Loading...
HomeMy Public PortalAbout13-8528 Change Order for JVA Engineering Contracto to Perform Addional Work o the 143rd Street Drainage Roadway Project Sponsored by: City Manager RESOLUTION NO. 13-8528 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF OPA-LOCKA, FLORIDA, REQUESTING APPROVAL OF A CHANGE ORDER FOR JVA ENGINEERING CONTRACTOR, INC., TO PERFORM ADDITIONAL WORK ON 143RD STREET DRAINAGE AND ROADWAY PROJECT TO INSTALL A ROUNDABOUT AT THE INTERSECTION OF NW 143R° STREET, 24TH AVENUE AND RUTLAND STREET, IN AN AMOUNT NOT TO EXCEED $174,890, PAYABLE FROM CAPITAL PROJECTS FUND, ACCOUNT 44-541805 AND PTP FUND, ACCOUNT 47-541805; PROVIDING FOR INCORPORATION OF RECITALS; PROVIDING FOR AN EFFECTIVE DATE WHEREAS, City Departments invited Miami-Dade County Traffic Engineers to assess the field conditions, to improve traffic management at the intersection of 143rd Street,NW 24th Avenue and Rutland Street; and WHEREAS, the Miami-Dade County Traffic Engineers' assessment, proposed a Roundabout, and provided the design for the proposed traffic circle(Roundabout); and WHEREAS, the proposed Roundabout will improve the traffic safety with better traffic control, and will be funded from Capital Projects Fund, Account 44-541805, and PTP Fund, Account 47-541805; and NOW, THEREFORE, BE IT DULY RESOLVED BY THE CITY COMMISSION OF THE CITY OF OPA-LOCKA, FLORIDA: Section 1. The recitals to the preamble herein are incorporated by reference. Section 2. The City Commission of the City of Opa-locka, hereby approves the Change Order for JVA Engineering Contractor, Inc., to perform additional work on 1431d Street Drainage and Roadway Project to install a Roundabout at the intersection of Resolution No. 13-8528 NW 143rd Street, 24th Avenue and Rutland Street, in an amount not to exceed $174,890, payable from Capital Projects Fund, Account 44-541805 and PTP Fund, Account 47- 541805. Section 3. This resolution shall take effect immediately upon adoption. PASSED AND ADOPTED this 23rd day of January, 2013. thT.�YLOR MA'OR Attest to: ' ty J•. a Flores CI y Clerk Approved as to •r m . 'i legal 'uf i'it n c : 1 J• ph� . GellMP" --� EEN.POO MARDER P.A. ty Attorney Moved by: VICE MAYOR KELLEY Seconded by: COMMISSIONER SANTIAGO Commission Vote: 4-0 Commissioner Holmes: YES Commissioner Johnson: NOT PRESENT Commissioner Santiago: YES Vice-Mayor Kelley: YES Mayor Taylor: YES 2 %o�p roc 0 \9 U � _ IDI /92 'LO��O RP'fb� City of Opa-Locka Agenda Cover Memo Commission Meeting Item Type: Resolution Ordinance Other Date: 01/23/2013 12-8338 (EnterXin box) Fiscal Impact: Ordinance Reading: 1st Reading _ 2nd Reading (EnterXin box) Yes No (EnterXin box) x Public Hearing: Yes No Yes No (EnterXin box) X X Funding Source: (Enter Fund&Dept) Advertising Requirement: Yes No Ex: (EnterXin box) X Account#44-541805,47- Water and Sewer 541805 fund Contract/P.O.Required: Yes No RFP/RFQ/Bid#: (EnterXin box) X Strategic Plan Related Yes No Strategic Plan Priority Area: Strategic Plan Obj./Strategy: (list the (Enter X in box) specific objective/strategy this item will address) X Enhance Organizational 0 Bus.&Economic Dev - 1. Will allow installation of Public Safety - the traffic circle for Quality of Education O improved traffic safety. Qual.of Life&City Image to Communcation Sponsor Name Department: City Manager Public Works Short Title: Change Order for JVA Engineering Contractor to install a roundabout(traffic circle)at the intersection of NW 143 Street,NW 24th Avenue,and Rutland Street Staff Summary: Staff recommends approval in order to complete the installation of the proposed roundabout. The original scope for the NW 143`d Street Roadway and Drainage Improvement with JVA Engineering Contractor does not include the roundabout. Approving the change order for JVA Engineering Contractor is for the best interest of the city. Proposed Action: JVA Engineering Contractor, Inc. was awarded the contract for the NW 143rd Street Roadway and Drainage Improvement Project. The installation of the proposed roundabout was not included in the original scope. The total funding available for the NW 143rd Street project is$585,000; $292,500 from DEP funding and a 100% match of $292,500 from PTP funding. The construction contract with JVA Engineering is in the amount of 468,645 leaving a balance of$116,355. The construction cost for the roundabout is $174,890 of which $116,355 will be funded from the available balance of NW 143`d Street Project and the remaining required $58,535 will be funded from PTP fund. Attachment: 1. Agenda 2. Resolution 12-8338 3. Quote for Change Order to install the roundabout 4. Engineering Plan for Traffic Circle at 143 St-Rutland&NW24th Avenue %-1..o °pP k4. Q i U D L 1N MEMORANDUM "T To: Mayor Myra L.Taylor Vice Mayor Joseph L.Kelley Commissioner TimothyhHolme Commissioner Dorothy Johns n Commissioner Luis B. Santi FROM: Kelvin L. Baker, Sr.,City Mana (/ DATE: January 23,2012 RE: Change Order for JVA Engineering Contractor to install a roundabout(traffic circle) at the intersection of NW 143 Street,NW 24th Avenue,and Rutland Street. Request: A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF OPA-LOCKA, FLORIDA, REQUESTING APPROVAL OF A CHANGE ORDER FOR JVA ENGINEERING CONTRACTOR, INC. TO PERFORM ADDITIONAL WORK ON NW 143'm STREET DRAINAGE AND ROADWAY PROJECT TO INSTALL A ROUNDABOUT AT THE INTERSECTION OF NW 143RD STREET, NW 24TH AVENUE AND RUTLAND STREET IN AN AMOUNT NOT TO EXCEED ONE HUNDRED SEVENTY FOUR THOUSAND EIGHT HUNDRED NINETY DOLLARS ($174,890.00) PAYABLE FROM CAPITAL PROJECTS FUND (44- 541805)AND PTP FUND (47-541805). Description: City of Opa-locka Police Department and Public Works Department invited Miami- Dade County Traffic Engineers for field condition assessment to improve the traffic management at the intersection of NW 143rd Street, NW 24th Avenue and Rutland Street. County conducted a study at the intersection, proposed a roundabout and provided the design for the proposed traffic circle (roundabout) at this intersection. The traffic circle (roundabout) will allow one-way traffic flows around a center island with yield control at the entry points, and will give priority to vehicles within the Roundabout. This will improve the traffic safety with better traffic control. Account Number: Capital Projects Fund (44-541805), and PTP Fund (47-541805). Financial Impact: The total funding available for the NW 143rd Street project is $585,000; $292,500 from DEP funding and a 100% match of$292,500 from PTP funding. The construction contract with JVA Engineering is in the amount of 468,645 leaving a balance of$116,355. The construction cost for the roundabout is $174,890 of which $116,355 will be funded from the available balance of NW 143rd Street Project and the remaining required $58,535 will be funded from PTP fund. Implementation Timeline: The project must be completed by May 31, 2013 as required per FDEP grant condition. Legislative History: Resolution#12-8338 Recommendation(s): Staff recommends approval in order to complete the installation of the proposed roundabout. The original scope for the NW 143`d Street Roadway and Drainage Improvement with JVA Engineering Contractor does not include the roundabout. Approving the change order for JVA Engineering Contractor is for the best interest of the city. Analysis: The roundabout will improve safety by simplifying conflicts, reducing vehicle speeds and providing a clearer indication of the driver's right-of-way. It will also provide an opportunity to improve the aesthetics of the intersection. There will be no design fee for the roundabout as it is already designed by Traffic Engineering Division of Miami-Dade County Public Works and Waste Management Department. Upon approval by the City Commission County will provide final construction documents for the roundabout. Attachment: 1. Resolution 12-8338 2. Quote for Change Order to install the roundabout 3. Engineering Plan for Traffic Circle at 143 St-Rutland&NW24th Avenue PREPARED BY: Mohammad Nasir,PE,Asst.Public Works Director/City Engineer END OF MEMORANDUM Sponsored by: City Manager RESOLUTION NO. 12-8338 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF OPA-LOCKA, TO AUTHORIZE THE CITY MANAGER TO ENTER INTO A CONTRACT WITH JVA ENGINEERING CONRACTOR, INC (JVA) FOR ,IMPROVEMENTS OF 143R0 STREET DRAINAGE AND ROADWAY, IN AN AMOUNT NOT TO EXCEED $468,644.80, PAYABLE FROM ACCOUNT NO'S 44-541805 AND 47- 541805; PROVIDING FOR INCORPORATION OF RECITALS; PROVIDING FOR AN EFFECTIVE DATE WHEREAS, the City of Opa-locka received five responses to a Request for Proposals (RFP) for corissruction services- or improvement of [43rd Street drainage and roadway improvement; and WHEREAS, the construction includes installation of a new drainage system, rehabilitation of the roadway and the repair and renovation of existing sidewalks; and WHEREAS, the improvements will address existing ponding/flooding problems, installation of a functional drainage system, repairing the roadway, additional sidewalks for pedestrian traffic to Segal Park and other adjacent streets; and WHEREAS, the City appointed an Evaluation Committee, which determine that TVA Engineering Contractor, Inc., is the lowest, most responsive, and most responsible proposer, of the five firms that responded; and WHEREAS, the Florida Department of Environmental Protection awarded a reimbursable grant in the amount of$292,500, and the City has committed additional funds from the PTP revenues to pay for the proposed improvements; and WHEREAS, the City Commission of the City of Opa-locka desires to authorize the City Manager to enter into a contract with JVA Engineering Contractor, Inc., for the improvements of 143'd Street drainage and roadway. Resolution No. 12-8338 NOW, THEREFORE, BE IT DULY RESOLVED BY THE CITY COMMISSION OF THE CITY OF OPA-LOCKA, FLORIDA: Session 1. The recitals to the preamble herein are incorporated by reference. Session 2. The City Commission of the City of Opa-locka, authorizes the City Manager to enter into a contract with JVA Engineering Contractor, Inc (JVA) for improvements of 143rd Street drainage and roadway, in an amount not to exceed $468,644.80, payable from Account No.'s 44-541805 and 47-541805, in substantially the form attached hereto as Exhibit «A» SessioAi -Thisi'esolutionshall take effect immediately upon adoption. PASSED A.ND ADOPTED this 22n3 day of ebruarv, 2012. Y /ILOR MAYOR Attest to: Ap.roved as o form and legal/ ciency: l oanna Flores Jo.� .r S t ler Interim City Clerk 9'i Att•mey ii Moved by: COMMISSIONER HOLNIES Seconded by: VICE MAYOR JOHNSON Commission Vote: 4-t Commissioner Holmes: NO Commissioner Miller: YES Commissioner Tydus: YES Vice-Mayor Johnson: YES Mayor Taylor: YES A ;N z '{ z ■ N y m A T oN "o' 1 ti m � mi a $ 5m zo• , JI5R \ U x m( a D 0 A bz 9 S < r5 D o; c a Z I n o � s o A 9, 6 1 ° z 8 o X o; * ( > Z0 m T. z 1 m 2 o 1iae Z T \ � y z/i*.° O n n r.',' - D x m '- I p Z 9 .1 0 ° ; O o n ° 0] Z 9Z LC 3 m v u n y0 : N I N 0 ° m N m Z VI N O 0 �.. z Z w 1n ° o f o ti ° a o Ilili !f1a 2 ° .. I Ill I �I - L ° NP) r '.� ° NW 24 UI.-. A iji\*JJ7i _ \ ..-----_-rt.r:::■-:■■■ =x ;' A- 4:.::::::::::::::::::.::::::::::::•% 'T 1 1°i 4 ° p NW 24 AV • A, \� 0 -(I H � a \ \\ \� � v..,,, 8 3*K ■ --,E> , „.....° Y D a \% L A,...,. i 1k . . it („...-- , N, t, , mzm '' I ,111.111 'P° A vvv r z z8n z \\;\\ \ m m n ' z \ \ `\ \ \ fAO� a 0 \i >g z \ \ \ O Za Z z � i \;° N \ ` \\ \ \I - �_ \ 7 — z m I 2) m O 12 0 I I \\\ \ ©W \\ -i O s I \ CA Z OZ w 4 w cn '7'5 �am a o aloo 8 F A M f 0 nit 6.00 P N z0.36' o ° r D 15.16' 960 C." I la� .7&A. / ) > m n fl< 6z.)6 a' o N JJ. .4, 813.0' 4 � . Q 1 z gA�x— $ o 4 S 0 z r- § m `. S ° malt. PN7R A c:Tf1R NG. 6600 N.W.32 Avenue Miami,FL 33147 Tel: (305)696-7902 Fax: (305)696-7903 suBMITTEO To: Cof Opa-Lpcka PROJECT NAME:Traffic Circle NAME Mohammed Nasir —� ADDRESS- 12950 LeJeune Road ADDRESS:NW 24th Ave and Rutland Street wrist-ATE: Opa-Locka FL 33054 cfrrlSTATE: C of Opa-Lacka PHONE: 305 953-2828 DATE:5/1/2012 °�--- mnneir FAX: .,nt....�_..t� 305 953-2824 v nail. v WE HEREBY SUBMIT SPECIFICATIONS AND ESC IIPTIO pOF WORK TO BE PERFORMED We proposed performed all materials,labor and equipment necessary to the follow Scope of Work: Furnish a d r st-�! Frs,�..:;?d T `I:_Olrt'e,It tat:2• h Ave and Ritlata9 Street as 7_1..1-7 Fl sr.s designed b, MDCPW± Musi^o Dated 03-08_01, NOTE — — - Permit f e In ran a fees bond f es densi ie r t im act f e no included. ° MOT is included in PrOPosal. ° Survey and Asbuilt is included in Proposal, JVA is t res n ible f r n leakin n the existin wa er main or failure the to tin referenced above. JVA re ewes the ri ht t revise and t its ro al rior to a contract issu ° Bid redica n JVA h vin a lear s fe una s ru ed work area wi h no overh d hazard An d wntim r ult of unforeseen nditions or work bein rformed b o hers ffectin are s wh re JVA can not complete their task will be paid by owner The work and performed by the Co may result in a lien being or contractor default its in any ng Placed on the premises described above,in case t1 a owner y payment under this contract. Owner hereby agrees to accept full responsibility for an fences,sidewalks,all underground pipes,wires,septic tanks, drain lines,wen,ect unless stated above. Owner is liable in fun amount of contract in the event owner cancel after work has started. The Co shall not be responsible for damage or delays do to strikes,fires,accidents,or the others cause beyond its control,not for inherent defects in the premises on which work to be done• In the event of any default of this contract by owner-owner agrees to pay an cost and reasonable attorneys fees incurred by JVA Engineering Contractor,INC-as a result of said default. All materials are guaranteed to be as specified. Al work to be completed in a workman like manner according to standard practices. Any alteration or deviation from above specifications involving extra cost will be executed only upon written orders and will become art extra charge over and above the estimate. This proposal subject to acceptance within_30_days and is void thereafter at the option of the under signed. Work shall begin 10 days of this contract being signed by all parties here and return to the no WE HEREBY PROPOSE TO FURNISH LABOR AND MATERIALS COMPLETE IN ACCORDANCE WITH THE ABOVE SPECIFICATIONS,FOR THE One Hundred Sew. Four Thousand El•M Hundred NI -- $174,890.00 WITH PAYMENT TO BE MADE AS FOLLOWS: Payment Application Authohzed Signature: ACCEPTANCE OF CONTRACT The above prices,specifications and cond6ons and conditions are hereby accepted. You are to do the work as specified payment will be made as outlined above. Accepted by: Signature: Date: