Loading...
HomeMy Public PortalAbout1990-78Member 72-)z4zete d moved its adoption: introduced the following Resolution CITY OF MEDIN RESOLUTION N0. 5� �j PERMIT/RESOLUTION FOR PUBLIC UTILITY INSTALLATION IN CITY RIGHT OF WAY WHEREAS , a public utility licensed to do busine in the City to the City for the installat on of located at within the City of Medina; "GGrx-ezir d ( Cl c4 44 tdiina, has made application NOW, THEREFORE, BE IT RESOLVED that said application be granted in accordance with the plans and specifications submitted, subject to the following conditions: 1. Street and Right of Way shall be restored to their original condition upon completion of Installation and Applicant shall be liable for settlement or other damage caused by said installation for a period of the year following completion. 2. Completion Date: 3. Performance Bond in the Amount of: 4. Depth of Conduit. 5. City Clerk • The motion for the doption in the foregoin_ Resolution is duly ser:onded by Member `^i'/(����.,� and upoil vote being there the follo�•ing voted in favor Hereof: C�-t�e-vL j f-te j n and the following voted against uJ/ kc►-,7z.a whereupon said Resolution was declared passed and adopted. Adopted by the City Council this /1 day of taken inns asco° A Company of Diversified Energies, Inc. A738-90 APPLICATION FOR PERMIT TO INSTALL UTILITIES OR TO PLACE UNDERGROUND CONSTRUCTION City of Medina Permit no. Name of party or organization performing work MINNEGASCO, INC. Address P.O. Box 1165, Mpls., MN55440-1165 Telephone 342-036 .Toter Roved 1. Nature of work V'gas main installation ❑ gas service installation ❑ other Type of surface to be disturbed As Required (Check type) ❑ Gravel ❑ Bituminous ❑ Concrete Boulevard 2. Location Willow Drive See Attached Drawings Street, avenue and house number (Additional information attached when necessary) 3. Size and kind of pipe, conduit or cable 3�r Depth from surface ❑ 2.5 feet ± ']X3 feet ± Dimensions of excavation As Required 4. Methodof installation or construction (including method of compaction and excavation) In accordance with procedures described in Minnegasco Operations Manual: Procedures, Plastic, CL6 Section 500, `Installation", the most recent edition on file with the permitting authority. Machine excavation: Yes X No 5. Work to start within 30 days and be completed within 3n days thereafter. 6. Wi11 detouring of traffic be necessary? If so, describe routing: For MINNEGASCO, INC. (Applicant) Signed by Ld Date The date when work is completed must be reported to the person designated by municipality. AUTHORIZATION OF PERMIT Upon payment of permit fee in the amount of $ and in consideration of the agreement to comply in all respects with the street or alley excavation ordinances and regulations applicable covering such operations, permission is hereby granted for the work to be done as described in the above application, said work to be done in accordance with special precautions required, as hereby stated: It is expressly understood that this permit is conditioned upon replacement or restoration of the road surface to its proper condition in accordance withthe appropriate rules and regulations. It is -further understood that this permit is subject to revocation within ten (10) days of receipt of copy of application by the county engineer when the permit is for work on a county road. APPROVED DATE A11 requirements shown on reverse side to be complied with. White copy —applicant. Yellow —Municipality Engineer. Blue —Municipality Street Superintendent. Form 16 R7/88 RULES PERTAINING TO STREET AND ALLEY EXCAVATIONS SAFETY 1. Excavations shall be properly protected and identified by barricades and flags in the daytime, and flares, red lanterns or flashing signals at night. 2. Barricades shall be erected so they provide suitable visibility in all directions. 3. Excavations must be cribbed when necessary, depending upon type of soil, in order to prevent cave-ins. 4. No guys or stays should be attached to trees on right-of-way. 5. Underground construction must be constructed so it will not harm or unnecessarily destroy the root growth of trees. ROADWAY 1. Installation of pipe under concrete or high type bituminous pavements shall be done by jacking or boring unless otherwise authorized by engineer. 2. All backfilling must be placed in 6-inch layers and thoroughly tamped; material must be flush and even with the road surface when finally in place, unless engineer authorizes alternate method of construction. 3. Finished surface, base, and sub -base of road after excavation and backfill shall be at least equal in stability to finished surface, base, and sub -base prior to excavation. 4. Concrete pavement shall be replaced according to specifications provided by the engineer. 5. If settlement or excavation caves in within one year of completion date so materials settle (bituminous mat or concrete base), it shall be restored to its original condition by the holder of this permit. 6. No pole anchors, anchors, braces, or other construction shall be put on roadway shoulder except by special authorization. 7. There will be no driving onto highway from ditch or driving on shoulders except when authorized by the engineer; if damage occurs, permit holder will make proper repairs. 8. No machine excavation shall be permitted except when noted in application for permit. 9. Excavations greater than four feet in width at top of trench will not generally be permitted and may be made only when expressly provided for on the permit. 10. Street may not be closed to traffic unless expressly authorized by the permit. LIMITATIONS 1. No lugs which will damage the road surface shall be used on equipment traversing road. 2. Roadside shall be cleaned up after work is completed. 3. The permit holder shall notify the municipality issuing the permit and, when applicable, the county engineer within 24 hours, (Saturdays, Sundays and legal holidays excluded) that the work has been completed and is ready for final inspection. 4. The county engineer shall notify the applicant of any objection the county may have to the application within 10 days of receiving the permit application. © 1988 Minnegasco, lnc. A Company of Diversified Energies, Inc. t i v i.,.,4 A 73 MINNEGASCO MAIN JOB i\ SCA4Le: /2.00' �W/NGO 4(,35 :.) DQ I Al Cic F{w y .S"6' ZIr± W S. fvig..Locc), _LXIS 7.4(-L .3" .4),x_n,c) sTr,p) EIJD C,4-P3 7/VST,AL.L 3" AtvSrnD,v V /SLFE'ver /7*.4e100G GV I 1411 01 1611 42-101 13171‘.131 MAJOR MINOR SUFFIX IIIrI/1 PROJECT LOCATN 141713 IS 111013101 I Pl WORK ORDER SIZE `YPE a-Nsr'A4- �. 13S+ u 2vu-a,r✓G slfeve 443s `ONE CALL: Quadrant Section Twp./Range 7i18 , �23 NE %9 4 Pipe Required ROO' 3 "-r":2 e, - 4. Total Pipe mint Main will lie _.3' ft. f6" below existing grade PERMITS REQUIRED St. Hwy. R.R. Co. Rd. City of /b1D1 NA Addition Map work needed Ye ❑ No g DESIGNED BY 943 BPy DATE TEL.NO. .347 --1, 4'34. 4Y/2i9v DESIGN APPROVED ° iOP2196 RELEASE FOR CONST. R rUSCo P / 0/3 Form 299M R3/90 ID007