Loading...
HomeMy Public PortalAboutStormTrap_ApprovalLetter_013123Metropolitan St. Louis Sewer District 2350 Market Street St. Louis, MO 63103-2555 (314) 768-6200 January 31, 2023 StormTrap Mr. Keith Pfeifer 1287 Windham Pkwy Romeoville, IL 60446 RE: Storm Trap Detention System Approval within District Mr. Pfeifer, MSD previously provided a Provisional Use Level (PUL) approval for the StormTrap system in November 2010. The PUL approval allowed for three (3) installations of the StormTrap system within the District and required post-installation documentation from these installations to be provided to MSD. After reviewing the post-installation documentation StormTrap has provided to the District, the District hereby authorizes full approval for the use of the StormTrap detention system, subject to the following terms: • The StormTrap detention system is approved for use on new and redevelopment projects of any size. • The StormTrap system shall be used to provide storage for the Channel Protection design storm (Cpr) and flood protection design storms (QP2>QPioo) • This system may also be used for storage of the Water Quality design storm (WQV) when it is used upstream of and in conjunction with an appropriate, approved water quality BMP. • The StormTrap system is not to be used as a standalone water quality BMP. • Consistent with MSD Rules & Regulations, the use of buried storage shall be avoided on residential projects. • Adequate access and inspection access must be provided. Minimum access diameter is thirty (30) inches. • A concrete bottom is required. No infiltration/volume reduction will be allowed using these systems under this approval. • Ability to handle an HS-20 loading is required. • Project specific design calculations and maintenance plans furnished by StormTrap must be included within the project's "Stormwater Management Facilities Report" prepared by the consulting engineer. Pretreatment measures upstream of the StormTrap system are encouraged by MSD to minimize and facilitate maintenance of the StormTrap system. MSD reserves the ability to withdraw or modify this approval based on subsequent information, including information indicating that this BMP does not satisfy MSD rules, requirements, or construction specifications. Sincerely, Curtis Zurliene, PE Civil Engineer (BMP Committee Chairman) Engineering Department/Development Review Metropolitan St. Louis Sewer District