HomeMy Public PortalAbout12-8459 Top Ranked Bidder, M.C. Harry & Associates for Engineering Services for the Historic City Hall Sponsored by: City Manager
Resolution No. 12-8459
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF
OPA-LOCKA, FLORIDA AUTHORIZING THE CITY MANAGER TO
NEGOTIATE WITH THE TOP RANKED BIDDER, M.C. HARRY &
ASSOCIATES, INC., SOLICITED UNDER RFP 12-1405100 FOR
ARCHITECTURAL AND ENGINEERING SERVICES FOR THE
REHABILITATION OF HISTORIC CITY HALL BUILDING,
PAYABLE FROM ACCOUNT NUMBER 44-541823.; PROVIDING
FOR INCORPORATION OF RECITALS; PROVIDING FOR AN
EFFECTIVE DATE
WHEREAS,pursuant to RFP 12-1405100, the City of Opa-locka requested proposals for
architectural and engineering services for the rehabilitation of Opa-locka Historic City Hall
Building; and
WHEREAS, the City received five responses to RFP 12-1405100, and invited the top
three (3) firms: 1) RJ Heisenbottle Architects, PA, 2) M.C. Harry & Associates, Inc., and 3)
Bender&Associates Architects, P.A., to make oral presentations; and
WHEREAS, the evaluation committee ranked the top three most responsive bidders,
respectively: and
WHEREAS, upon oral presentation by the top three bidders, the evaluation committee
selected M.C. Harry & Associates, Inc., based on company knowledge and project
understanding, approach to the design solutions for the domes and towers, structural integrity
solutions, project cost control methodology, and their unique qualification for the project; and
WHEREAS, the City Commission of the City of Opa-locka desires to authorize the City
Manager to negotiate with the top ranked bidder M.C., Harry& Associates, Inc., for architectural
and engineering services for the rehabilitation of Opa-locka's Historic City Hall Building.
Resolution No. 12-8459
NOW,THEREFORE, BE IT DULY RESOLVED BY THE CITY COMMISSION
OF THE CITY OF OPA-LOCKA, FLORIDA:
Section 1. The recitals to the preamble herein are incorporated by reference.
Section 2. The City Commission of the City of Opa-locka hereby directs and
authorizes the City Manager to negotiate with the top ranked bidder, M.C. Harry & Associates,
Inc., for architectural and engineering services for the rehabilitation of Opa-locka's Historic City
Hall Building, costs to be payable from Account Number 44-541823.
Section 3. This resolution shall take effect immediately upon adoption.
PASSED AND ADOPTED this 26th day of September, 2012.
YRA AYLOR
MAYOR
Attest to:
J•4nna Flores
In -rim City Clerk
Approved as to form and legal suff iency:
/ / it
Jo• ph"S. "eller v
Atto! ey
Moved by: COMMISSIONER M L R
Seconded by: VICE MAYOR JOHN`•N
Commission.Vote: 3-2
Commissioner Holmes: NO
Commissioner Miller: YES
Commissioner Tydus: YES
Vice-Mayor Johnson: NO
Mayor Taylor: YES
0PPLO k4
0; •0
h. a
O
/9
ApORAT��
City of Opa-Locka
Agenda Cover Memo
Commission Meeting Item Type: Resolution Ordinance Other
Date: 9/26/2012 X
(EnterX in box)
Fiscal Impact: Ordinance Reading: 1st Reading 2nd Reading
(Enter X in box) Yes No (Enter X in box)
x Public Hearing: Yes No Yes No
(Enter X in box) X X
Funding Source: (Enter Fund&Dept) Advertising Requirement: Yes No
Ex: (EnterXin box) X
Account#44-541823
Contract/P.O.Required: Yes No RFP/RFQ/Bid#:
(Enter X in box) RFP#12-1405100
Strategic Plan Related Yes No Strategic Plan Priority Area: Strategic Plan Obj./Strategy: (fist the
(Enter X in box) specific objective/strategy this item will address)
X Enhance Organizational 0
Bus.&Economic Dev um 1. Will restore the Historic
Public Safety - City Hall.
Quality of Education (]
Qual.of Life&City Image N.
Communication ll
Sponsor Name Department:
City Manager Public Works
Short Title:
Authorization for the City Manager to negotiate fee for the Architectural and Engineering Services for the
Historic City Hall Building Rehabilitation
Staff Summary:
The three top ranked bidders were invited for oral presentation in order to make the final recommendations to the
City Commission. The bidders were scored based on project understanding, similar experience,
recommendations for the top rated roofing system, approach to the design solutions for the domes and
towers, recommendations for the structural integrity including spiral stairway, project cost control
methodology, and also the evaluation of how the particular consulting firm is uniquely qualified for this
project.
1
Proposed Action:
Staff recommends negotiating the Architectural and Engineering services fee with the top ranked M.C. Harry &
Associates, Inc.
Attachment:
1. Agenda
2. RFQ Evaluation Summary Sheets
3. Panel Member's evaluation sheet for RFQ package
4. Evaluation Summary for the Oral Presentation
5.Copy of Resolution#12-8388
2
O" p
V' a
r71:4", I�
o
�i ro
O /9
\pP O p aS E0"
Memorandum
TO: Mayor Myra L.Taylor
Vice-Mayor Dor.thy John o
Commissioner Ti .I thy Hol •
Commissioner Ros: Tydus
Commissioner Gail ill
FROM: Kelvin L.Baker,Sr.,City Manag
DATE: September 26,2012
RE: Authorization for the City Manage to negotiate fee for the Architectural
and Engineering Services for the Historic City Hall Building Rehabilitation
Request: A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF OPA-LOCKA,
FLORIDA AUTHORIZING THE CITY MANAGER TO NEGOTIATE WITH THE
TOP RANKED BIDDER M.C. HARRY & ASSOCIATES, INC. SOLICITED UNDER
RFP 12-1405100 FOR ARCHITECTURAL AND ENGINEERING SERVICES FOR
THE REHABILITATION OF HISTORIC CITY HALL BUILDING LOCATED AT 777
SHARAZAD BOULEVARD,OPA-LOCKA,FLORIDA 33054.
Description: The City of Opa-locka requested and received proposals from five (5) bidders for the
Architectural and Engineering Services for the Historic City Hall Building Rehabilitation. The
evaluation committee ranked the three top most responsive bidders based on the criteria listed in
the Request for Qualifications (RFQ) as listed below:
BIDDER SCORE RANK
RJ HEISENBOTTLE ARCHITECTS, P.A. 458 1sT
M.C. HARRY&ASSOCIATES, INC. 443 2ND
BENDER&ASSOCIATES ARCHITECTS, P.A. 415 3RD
These three top ranked bidders were invited for oral presentation in order to make the final
recommendations to the City Commission. The bidders were scored based on project
understanding, similar experience, recommendations for the top rated roofing system, approach to
the design solutions for the domes and towers, recommendations for the structural integrity
including spiral stairway, project cost control methodology, and also the evaluation of how the
particular consulting firm is uniquely qualified for this project. The evaluation panel finalized the
evaluation with the following score:
1
BIDDER SCORE RANK
M.C. HARRY&ASSOCIATES,INC. 400 1ST
RJ HEISENBOTTLE ARCHITECTS,P.A. 371 2ND
BENDER&ASSOCIATES ARCHITECTS, P.A. 345 3RD
Account Number: 44-541823
Financial Impact: The engineering services will be for rehabilitation of Old City Hall in FY 2013.
Implementation Time Line:As soon as possible.
Legislative History: Resolution#12-8388
Recommendation(s): Staff recommends negotiating the Architectural and Engineering services
fee with the top ranked M.C. Harry&Associates,Inc.
Analysis: Based on the presentation M.C. Harry scored the highest points and ranked 1st. MC
Harry provided the original construction drawings which will assist in the preparation of
construction documents for permitting and the restoration of the historic City Hall Buildings.
ATTACHMENT(S):
1. RFQ Evaluation Summary Sheets
2. Panel Member's evaluation sheet for RFQ package
3. Evaluation Summary for the Oral Presentation
3.Copy of Resolution# 12-8388
PREPARED BY: Mohammad Nasir, PE,Interim Public Works Director
Arshad Vigar,PE,Project Utilities Engineer
END OF MEMORANDUM
2
Sponsored by: City Manager
Resolution No. 12-8388
A RESOLUTION OF THE CITY COMMISSION OF THE CITY
OF OPA-LOCKA TO AUTHORIZE THE CITY MANAGER TO
ISSUE A REQUEST FOR PROPOSALS FOR GENERAL
ENGINEERING SERVICES FROM QUALIFYING
ENGINEERING CONSULTING FIRMS, FOR THE
REHABILITATION AND RESTORATION OF HISTORIC
CITY HALL LOCATED AT 777 SHARAZAD BOULEVARD;
PROVIDING FOR INCORPORATION OF RECITALS;
PROVIDING FOR AN EFFECTIVE DATE
WHEREAS, Opa-locka Historic City Hall is in desperate need of rehabilitation and
restoration, due to the mold and moisture, the City seeks qualified, professional consultants,
experienced in servicing of historic building; and
WHEREAS, the rehabilitation will be for FY 2012, funding for the engineering services
will come from CDBG (Account 001512494) dollars assigned to Segal Park, if approved by the
City Commission; and
WHEREAS, the City Commission of the City of Opa-locka desires to authorize the City
Manager to issue a Request for Proposals (RFP) from qualifying engineering consulting firms for
engineering services for the rehabilitation and restoration of Opa-locka Historic City Hall; and
NOW,THEREFORE, BE IT DULY RESOLVED BY THE CITY COMMISSION OF
THE CITY OF OPA-LOCKA, FLORIDA:
Section 1. The recitals to the preamble herein are incorporated by reference.
Section 2. The City Commission of the City of Opa-locka,hereby authorizes the City
Manager to issue a Request for Proposals(RFP) for general engineering services from qualifying
engineering consulting firms, for the rehabilitation and restoration of Opa-locka Historic City Hall,
located at 777 Sharazad Boulevard.
Resolution No. 12-8388
Section 3. This resolution shall take effect immediately upon adoption.
PASSED AND ADOPTED this 1 1`' day of April, 2012.
,MYR TAYLOR
M AYOR
Attest to:
J a Flores
terim City Clerk
Ap. Ived as < n and leg f 'iciency:
l � t
Joser . .: I -r
City /tuom.•
Moved by: COMMISSIONER MtLLER
Seconded by: VICE MAYOR JOHNSON
Commission Vote: 4-1
Commissioner Holmes: NO
Commissioner Miller: YES
Commissioner Tydus: YES
Vice-Mayor Johnson: YES
Mayor Taylor: YES
r
rely, IM& degil
Pt* MON
City of Opa-Locka
Agenda Cover Memo
Commission Meeting 4-11-12 Item Type: Resolution Ordinance Other
Date: X
(EnterX in box)
Fiscal Impact: Ordinance Reading: , 1st Reading 2nd Reading
(Enter X in box) Yes No (Enter X in box)
X Public Hearing: Yes No Yes No
(Enter X in box)
' _ I
Funding Source: (Enter Fund&Dept) Advertising Requirement: Yes No
Advertising 001512494 (Enter X in box) X
CDBG i CDBG
-Contract/P.O.Required: Yes No RFP/RFQ/$id#: �� }
(Enter X in box) N/A
Strategic Plan Related Yes No Strategic Plan Priority Area: Strategic Plan Obj./Strategy: (list the
(Enter X in box) X specific objective/strategy this item will oddres )
Enhance Organizational o
Bus.&Economic Bev 0
Public Safety Q
Quality of Education LJ
Qual.of Life&City image g
Communcation 0
Sponsor Name City Manager Department: Building&Licensing
Short Title:
A Resolution of the City Commission authorizing the City Manager to issue a Request for Proposal from
Engineering companies to prepare documents for the rehabilitation of Historic City Hall building.
Staff Summary:
City Hall was built in 1926.The external envelop of the building including windows and roof are in poor condition
and need to be repaired.
Proposed Action:
Staff recommends approval in order to move ahead with the rehabilitation of Historic City Hall. City
Commission to approve.
Historic City Hall 1
RFP—General Engineering Services
Attachment:
1) Request for Proposal for Rehabilitaion of City Hall Building.
2) Mold & Moisture Evaluation Report prepared by Airquest Environmental, Inc. dated January 19, 2012.
3) City's inspection report dated March 2011.
4) Resolution #08-7363
5) Resolution N10-8041
6) Resolution #10-8107
Historic City Hall 2
RFP-General Engineering Services
rte. ,
a N `
Memorandum
TO: Mayor Myra L.Taylor
Vice-Mayor Dorothy Johnson
Commissioner Timothy Holmes
Commissioner Rose Tydus
Commissioner Gail Miller
FROM: Bryan.K. .nnie,City Manager
DATE: . April 02, 12
RE: Request for Proposal (RFP) for General Engineering Services
Request: A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF OPA-
LOCKA, FLORIDA, AUTHORIZING THE CITY MANAGER TO ISSUE A
REQUEST FOR PROPOSAL (RIP) FOR GENERAL ENGINEERING
SERVICES FOR REHABILITATION OF HISTORIC CITY HALL BUILDING
TO THE CITY FROM RESPONSIVE ENGINEERING CONSULTING FIRMS
FOR THE REHABILITATION OF HISTORIC CITY HALL LOCATED AT
777 SHARAZAD BOULEVARD,OPA-LOCKA, FLORIDA 33054
Description: The purpose of this Request for Proposal is to seek Engineering services from qualified
professional consultants experienced in rehabilitation of historic buildings for rehabilitation of City Hall.
The City will select three consultants to compete in providing professional engineering services, based on
an agreed-upon specific scope of services and fees.
Financial Impact: The engineering services will be for rehabilitation of Old City Hall in FY 2012..
Funding for the engineering services will come from CDBG dollars assigned to Segal Park if approved by
the City Commission,
Implementation Time Line: As soon as possible.
Legislative History: Resolutions#08-7363, 10-8041 and 10-8107
City Hall was built in 1926. The external envelop of the building including roof are in poor condition.
Most of the stucco on exterior walls is being deteriorated because of the water infiltration through the roof
and windows. Visible mold and water damage have been observed on this building. As a result, this is
causing stucco to lose its bond and is affecting the masonry walls.
Recommendation(s): Staff recommends approval in order to move ahead with the rehabilitation of
Historic City Hall.
Analysis: The engineering services from the qualified firms, experienced in the restoration of historic
buildings, will assist City staff and contractors to rehabilitate Historic City Hall.
HCH Rehabilitation, RFP f
General Engineering Companies
Mayor and City Commission
Page 2
April 02, 2012
ATTACHMENT(S): 1)Copy of Request for Proposal for Rehabilitation of City Hall Building.
2)Mold&Moisture Evaluation Report prepared by Airquest Environmental, Inc.
dated January 19, 2012.
3)City's Inspection report dated March 2011.
4)Resolution #08-7363
5)Resolution#10-8041
6) Resolution#10-8107
PREPARED BY: Arshad Vigar, P.E., CFM, Interim Building Director, Building & Licensing
Department
END OF MEMORANDUM
HCH Rehabilitation,RFP 2
General Engineering Companies
CITY OF OPA LOCKA
HISTORIC CITY HALL PRESENTATION
RATINGS
23-Aug-12
COMPANY M C HARRY BENDER R J HEISENBOTTLE
Recommendations for the
structural integrity including
spiral stairway. Max
pts 20
Faye 20 19 19
Mary 20 15 18
Arshad 20 15 20
Howard 20 15 15
Approach to the design solutions
for the domes and towers.
Max pts 20
Faye 20 19 19
Mary 20 15 18
Arshad 20 15 15
Howard 20 15 15
Project cost control
methodology
Max pts 20
Faye 20 19 20
Mary 20 15 15
Arshad 20 20 20
Howard 20 20 20
Project understanding
Max pts 10
Faye 10 9 10
Mary 10 10 10
Arshad 10 10 10
Howard 10 10 10
Similar experience Max
pts 10
Faye 10 8 10
Mary 10 8 10
Arshad 10 10 10
Howard 10, 8 10
CITY OF OPA LOCKA
HISTORIC CITY HALL PRESENTATION
Recommendations for roofing KAI INt3J
system
Max pts 10
Faye 10 9 9
Mary 10 8 8
Arshad 10 8 10
Howard 10 8 10
How firm is uniquely qualified
for this project Max pts 10
Faye 10 9 10
Mary 10 8 10
Arshad 10 10 10
Howard 10 10 10
TOTALS 400 345 371
RANKING
M C HARRY
R J HEISENBOTTLE
BENDER
CITY OF OPA LOCKA
HISTORIC CITY HALL PRESENTATION
RATINGS
23-Aug-12
COMPANY M C HARRY BENDER R J HEISENBOTTLE
Recommendations for the
structural integrity including ii)
spiral stairway. Max /
pts 20
Approach to the design solutions ='?° / /
for the domes and towers.
Max pts 20
Project cost control
methodology O / 5 /'1(�
Max pts 20
Project understanding /
Max pts 10 / 0
9 0
Similar experience Max /O 7 /
pts 10
Recommendations for roofing
system / 0 67 (7
Max pts 10
How firm is uniquely qualified /O / 0
for this project Max pts 10
,c)\) 6,1
Fay,e, Dps ,
Oe-____
CP
CITY OF OPA LOCKA
HISTORIC CITY HALL PRESENTATION
RATINGS
23-Aug-12
COMPANY M C HARRY BENDER R J HEISENBOTTLE
Recommendations for the
structural integrity including
spiral stairway. Max
2-0 1 5
pts 20
Approach to the design solutions
for the domes and towers. 20
Max pts 20 S
Project cost control
methodology
Max pts 20 /5 / S
Project understanding
Max pts 10 /0 /0 /
Similar experience Max
pts 10 /0 g /0
Recommendations for roofing
system
Max pts 10 /t7 $
How firm is uniquely qualified
for this project Max pts 10 /0 /0
/DO 7 9 F9
API NwPNS / l
1
iV
CITY OF OPA LOCKA
HISTORIC CITY HALL PRESENTATION
RATINGS
23-Aug-12
COMPANY M C HARRY BENDER R J HEISENBOTTLE
Recommendations for the
structural integrity including
spiral stairway. Max 2 c� t S' 2 0
pts 20
Approach to the design solutions
for the domes and towers. 2- 0 I C I 5
Max pts 20
Project cost control
methodology L 0 2 0 L d
Max pts 20
Project understanding
Max pts 10 / � 1 " I o
Similar experience Max
pts10 /0 IO
Recommendations for roofing
system J o 1 p
Max pts 10
How firm is uniquely qualified / I p / v
for this project Max pts 10
vs) �� 2)
_zs —�z '
ARSNAD V16216(2 ! \�J ,
CITY OF OPA LOCKA
HISTORIC CITY HALL PRESENTATION
RATINGS
23-Aug-12
COMPANY M C HARRY BENDER R .1 HEISENBOTTLE
Recommendations for the
structural integrity including
spiral stairway. Max � l c / S
pts 20
Approach to the design solutions l
for the domes and towers. Z(' l j ' J
Max pts 20
Project cost control
methodology
Max pts 20 2 O 2 U Z o
Project understanding
Max pts 10 � 0 < U
Similar experience Max r /�
pts 10
Recommendations for roofing
system /
Max pts 10 ` ` O
How firm is uniquely qualified /O (c) l0
for this project Max pts 10
0) b 9u
n�44mA )- gig 3 / L-
vv
6,
CITY OF OPA-LOCKA
SUMMARY EVALUATION FORM
REHABILITATION OF HISTORIC CITY HALL BUILDING
RFQ# 12-0706100
MC HARRY BENDER& BEILINSON- R.E. R.J.
ASSOCIATES GOMEZ CHISHOLM HEISENBOTTLE
Letter of
Introduction
(10 points)
Howard 10 10 10 10 10
Mary 9 9 9 9 9
Charmaine 9 7 7 8 9
Mohammad 9 9 8 8 10
Arshad 9 10 9 8 9
Company Profile,
Experience,&
Qualifications
(35 points)
Howard 34 32 30 30 35
Mary 35 30 30 34 34
Charmaine 33 31 30 32 34
Mohammad 32 32 27 30 33
Arshad 33 33 29 31 34
Project Staffing
( 5 points)
Howard 5 5 5 5 5
Mary 5 5 5 5 5
Charmaine 3 2 3 3 4
Mohammad 4 4 3 3 4
Arshad 5 4 3 3 5
Project
Management
(5 points)
Howard 5 5 3 5 5
Mary 5 5 2 5 5
Charmaine 3 3 1 2 4
Mohammad , 4 4 4 4 5
Arshad 4 5 4 3 5
MC HARRY BENDER & BEILINSON- R.E. R.J.
ASSOCIATES GOMEZ CHISHOLM HEISENBOTTLE
Quality Control
Process
(5 points)
Howard 5 4 3 5 5
Mary 5 4 2 5 5
Charmaine 3 2 1 2 4
Mohammad 4 4 3 4 4
Arshad 4 4 3 4 5
Technical
Approach to the
Project
(35 points)
Howard 35 30 20 30 35
Mary 35 30 5 30 35
Charmaine 33 33 30 34 34
Mohammad 31 29 20 28 34
Arshad 32 30 21 29 33
Total (95
points
Available) 443 415 330 409 458
SUMMARY RAKING
R J Heisenbottle 458
Mcharry 443
Bender&Associates 415
R. E. Chisholm 409
Belinson-Gomez 330
CITY OF OPA-LOCKA
EVALUATION FORM
REHABILITATION OF HISTORIC CITY HALL BUILDING
RFQ# 12-0706100
MC HARRY BENDER& BEILINSON- R.E. R.J.
ASSOCIATES GOMEZ CHISHOLM HEISENBOTTLE
Letter of
Introduction I
(10 points) ! o 1° lU { D
, {
Company Profile,
Experience, & 'r 3`,t 2 2 J 3 O 2
Qualifications 7 3�
(35 points)
Project Staffing
(5 points) 5 5 5 5 5
Project
Management 5 5' 3 5- c
(5 points)
Quality Control
Process 3 5 5
(5 points)
.5'Technical
Approach to the �1 35
Project 3 5 30 2C/ 3D
(35 points)
Total
(95 points
available) I
/ ' IA/P14P PV'Arthj,
4-C1 Mil
iil mittee Member Signatur
—7-30_ 12. ()
Date /
eA0_,
\\/
CITY OF OPA-LOCKA
EVALUATION FORM
REHABILITATION OF HISTORIC CITY HALL BUILDING
RFQ# 12-0706100
MC HARRY BENDER& BEILINSON- R.E. R.J.
ASSOCIATES GOMEZ CHISHOLM HEISEN BOTTLE
Letter of
Introduction 'I 7 i 9
(10 points)
Company Profile,
Experience,&
� a 34
33 3 i 30
Qualifications �1
(35 points)
Project Staffing 3 _ 3
4(5 points)
Project
Management l j-
(5 points) I `�`
Quality Control
Process ,3 oz / i
(5 points) j 4`
Technical
Approach to the
Project 3,3 3 4 4
(35 points)
(
Total oi 7`J G
95 points � �d Si ¢
available) a f O
s
Committee Member Signature
f /
Date
\r/
/
n
CITY OF OPA-LOCKA
EVALUATION FORM
REHABILITATION OF HISTORIC CITY HALL BUILDING
RFQ# 12-0706100
MC HARRY BENDER & BEILINSON- R.E. R.J.
ASSOCIATES GOMEZ CHISHOLM HEISENBOTTLE
Letter of
Introduction 9 9 8 8 10
(10 points)
Company Profile,
Experience, & 32 32 27 30 33
Qualifications
(35 points)
Project Staffing 4 4 3 3 4
(5 points)
Project
Management 4 4 4 4 5
(5 points)
Quality Control
Process 4 4 3 4 4
(5 points) '
Technical
Approach to the
Project 31 29 20 28 34
(35 points)
Total
(95 points 84 82 65 77 90
available)
jti
Co .•ee Member Signature
e)/ 1 !(
Date A')
CITY OF OPA-LOCKA
EVALUATION FORM
REHABILITATION OF HISTORIC CITY HALL BUILDING
RFQ# 12-0706100
MC HARRY BENDER& BEILINSON- R.E. RJ.
ASSOCIATES GOMEZ CHISHOLM HEISENBOTTLE
Letter of
Introduction 9 10 9 8 9
(10 points)
Company Profile,
Experience, & 33 33 29 31 34
Qualifications
(35 points)
Project Staffing 5 4 3 3 5
(5 points)
Project
Management 4 5 4 3 5
(5 points)
Quality Control
Process 4 4 3 4 5
(5 points)
Technical
Approach to the 32 30 21 29 33
Project
(35 points)
Total
(95 points 87 86 69 78 91
available)
vir
Committee Member Signature
- 4- +Z
Date
11'
CITY OF OPA-LOCKA
EVALUATION FORM
REHABILITATION OF HISTORIC CITY HALL BUILDING
RFQ# 12-0706100
MC HARRY BENDER& BEILINSON- R.E. R.J.
ASSOCIATES GOMEZ CHISHOLM HEISENBOTTLE
Letter of
Introduction 9 9 9 9 9
(10 points)
Company Profile,
Experience,& 35 30 30 34 34
Qualifications
(35 points)
Project Staffing 5 5 5 5 5
(5 points)
Project
Management 5 5 2 5 5
(5 points)
Quality Control
Process 5 4 2 5 5
(5 points)
Technical
Approach to the 35 30 5 30 35
Project
(35 points)
Total
(95 points 94 83 53 88 93
available)
C/(A4) --
nAILJ:1
A) \ric
Committee Member Signature
(1/
l '
Date