HomeMy Public PortalAboutORD14751 BILL NO. 2010-91 SPONSORED BY COUNCILMAN Penfold ORDINANCE NO. // 7'-5, AN ORDINANCE OF THE CITY OF JEFFERSON, MISSOURI, AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE A CHANGE ORDER WITH DONOHUE AND ASSOCIATES TO DESIGN A REPLACEMENT FORCEMAIN FOR THE COLE JUNCTION PUMP STATION. WHERAS, Donohue and Associates, a professional engineering company located in Chesterfield, Missouri, is the most qualified firm to complete the engineering work needed to facilitate this project. NOW, THERFORE, BE IT ENACTED BY THE CITY COUNCIL OF THE CITY OF JEFFERSON, MISSOURI AS FOLLOWS: Section 1. The Mayor is hereby authorized to execute a change order with Donohue and Associates for the forcemain replacement improvements for the Cole Junction Pump Station. Section 2. The change order shall be substantially the same in form and content as the change order attached hereto as Exhibit A. Section 3. This Ordinance shall be in full force and effect from and after the date of its passage and approval. Passed: ll�t�, -v 65;;V21 Approved:2'"� - - Pjersiding Officers' Mayor ATTEST: APPROVED AS TO FORM: IV V— City Clerk City Counselor P;FviscC) r0hBiTA SCOPE AND FEE COLE JUNCTION PUMP STATION AND FORCE MAIN The following is our understanding of the project as defined in the Technical Memo issued on October 15, 2010. The project includes the replacement of the Cole.function Pump Station to pump a firm capacity of 14,000 gpm or provide a new Pump Station and storage system to pump directly to the wastewater treatment plant. The project also includes the design of a single or dual force main system conveying the Pumped wastewater north under the Missouri River and east to the treatment plant, a piping system of approximately 23,000 linear feet. 'file estimate for the project is $4,800,000 for the pump station and/or a new pump station and storage system. The estimate for the force main is $9,000,000 for a single system or$10,000,000 for a dual force main system. Fees are based on the$4,800,000 for a pump station system regardless if just a pump station or a smaller pump station with storage. The fees for the force main will be based on $9,000,000 regardless if a single or dual force main is designed. Pre-Design Report and Analysis Although a general route has been selected a more defined route needs to be analyzed to determine physical obstacles as well as wetlands, property easements, street and highway crossings and Utility/railroad easements. The route will also be analyzed for constructability to insure the lowest possible construction cost. An analysis will be performed on the pump station system to determine what is more cost-effective, a pump station to pump all flow or a pump station with storage. The selection of this system will determine the size of the force main. A transient analysis of the proposed pump station and force main will be performed to define any restrictions on piping material, location of pressure relief/vacuum relief,appurtenances to prevent hydraulic surge at either the pump station or in the force main. A more detailed capital and O&M cost will be performed. Donohue along with Central Missouri Professional Services, Inc. (CMPS)will perform the study, with CMPS assisting in the route selection. The estimated engineering cost for this analysis is shown on the attached spreadsheet as I A for Donohue and I B for CMPS,and includes costs already incurred. Topographic Survey Surveying at the pump station site and force main route will be performed by CMPS. The fee for surveying is shown in item 2 on the attached spreadsheet. Survey also includes a river crossing survey performed by a sub-consultant for CMPS. Geological Survey Borings will be performed by Engineering Surveys and Services(ESS). The fee for the borings at the pump station site and along the force main route is shown in item 3 of the attached spreadsheet. Permitting Permitting will be needed from the COE, MDOT,and Union Pacific. This task will be performed by Donohue and CMPS. The fee for Donohue and CMPS are shown in 4A and 4B respectively. Easements An estimate of 15 parcels will need easements. This task will be performed by CMPS and is included in item 5. Design Donohue will perform the design of the pump station system and force main system. Design includes review and quality control of sub-consultants work and coordination with either respective design team. Also included are meeting with the City Staff to discuss the design at a kick-off meeting and the 30%and 90% design completion levels to discuss the project details and provide an updated cost opinion. Fee includes particular emphasis on erosion control design. Design also includes a QA/QC of the entire project. Bid documents will be prepared either as one package or separate pump station and fare main documents. The proposed fee for design is shown in item G. Expenses Expenses include reproduction costs for documents and mileage from St. Louis to Jefferson City and are shown in Item 7. Special Investigations During the course of the design and/or right-of-way acquisition phase, certain unforseen investigations may be required. Examples may include geotechnical investigations, geotechnical/hydrological investigations for contaminated soil and/or environmental testing, historical investigations, various record searches, grave sites and/or other investigation or analysis work. The work shall be initiated only with the approval of the City and shall be billed to the City at an Hourly Cost. COLE JUNCTION PUMP STATION AND FORCE MAIN IMPROVEMENTS ITEM NO. TASK AND DESCRIPTION FEE 1 Pre-Design Report 1A Donohue Report $43,500.00 Transient Analysis $15,000.00 1B CMPS $7,000.00 !CMPS $72,000.00 TOTAL $65,500.00 HESS $50,0001 ;Donohue 500,500.0 $ 0 2 Topographic Survey �_______.____ 2A Donahue $2,500.00 2B CMPS $44,000.00 TOTAL $46,500.00 3 Geological Survey 3A Donohue $2,500.00 3B ESS $50,000 TOTAL $52,500 4 Permitting 4A Donohue $3,500.00 4B CMPS $14,000.00 TOTAL $17,500.00 5 Easements 5A Donohue $1,000.00 58 CMPS $7,000.00 TOTAL $6,000.00 6 Design Pump Station System $220,000 Force Main $175,000.00 TOTAL $395,000 7 Expenses $7,500 B Special investigations $30,000.00 Original TOTAL $622,500.00 Contract $233,500.00 %of Construction Cost 4,51% - Change Order $389,000.00 Change Order No. Five (5) DEPARTMENT .OF PUBLIC WORKS Wastewater Division 320 EAST McCARTY STREET JEFFERSON CITY, MISSOURI 65101 Project No. 31099 Ord. No. 147,17, 14751 Date: Job & Location: Cole Junction Contractor: Donohue 8 Aswddtes. ........................ ................... ...... ---- -- --......... ............. it is hereby mutually agreed that when this change order has been. signed by the. contracting parties, the following described changes in the work required by the contract shall be executed by the contractor without changing the terms :of the contract except as herein stipulated and agreed. --- .----- _------------------ _--- ,................. .---- ----------- -- - --- - ----------------- Description of Changes: (See attached Sheet for Detailed Description/Explanation Note: Item numbers prefixed with'EW (Extra Work) are new line items to the contract Quantity. Amount of item Quantity in in Overrun or No. Description Unit Contract Change Order Unit. Price Underrun 1,700.00 $11, CONTRACTORS PROPOSAL: FOR THE ABOVE DESCRIBED CHANGES: INVe hereby agree to the modifications of the contract as. described above.and agree to furnish all materials and. labor and perform all work in connection therewithin accordance with the requlrerrients for similar work_ in existing-conVaclexcept as. otherwise stipulated herein; for the: foilowing-considerations: Contract Amount - Add $11,700:00 (Eleven Thousand, Seven Hundred Dollars and No Cents) to the Contract Amount.. Time and .Matertal Not -to Ficeed Contract Tim® — There is no change to the Contract Time. . STATEMENT OF CONTRACT AMOUNT: -- Amount % Change ORIGINAL CONTRACT $533;500.00. PREVIOUS APPROVED CHANGE ORDERS $788;361.00 _ 146%_T 0.9°Io TOTAL THIS CHANGE ORDER $11,700.00 TOTAL OF ALL CHANGE ORDERS $800,061.00 147% ~� l CONTRACTAMOUNTTODATE $1,333;561.00 C-0 0 `! E . /' r �- . Consultant Date Recommended by. ub Works'Director/Division Director late Verification of Encumbrance: Finance Director Date Accepted By: r S (Owner) Mayor D e Approved As To Form: / 5 -X —)' Jqr Ctty ounselor Date a CITY OF JEFFERSON ATTACHMENT TO CHANGE ORDER NO.5 PROJECT NO. 31099 Bidding and Construction Related Services: Incorporation of easement information, and Livingston Ave (as designed by the City and sealed by the City; added as an alternate or addendum) onto the drawings. Plans and specifications to final "Bid Ready" completion for sending to City. SCOPE OF WORK: The services shall include the following: -One set of Pre -final plans and specifications for City to review prior to bid. -Prepare opinion of cost for bid purposes. -Prepare agenda and attend Pre-bid meeting. -Respond to technical questions from bidders. -Assist City with issuing Technical Addenda. -Attend pre -construction meeting. - Respond to contractor's technical questions. - Issue Responses to requests for information. -Review shop drawings. - Attend a maximum of two (2) construction progress meetings. - Perform final inspection. -Prepare As-builts from Contractors and City's project representative mark-up's. MEASUREMENT, PAYMENT, AND TIME: Payment will be made as a time and material not -to -exceed Eleven Thousand Seven Hundred Dollars and Zero Cents ($11,700.00).