Loading...
HomeMy Public PortalAbout2023-77 Approving modifications to the modeling parameters and level of service standards for the four-wide modeling alternativesRESOLUTION NO. 2023-77 A RESOLUTION OF THE VILLAGE COUNCIL OF THE VILLAGE OF KEY BISCAYNE, FLORIDA, APPROVING MODIFICATIONS TO THE MODELING PARAMETERS AND LEVEL OF SERVICE STANDARDS FOR THE FOUR VILLAGE-WIDE MODELING ALTERNATIVES; PROVIDING FOR IMPLEMENTATION; AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, on October 10, 2023, the Village Council adopted Resolution No. 2023-65, authorizing the Village Manager to issue a work order (the "Work Order") to AECOM Technical Services, Inc. (the "Consultant") to provide pre-design services relating to the K-8 School Stormwater Drainage Improvements Project (the "Project"); and WHEREAS, Task Order O of the Work Order provided for the incorporation of Village Council feedback for the four (4) Village-wide modeling alternatives for the Project; and WHEREAS, on October 26, 2023, the Village Council held a Resilient Infrastructure and Adaptation Program Workshop ("Workshop") to discuss modifications to the Village-wide modeling alternatives for the Project; and WHEREAS, based on the Workshop discussions, the Village Council desires to approve the modeling parameter and level of service standard modifications attached hereto as Exhibit "A"; and WHEREAS, the Village Council finds that this Resolution is in the best interest and welfare of the residents of the Village. NOW, THEREFORE, BE IT RESOLVED BY THE VILLAGE COUNCIL OF THE VILLAGE OF KEY BISCAYNE, FLORIDA, AS FOLLOWS: Section 1. Recitals. That each of the above-stated recitals are hereby adopted, confirmed, and incorporated herein. Section 2. param eter an d level of serv ice stan dard modifications attached hereto as Exhibit "A." Section 3. Approval. That the Village Council hereby approves the modeling Implementation. The Village Council hereby authorizes the Village M an ager to tak e an y action which is reasonably necessary to implement the purp ose of this Resolution. Section 4. Effective Date. That this Resolution shall be effective imm ediately upon adoption. PASSED and ADOPTED this ---111!!_ day of November , 2023. ATTEST: ~ffl:L Ko&-., VILLAGE CLERK APPROVED AS TO FORM AND LEGAL SUFFICIENCY: ~J~ WEISS SEROTA HELFMAN COLE & BIERMAN, P.L. VILLAGE ATTORNEY Page 2 of 3 E X H IBIT "A " Modifications to Modeling Parameters and Level of Service Standards The four Village-wide alternatives shall incorporate the following modeling parameters and level of service standards: 1. Lower 10-year, 24-hour design storm rainfall amount to 7 inches. 11. Modify rainfall distribution (from NRCS to SFWMD). 111. Modification of runoff curve number (infiltration). 1v. Lower contributing area from 100' to 75' (as a point of interest). v. Modify sea level rise target year to 2040. v1. Increase outfall discharge velocity to a maximum of 5 feet per second (ft/s) for each existing outfall. v11. Increase outfall discharge velocity for each existing outfall to the maximum extent necessary to meet level of service. 1. This will be an iterative process. v111. Optimize Pipe Sizes and Pump Station Capacities (Based on Hydrologic Modifications). 1. This will be an iterative process. 1x. Addition of Straight Pipe Easement in Zone 1 discharging at a non-erosive velocity (less than 2 feet per second). x. Addition of Straight Pipe Easement in Zone 1 discharging at a maximum of 5 feet per second (ft/s). x1. Addition of Dissipator Box Easement in Zone 1. x11. Modification of Level of Service Metrics: 1. Allow surface ponding in streets to 6 inches above the crown of road for a duration not to exceed 6 hours. 2. Allow surface ponding in streets to 12 inches above the crown of road for a duration not to exceed 6 hours. 3. Allow surface ponding in streets to a depth that is passable by emergency response vehicles (14-inches) for a duration not to exceed 6 hours. 4. Allow surface ponding in streets to a depth that is passable by emergency response vehicles (14-inches) for a duration not to exceed 12 hours Page 3 of 3