Loading...
HomeMy Public PortalAbout11-8284 C & I Construction for Work On Pump Station 1 and 2 Sponsored by: City Manager Resolution No.11-8284 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF OPA-LOCKA, FLORIDA, REQUESTING APPROVAL TO AMEND THE CONTRACT OF C&I CONSTRUCTION AND DESIGN, INC. TO PERFORM ADDITIONAL WORK ON PUMP STATIONS 1 AND 2, AS PER CHANGE ORDERS 1, 2 AND 3, INCLUDING A PERFORMANCE AND PAYMENT BOND AGREEMENT, AT A COST NOT TO EXCEED $93,748.00, PAYABLE FROM ACCOUNT NUMBER 35-535630;PROVIDING FOR INCORPORATION OF RECITALS; PROVIDING FOR AN EFFECTIVE DATE. WHEREAS,pursuant to Resolution No. 11-8237,C&I Construction and Design,Inc.,was contracted to perform the rehabilitation of Pump Stations 1 and 2; and. WHEREAS,during the installation of the Force Main at Pump Station 1,C&I discovered that the City Map location of the pipe was not properly mapped,causing the existing pipe to rupture during excavation and a section of the asphalt road to be removed,necessitating a Change Order to restore temporary sewer service and restoration of the road, Change Order 2; and WHEREAS, a visual inspection of the existing pipe at Pump Station 2 revealed severe decay and the possibility of rupturing, and based on the assessment, a Change Order was recommended, Change Order 1; and WHEREAS, a Performance and Payment Bond Agreement was requested, which constitutes Change Order 3; and WHEREAS, the cost of Change Order 1 is $37,088.00, the cost of Change Order 2 is $41,660.00, and the cost of Change Order 3 is $15,000.00,bringing the total cost to Ninety Three • Thousand Seven Hundred Forty-Eight-Dollars ($93,748.00); and WHEREAS,the City Commission of the City of Opa-locka desires to amend the contract of C&I Construction and Design, Inc. to perform additional work on Pump Stations 1 and 2, and Resolution No. 11-8284 approve the Performance and Payment Bond Agreement, as per Change Orders 1, 2 and 3. NOW,THEREFORE,BE IT DULY RESOLVED BY THE CITY COMMISSION OF THE CITY OF OPA-LOCKA: Section 1. The recitals to the preamble are hereby incorporated by reference. Section 2. The City Commission of the City of Opa-locka hereby authorizes the City Manager to amend the contract of C&I Construction and Design, Inc. to perform additional work on Pump Stations 1 and 2, as per Change Orders 1, 2 and 3, including the Performance and Payment Bond Agreement,at a cost not to exceed$93,748.00,payable from Account Number 35- 535630. Section 3. This resolution shall take effect immediately upon adoption. PASSED AND ADOPTED THIS 28th DAY OF September,2011. (61CM A TAYLOR MAYOR Attest to: Approved as to form and legal sufficiency:it tip Deborah S. Irby Jo ep 1 eller City Clerk C'ty Att., ey Resolution No. 11-8284 Moved by: MILLER Seconded by: JOHNSON Commission Vote: 5-0 Commissioner Holmes: YES Commissioner Miller: YES Commissioner Tydus: YES Vice-Mayor Johnson: YES Mayor Taylor: YES QP LOCK\ Ofd �F ng Zc ` g2 \,"ORGT EO MEMORANDUM TO: Mayor Myra L. Taylor Vice-Mayor Dorothy Johnson Commissioner Timothy Holmes Commissioner Rose Ty. s Commissioner G filler FROM: Bryan K. Fin icy• •rim City Manager DATE: SeptembeI 1 RE: Pu 'I Stations 1 and 2 Change Orders Request: A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF OPA- LOCKA, FLORIDA, REQUESTING APPROVAL TO AMEND THE CONTRACT OF C&I CONSTRUCTION AND DESIGN, INC. TO PERFORM ADDITIONAL WORK ON PUMP STATION 1 AND 2 IN AN AMOUNT NOT TO EXCEED NINETY THREE THOUSAND SEVEN HUNDRED FOURTY EIGHT DOLLARS (93,748.00) PAYABLE FROM ACCOUNT NO. 35-535630. THESE CHANGE ORDERS ARE FOR ADDITIONAL WORK DUE TO UNFORSEEN CONDITIONS UNDERGROUND ALSO FOR PERFORMANCE AND PAYMENT BOND REQUESTED AFTER THE AGREEMENT WITH THE CONTRACTOR. Description: C&I Construction and Design, Inc. is the contractor for lift stations 1 & 2 rehabilitation project. While installing 6" force main at Pump Station 1, C&I found that the existing pipe is not located where the City map indicates causing it to be ruptured while excavating. Temporary pipes had to be installed to keep the station operating. In order to install the new pipe, an asphalt section of the road had to be removed causing the need for a change order to restore temporary sewer service and final restoration of the road. The change order for Pump Station 1 totals $37,088.00. CHANGE ORDER# 1 ITEM DESCRIPTION PRICE 1 REMOVAL OF ASPLALT TO INSTALL PIPE (Per City Request) $3,000.00 2 TEMPORARY REPAIR OF FORCEMAIN (Per City Request) $3,500.00 3 ASPHALT RESTORATION FOR NEW PIPE (Per City Request) $22,029.60 4 ADDITIONAL 180' OF PIPE (Per City Request) $5,558.40 5 2FT ROAD EXPANSION REQUIRED PER FDOT(Per City Request) $3,000.00 TOTAL $37,088.00 The City Engineer has conducted a visual inspection of the existing pipe linking Pump Station 2 to the manhole and found that it has decayed considerably where it could rupture anytime. Based on that assessment, he recommends a change order to replace 200 feet of pipe connecting Pump Station 2 to the manhole in order to avoid future problem. The change order also includes additional ornamental work for the diesel engine building at Pump Station 2 to reflect Moorish theme per request of the Building Official of the City as well as other items requested by the city as indicated below. CHANGE ORDER#2 ITEM DESCRIPTION PRICE 1 MOORISH ORNEMENTAL MOLDING (Per City Request) $3,500.00 2 SUMP PUMP NOT SUPPLIED BY CITY(Pre City Request) $2,500.00 3 INSTALL NEW LIGHTING FOR PARK(Per City Request) $2,000.00 4 PERCOLATION TEST(Per City Request) $2,000.00 5 REMOVE AND REPLACE 5 FEET OF BAD SOIL(Per City Request) $4,500.00 6 CONVERT WET WELL INTO MANHOLE (Per City Request) $4,000.00 7 REPLACE 200 FEET OF FORCEMAIN PIPE (Per City Request) $6,160.00 8 ASPHALT RESTORATION FOR NEW PIPE (Per City Request) $10,000.00 9 TREAT AND ABANDON ASBESTOS PIPE (Per City Request) $2,500.00 10 INSTALL NEW WATER LINE PER DERM STD (Per City Request) $4,500.00 TOTAL $41,660.00 The third change order for $15,000.00 is for performance bond requested by the City because it was not part of the RFQ. CHANGE ORDER#3 ITEM DESCRIPTION PRICE 1 PERFORMANCE BOND (Per City Request) $15,000.00 TOTAL $15,000.00 The total of the three change orders in this request is $93,748.00. Account No.: 35-535630 Financial Impact: The stations have approved funding in the FY 2011 budget plan. Implementation Timeline: Immediately Legislative History: Resolution#11-8237 Recommendation(s): Staff recommends approval in order close-out construction of both pump stations and request final inspection from DERM. Analysis: The new force main installation for Pump Station 2 and also the installation location of the force main for Pump Station 1 are the due to unforeseen conditions as revealed during construction and the approval of the change order is a required to complete the station per DERM requirements. ATTACHMENTS 1. Letters from C&I Construction 2. Change Order#1 for pump station 1 3. Change Order#2 for pump station 2 4. Change Order#3 for pump stations 1 & 2 5. Resolution#11-8237 6. Copy of agreement with C&I Construction PREPARED BY: Mohammad Nasir,PE,City Engineer END OF MEMORANDUM