The Metropolitan St. Louis Sewer District (MSD) is pleased to
provide HUL and RUL approval for the use of the ADS Barracuda MAX
HDS unit as a stand-alone water quality BMP, subject to the
following provisions:
The Barracuda MAX is only approved for use on public highway
and roadway projects, and for redevelopment sites less than
5 acres. This approval is based upon compliance with
requirements listed in MSD's Proprietary Water Quality
Products and the MSD's Stormwater Management Program (Revised
Jan. 2009).
The Barracuda MAX must be sized such that the Maximum
Treatment Flow Rate (MTFR) for the unit exceeds the Water
Quality flow rate calculated for the unit's tributary area.
The Barracuda MAX's approved MTFRs will be those shown in
Table 1 below, to match the certified flow rates provided by
the New Jersey Department of Environmental Protection
(NJDEP). Procedures for calculating the Water Quality flow
rate are provided in Appendix 3.10 of the Maryland Stormwater
Design Manual (2000).
Table 1: Barracuda MAX Models and Approved MTFRs
Model
Manhole
Dim;; eter (ft)
FR (cfs)
50% Max.
Sediment
Storage
Vol e (f t3)
Barracuda
S3
MAX
3
0.85
5.89
Barracuda
S4
MAX
4
1.52
10.47
Barracuda
S5
MAX
5
2.37
16.36
Barracuda
S6
MAX
6
3.40
23.56
Barracuda
S8
MAX
8
6.08
41.89
Barracuda
S10
MAX
10
9.48
65.45
• The Barracuda MAX will be configured as an off-line unit,
downstream from a diversion manhole. In most cases, the BMP
will be installed without the need to store the Water Quality
volume upstream of the unit.
• All devices shall provide a minimum sediment storage capacity
of 10 cubic feet.
All proprietary iids and covers should be captive components.
The minimum size access hole is 30 inches in diameter.
® Confined space entry shall not be a requirement for routine
maintenance. No special tools or attachments should be
required to provide for routine maintenance with a vacuum
pumping truck.
Project specific design calculations and maintenance plans
furnished by the manufacturer must be included within the
project's Stormwater Management Facilities Report prepared by
the consulting engineer.
MSD reserves the ability to withdraw or modify this approval based
on subsequent information, including information indicating that
this BMP does not satisfy MSD rules, requirements, or construction
specifications.
Sincerely,
Curtis Zurliene, PE
Civil Engineer (BMP Committee Chairman)