Loading...
HomeMy Public PortalAbout16166 Upper River Des Peres and River Des Peres Tributaries Storage Tunnel (12441) HDRORDI NANCE NO. 16166 AN ORDINANCE, making a supplemental appropriation of Two Million Two Hundred Thousand Dollars ($2,200,000.00) from the Sanitary Replacement Fund to be used for pre-design in Upper River Des Peres and River Des Peres Tributaries Storage Tunnel (12441) in various municipalities and Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to amend Contract No. 20202 with HDR Engineering, Inc. for pre-design. WHEREAS, Ordinance No. 13969, adopted October 9, 2014, appropriated the initial funding for and authorized Contract No. 20202; and WHEREAS, the Director of Finance has certified that there is an unencumbered balance in the above-named fund sufficient to pay the obligation authorized herein. NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of Two Million Two Hundred Thousand Dollars ($2,200,000.00) is hereby appropriated from the Sanitary Replacement Fund to be used for pre- design in Upper River Des Peres and River Des Peres Tributaries Storage Tunnel (12441) in various municipalities and Unincorporated St. Louis County, Missouri. Section Two. The Executive Director and Secretary-Treasurer are hereby authorized on behalf of The Metropolitan St. Louis Sewer District to amend Contract No. 20202 with HDR Engineering, Inc. for pre-design in Upper River Des Peres and River Des Peres Tributaries Storage Tunnel (12441) in various municipalities and Unincorporated St. Louis County, Missouri; and said contract shall be comprised of such other terms and conditions as are approved by the Office of the General Counsel of the District. The foregoing Ordinance was adopted August 10, 2023