HomeMy Public PortalAboutMSD Wage Order 7-23 DraftMETROPOLITAN ST. LOUIS SEWER DISTRICT
WAGE ORDER NO. 07-23
EFFECTIVE 07/01/2023
*The Division of Labor Standards received less than 1,000 reportable hours for this occupation title. Hourly rate was
based on applicable Collective Bargaining Agreements.
OCCUPATIONAL TITLE BUILDING CONSTRUCTION
HOURLY RATES
HIGHWAY AND HEAVY BASIC
HOURLY RATES
Asbestos Worker $66.79
Boilermaker * $80.15
Bricklayer $61.81
Carpenter $61.84 $61.82
Lather
Linoleum Layer
Millwright
Pile Driver
Cement Mason $57.29 $57.16
Plasterer
Communications Technician $63.78
Electrician (Inside Wireman) $70.27
Electrician Outside Lineman $85.68 $55.16
Lineman Operator
Lineman -Tree Trimmer
Groundman
Groundman - Tree Trimmer
Elevator Constructor $99.41
Glazier $65.25
Ironworker $66.48 $66.29
Laborer $52.57 $52.57
General Laborer
First Semi-Skilled
Second Semi-Skilled
Mason $53.52
Marble Mason
Marble Finisher
Terrazzo Worker
Terrazzo Finisher
Tile Setter
Tile Finisher
Operating Engineer $67.48 $67.48
Group I
Group II
Group Ill
Group 111-A
Group IV
Group 4A
Painter $52.61 $52.61
Plumber $73.33
Pipefitter
Roofer $55.72
Sheet Metal Worker $72.25
Sprinkler Fitter $73.58
Truck Driver* $51.65* $52.44
Truck Control Service Driver
Group I
Group II
Group Ill
Group IV
METROPOLITAN ST. LOUIS SEWER DISTRICT
WAGE ORDER NO. 07-23
EFFECTIVE 07/01/2023
*The Division of Labor Standards received less than 1,000 reportable hours for this occupation title. Hourly rate was
based on applicable Collective Bargaining Agreements.
Use Heavy Construction Rates on Highway and Heavy construction in accordance with the classifications of construction
work established in 8 CSR 30-3.00(3).
Use Building Construction Rates on Building construction in accordance with the classifications of construction work
established in 8 CSR 30-3.040(2)
If a work is performing work on a heavy construction project within an occupational title that is not listed on the Heavy
Construction Rate Sheet, use the rate for that occupational title as shown on the Building Construction Rate Sheet.
OVERTIME
For all work performed on a Sunday or a holiday, not less than twice (2x) the prevailing hourly rate of wages as stated
above shall be paid to all workers employed by or on behalf of the District on projects subject to the District’s Prevailing
Wage Rules.
For all overtime work performed, not less than one and one-half (1½) the prevailing hourly rate of wages as stated above
shall be paid to all workers employed by or on behalf of the District on projects subject to the District’s Prevailing Wage
Rules. “Overtime work” shall include work that exceeds ten hours in one day and work in excess of forty hours in one
calendar week; and
A thirty-minute lunch period on each calendar day shall be allowed for each work on a project subject to the District’s
Prevailing Wage Rules, provided such time shall not be considered as time worked.
HOLIDAYS
January 1st
The last Monday in May
July 4th
The first Monday in September
November 11th
The fourth Thursday in November
December 25th
If any holiday falls on a Sunday, the following Monday shall be considered a holiday.