIRS
(REHABILITATION) (2023)
STORMWATER VARIOUS 161
13231 HARLEM CITYSHED MITIGATION BASINS
(ASHLAND AND ESSEX)
WASTEWATER VARIOUS 80
13352 STORMWATER QUALITY GREEN
INFRASTRUCTURE - SMALL GRANT
RAINSCAPING PROGRAM
STORMWATER VARIOUS 162
13436 WET WEATHER OPTIMIZATION STUDY WASTEWATER VARIOUS 54
13487 DEER CREEK OMCI REIMBURSEMENTS
PROGRAM
STORMWATER VARIOUS 150
13488 COLDWATER CREEK OMCI REIMBURSEMENTS
PROGRAM
STORMWATER VARIOUS 148
13489 UNIVERSITY CITY OMCI REIMBURSEMENTS
PROGRAM
STORMWATER VARIOUS 164
13490 SUGAR CREEK OMCI REIMBURSEMENTS
PROGRAM
STORMWATER VARIOUS 163
13491 SEMINARY OMCI REIMBURSEMENTS PROGRAM STORMWATER VARIOUS 159
11 April 2022
Page 10 of 11
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY23
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
13548 HARLEM BADEN RELIEF PHASE IV (HEBERT) -
SEWER REHABILITATION
WASTEWATER VARIOUS 79
13566 PUMP STATION MANLIFT REPLACEMENT WASTEWATER VARIOUS 102
13595 STORMWATER ASSET INVESTIGATIONS (2022) STORMWATER VARIOUS 145
13678 GRAVOIS CREEK OMCI REIMBURSEMENTS
PROGRAM
STORMWATER VARIOUS 153
13680 PUMP STATION FALL PROTECTION UPGRADES -
PHASE I
WASTEWATER VARIOUS 101
13705 GRAND GLAIZE CREEK WATERSHED
INITIATIVE
STORMWATER VARIOUS 152
13710 GENERAL SERVICES AGREEMENT -
STORMWATER DESIGN FOR ARPA GRANT
PROJECTS (2023) CONTRACT A
STORMWATER VARIOUS 137
13711 GENERAL SERVICES AGREEMENT -
STORMWATER DESIGN FOR ARPA GRANT
PROJECTS (2023) CONTRACT B
STORMWATER VARIOUS 138
13712 GENERAL SERVICES AGREEMENT -
STORMWATER DESIGN FOR ARPA GRANT
PROJECTS (2023) CONTRACT C
STORMWATER VARIOUS 139
13714 GRAVOIS CREEK OMCI STORMWATER DESIGN
(2023)
STORMWATER VARIOUS 141
13731 INFRASTRUCTURE REPAIRS (REHABILITATION)
(2023) CORPS CSO PROGRAM
WASTEWATER VARIOUS 86
11205 DEARBORN DR STORM SEWER STORMWATER WARSON WOODS 149
11972 MEADOW CREEK LN 508 STORM SEWER STORMWATER WARSON WOODS 157
12469 BEAUCAIRE DRIVE - MARK DRIVE - MONACO
DRIVE STORM SEWER
STORMWATER WARSON WOODS 147
11 April 2022
Page 11 of 11
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY23
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
10794 WEBSTER GROVES TRUNK E SANITARY RELIEF
(SKME-628)
WASTEWATER WEBSTER
GROVES
53