Loading...
HomeMy Public PortalAbout1677th Board Agenda 10-12-20231 UPDATED 10/11/2023 AGENDA 1677th MEETING OF THE BOARD OF TRUSTEES METROPOLITAN ST. LOUIS SEWER DISTRICT October 12, 2023 5:00 P.M. ROLL CALL & PUBLIC BOARD MEETING MSD OFFICES 2350 MARKET STREET ROOM 109 1.ROLL CALL 2.APPROVAL OF THE JOURNAL OF THE PRECEDING MEETINGS: o September 14, 2023 • 1675th Meeting o September 27, 2023 • 1676th Special Tax Levy Meeting 3.COMMENTS BY THE CHAIR 4.REPORT OF THE BOARD COMMITTEES: o Program Management Committee o Finance Committee o Stakeholder Relations Committee 5.REPORT OF EXECUTIVE DIRECTOR 6.COMMENTS FROM THE PUBLIC To observe the Board meeting remotely, you may access the meeting at: MSD Streaming Meetings -Metropolitan St. Louis Sewer District (msdprojectclear.org). To submit your comments and questions for the Board Meeting, please email: BoardComments@stlmsd.com no later than 12:00pm, the day of Board meeting, October 12, 2023. 7.SUBMISSION OF PUBLIC HEARING REPORTS 8.COMMUNICATIONS 9.CONSENT AGENDA: - Items 10 through 28 Members of the public are invited to attend MSD Board of Trustees meetings in person, attendees are welcome, though seating will be somewhat restricted by seating spacing. MSD will continue to live stream all Board of Trustees meetings at www.youtube.com/msdprojectclear indefinitely. 2 CONSENT AGENDA Item # ORDINANCES 10 Adoption of Ordinance No. 16204 - CSO Volume Reduction Green Infrastructure – Apiary at the Park (14009) Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into an agreement with HGS, LLC dba RES Environmental Operating Company, LLC, for cost sharing for green infrastructure construction in CSO Volume Reduction Green Infrastructure – Apiary at the Park (14009) in the City of St. Louis, Missouri. 11 Adoption of Ordinance No. 16205 - CSO Volume Reduction Green Infrastructure – Doorways Phase II – Elliot Place (13853) Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into an agreement with Interfaith Residences DBA Doorways, for cost sharing for green infrastructure construction in CSO Volume Reduction Green Infrastructure – Doorways Phase II – Elliot Place (13853) in the City of St. Louis, Missouri. 12 Adoption of Ordinance No. 16206 - CSO Volume Reduction Green Infrastructure – Peace Park (14016) Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into an agreement with LRA c/o Green City Coalition, for cost sharing for green infrastructure construction in CSO Volume Reduction Green Infrastructure – Peace Park (14016) in the City of St. Louis, Missouri. 13 Adoption of Ordinance No. 16207 - CSO Volume Reduction Green Infrastructure – Project Terminus (14014) Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into an agreement with Procter & Gamble Manufacturing Company, for cost sharing for green infrastructure construction in CSO Volume Reduction Green Infrastructure – Project Terminus (14014) in the City of St. Louis, Missouri. 14 Adoption of Ordinance No. 16208 - CSO Volume Reduction Green Infrastructure – Ronald McDonald House (14022) Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into an agreement with Ronald McDonald House Charities, for cost sharing for green infrastructure construction in CSO Volume Reduction Green Infrastructure – Ronald McDonald House (14022) in the City of St. Louis, Missouri. 15 Adoption of Ordinance No. 16209 - CSO Volume Reduction Green Infrastructure – Urban League (14015) Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into an agreement with Urban League of Metropolitan St. Louis, Inc., for cost sharing for green infrastructure construction in CSO Volume Reduction Green Infrastructure – Urban League (14015) in the City of St. Louis, Missouri. 16 Adoption of Ordinance No. 16210 - Dearborn Dr Storm Sewer (11205) Making a supplemental appropriation of Seventy-Five Thousand Dollars ($75,000.00) from the Operations, Maintenance, Construction and Improvement Fund of Deer Creek to be used for storm sewer construction in Dearborn Dr Storm Sewer (11205) in the City of Warson Woods, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to appropriate additional funds to Contract No. 22253 with Gershenson Construction Co., Inc. for storm sewer construction. 17 Adoption of Ordinance No. 16211 - Lemay WWTF Repairs and Improvements (2023) (Grit Tanks and Secondary Clarifier Duct Bank) (13153) Making a supplemental appropriation of Five Million Three Hundred Thousand Dollars ($5,300,000.00) from the Sanitary Replacement Fund to be used for wastewater treatment plant construction in Lemay WWTF Repairs and Improvements (2023) (Grit Tanks and Secondary Clarifier Duct Bank) (13153) in Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to appropriate additional funds to Contract No. 22192 with Goodwin Brothers Construction Co. for wastewater treatment plant construction. 3 18 Adoption of Ordinance No. 16212 - Biddle 1307 Combined Sewer And Junction Chamber Repair (13701) Making an appropriation of Five Hundred Thirty Thousand Dollars ($530,000.00) from the Sanitary Replacement Fund to be used for combined sewer construction in Biddle 1307 Combined Sewer And Junction Chamber Repair (13701) in the City of St. Louis, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 53008 with Bates Utility Company, Inc. for combined sewer construction. 19 Adoption of Ordinance No. 16213 - Cross Timbers #705 Sanitary Replacement (13163) Making an appropriation of Eight Hundred Seventy-Five Thousand Dollars ($875,000.00) from the Sanitary Replacement Fund to be used for sanitary sewer construction in Cross Timbers #705 Sanitary Replacement (13163) in the City of Town & Country, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 53007 with Keeley Construction Group, Inc. for sanitary sewer construction. 20 Adoption of Ordinance No. 16214 - Valley Sanitary Relief Phase III (13444) Making an appropriation of Five Million One Hundred Fifty Thousand Dollars ($5,150,000.00) from the Sanitary Replacement Fund to be used for sanitary sewer construction in Valley Sanitary Relief Phase III (13444) in the Cities of Clarkson Valley and Ballwin, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 53014 with Pace Construction Company, LLC for sanitary sewer construction. 21 Adoption of Ordinance No. 16215 - Wilton Lane Pump Station (P-412) Replacement and Storage (12288) Making an appropriation of One Million Two Hundred Thousand Dollars ($1,200,000.00) from the Sanitary Replacement Fund to be used for pump station improvements in Wilton Lane Pump Station (P-412) Replacement and Storage (12288) in the City of Kirkwood, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 53016 with Kelpe Contracting, Inc. for pump station improvements. 22 Adoption of Ordinance No. 16216 - Fairway Ct 3901 Bank Stabilization (10895) Making an appropriation of Four Hundred Eighty Thousand Dollars ($480,000.00) from the Operations, Maintenance, Construction, and Improvement Fund of Coldwater Creek to be used for channel stabilization in Fairway Ct 3901 Bank Stabilization (10895) in the City of St. Ann, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 53015 with Wehmeyer Farms, Inc. for channel stabilization. 23 Adoption of Ordinance No. 16217 - Litzsinger #10412 Storm Sewer Improvements (12900) Making an appropriation of Seventy-Five Thousand Dollars ($75,000.00) from the Operations, Maintenance, Construction, and Improvement Fund of Deer Creek to be used for storm sewer construction in Litzsinger #10412 Storm Sewer Improvements (12900) in the City of Frontenac, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 53010 with ASKR Construction LLC for storm sewer construction. 24 Adoption of Ordinance No. 16220 - Infrastructure Repairs (Facilities) (FY2024) (12998) Making an appropriation of Three Million Dollars ($3,000,000.00) from the Sanitary Replacement Fund to be used for repair, replacement, or improvement projects to address needs at facilities in Infrastructure Repairs (Facilities) (FY2024) (12998) at various locations throughout the District. 25 Adoption of Ordinance No. 16221 - Conway Road Sanitary Relief (Conway Ln to Dwyer Ave) (12130) Declaring the necessity for the acquisition of easements and temporary easements in certain real property within The Metropolitan St. Louis Sewer District for the purpose of construction of sewers and related appurtenances in the project known as Conway Road Sanitary Relief (Conway Ln to Dwyer Ave) (12130) in the City of Ladue, Missouri to serve the needs of residents of the area, and authorizing staff to proceed with further condemnation efforts related to the project, including but not limited to the purchase and/or the filing of all necessary court pleadings or documents to commence and prosecute formal legal proceedings for the acquisition of said easements and temporary construction easements. 26 Adoption of Ordinance No. 16222 - N Clay 728 Sanitary Relocation (13515) Declaring the necessity for the acquisition of easements and temporary easements in certain real property within The Metropolitan St. Louis Sewer District for the purpose of construction of sewers and related appurtenances in the project known as N Clay 728 Sanitary Relocation (13515) in the City of Kirkwood, Missouri to serve the needs of residents of the area, and authorizing staff to proceed with further condemnation efforts related to the 4 project, including but not limited to the purchase and/or the filing of all necessary court pleadings or documents to commence and prosecute formal legal proceedings for the acquisition of said easements and temporary construction easements. 27 Adoption of Ordinance No. 16223 - Spoede Road Sanitary Sewer Improvements (13623) Declaring the necessity for the acquisition of easements and temporary easements in certain real property within The Metropolitan St. Louis Sewer District for the purpose of construction of sewers and related appurtenances in the project known as Spoede Road Sanitary Improvements (13623) in the Cities of Frontenac and Creve Coeur, Missouri to serve the needs of residents of the area, and authorizing staff to proceed with further condemnation efforts related to the project, including but not limited to the purchase and/or the filing of all necessary court pleadings or documents to commence and prosecute formal legal proceedings for the acquisition of said easements and temporary construction easements. 28 Adoption of Ordinance No. 16224 - TM-01 Two Mile Creek Outfall Sanitary Relief (12231) Declaring the necessity for the acquisition of easements and temporary easements in certain real property within The Metropolitan St. Louis Sewer District for the purpose of construction of sewers and related appurtenances in the project known as TM-01 Two Mile Creek Outfall Sanitary Relief (12231) in the Cities of Huntleigh and Ladue, Missouri to serve the needs of residents of the area, and authorizing staff to proceed with further condemnation efforts related to the project, including but not limited to the purchase and/or the filing of all necessary court pleadings or documents to commence and prosecute formal legal proceedings for the acquisition of said easements and temporary construction easements. UNFINISHED BUSINESS Item # ORDINANCES • None RESOLUTIONS • None NEW BUSINESS Item # ORDINANCES Pg # 29 Introduction of Ordinance No.16228 - CSO Volume Reduction Green Infrastructure - Triumph Academy (13659) 9 Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into an agreement with Fresh Coast Capital, LLC, d/b/a Greenprint Partners, for cost sharing for green infrastructure construction in CSO Volume Reduction Green Infrastructure – Triumph Academy (13659) in the City of St. Louis, Missouri. 30 Introduction of Ordinance No.16229 - Bonfils Pump Station (P-784) Rehabilitation (13439) 10 An appropriation of Seven Hundred Seventy Thousand Dollars ($770,000.00) from the Sanitary Replacement Fund to be used for design of pump station in Bonfils Pump Station (P-784) Rehabilitation (13439) in the City of Bridgeton, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 53036 with Stantec Consulting Services, Inc. for design of pump station. 31 Introduction of Ordinance No.16230 - Deer Creek OMCI Stormwater Design (2024)(Contract A) (12519) 12 An appropriation of Six Hundred Fifty Thousand Dollars ($650,000.00) from the Operations, Maintenance, Construction, and Improvement Fund of Deer Creek to be used for design in Deer Creek OMCI Stormwater Design (2024) (Contract A) (12519) in the Cities of Kirkwood, Ladue, and University City, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 53037 with HR Green, Inc. for design. 5 32 Introduction of Ordinance No.16231 - General Services Agreement – Water Quality Support Services (2024) (13299) 14 An appropriation of One Hundred Fifty Thousand Dollars ($150,000.00) from the Stormwater Regulatory Fund to be used for water quality and environmental regulatory support in General Services Agreement – Water Quality Support Services (2024) (13299) at various locations within the District; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 53039 with HDR Engineering, Inc. for water quality and environmental regulatory support. 33 Introduction of Ordinance No.16232 - Missouri River WWTF Engine Generator Replacement and Digester System Improvements (12556) 15 An appropriation of One Million Fourteen Thousand Dollars ($1,014,000.00) from the Sanitary Replacement Fund to be used for design of improvements in Missouri River WWTF Engine Generator Replacement and Digester System Improvements (12556) in the City of Maryland Heights, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 53035 with CDM Smith, Inc. for design of improvements. 34 Introduction of Ordinance No.16233 - South County Relief Pump Station (P-419) Improvements (12204) 17 An appropriation of Four Hundred Ninety-Four Thousand Dollars ($494,000.00) from the Sanitary Replacement Fund to be used for design of pump station in South County Relief Pump Station (P-419) Improvements (12204) in Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 53034 with Thouvenot, Wade & Moerchen, Inc. for design of pump station. 35 Introduction of Ordinance No.16234 - General Services Agreement – Facility & Sewer Design (2022) Contract A (13098) 19 A supplemental appropriation of Two Hundred Thousand Dollars ($200,000.00) from the Sanitary Replacement Fund to be used for general engineering services in General Services Agreement – Facility & Sewer Design (2022) Contract A (13098) at various locations within the District; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 4 to Contract No. 22119 with Donohue & Associates, Inc. for general engineering services. 36 Introduction of Ordinance No.16235 - Lower Meramec WWTF Expansion Phase II (Design) (12255) 20 A supplemental appropriation of One Million One Hundred Ninety Thousand Five Hundred Dollars ($1,190,500.00) from the Sanitary Replacement Fund to be used for engineering during construction phase services in Lower Meramec WWTF Expansion Phase II (Design) (12255) in Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 11 to Contract No. 21719 with HDR Engineering, Inc. engineering during construction phase services. 37 Introduction of Ordinance No.16236 - Greenbriar #2 Pump Station (P-448) Elimination (12291) 22 A supplemental appropriation of Two Hundred Thousand Dollars ($200,000.00) from the Sanitary Replacement Fund to be used for sanitary sewer construction in Greenbriar #2 Pump Station (P-448) Elimination (12291) in the City of Des Peres and Unincorporated St. Louis County, Missouri. 38 Introduction of Ordinance No.16237- CSO – Brentwood and Red Bud Ave CSO Interceptor (I-118)/Outfall (L-111) Elimination and Sewer Separation (12139) 23 An appropriation of One Million One Hundred Thousand Dollars ($1,100,000.00) from the Sanitary Replacement Fund to be used for utility relocation in CSO – Brentwood and Red Bud Ave CSO Interceptor (I-118)/Outfall (L-111) Elimination and Sewer Separation (12139) in the Cities of Richmond Heights and Clayton, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into an agreement with Ameren – Missouri Company, Spire Missouri Inc, Missouri American Water Company, AT&T Missouri for utility relocation. 6 39 Introduction of Ordinance No.16238 - Infrastructure Repairs (Rehabilitation) (2024) Contract A (13020) 25 An appropriation of Five Million Two Hundred Thousand Dollars ($5,200,000.00) from the Sanitary Replacement Fund to be used for sanitary sewer rehabilitation in Infrastructure Repairs (Rehabilitation) (2024) Contract A (13020) in the City of St. Louis and various municipalities in St. Louis County and Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 53012 with SAK Construction, LLC for sanitary sewer rehabilitation. 40 Introduction of Ordinance No.16239 - Sherwood Dr. #2790 Storm Sewer (11133) 26 An appropriation of Two Hundred Thirty-Five Thousand Dollars ($235,000.00) from the Operations, Maintenance, Construction, and Improvement Fund of Coldwater Creek to be used for storm sewer construction in Sherwood Dr. #2790 Storm Sewer (11133) in Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 53023 with J.H. Berra Construction Co., Inc. for storm sewer construction. 41 Introduction of Ordinance No.16240 - Stormwater Infrastructure Repairs (2024) (13007) 27 An appropriation of Five Million Dollars ($5,000,000.00) from the Districtwide Stormwater Fund to be used for repair, replacement and/or construction of inlets, manholes, sewers, and other infrastructure in Stormwater Infrastructure Repairs (2024) (13007) at various locations throughout the District. 42 Introduction of Ordinance No.16241 - Coldwater Creek OMCI Reimbursements Program (St. Ann Agreement) (13488) 28 Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into an intergovernmental agreement with the City of St. Ann, for cost sharing for municipal stormwater expenditures in Coldwater Creek OMCI Reimbursements Program (St. Ann Agreement) (13488) in St. Louis County, Missouri. 43 Introduction of Ordinance No.16242 - Deer Creek OMCI Reimbursements Program (City of Des Peres Agreement) (13487) 30 Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into an intergovernmental agreement with the City of Des Peres, for cost sharing for municipal stormwater expenditures in Deer Creek OMCI Reimbursements Program (City of Des Peres Agreement) (13487) in St. Louis County, Missouri. 44 Introduction of Ordinance No.16243 - Deer Creek OMCI Reimbursements Program (City of Town and Country Agreement) (13487) 31 Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into an intergovernmental agreement with the City of Town and Country, for cost sharing for municipal stormwater expenditures in Deer Creek OMCI Reimbursements Program (City of Town and Country Agreement) (13487) in St. Louis County, Missouri. 45 Introduction of Ordinance No.16244 - McCutcheon Rd and Thorndell Sanitary Relief (12346) 32 Declaring the necessity for the acquisition of easements and temporary easements in certain real property within The Metropolitan St. Louis Sewer District for the purpose of construction of sewers and related appurtenances in the project known as McCutcheon Rd and Thorndell Sanitary Relief (12346) in the City of Richmond Heights, Missouri to serve the needs of residents of the area, and authorizing staff to proceed with further condemnation efforts related to the project, including but not limited to the purchase and/or the filing of all necessary court pleadings or documents to commence and prosecute formal legal proceedings for the acquisition of said easements and temporary construction easements. 46 Introduction of Ordinance No.16245 - Normandie Sanitary Relief (Page Ave to Saint Charles Rock Road) (12360) 33 Declaring the necessity for the acquisition of easements and temporary easements in certain real property within The Metropolitan St. Louis Sewer District for the purpose of construction of sewers and related appurtenances in the project known as Normandie Sanitary Relief (Page Ave to Saint Charles Rock Road) (12360) in the Cities of Pagedale, Hanley Hills, Bel Nor, and Unincorporated St. Louis County, Missouri to serve the needs of residents of the area, and authorizing staff to proceed with further condemnation efforts related to the project, including but not limited to the purchase and/or the filing of all necessary court pleadings or documents to commence and prosecute formal legal proceedings for the acquisition of said easements and temporary construction easements. 7 47 Introduction and Adoption of Ordinance No.16246 - Oracle EBS 12.1.3 Support Services 35 Authorizing the Executive Director and Secretary-Treasurer on behalf of the Board of Trustees of The Metropolitan St. Louis Sewer District to enter into a contract with Rimini Street, whereby Rimini Street will provide Oracle EBS 12.1.3 Support Services for the District. 48 Introduction of Ordinance No.16247 - Conflict of Interest Policy 36 Repealing Ordinance No. 16201, as adopted September 14, 2023, and enacting a new ordinance in lieu thereof, establishing a Conflict of Interest Policy for District trustees, officers, and employees with an updated Vendor/Contractor/Consultant Conflict of Interest Questionnaire attachment. 49 Introduction and Adoption of Ordinance No.16248 – WIFIA Loan Agreement Amendment 37 Amending the WIFIA loan agreement (WIFIA ID – N17132MO) dated December 19, 2018 between the Metropolitan St. Louis Sewer District and the United States Environmental Protection Agency. 50 Introduction of Ordinance No.16249 - Group Vision Services 2024 38 Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with National Vision Administrators, L.L.C. (NVA) to provide vision plan benefits for the District's employees and family members. 51 Introduction of Ordinance No.16250 - Group Medical Services 2024 39 Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with CIGNA Healthcare to provide medical plan benefits for the District's employees and family members. 52 Introduction of Ordinance No.16251 – Group Dental Services 2024 40 Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with CIGNA Healthcare to provide dental plan benefits for the District's employees and family members. Item # RESOLUTIONS Pg # 53 Adoption of Resolution No. 3859 - Power Systems Studies 41 Resolution No. 3859 will exercise option year three (3) of the contract previously authorized by Ordinance No. 15489, adopted September 10, 2020, which authorized the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Ross & Baruzzini, whereby Ross & Baruzzini would provide power systems studies for the District. 54 Adoption of Resolution No. 3860 – Standard Life Insurance - FMLA 42 The adoption of Resolution No. 3860 will exercise option year two (2) of the contract previously authorized by Ordinance No. 15795, adopted November 10, 2021, which authorized the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Standard Life Insurance Company, whereby Standard Life Insurance Company, would provide FMLA administration Districtwide. 55 Adoption of Resolution No. 3861 – Standard Life Insurance Group Life and ADD 43 The adoption of Resolution No. 3861 will exercise option year two (2) of the contract previously authorized by Ordinance No. 15796, adopted November 10, 2021, which authorized the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Standard Life Insurance Company, whereby Standard Life Insurance Company would provide group life and accidental death and dismemberment insurance Districtwide. 56 Adoption of Resolution No. 3862 – Standard Life Insurance Long Term Disability 44 The adoption of Resolution No. 3862 will exercise option year two (2) of the contract previously authorized by Ordinance No. 15797, adopted November 10, 2021, which authorized the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Standard Life Insurance Company, whereby Standard Life Insurance Company would provide group long-term disability coverage Districtwide. 8 57 Adoption of Resolution No. 3863 – Replacement of Bid Guidelines Resolution 2474 45 The adoption of Resolution No. 3863 will replace Resolution No. 2474, adopted October 3, 2002 ITEMS PROPOSED FOR INTRODUCTION AND ADOPTION AT THE NEXT BOARD MEETING • None ANY OTHER BUSINESS THAT MAY PROPERLY BE BROUGHT BEFORE THE BOARD: CLOSED SESSION - CLOSED SESSION TO DISCUSS LEGAL, CONFIDENTIAL, or PRIVILEGED MATTERS UNDER §610.021(1), RSMO 1988 SUPP. ADJOURNMENT 9 AGENDA ITEM NUMBER: 29 10/12/2023 NAME OF PROJECT: CSO Volume Reduction Green Infrastructure - Triumph Academy (13659) LOCATION: 1409 Linton Ave in the City of St. Louis, Missouri TYPE OF PROJECT: Cost Share for Green Infrastructure Construction (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Authorizes staff to enter into an agreement with Fresh Coast Capital, LLC, d/b/a Greenprint Partners What does action accomplish?: Provides Green Infrastructure Grant for construction of green infrastructure to reduce combined sewer overflows, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: N/A Consultant: N/A Agency: Fresh Coast Capital, LLC, d/b/a Greenprint Partners Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: N/A Designer’s Estimate: N/A Total MWBE Participation: N/A Type of Contract: N/A Properties Affected: N/A Properties Benefiting: N/A Designed by: N/A This ordinance authorizes the District to enter into an agreement with Fresh Coast Capital, LLC, d/b/a Greenprint Partners to provide financial assistance through a Green Infrastructure Grant Program for construction of green infrastructure. The purpose of this project is to reduce combined sewer overflows into the Mississippi River per the Long Term Control Plan. This project will reduce runoff volume with the installation of two (2) bioretention basins and two (2) rain barrels. Total cost of the project is estimated at $707,956 and Fresh Coast Capital, LLC, d/b/a Greenprint Partners is requesting approximately $707,956 reimbursement for the cost of green infrastructure. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2023, Pg. 70 Amount: $5,000,000* Fund Name: #1101 – General Fund Additional Comments: None. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 1/12/2023 – Ord. No. 16037 – Amount: $5,000,000 – CSO Volume Reduction Green Infrastructure (11146) – Supplemental *Requesting Board approval of an ordinance for which $707,956 is being encumbered from Ordinance No. 16037 10 AGENDA ITEM NUMBER: 30 10/12/2023 NAME OF PROJECT: Bonfils Pump Station (P-784) Rehabilitation (13439) LOCATION: North of Taussig Avenue and east of St. Charles Rock Road in the City of Bridgeton, Missouri TYPE OF PROJECT: Design of Pump Station (011.0 Design Phase Project Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a design contract. What does action accomplish?: Implements the design of a CIP project, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: Stantec Consulting Services, Inc. 500 N. Broadway, Suite 1425 St. Louis, MO 63102 Corporate Headquarters: Denver, Colorado Agency: N/A Number of proposers: (5) CDG Engineers, Inc.; Horner & Shifrin, Inc.; Jacobs Engineering Group, Inc.; Stantec Consulting Services, Inc.; Thouvenot, Wade & Moerchen, Inc. Appropriation Amount: $ 770,000 Designer’s Estimate: N/A Total MWBE Participation: MBE = 20.08% WBE = 14.05% (MBE Goal is 18% - WBE Goal is 13%) Custom Engineering – 17.11% - MBE EFK Moen, LLC – 10.48% - WBE Penta Engineering Company, LLC – (2.97) MBE TSi Geotechnical, Inc. – 3.57% - WBE Type of Contract: Lump Sum Properties Affected: 1 Properties Benefiting: 7,500 Designed by: N/A This ordinance authorizes the District to enter into Contract #53036 with Stantec Consulting Services, Inc. for the design of the Bonfils Pump Station (P-784) Rehabilitation (13439) project. Bonfils Pump Station (P-784) Rehabilitation (13439) is a lump sum cost project for the design and preparation of construction documents to construct significant upgrades to the piping, electrical, mechanical and structural systems to avoid failure due to the pump station approaching 35 years of age and construct flood mitigation improvements. The purpose of this project is to replace pumps, an automatic transfer switch, VFDs and control panels, the demolition and removal of unused chemical storage tanks, site improvements to minimize access road and structure flooding, and address structural deficiencies through concrete and lining repairs. The construction cost estimate for this project is $6,339,000. Construction is anticipated to begin in FY2026. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2024, Pg. 4 Amount: $695,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: There were four (4) other proposals considered on this project. The appropriation of $770,000 for design services is $75,000 above the proposed funding for this project presented in the CIP Budget Supplement. The proposed funding appropriation exceeded the budget due to the additional design service needed for completing computational fluid dynamics modeling to analyze problem conditions of the pump station intake and discharge conditions, system head conditions of the force main, and the need for surge protection at the pump station as identified in the consultant 11 proposal. The appropriation includes $622,357 in design services; $30,643 in contingencies and $117,000 for construction phase services. These services include construction field surveys, review of shop drawings and submittals, responding to design questions and changes during construction, as-built surveys, and preparation of as-built record drawings. This project is expected to be funded by Bond proceeds. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 12 AGENDA ITEM NUMBER: 31 10/12/2023 NAME OF PROJECT: Deer Creek OMCI Stormwater Design (2024)(Contract A) (12519) LOCATION: In the Cities of Kirkwood, Ladue and University City, Missouri TYPE OF PROJECT: Design (016.0 Consultant/Vendor Services) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a design contract. What does action accomplish?: Provides for a consultant contract to implement the design of CIP projects. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: HR Green, Inc. 520 Maryville Centre Drive, Suite 100 Chesterfield, MO 63141 Corporate Headquarters: Cedar Rapids, Iowa Agency: N/A Number of proposers: (3) HR Green, Inc.; Intuition & logic Engineering Inc.; TREKK Design Group, LLC Appropriation Amount: $650,000.00 Designer’s Estimate: N/A Total MWBE Participation: MBE = 18.24%, WBE=14.17% (MBE Goal is 18% - WBE Goal is 13%) EFK Moen, LLC – 14.170% - WBE Millennia Professional Services (Asian American) – 18.24% - MBE Nafe & Associates Landscape Architects, LLC – 0.00% - WBE Type of Contract: Lump Sum Fee Work Properties Affected: N/A Properties Benefitting: Deer Creek Watershed Wide Designed by: N/A This ordinance authorizes the District to enter into Contract #53037 with HR Green, Inc. to provide design services for all projects included in the Deer Creek OMCI Stormwater Design (2024)(Contract A) (12519) project. This project consists of the design and preparation of construction documents for multiple stormwater infrastructure improvement projects. This design contract consists of three (3) potential stormwater infrastructure improvement projects. The construction cost estimate for these projects in FY2023 is $1,776,000. Future construction appropriations for the Deer Creek OMCI Stormwater Design (2024)(Contract A) (12519) projects to be designed as part of this contract are identified below. Project Name Estimated Construction Cost North Harrison Avenue 1030 Storm Sewer (13615) $ 711,000 Old Bonhomme 8444 Storm Sewers (13683) $ 980,000 Warson Road South 2000 Streambank Stabilization (13293) $ 85,000 Total $1,776,000 FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2024, Pg. 140 Amount: $820,000 Fund Name: #5566 – Deer Creek OMCI Fund 13 Additional Comments: There were three (2) other proposals considered on this project. The total appropriation for design services is $170,000 below the total proposed funding presented in the CIP Budget Supplement. The design fee includes an initial investigation of stormwater problems, meeting with property owners to confirm the need for each project, the preparation of construction documents for alleviation of the stormwater problems and construction phase services. These services include construction field surveys, review of shop drawings and submittals, responding to design questions and changes during construction, as-built surveys, and preparation of as-built record drawings. Additional projects may be substituted into the contract if it is determined that there is not a need for an individual project. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 14 AGENDA ITEM NUMBER: 32 10/12/2023 NAME OF PROJECT: General Services Agreement – Water Quality Support Services (2024) (13299) LOCATION: Various Locations Within the District TYPE OF PROJECT: Water Quality and Environmental Regulatory Support (011.0 Design Phase Project Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a contract. What does action accomplish?: Provides regulatory support for water quality issues and other environmental requirements, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: HDR Engineering, Inc. 401 South 18th Street, Suite 300 St. Louis, MO 63103 Corporate Headquarters: Omaha, Nebraska Agency: N/A Number of proposers: (2) Barr Engineering Co. and HDR Engineering, Inc. Appropriation Amount: $150,000.00 Designer’s Estimate: N/A Total MWBE Participation: 0.00% (No MWBE Goal) N/A – There are no MWBE goals for this Professional Services project. Type of Contract: Hourly Billing Rate Plus Reimbursables Properties Affected: N/A Properties Benefitting: N/A Designed by: N/A This ordinance authorizes the District to enter into Contract #53039 for one (1) year with two (2) option years with HDR Engineering, Inc. The purpose of this project is to provide up to $150,000 annually of water quality and other environmental regulatory support to help ensure District compliance with all environmental laws and regulations. This contract will utilize HDR to provide MSD with regulatory support for a wide variety of environmental issues including, MDNR Water Quality Standards (WQS); Total Maximum Daily Loads (TMDLs); Integrated Planning; 303(d) List of Impaired Waters and Listing Methodology Documents; air pollution control; and solid and hazardous waste management. HDR will attend MDNR, EPA, and other regulatory agency meetings; review and comment on draft and proposed environmental regulations and policies; evaluate and interpolate environmental data; and assist District staff with environmental permitting and developing compliance strategies. A scope of work will be developed for each regulatory issue on an as needed basis and the consultant must submit a list of tasks to be performed and the estimated cost, which must be approved by District staff prior to proceeding with each project. The initial contract is for an amount of $150,000. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2024, Pg. 141 Amount: $150,000 Fund Name: #5110 – Stormwater Regulatory Fund Additional Comments: There was one (1) other proposal considered on this project. The appropriation for design services is equal to the proposed funding presented in the CIP Budget Supplement. MSD’s Diversity program issued a waiver and there is not a diversity goal for this contract. However, the consultant has indicated that an effort will be made to utilize MWBE subcontractors as the scope of work is developed for each task. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 15 AGENDA ITEM NUMBER: 33 10/12/2023 NAME OF PROJECT: Missouri River WWTF Engine Generator Replacement and Digester System Improvements (12556) LOCATION: 3455 Creve Coeur Mill Road in the City of Maryland Heights, Missouri TYPE OF PROJECT: Design of Improvements (011.0 Design Phase Project Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a design contract. What does action accomplish?: Implements the design of a CIP project. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: CDM Smith, Inc. 111 West Port Plaza, Suite 630 St. Louis, MO 63146 Corporate Headquarters: Boston, Massachusetts Agency: N/A Number of proposers: (3) Brown and Caldwell, Inc.; CDM Smith, Inc.; Donohue & Associates, Inc. Appropriation Amount: $ 1,014,000 Designer’s Estimate: N/A Total MWBE Participation: MBE = 19.57% WBE = 13.01% (MBE Goal is 18% - WBE Goal is 13%) Custom Engineering, Inc. – 16.52% - MBE Civil Design, Inc. – 11.48% - WBE Engineering Design Source, Inc. – 3.05% - MBE KMB Engineering, LLC – 1.53% WBE Type of Contract: Lump Sum Properties Affected: 1 Properties Benefiting: Missouri River Service Area Designed by: N/A This ordinance authorizes the District to enter into Contract #53035 with CDM Smith, Inc. for the design of the Missouri River WWTF Engine Generator Replacement and Digester System Improvements (12256) project. Missouri River WWTF Engine Generator Replacement and Digester System Improvements (12256) is a lump sum cost project for the design and preparation of construction documents to construct significant upgrades to the cogeneration process and optimize the plant’s overall energy efficiency to extend their useful life. The purpose of this project is to replace the existing engine generators, complete upgrades to electrical components to optimize power distribution across the entire facility, replace dual membrane covers and associated piping instruments and control panels, and construct an enclosure for the gas flare system. The construction cost estimate for this project is $6,571,000. Construction is anticipated to begin in FY2026. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2024, Pg. 44 Amount: $770,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: There were two (2) other proposals considered on this project. The appropriation of $1,014,000 for design services is $244,000 above the proposed funding for this project presented in the CIP Budget Supplement. The proposed funding appropriation exceeded the budget due to the additional design services to install an online biogas quality instrumentation meter and address upgrades to the existing biogas handling system, heat exchanger and air-cooled chiller to meet the requirements for the new generator sets. The appropriation includes $848,237 in design services; $40,763 in 16 contingencies and $125,000 for construction phase services. These services include construction field surveys, review of shop drawings and submittals, responding to design questions and changes during construction, as-built surveys, and preparation of as-built record drawings. This project is expected to be funded by Bond proceeds. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 17 AGENDA ITEM NUMBER: 34 10/12/2023 NAME OF PROJECT: South County Relief Pump Station (P-419) Improvements (12204) LOCATION: 7491 Christopher Drive in unincorporated St. Louis County, Missouri TYPE OF PROJECT: Design of Pump Station (011.0 Design Phase Project Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a design contract. What does action accomplish?: Implements the design of a CIP project, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: Thouvenot, Wade & Moerchen, Inc. 3701 S. Lindbergh Blvd., Suite 100 St. Louis, MO 63127 Corporate Headquarters: Swansea, Illinois Agency: N/A Number of proposers: (5) CDG Engineers, Inc.; Horner & Shifrin, Inc.; Jacobs Engineering Group, Inc.; Stantec Consulting Services, Inc.; Thouvenot, Wade & Moerchen, Inc. Appropriation Amount: $ 494,000 Designer’s Estimate: N/A Total MWBE Participation: 31.29% (MWBE Goal is 31% Combined MWBE) Custom Engineering (African American) – 15.99% - MBE Lion CSG, LLC – 11.45% - WBE TSi Geotechnical, Inc. (African American) – 3.85% - MWBE Type of Contract: Lump Sum Properties Affected: 1 Properties Benefiting: 3,000 Designed by: N/A This ordinance authorizes the District to enter into Contract #53034 with Thouvenot, Wade & Moerchen, Inc. for the design of the South County Relief Pump Station (P-419) Improvements (12204) project. South County Relief Pump Station (P-419) Improvements (12204) is a lump sum cost project for the design and preparation of construction documents to construct significant upgrades to the piping, electrical and mechanical systems and complete structural improvements to avoid failure due to the pump station approaching 40 years of age. The purpose of this project is to replace pumps, motors, VFDs and control panels, improve operator safety by relocating the existing discharge header and valves from the lower level to the first floor, improve the station capacity with the installation of wet weather storage pipes and address structural deficiencies through concrete repairs and replacement of the overhead crane system. The construction cost estimate for this project is $3,592,000. Construction is anticipated to begin in FY2026. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2024, Pg. 49 Amount: $418,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: There were four (4) other proposals considered on this project. The appropriation of $494,000 for design services is $76,000 above the proposed funding for this project presented in the CIP Budget Supplement. The proposed funding appropriation exceeded the budget due to additional HVAC and Odor Control construction improvements that are necessary for the safety of District staff and long term protection and maintenance of District facilities that were identified separately from the budget. The appropriation includes $376,793 in design services; $17,207 in contingencies 18 and $100,000 for construction phase services. These services include construction field surveys, review of shop drawings and submittals, responding to design questions and changes during construction, as-built surveys, and preparation of as-built record drawings. This project is expected to be funded by Bond proceeds. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 19 AGENDA ITEM NUMBER: 35 10/12/2023 NAME OF PROJECT: General Services Agreement – Facility & Sewer Design (2022) Contract A (13098) LOCATION: Various Locations Within the District TYPE OF PROJECT: General Engineering Services (011.0 Design Phase Project Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates additional funds and authorizes staff to amend a design contract. What does action accomplish?: Provides additional funding for the design of small capital improvements and Operations projects, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: Donohue & Associates, Inc. 12400 Olive Blvd., Suite 120 St. Louis, MO 63141 Corporate Headquarters: Sheboygan, Wisconsin Agency: N/A Number of proposers: N/A Appropriation Amount: $200,000.00 Designer’s Estimate: N/A Total MWBE Participation: 25.00% (Overall – 17.34%) (No MWBE Goal) Electrical Design & Control Systems, LLC – 0.00% - WBE (This Amendment – 0.00%) Gonzalez Companies, LLC (Hispanic) – 9.02% - MBE (This Amendment – 0.00%) Lion CSG, LLC - 0.00% - WBE (This Amendment – 0.00%) Type of Contract: Lump Sum Properties Affected: To be determined Properties Benefitting: To be determined Designed by: N/A This ordinance authorizes the District to enter into Amendment No. 4 to Contract #22119 with Donohue & Associates, Inc. for the design of various projects in the CIP and the Operations budgets. This project consists of design of small sanitary, combined, storm sewer, and treatment plant projects as needed throughout the District in support of an ongoing internal design effort. The purpose of this project is to complete an independent review of the original design plans, specifications and structural calculations and the proposed corrective actions for the ongoing Lower Meramec Expansion Phase II project. This contract amendment is for a total maximum amount of $200,000. After this amendment, the total design appropriation will be $1,150,000. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2023, Pg. 17 Amount: $475,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: This supplemental appropriation of $200,000 is also required to complete design services to review shop drawings, daily field reports, requests for information, pile installation and testing, geotechnical testing reports, concrete mix designs, concrete cylinder test breaks and other as-built information for the ongoing construction of the Lower Meramec Expansion Phase II project. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 12/9/21 – Ord. No. 15813 – Amount: $475,000 – Donohue & Associates, Inc. – Original Design Contract No. 22119 10/13/22 – Ord. No. 16007 – Amount: $475,000 – Donohue & Associates, Inc. – Original Design Contract No. 22119 20 AGENDA ITEM NUMBER: 36 10/12/2023 NAME OF PROJECT: Lower Meramec WWTF Expansion Phase II (Design) (12255) LOCATION: South of Interstate 270 and East of Telegraph Road in Unincorporated St. Louis County, Missouri TYPE OF PROJECT: Engineering During Construction Phase Services (011.0 Design Phase Project Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates additional funds and authorizes staff to amend a design contract. What does action accomplish?: Provides additional funding for the design of a CIP project, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: HDR Engineering, Inc. 401 South 18th Street, Suite 300 St. Louis, MO 63103 Corporate Headquarters: Omaha, Nebraska Agency: N/A Number of proposers: N/A Appropriation Amount: $1,190,500.00 Designer’s Estimate: N/A Total MWBE Participation: 7.10% (Overall – 19.60%) (No MWBE Goal) David Mason & Associates, Inc. (African American) – 2.46% - MBE (This Amendment – 6.90%) Intelligent Design & Construction Services, LLC* – 4.64% - WBE (This Amendment – 0.00%) TSI Geotechnical, Inc. (African American) – 0.00% - MWBE (This Amendment – 0.00%) Kowelman Engineering, Inc. – 0.00% - WBE (This Amendment – 3.45%) StratcomRx – 0.00% - WBE (This Amendment – 0.00% KMB Engineering LLC** – 0.00% - WBE (This Amendment – 7.14%) Total = 17.49% *Intelligent Design & Construction Services, LLC is no longer in business. **KMB Engineering LLC is being added as a certified WBE firm under contract amendment No. 8 Type of Contract: Lump Sum Properties Affected: 1 Properties Benefiting: The Entire Lower Meramec Watershed Designed by: N/A This ordinance authorizes the District to enter into Amendment No. 11 to Contract #21719 with HDR Engineering, Inc. for the construction phase services for the Lower Meramec WWTF Expansion Phase II (12255) project. Lower Meramec WWTF Expansion Phase II (12255) is a lump sum cost project for the design and preparation of construction documents to construct the expansion or addition of the following: influent pump station, fine screen and washer compactor system, activated sludge process, primary and secondary clarifiers, trickling filters, piping and isolation system, solids handling system, odor control system, the electrical and instrumentation controls system, and the administration building. The purpose of this project is to increase overall plant capacity to treat future additional flows from the interim Fenton Wastewater Treatment Facility, improve reliability of critical aging facility assets, and to meet current and future regulatory permitting. The construction cost for this project is $114,443,000. Construction began in FY2023. 21 FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2024, Pg. 40 Amount: $1,190,500 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: The appropriation of $1,190,500.00 for design and engineering during construction phase services is equal to the proposal funding in the CIP Budget Supplement. This project includes the replacement of the existing fine screens and washer compactors that have approached their end of life as identified in the Lower Meramec WWTF – Solids Handling Equipment Replacement (13407) project; the installation of a low flow pump, the replacement of two (2) 800 horsepower pumps, and to provide structural supports for three (3) 2,000 horsepower pumps to improve undesirable operating conditions and correct extreme vibratory issues as identified in the Lower Meramec WWTF – Influent Pump Station Improvements (13408) project; and the expansion of staff offices, conference and locker rooms to accommodate additional staff for the plant expansion as identified in the Lower Meramec WWTF – Administration Building Facility Improvements (13409) project. This project is expected to be funded by Bond proceeds. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 10/11/18 – Ord. No. 15027 – Amount: $1,058,000 – HDR Engineering, Inc. – Original Design Contract No. 21719 11/14/19 – Ord. No. 15307 – Amount: $4,000,000 – HDR Engineering, Inc. – Design Contract No. 21719 – Amendment No. 1 11/12/20 – Ord. No. 15542 – Amount: $2,400,000 – HDR Engineering, Inc. – Design Contract No. 20179 – Amendment No. 3 06/09/22 – Ord. No. 15903 – Amount: $1,000,000 – HDR Engineering, Inc. – Design Contract No. 20179 – Amendment No. 8 12/08/22 – Ord. No. 16026 – Amount: $1,238,000 – HDR Engineering, Inc. – Design Contract No. 20179 – Amendment No. 10 22 AGENDA ITEM NUMBER: 37 10/12/2023 NAME OF PROJECT Greenbriar #2 Pump Station (P-448) Elimination (12291) LOCATION: South of Dougherty Ferry Road and east of Barrett Station Road in the City of Des Peres and Unincorporated St. Louis County, Missouri TYPE OF PROJECT: Sanitary Sewer Construction (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates additional funds What does action accomplish?: Provides additional funding for the construction of a CIP project, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: Gershenson Contracting Co., Inc. Previous District Contract: Yes #2 Truitt Drive Eureka, MO 63025 Consultant: N/A Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: $200,000 Designer’s Estimate: $ 396,000 Total MWBE Participation: 17.01% (MBE Goal is 17% - African American) Top to Bottom C.S.L. LLC (African American) 8.33% - MBE Westfall Hauling Inc. (African American) – 3.07% - MBE McKay’s Hauling Company, Inc. (African American) – 5.61% - MBE Type of Contract: Unit Cost Properties Affected: 7 Properties Benefiting: 20 Designed by: Crawford Murphy & Tilly, Inc. The work to be done under Contract #22255 consists of the construction of approximately 928 lineal feet of 8-inch sanitary sewers, the abandondment and filling of one pump station and detention pipe, and the abandonment of approximately 834 lineal feet of sanitary force main, and appurtenances. The purpose of this project is to eliminate Greenbriar #2 Pump Station (P-448) which has exceeded its design life. This project is scheduled to be completed in 260 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY 2023, Pg. 77 Amount: $ 425,000 Fund Name: 6660 - Sanitary Replacement Fund Additional Comments: This supplemental appropriation of $200,000 is necessary due to the additional costs associated with encountering Class A rock excavation. This project was one of five (5) design projects included in Pump Station Repair and Improvement Design (Contract C) (12699). This supplemental appropriation will bring the total appropriation for the project to $590,000. This project is expected to be funded by Bond proceeds. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 01/14/21– Ord. No. 15595 – Amount: $810,000 - Crawford Murphy & Tilly, Inc. - Design Contract No. 22000 05/11/23 - Ord. No. 16093 – Amount: $390,000 – Greenbriar #2 Pump Station (P-448) Elimination (12291) - Original Construction Contract No. 22225 - Gershenson Construction Co., Inc. 23 AGENDA ITEM NUMBER: 38 10/12/2023 NAME OF PROJECT: CSO – Brentwood and Red Bud Ave CSO Interceptor (I-118)/Outfall (L-111) Elimination and Sewer Separation (12139) LOCATION: North of I-64 and East of Brentwood Boulevard in the City of Richmond Heights and Clayton, Missouri TYPE OF PROJECT: Utility Relocation (015.0 Construction, Phase II Project Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into agreements with Ameren–Missouri Company, Spire Missouri Inc, Missouri American Water Company, AT&T Missouri, MCI, Charter What does action accomplish?: Implements the design of a CIP project, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: N/A Agency: Ameren–Missouri Company, Spire Missouri Inc, Missouri American Water Company, AT&T Missouri Number of proposers: N/A Appropriation Amount: $1,100,000.00 Designer’s Estimate: N/A Total MWBE Participation: 0.00% (No MWBE Goal) Type of Contract: Unit Cost Properties Affected: 200 Properties Benefiting: 433 Designed by: Ameren–Missouri Company, Spire Missouri Inc, Missouri American Water Company, AT&T Missouri This ordinance authorizes the District to complete work under Contract #20202 which consists of the relocation of utility poles, gas lines, water lines and overhead utilities that are in conflict with the proposed CSO – Brentwood and Red Bud Ave CSO Interceptor (I-118)/Outfall (L-111) Elimination and Sewer Separation (12139) project. This work will be completed under individual agreements with Ameren–Missouri Company, Spire Missouri Inc, Missouri American Water Company, AT&T Missouri, MCI, Charter prior to the sewer construction project. The CSO – Brentwood and Red Bud Ave CSO Interceptor (I-118)/Outfall (L-111) Elimination and Sewer Separation (12139) project will construct approximately 14,700 feet of 8-inch to 30-inch diameter storm and sanitary/combined sewers and appurtenances, and public and private I/I reduction in the 1247 Meramec Study Area including sewer separation. The purpose of this project is to remove excessive inflow from the combined sewers. This project will provide for the elimination of Interceptor I-118 and CSO Outfall L-111. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2024 Pg. 70 Amount: $3,059,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: This is the first phase of utility relocation for this project (Ameren–Missouri Company- $100,000.00, Spire Missouri Inc- $292,722.00, Missouri American Water Company- $366,215.00, AT&T Missouri- $69,717.00, MCI- $81,945.60, Charter - $2,000.00). The appropriation for utility reimbursement is $1,959,000.00 less than the proposed funding presented in the CIP Budget Supplement. Additional utility relocation may be required during actual sewer construction. This work needs to be completed prior to construction in order to avoid excessive delays in the construction of the CSO – Brentwood and Red Bud Ave CSO Interceptor (I-118)/Outfall (L-111) Elimination and Sewer Separation 24 (12139) project. Additional contingency of $187,400.40 was added to this appropriation for unforeseen changes related to the utility relocation, pavement replacement and restoration. This project is expected to be funded by Bond proceeds. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 8/10/23 – Ord. No. 16161 – Amount: $100,000 – HDR Engineering, Inc. – Design Contract No. 20202 Amendment – Original Appropriation to Project No. 12139 25 AGENDA ITEM NUMBER: 39 10/12/2023 NAME OF PROJECT Infrastructure Repairs (Rehabilitation) (2024) Contract A (13020) LOCATION: All Five Service Areas of the District in the City of St.Louis and Various Municipalities in St.Louis County and Unincorporated St.Louis County, Missouri TYPE OF PROJECT: Sanitary Sewer Rehabilitation (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract. What does action accomplish?: Implements the construction of a CIP project, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: SAK Construction, LLC Previous District Contract: Yes 864 Hoff Road O’Fallon, MO 63366 Consultant: N/A Agency: N/A Number of bidders: 2 Low Bid: $4,987,917.00 High Bid: $5,337,407.08 Appropriation Amount: $5,200,000.00 Designer’s Estimate: $4,000,000.00 Total MWBE Participation: 22.17 % (MBE Goal is 10% - WBE Goal is 10%) David Mason + Associates, Inc (African American) – 11.32% - MBE Girdner Contracting LLC – 8.16% - WBE SweenCo LLC – 2.10% - WBE TraMar Contracting, Inc. dba TraMar Traffic – 0.59% - WBE Type of Contract: Unit Cost Properties Affected: 250 Properties Benefiting: 800 Designed by: District Staff The work to be done under Contract #53012 consists of the rehabilitation of approximately 108,599 lineal feet of sanitary sewers varying in size from 6-inches to 30-inches in diameter, utilizing cured-in-place pipe (CIPP) methods. The purpose of this project is to reduce infiltration into and to rehabilitate older, damaged and deteriorated sanitary sewers throughout the District boundaries. Sewers identified for rehabilitation are identified through the annual CMOM inspection program required by the Consent Decree. This project is scheduled to be completed in 365 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY 2024, Pg. 83 Amount: $4,000,000 Fund Name: #6660 - Sanitary Replacement Fund Additional Comments: This project is expected to be funded by a low interest loan from the State of Missouri, under the State Revolving Loan Fund (SRF). PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 26 AGENDA ITEM NUMBER: 40 10/12/2023 NAME OF PROJECT Sherwood Dr. #2790 Storm Sewer (11133) LOCATION: Area located north of Patterson Road and west of New Halls Ferry Road in unincorporated St. Louis County, Missouri TYPE OF PROJECT: Storm Sewer Construction (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract What does action accomplish?: Implements the construction of a CIP project SUMMARY EXPLANATION/BACKGROUND: Contractor: J.H. Berra Construction Co., Inc Previous District Contract: Yes 5091 Baumgartner Road St. Louis, MO 63129 Consultant: N/A Agency: N/A Number of bidders: 4 Low Bid: $195,434.00 High Bid: $265,000.00 Appropriation Amount: $235,000.00 Designer’s Estimate: $ 167,000 Total MWBE Participation: 20.47% (MBE Goal is 10% - WBE Goal is 10%) XL Contracting, Inc (African American) – 3.84% - MBE ABNA Engineering, Inc (African American) – 6.40% - MBE Site System Landscaping, LLC – 7.68% - WBE Prestige Trucking, Inc – 2.56% - WBE Type of Contract: Unit Cost Properties Affected: 5 Properties Benefiting: 2 Designed by: HR Green, Inc. The work to be done under Contract #53023 consists of the construction of approximately 508 lineal feet of storm sewer, varying in size from 12-inches to 18-inches in diameter, and appurtenances. The purpose of this project is to alleviate yard flooding at 2790 and 2800 Sherwood Drive. This project is scheduled to be completed in 225 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY24, Pg. 164 Amount: $ 245,000 Fund Name: 5564 - Coldwater Creek OMCI Fund Additional Comments: An additional contingency of $20,000 for utility relocation (Electric - $20,000) is included in the appropriation. The designer’s estimate decreased due to updated quantities and materials. This project was one of 9 design projects included in OMCI Stormwater Infrastructure Improvement Design (2021) (13193). PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 02/11/21– Ord. No. 15611 – Amount: $100,000 - HR Green, Inc. – OMCI Stormwater Infrastructure Improvement Design (2021) (13193) - Design Contract No. 22011 27 AGENDA ITEM NUMBER: 41 10/12/2023 NAME OF PROJECT: Stormwater Infrastructure Repairs (2024) (13007) LOCATION: Various Locations Throughout the District TYPE OF PROJECT: Repair Replacement or Construction of Inlets, Manholes, Sewers, and Other Infrastructure (017.0 Work Order Repair Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds for stormwater infrastructure repair, replacement and/or construction projects to be bid through Purchasing. What does action accomplish?: Implements a CIP project. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: N/A Consultant: N/A Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: $5,000,000.00 Designer’s Estimate: N/A Total MWBE Participation: As appropriate for individual projects Type of Contract: N/A Properties Affected: N/A Properties Benefiting: N/A Designed by: District staff FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2024, Pg. 165 Amount: $5,000,000 Fund Name: #5120 – Districtwide Stormwater Fund Additional Comments: This appropriation of $5,000,000 will address stormwater projects consisting of the repair, replacement and/or construction of stormwater inlets, manholes, sewers, and other infrastructure as they are identified by the Operations and Engineering departments at various locations throughout the District. As projects are identified, contractors will be hired by the rules of the Purchasing Ordinance. Staff will periodically update the Board of Trustees of the status of the appropriation. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 28 AGENDA ITEM NUMBER: 42 10/12/2023 NAME OF PROJECT: Coldwater Creek OMCI Reimbursements Program (St. Ann Agreement) (13488) LOCATION: Various Municipalities in the Coldwater Creek Watershed in St. Louis County, Missouri TYPE OF PROJECT: Cost-Share for Municipal Stormwater Expenditures (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Authorizes staff to enter into an intergovernmental agreement with the City of St. Ann in the Coldwater Creek OMCI. What does action accomplish?: Provides financial assistance to municipalities for local stormwater improvements and expenses. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: N/A Consultant: N/A Agency: City of St. Ann, Missouri Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: N/A Designer’s Estimate: N/A Total MWBE Participation: N/A Type of Contract: N/A Properties Affected: N/A Properties Benefiting: N/A Designed by: N/A This ordinance authorizes the District to enter into an intergovernmental agreement with the City of St. Ann for eligible stormwater expenditures where revenue is collected by the Coldwater Creek OMCI subdistrict in St. Louis County, Missouri. Eligible stormwater expenditures include the following: storm sewer and inlet construction; drainage improvements; streambank stabilization and erosion control projects; clearing under bridges or cleaning detention basins; stormwater planning or engineering costs; and other stormwater related expenses as determined appropriate by the District. This agreement is with the City of St. Ann: • St. Ann Golf Course Storm Sewer, Amount: $207,883 The City has completed design services for 1,900 linear feet of storm sewer and appurtenances to address issues with undersized and failing infrastructure. The City will follow with a contract for construction services. This agreement follows an earlier agreement with MSD for stormwater study services reimbursement. The estimated total cost of design and construction is $519,698 and this agreement provides reimbursement up to $207,883. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2021, Page 177 Amount: $995,884* Budgeted: Capital Improvement Program Budget Year: FY2022, Page 147 Amount: $1,076,519** Budgeted: Capital Improvement Program Budget Year: FY2023, Page 148 Amount: $1,076,519*** Fund Name: #5564 – Coldwater Creek OMCI Fund Additional Comments: None PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 29 01/14/21 – Ord. No. 15580 – Amount: $705,381 – Coldwater Creek OMCI Reimbursements Program (13488) - Appropriation 01/13/22 – Ord. No. 15836 – Amount: $1,049,544 – Coldwater Creek OMCI Reimbursements Program (13488) - Supplemental 01/12/23 – Ord. No. 16040 – Amount $1,050,971 – Coldwater Creek OMCI Reimbursements Program (13488) - Supplemental *Requesting Board approval of an ordinance for which $40,037 is being encumbered from Ordinance No. 15580. **Requesting Board approval of an ordinance for which $83,923 is being encumbered from Ordinance No. 15836. ***Requesting Board approval of an ordinance for which $83,923 is being encumbered from Ordinance No. 16040. 30 AGENDA ITEM NUMBER: 43 10/12/2023 NAME OF PROJECT: Deer Creek OMCI Reimbursements Program (City of Des Peres Agreement) (13487) LOCATION: Various Municipalities in the Deer Creek Watershed in St. Louis County, Missouri TYPE OF PROJECT: Cost-Share for Municipal Stormwater Expenditures (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Authorizes staff to enter into an intergovernmental agreement with the City of Des Peres in the Deer Creek OMCI. What does action accomplish?: Provides financial assistance to municipalities for local stormwater improvements and expenses. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: N/A Consultant: N/A Agency: City of Des Peres, Missouri Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: N/A Designer’s Estimate: N/A Total MWBE Participation: N/A Type of Contract: N/A Properties Affected: N/A Properties Benefiting: N/A Designed by: N/A This ordinance authorizes the District to enter into an intergovernmental agreement with the City of Des Peres for eligible stormwater expenditures where revenue is collected by the Deer Creek OMCI subdistrict in St. Louis County, Missouri. Eligible stormwater expenditures include the following: storm sewer and inlet construction; drainage improvements; streambank stabilization and erosion control projects; clearing under bridges or cleaning detention basins; stormwater planning or engineering costs; and other stormwater related expenses as determined appropriate by the District. This agreement is with the City of Des Peres: • City of Des Peres – Brookbend Drive Drainage Improvements – Design, Amount: $29,863 The city will contract for design services for a new curb inlet and piping which will tie into the existing storm sewer system. The estimated cost of the design is $29,863 and this agreement provides reimbursement for up to $29,863. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2022, Page 148 Amount: $1,958,164* Fund Name: #5566 – Deer Creek OMCI Fund Additional Comments: None PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 01/13/22 – Ord. No. 15837 – Amount: $1,563,211 – Deer Creek OMCI Reimbursements Program (13487) Appropriation *Requesting Board approval of an ordinance for which $29,863 is being encumbered from Ordinance No. 15837. 31 AGENDA ITEM NUMBER: 44 10/12/2023 NAME OF PROJECT: Deer Creek OMCI Reimbursements Program (City of Town and Country Agreement) (13487) LOCATION: Various Municipalities in the Deer Creek Watershed in St. Louis County, Missouri TYPE OF PROJECT: Cost-Share for Municipal Stormwater Expenditures (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Authorizes staff to enter into an intergovernmental agreement with the City of Town and Country in the Deer Creek OMCI. What does action accomplish?: Provides financial assistance to municipalities for local stormwater improvements and expenses. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: N/A Consultant: N/A Agency: City of Town and Country, Missouri Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: N/A Designer’s Estimate: N/A Total MWBE Participation: N/A Type of Contract: N/A Properties Affected: N/A Properties Benefiting: N/A Designed by: N/A This ordinance authorizes the District to enter into an intergovernmental agreement with the City of Town and Country for eligible stormwater expenditures where revenue is collected by the Deer Creek OMCI subdistrict in St. Louis County, Missouri. Eligible stormwater expenditures include the following: storm sewer and inlet construction; drainage improvements; streambank stabilization and erosion control projects; clearing under bridges or cleaning detention basins; stormwater planning or engineering costs; and other stormwater related expenses as determined appropriate by the District. This agreement is with the City of Town and Country: • City of Town and Country – 2717 North Ballas Drainage Improvements, Amount: $32,491 The City will contract for engineering services to design curb inlets and area inlets in the vicinity of 2717 and 2621 North Ballas Road. The estimated cost of the design is $32,491 and this agreement provides reimbursement for up to $32,491. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2021, Page 178 Amount: $1,926,895* Fund Name: #5566 – Deer Creek OMCI Fund Additional Comments: None PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 01/14/21 – Ord. No. 15581 – Amount: $1,537,287 – Deer Creek OMCI Reimbursements Program (13487) Appropriation *Requesting Board approval of an ordinance for which $32,491 is being encumbered from Ordinance No. 15581. 32 AGENDA ITEM NUMBER: 45 10/12/2023 NAME OF PROJECT: McCutcheon Rd and Thorndell Sanitary Relief (12346) LOCATION: South of Ridgetop Dr., East of S. McKnight Rd., North of McKnight Woods Ln., and West of S. Brentwood Blvd. in the City of Richmond Heights, Missouri TYPE OF PROJECT: Easement Condemnation DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Authorizes staff to proceed with further condemnation efforts including the filing of all necessary court pleadings or documents. What does action accomplish?: Acquires permanent easements and temporary construction easements to a construct a sanitary sewer project with appurtenances, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: N/A Consultant: N/A Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: N/A District’s Estimate: N/A Total MWBE Participation: N/A Type of Contract: N/A Properties Affected: 4 Properties Benefiting: 206 Designed by: N/A This ordinance authorizes the staff to proceed with further condemnation efforts including the filing of all necessary court pleadings or documents leading to the acquisition of permanent easement and/or temporary construction easements on four (4) parcels of ground located in the City of Richmond Heights, Missouri. The easements and temporary construction easements are needed to construct this project, which consists of the construction of approximately 1,767 lineal feet of 12 inch to 15 inch sanitary sewer and appurtenances. The purpose of this project is to alleviate building backups and overcharging of the sanitary sewer. Currently, the District has been unable to negotiate a settlement with the owners. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2024 Pg. 95 Amount: $1,285,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: None PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 33 AGENDA ITEM NUMBER: 46 10/12/2023 NAME OF PROJECT: Normandie Sanitary Relief (Page Ave to Saint Charles Rock Road) (12360) LOCATION: South of St. Charles Rock Rd, East of North Hanley Rd, North of Page Ave, and West of Pennsylvania Ave. in the Cities of Pagedale, Hanley Hills, Bel Nor and Unincorporated St. Louis County, Missouri TYPE OF PROJECT: Easement Condemnation DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Authorizes staff to proceed with further condemnation efforts including the filing of all necessary court pleadings or documents. What does action accomplish?: Acquires permanent easements and temporary construction easements to a construct a sanitary sewer project with appurtenances, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: N/A Consultant: N/A Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: N/A District’s Estimate: N/A Total MWBE Participation: N/A Type of Contract: N/A Properties Affected: 9 Properties Benefiting: 800 Designed by: N/A This ordinance authorizes the staff to proceed with further condemnation efforts including the filing of all necessary court pleadings or documents leading to the acquisition of permanent easement and/or temporary construction easements on nine (9) parcels of ground located in the Cities of Pagedale, Hanley Hills, Bel Nor and Unincorporated St. Louis County, Missouri. The easements and temporary construction easements are needed to construct this project, which consists of the construction of approximately 8,600 lineal feet of 12-inch to 54-inch sanitary sewer and appurtenances. The purpose of this project is to alleviate building backups, overcharging of the sanitary sewer eliminate Constructed SSO Outfalls BP- 454 and BP-457. Currently, the District has been unable to negotiate a settlement with the owners. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2024 Pg. 98 Amount: $6,000,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: This project will be a priority project as part of MSD’s ARPA Grant submittal to Missouri DNR this month. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 34 PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 09/08/20 – Ord. No. 15489 – Ross & Baruzzini. – Original Contract for a Professional Services Agreement 10/14/21 – Res. No. 3705 – Ross & Baruzzini – Amendment 10/17/2022 – Res. No. 3794 – Ross & Baruzzini - Amendment 35 AGENDA ITEM NUMBER:47 PROPOSED ORDINANCE NO. 16246 NAME OF PROJECT Oracle EBS 12.1.3 Support Services LOCATION: District-wide TYPE OF PROJECT: Professional Service DEPARTMENT REQUESTING ACTION: Information Technology REQUESTED ACTION: Why is this action necessary?: To continue to provide technical and security support of the Oracle EBS system. What does action accomplish?: This action authorizes the district to enter into a one-year contract with one option year with Rimini Street to provide technical support services for the Oracle EBS 12.1.3 system. This action is required for the District to continue to produce payroll, administer employee benefits, and to report and reference historical (prior to 4/17/2023) financial and human resource information. SUMMARY EXPLANATION/BACKGROUND: Contractor: Rimini Street, Inc. Previous District Contract: ORD. NO. 15843 7251 West Lake Mead Blvd., Ste. 500 Las Vegas, NV 89128 Consultants: N/A Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: $450,000 District Estimate: N/A MBE/WBE Participation: N/A Plan Approval Date: N/A Type of Contract: Fixed Annual Contract Properties Affected: N/A Properties Benefiting: N/A Designed by: N/A FUNDING/COST SUMMARY: Budgeted: Information Technology Budget Year: FY24/25 Amount: $450,000 Fund Name: General Fund Additional Comments: Technical and security support services are required through May of FY25 when the following two projects will be completed, and the Oracle EBS System can be retired. The first project replaces the payroll function provided by the Oracle EBS system and is planned to complete January 2024. FY24 cost will be $237,333. The second project will migrate historical financial and human resource data that was not migrated to Oracle Fusion (system that replaced all other functions of the Oracle EBS System) to a reporting application scheduled to complete in May of FY25. FY25 cost will be $183,800 with $28,867 for contingency. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 10/13/2022 - Resolution # 3793 - exercise of option year one of one through November 30, 2023 12/09/2021 - Ordinance No. 15843 - Ordinance authoring staff to enter into contract with Rimini Street 36 AGENDA ITEM NUMBER: 48 Introduction of Proposed Ordinance No. 16247 NAME OF PROJECT: Conflict of Interest Policy LOCATION: District-wide TYPE OF PROJECT: N/A DEPARTMENT REQUESTING ACTION: REQUESTED ACTION: Why is this action necessary?: To update Attachment B of the Conflict of Interest Policy, The Vendor/Contractor/Consultant Conflict of Interest Questionnaire, to include more stringent requirements What does action accomplish?: Establishes more stringent requirements than those specified in RSMo §105.454. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: N/A Consultant: N/A Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: N/A District’s Estimate: N/A MBE/WBE Participation: NA Plan Approval Date: N/A Type of Contract: N/A Properties Affected: N/A Properties Benefiting: N/A Designed by: N/A FUNDING/COST SUMMARY: Budgeted: N/A Budget Year: N/A Amount: N/A Fund Name: N/A Additional Comments: The MSD Charter and State Law prohibit MSD trustees, officers, and employees from engaging in conduct which could be perceived as a conflict of interest. The District enacted its own Conflict of Interest Policy which is updated as needed and maintained on the District website. Missouri Statute, RSMo §105.454(1), restricts certain MSD employees from working on MSD projects for a one-year period after they leave the District, while RSMo §105.476 provides that nothing shall prohibit any political subdivision of the State of Missouri from establishing additional or more stringent requirements than those specified in RSMo §105.454. • Pursuant to RSMo §105.476, MSD intends to impose the restriction that if a former MSD employee is a managing member or controls the operations &/or governance of an entity, then that entity will be disqualified from being awarded the particular MSD contract or project under solicitation or will not be prequalified as the case may be, for a period of one-year after the employee leaves MSD. • MSD will continue the one-year ban that applies under RSMo §105.454. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 09/14/2023 - Ordinance No. 16201 37 AGENDA ITEM NUMBER: 49 INTRODUCTION & ADOPTION OF PROPOSED ORDINANCE NO. 16248 NAME OF PROJECT: Amendment - Wastewater System Revenue Bonds Series 2018A (WIFIA) LOCATION: District-Wide TYPE OF PROJECT: Capital Project Financing DEPARTMENT REQUESTING ACTION: Secretary-Treasurer REQUESTED ACTION: Why is this action necessary?: Board authorization is required for the District to amend the Wastewater System Revenue Bonds Series 2018A Loan Agreement. What does action accomplish?: This Ordinance authorizes amendments to the 2018A WIFIA Loan Agreement to align certain reporting requirements with the new 2023E WIFIA Loan Agreement. SUMMARY EXPLANATION/BACKGROUND: The Series 2023E WIFIA Loan has new reporting timelines and requirements that Staff would like reflected in the 2018A Agreement to ease administration and compliance. Contractor: N/A Previous District Contract: Yes Consultant: Gilmore & Bell, P.C. St. Louis, Missouri Bond Counsel Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: N/A District’s Estimate: N/A MBE/WBE Participation: N/A Plan Approval Date: N/A Type of Contract: Bond Contract Properties Affected: District-wide Properties Benefitting: District-wide Designed by: N/A FUNDING/COST SUMMARY: Budgeted: Bond Issue/Financed Budget Year: Amount: N/A Fund Name: N/A Additional Comments: The Amendment eliminates the need for email notifications to WIFIA/EPA when certain filings are made on EMMA, updates the DUNS language to reflect registration through SAM, and aligns due date for submission of annual financial model to match the timeline in the 2023E WIFIA Loan Agreement so that only one model has to be provided for both loans. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 12/13/2018 - Ordinance 15077 Wastewater System Revenue Bonds Series 2018A (WIFIA) 38 AGENDA ITEM NUMBER: 50 PROPOSED ORDINANCE NO. 16249 NAME OF PROJECT: Group Vision Plan Benefits LOCATION: District-wide TYPE OF PROJECT: Group Vision Insurance Plan DEPARTMENT REQUESTING ACTION: Human Resources Department REQUESTED ACTION: Why is this action necessary?: The district is implementing a new vision insurance plan and entering into a new contract with NVA that will begin effective January 1, 2024. What does action accomplish?: This action authorizes MSD to enter into new contract with NVA to provide vision insurance coverage to the District’s employees and family members. SUMMARY EXPLANATION/BACKGROUND: Contractor: NVA (National Vision Administrators, L.L.C.) Previous District Contract: N/A 1200 Route 46 West Clifton, NJ 07013 Consultant: N/A Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: N/A District’s Estimate: N/A MBE/WBE Participation: N/A Plan Approval Date: N/A Type of Contract: Installment Properties Affected: N/A Properties Benefitting: N/A Designed by: N/A FUNDING/COST SUMMARY: Budgeted: N/A Budget Year: FY24/25 Amount: $82,000/year Fund Name: N/A Additional Comments: During the renewal process for the new plan year commencing January 1, 2024, Gallagher Benefits Services, Inc., solicited bids from (4) vision insurance plan carriers. Based on comparison of the plan cost, networks, additional information received, and recommendation of Gallagher Benefits Services, Inc. the committee elected to implement a vision insurance plan and enter into a contract with NVA effective January 1, 2024, to provide vision insurance coverage for the District’s employees. This is a one-year contract commencing on January 1, 2024 through December 31, 2024 which may be renewed at the option of the District for three (3) additional one-year terms. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 39 AGENDA ITEM NUMBER: 51 PROPOSED ORDINANCE NO. 16250 NAME OF PROJECT: Group Medical Plan Benefits LOCATION: District-wide TYPE OF PROJECT: Group Medical Plan and Stop Loss Coverage DEPARTMENT REQUESTING ACTION: Human Resources Department REQUESTED ACTION: Why is this action necessary?: The current plan year agreement with CIGNA will expire December 31, 2023. What does action accomplish?: This action authorizes MSD to enter into new contract with CIGNA to provide medical coverage to the District’s employees and family members. SUMMARY EXPLANATION/BACKGROUND: Contractor: Cigna Healthcare Previous District Contract: Yes P.O. Box 188037 Chattanooga, TN 37422 - 8037 Consultant: N/A Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: N/A District’s Estimate: N/A MBE/WBE Participation: N/A Plan Approval Date: N/A Type of Contract: Installment Properties Affected: N/A Properties Benefitting: N/A Designed by: N/A FUNDING/COST SUMMARY: Budgeted: N/A Budget Year: FY24/25 Amount: $14,490,000 Fund Name: N/A Additional Comments: During the renewal process for the new plan year commencing January 1, 2024, Gallagher Benefits Services, Inc., solicited bids from (2) medical plan carriers including the incumbent. Based on comparison of the plan cost, networks, additional information received, and recommendation of Gallagher Benefits Services, Inc. the committee elected to enter into a contract with Cigna effective January 1, 2024, to provide medical coverage for the District’s employees. This is a one-year contract commencing on January 1, 2024 through December 31, 2024 which may be renewed at the option of the District for two (2) additional one-year terms. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 40 AGENDA ITEM NUMBER: 52 PROPOSED ORDINANCE NO. 16251 NAME OF PROJECT: Group Dental Plan Benefits LOCATION: District-wide TYPE OF PROJECT: Group Dental Plan DEPARTMENT REQUESTING ACTION: Human Resources Department REQUESTED ACTION: Why is this action necessary?: The current plan year agreement with CIGNA will expire December 31, 2023. What does action accomplish?: This action authorizes MSD to enter into new contract with CIGNA to provide dental coverage to the District’s employees and family members. SUMMARY EXPLANATION/BACKGROUND: Contractor: Cigna Healthcare Previous District Contract: Yes P.O. Box 188037 Chattanooga, TN 37422 - 8037 Consultant: N/A Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: N/A District’s Estimate: N/A MBE/WBE Participation: N/A Plan Approval Date: N/A Type of Contract: Installment Properties Affected: N/A Properties Benefitting: N/A Designed by: N/A FUNDING/COST SUMMARY: Budgeted: N/A Budget Year: FY24/25 Amount: $167,000/year Fund Name: N/A Additional Comments: During the renewal process for the new plan year commencing January 1, 2024, Gallagher Benefits Services, Inc., solicited bids from (2) dental plan carriers including the incumbent. Based on comparison of the plan cost, networks, additional information received, and recommendation of Gallagher Benefits Services, Inc. the committee elected to enter into a contract with Cigna effective January 1, 2024, to provide dental coverage for the District’s employees. This is a one-year contract commencing on January 1, 2024 through December 31, 2024 which may be renewed at the option of the District for two (2) additional one-year terms. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 41 AGENDA ITEM NUMBER: 53 Adoption of Resolution No. 3859 10/12/2023 NAME OF PROJECT: Power Systems Studies LOCATION: Various Locations Throughout the District TYPE OF PROJECT: Power Systems Studies/Arc Flash Assessment – Treatment Plants and Pump Stations DEPARTMENT REQUESTING ACTION: Operations REQUESTED ACTION: Why is this action necessary?: Authorizes staff to exercise option year three (3) of a Professional Services Agreement for Power Systems Studies/Arc Flash Assessments. What does action accomplish?: Provides Operations with electrical power systems studies and arc flash assessments at various District facilities. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: N/A Consultant: Ross & Baruzzini 6 S. Old Orchard Ave. Webster Groves, MO 63119 Agency: N/A Number of proposers: N/A Appropriation Amount: N/A (Per Facility Proposal) Designer’s Estimate: N/A Total MWBE Participation: 0.00% (No MWBE Goal) N/A – There are no MWBE goals for this Professional Services project. Type of Contract: Hourly Billing Rate Plus Reimbursables Properties Affected: MSD Service Area Properties Benefitting: MSD Service Area Designed by: N/A This resolution authorizes the District to enter into an amendment and exercise year three (3) option of services authorized in Ordinance No. 15489, which authorized the District to enter into a four (4) year Professional Services Agreement with Ross & Baruzzini for engineering services throughout the District. FUNDING/COST SUMMARY: Budgeted: Operations Dept. Operating Budget Budget Year: FY2024 Amount: Varies Annually (Approximately $200,000) Fund Name: N/A Additional Comments: The purpose of this contract is to provide District staff with the ability to assess existing electrical power lineups at District facilities and assist District staff in safely operating electrical power lineups. Studies include short circuit analysis, electrical equipment evaluations, protective device coordination analysis, and arc flash hazard risk assessments for all electrical equipment. These studies will assess the electrical hazards in the workplace and provide PPE equipment selection guidelines for District employees based on the arc flash hazard risk. The short circuit analysis and coordination study address protection of electrical equipment and provides recommendations to address system protection and device coordination through a series of connected overcurrent devices. The power system study complies with OSHA 29 1910.132 (PPE), and NFPA 70E (Electrical Safety & Standards). 42 AGENDA ITEM NUMBER: 54 RESOLUTON NO. 3860 NAME OF PROJECT: FMLA Administration Provider LOCATION: District-Wide TYPE OF PROJECT: FMLA Administration DEPARTMENT REQUESTING ACTION: Human Resources Department REQUESTED ACTION: Why is this action necessary? The current plan year agreement with The Standard is due to expire December 31, 2023. What does action accomplish? This action authorizes MSD to exercise its second (2nd) of two (2) option years with The Standard to provide FMLA administration for the District’s employees. SUMMARY EXPLANATION/BACKGROUND: Contractor: The Standard Life Insurance Company Previous District Contract: N/A 1100 SW Sixth Avenue Portland, OR 97204 Consultants: N/A Agency: Number of bidders: N/A Low Bid High Bid: Appropriation Amount: N/A District Estimate: MBE/WBE Participation: N/A Plan Approval Date: N/A Type of Contract: Properties Affected: N/A Properties Benefiting: Designed by: N/A FUNDING/COST SUMMARY: Budgeted: Human Resources Budget Year: 2024/2025 Amount: $14,100 Fund Name: Additional Comments: This Resolution authorizes the District to exercise its second (2nd) of two (2) option years to renew said contract for an additional one-year term with Standard Life Insurance Company for FMLA Administration. Option year two (2) will begin on January 1, 2024 and end on December 31, 2023 at a cost of $14,100 for the year. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 10/13/2022 - Resolution No. 3790 - Exercise option to renew an additional one year 11/10/2021 - Ordinance No. 15795 - Enter a three year agreement with vendor 43 AGENDA ITEM NUMBER: 55 RESOLUTON NO. 3861 NAME OF PROJECT: Group Life Insurance & AD&D Benefits Coverage LOCATION: District Wide TYPE OF PROJECT: Group Life and Accidental Death & Dismemberment Insurance DEPARTMENT REQUESTING ACTION: Human Resources Department REQUESTED ACTION: Why is this action necessary?: The current plan year agreement with The Standard expires December 31, 2023. What does action accomplish?: This action authorizes MSD to exercise its second (2nd) of two (2) option years with The Standard, to continue to provide life and accidental death & dismemberment coverage to the District’s employees. SUMMARY EXPLANATION/BACKGROUND: Contractor: The Standard Life Insurance Company Previous District Contract: N/A 1100 SW Sixth Avenue Portland, OR 97204 Consultant: N/A Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: N/A District Estimate: N/A MBE/WBE Participation: N/A Plan Approval Date: Type of Contract: N/A Properties Affected: N/A Properties Benefitting: N/A Designed by: N/A FUNDING/COST SUMMARY: Budgeted: N/A Budget Year: 2024/2025 Amount: $192,000 Fund Name: N/A Additional Comments: This Resolution authorizes the District to exercise its second (2nd) of two (2) option years to renew said contract for an additional one-year term with Standard Life Insurance Group for Group Life and Accidental Death & Dismemberment Insurance. Option year two (2) will begin on January 1, 2024 and end on December 31, 2024 at a cost of $192,000 for the year. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 10/13/2022 - Resolution No. 3791 - Exercise option to renew an additional one year 11/10/2021 - Ordinance No. 15796 - Enter a three year agreement with vendor 44 AGENDA ITEM NUMBER: 56 RESOLUTON NO. 3862 NAME OF PROJECT: Group Long-Term Disability Coverage Benefits LOCATION: District-wide TYPE OF PROJECT: Group Long-Term Disability Coverage DEPARTMENT REQUESTING ACTION: Human Resources REQUESTED ACTION: Why is this action necessary?: The current plan agreement with The Standard is due to expire December 31, 2023. What does action accomplish?: This action authorizes MSD to exercise its second (2nd) of two (2) option years with The Standard to provide long term disability coverage to the District’s employees. SUMMARY EXPLANATION/BACKGROUND: Contractor: The Standard Life Insurance Company Previous District Contract: N/A 1100 SW Sixth Avenue Portland, OR 97204 Consultant: N/A Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: N/A District’s Estimate: N/A MBE/WBE Participation: N/A Plan Approval Date: N/A Type of Contract: N/A Properties Affected: N/A Properties Benefiting: N/A Designed by: N/A FUNDING/COST SUMMARY: Budgeted: Human Resources Budget Year: 2024/2025 Amount: $170,000 Fund Name: N/A Additional Comments: This Resolution authorizes the District to exercise its second (2nd) of two (2) option years to renew said contract for an additional one-year term with Standard Life Insurance Company for Group Long-Term Disability Coverage. Option year two (2) will begin January 1, 2024 and end on December 31, 2024 at a cost of $170,000 for the year. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 10/13/2022 - Resolution No. 3792 - Exercise option to renew an additional one year 11/10/2021 - Ordinance No. 15797 - Enter into a three-year contract with vendor 45 AGENDA ITEM NUMBER: 57 RESOLUTION NO. 3863 NAME OF PROJECT: Replacement of Resolution 2474 LOCATION: District Wide TYPE OF PROJECT: N/A DEPARTMENT REQUESTING ACTION: Finance REQUESTED ACTION: Why is this action necessary? Resolution 2474 is outdated and needs to be revised. What does action accomplish? Establishes a new resolution with updated language. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: N/A Consultants: N/A Agency: N/A Number of bidders: N/A Low Bid N/A High Bid: N/A Appropriation Amount: N/A District Estimate: N/A MBE/WBE Participation: N/A Plan Approval Date: N/A Type of Contract: N/A Properties Affected: N/A Properties Benefiting: N/A Designed by: N/A FUNDING/COST SUMMARY: Budgeted: N/A Budget Year: N/A Amount: N/A Fund Name: N/A Additional Comments: Resolution 2474 contains language that in the event a low bidder for a District construction project is rejected as non-responsive, and all other responsive bids do not conform to the guidelines in the resolution, the project will be rebid. It allows a contract to be awarded to the next lowest responsive bidder provided their bid does not exceed the bid variance thresholds as identified in the chart below. The resolution has dollar and percentage guidelines that are outdated. Staff wishes to revise the “bid variance” amounts and provide additional clarity regarding timing and explanations to be provided to the Board of Trustees when a recommendation to award a construction contract to the next lowest responsive bidder is made. Staff also wishes to replace the reference to Disadvantage Business Enterprise Criteria (DBE) to Minority or Women Business Enterprise (MWBE) and update the language referring to State Revolving Fund (SRF) criteria to state and federal funding criteria. Project Cost (rejected bid) Bid Variance Resolution 2474 to be Repealed Replace with: $0 - $250,000 not to exceed $30,000 $30,000 $250,000 - $1,000,000 not to exceed 10% or not more than $75,000 not to exceed 10% $1,000,000 - $5,000,000 not to exceed 7.5% or not more than $200,000 not to exceed 7.5% Greater than $5,000,000 not to exceed 5% or nor more than $300,000 not to exceed 5% PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 10/03/2002 - Establishes Resolution No. 2474