Loading...
HomeMy Public PortalAbout1991-80L Member introduced introduced the following Resolution d moved its adoption: CITY OF MEDINA RESOLUTION NO. 9t fD PERMIT/RESOLUTION FOR PUBLIC UTILITY INSTALLATION IN CITY RIGHT OF WAY WHEREAS t//tc_ A 44) , a public utility licensed to1�o business in the City of Medina, has made application to the City for the installation of located at within the City of Medina; NOW, THEREFORE, BE IT RESOLVED that said application be granted in accordance with the plans and specifications submitted, subject to the following conditions: 1. Street and Right of Way shall be restored to their original condition upon completion of Installation and Applicant shall be liable for settlement or other damage caused by said installation for a period of the year following completion. 2. Completion Date: 3. Performance Bond in the Amount of: 4. Depth of Conduit. 5. City Clerk Mayor The motion for the gdoption in the foregoing Resolution is duly sec:onded by Member rbte,s and upon vote being taken thereon the follovV,�pg voted in favor thereof: Ac ro fiv ft, � T�h 1{5 c //, � /€ Neu, and the following voted against 4Jvi✓e i•:hu,reupon said Resolution was declared passed and adopted. Adopted by the City Counci..l. this /-S day of ��fje U1.4 5e v) -56/G.v2� Wright -Hennepin Cooperative Electric Association P.O. Box 330 • Maple Lake • MN 55358-0330 UTILITY PERMIT President 10/03/91 Donald J. Paumen Maple Lake, Mn. Vice President Alvin E. Heinz Rogers, Mn. Secretary -Treasurer E.S. Knickerbocker Annandale, Mn. Directors Byron C. Gustafson Buffalo, Mn. Howard L. Ellis Buffalo, Mn. Chris A. Lantto Annandale, Mn. Thomas Mach Maple Grove, Mn. Sandra Hunz Maple Plain, Mn. Arthur E. Watkins Hamel, Mn. General Manager David P. Larson Buffalo, Mn. Ms. Donna Roehl City Clerk City of Medina 2052 County Road #24 Hamel, MN 55340 PROJECT : Tuckborough Farm 3rd and 4th Ms. Roehl: Enclosed is a map of the above project with our proposed electric layout for your review and approval. Respectfully submitted, Rod Nikula Engineering Man er Mike Dougherty, dir 4 f ld Engineer ************************************************************ YOUR PERMISSION IS REQUESTED FOR THE INSTALLATION OF THE FOLLOWING FACILITIES: 1 - 7.2 Kv cable crossing APPROVED: rfr3��,.%J DATE: /=' / i /' Title ************************************************************ FORM 8-74 REV.12-87 • Hennepin County Toll Free 441-5280 • Wright County Toll Free 1-800-762-1206 • Maple Lake & Locale 963-3131 • 24-Hour Fax (612) 963-3915 TUCKB❑R❑UGH FARM 4TH ADDITION WRIGHT-HENNEPIN ELECTRIC ASS'N DATE: 8-30-91 DWN BY: K. KNUTSON DWG NAME: TUCKB❑R❑ END