WORK SESSION AGENDA
MEDINA CITY COUNCIL
Tuesday, June 18, 2019
5:30 P.M.
Medina City Hall
2052 County Road 24
I. Call to Order
II. WSB Chippewa Road and Arrowhead Drive Corridors Proposal to
Provide Engineering Services for Project Development/Visioning
Discussion
III. 2020 Preliminary Budget Discussion
IV. Adjourn
Posted 6.14.19
https://medinamn.sharepoint.com/Shared Documents/Active Packets/CC PACKET - JUNE 18/CA Approved/WS - 01 2019-06-13 Medina Chippewa Rd &
Arrowhead Dr Project Devel_Visioning - WSB Proposal.docx
70
1
X
E
N
I
A
A
V
E
N
U
E
S
|
SU
I
T
E
3
0
0
|
MI
N
N
E
A
P
O
L
I
S
,
M
N
|
55
4
1
6
|
76
3
.
5
4
1
.
4
8
0
0
|
WS
B
E
N
G
.
C
O
M
June 13, 2019
Mr. Scott Johnson
City Administrator
City of Medina
2052 County Rd 24
Medina, MN 55340
Re: City of Medina – Chippewa Road and Arrowhead Drive Corridors
Proposal to Provide Engineering Services for Project Development / Visioning
Dear Mr. Johnson:
We are pleased to present this proposal for professional engineering services to complete the project
development / visioning for the Chippewa Road and Arrowhead Drive corridors. The following letter
proposal represents our entire understanding of the project scope and level of engineering services
requested.
PROJECT UNDERSTANDING
The City’s 2040 Comprehensive Plan identifies the need to extend Chippewa Road from Mohawk
Drive to Arrowhead Drive. These improvements were identified in conjunction with the capacity and
operations needs for TH 55. The plan indicates that “MnDOT and the City of Medina should work
cooperatively, as redevelopment occurs, to close existing direct access driveways onto TH 55 and
relocate direct access to a frontage/backage road system, consistent with the 2007 TH 55 design
concept vision”. That concept vision included the idea of connecting Chippewa Road from Arrowhead
Drive to Mohawk Drive, completing the roadway network in the area.
The Comprehensive Plan anticipates residential and commercial growth within the Chippewa Road
and Arrowhead Drive corridors north of TH 55. Staff has therefore asked WSB to prepare a Project
Development Visioning Study for the Chippewa Road and Arrowhead Drive corridors, to document the
roadway, intersection, public utility, and right-of-way needs.
The primary goal of the City is to have a cohesive plan that can be provided to property owners and
developers guiding the transportation needs, right-of-way, public utilities, and other parameters
adjacent to their properties. In addition, the study will document preliminary costs for the anticipated
improvements so that the City can plan to secure funding for the projects. The following Scope of
Services outlines the tasks to complete the Project Development Visioning Study.
SCOPE OF SERVICES
Task 1 – Project Management
This task includes planning and coordination of all work tasks, establishment and monitoring of
budgets, and correspondence with the City of Medina. The project manager will provide technical
direction on all aspects of the project review, all work products, and keep the City informed on the
project progress. The project manager will serve a primary role in the analysis and preparation of the
Study.
City of Medina – Chippewa Rd & Arrowhead Dr Project Development / Visioning – Proposal for Engineering Services
June 13, 2019
Page 2
https://medinamn.sharepoint.com/Shared Documents/Active Packets/CC PACKET - JUNE 18/CA Approved/WS - 01 2019-06-13 Medina Chippewa Rd &
Arrowhead Dr Project Devel_Visioning - WSB Proposal.docx
This task will consist of continued management and administration, project coordination and
communication with the City. Also included in this task is billing preparation, invoicing, progress
reports, and other non-technical work associated with this phase of the project.
Task 2 – Data Collection
Available data will be collected from the City of Medina, Hennepin County, MnDOT and other impacted
agencies. This data will include but is not limited to:
• Existing and historic traffic volume data
• Updated crash history
• Proposed and anticipated development plans
• As built roadway plans
• Survey/topographic data previously obtained or readily available
• Wetland and floodplain locations from available mapping
It is assumed that existing traffic volume data will be used as the baseline to conduct the traffic
analysis, and that no additional traffic counts would be required.
Task 3 – Traffic Forecasts
Projected 2040 ADT and turning movement counts will be developed for Chippewa Road, Arrowhead
Drive and each primary intersection in the corridors. The projected traffic will be based on traffic
generation for the proposed development and/or anticipated land use in the area, as well as the
historical traffic count trends for the area.
Task 4 – Traffic Operations Analysis
A traffic analysis will be completed evaluating the existing and projected traffic operations for
Chippewa Road and Arrowhead Drive corridors, including the intersections of Chippewa Road at
Mohawk Drive, Chippewa Road at Arrowhead Drive, Arrowhead Drive at Meander Road and
Arrowhead Drive at TH 55.
The traffic operations will be evaluated using Synchro/SimTraffic software for the signal and stop sign
analysis and RODEL software for the roundabout analysis. Output from Synchro is transferred to
SimTraffic, a micro-simulation computer modeling software that simulates each individual vehicle’s
characteristics and driver behavior in response to traffic volumes, intersection configuration, and signal
operations. The model simulates drivers’ behaviors and responses to surrounding traffic flow as well
as different vehicle types and speeds. Its outputs estimated vehicle delay and queue lengths at each
intersection being analyzed.
The capacity and level of service analysis will be conducted for the existing 2019 and projected 2040
traffic conditions. The analysis will document the corridor level of service, intersection level of service,
any operational deficiencies and recommendation for intersection control and lane configuration
improvements.
In addition, the analysis will include: conducting a crash analysis; evaluating the physical
characteristics of the corridors including right-of-way impacts; preparing control evaluation and/or
roundabout justification analyses for the intersection.
Task 5 – Preliminary Design/Concept Plan
WSB will prepare up to two concept layouts based on the recommendations from the Traffic
Operations Analysis, guidance from City Staff, and City Council (Task 4) that include the following
features:
• Recommended roadway geometric improvements
• Intersection signing and pavement markings
City of Medina – Chippewa Rd & Arrowhead Dr Project Development / Visioning – Proposal for Engineering Services
June 13, 2019
Page 3
https://medinamn.sharepoint.com/Shared Documents/Active Packets/CC PACKET - JUNE 18/CA Approved/WS - 01 2019-06-13 Medina Chippewa Rd &
Arrowhead Dr Project Devel_Visioning - WSB Proposal.docx
• Preliminary intersection control design (stop condition or roundabout)
• Preliminary construction limits
• Right-of-way needs
• Access recommendations for each corridor
• Public utilities (watermain, sewer)
• Environmental permitting analysis
The proposed concept plans will be prepared based on the City, County and State Aid design
standards. It is assumed that existing survey information and/or Lidar information will be used to
develop the concept layouts on aerial base mapping. This task will include preparation of a preliminary
project cost estimate for the recommended improvements (final concept option). A review of the
environmental components of the project will also be performed to determine what permits will be
required for the anticipated impacts with respect to wetlands and floodplains.
Task 6 – Recommendation/Report Preparation
WSB will prepare a summary report documenting the data collection, traffic projections, traffic
operations analysis methodologies and recommendations, concept layouts and the estimated
improvement costs with an anticipated timeline. WSB would submit a draft report to the City for their
review. WSB would then prepare a final report to incorporate any comments received from the City
and present the report to the City Council. An analysis of potential assessments has not been
included with this scope of services.
Task 7 – Agency Coordination/Meetings
WSB will coordinate the preparation of the traffic analysis and concept plans with the City of Medina
and all other impacted agencies though use of phone and email correspondence. In addition, this task
will include six meetings; three with City staff; one with the Medina City Council at a work session to
present the study methodologies and discussion of preliminary concepts; an open house to present the
study and receive comments from the public, and; a second meeting with the City Council to review
and approve the final study and concept plan.
ANTICIPATED PROJECT SCHEDULE
Based on the above Scope of Work WSB will complete the Project Development / Visioning Study
based on the following schedule:
City Councils Authorizes Study .......................................................................................... June 18, 2019
Project Kickoff Meeting with City Staff .................................................................. Week of June 24, 2019
Draft Analysis and Preliminary Concept Plan .................................................................... August 2, 2019
City Council Work Session .............................................................................................. August 20, 2019
Meeting with City Staff ....................................................................................... Week of August 26, 2019
Public Information Meeting .............................................................................................. October 8, 2019
Final Analysis and Concept Plan ................................................................................... October 18, 2019
Meeting with City Staff ..................................................................................... Week of October 21, 2019
City Council Meeting to Review Final Analysis and Concept Plan .............................. November 5, 2019
City of Medina – Chippewa Rd & Arrowhead Dr Project Development / Visioning – Proposal for Engineering Services
June 13, 2019
Page 4
https://medinamn.sharepoint.com/Shared Documents/Active Packets/CC PACKET - JUNE 18/CA Approved/WS - 01 2019-06-13 Medina Chippewa Rd &
Arrowhead Dr Project Devel_Visioning - WSB Proposal.docx
PROPOSED FEE
The estimated cost to prepare the Project Development / Visioning Study is based on the above Scope
of Work and is as follows:
Task Amount
Task 1 – Project Management $ 2,600
Task 2 – Data Collection $ 2,982
Task 3 – Traffic Forecasts $ 2,422
Task 4 – Traffic Operations Analysis $ 4,410
Task 5 – Preliminary Design/Concept Plan $10,074
Task 6 – Report Preparation $ 2,748
Task 7 – Agency Coordination $ 4,686
Total Cost $29,922
WSB would invoice the City of Medina for the actual hours worked at each employee classification with
the current WSB hourly rates up to the maximum of $29,922. No work in excess of the $29,922 will be
completed without prior written approval from the City of Medina. A copy of the project task hour
budget is attached for your reference. This represents our complete understanding and scope of the
project. We are available to begin work immediately upon authorization.
WSB appreciates the opportunity to provide the City of Medina with this proposal. As always, we are
looking forward to working with you and your staff toward the completion of the project. Please feel
free to contact me with any questions or concerns you have.
Sincerely,
WSB
Jim Stremel, P.E.
Senior Project Manager
City of Medina:
_________________________________
Authorized signature
_________________________________
Title
_________________________________
Date
?ØA@
?ØA@
GsWX
)n
GjWX
GyWX
GyWX
Së
GïWX
H
O
M
E
S
T
E
A
D
T
R
L
GïWX
Medina Rd
Tamarack Dr
Brockton Ln
Brockton Ln
Hackamore RdHackamore Rd
Arrowhead Dr
Hunter Dr
Sû118
GöWX115
Sñ201
Sñ201
Willow Dr
Hunter Dr
Chippewa Rd
Loretto
Independence
Maple Plain
Independence
Medina
Independence
Greenfie ld
Maple Plain
Medina
Medina
Orono
Medina
Orono
Medina
Plymouth
Medina
Corcoran
Plymouth
Maple Grove
MorrisT. Baker
C a na di a n P a c i f i c R a i l w a y
Burlington Northern Santa Fe Railway
Half MoonLake
SpurzenLake
KatrinaLake
LakeIndependence
LakeSarah
MooneyLake
LakeArdmore
WolsfeldLake
ThiesLake
KriegLake
MillerLake
SchoolLake
PeterLake
WinterhalterLake
ThomasLake
HolyNameLake
RollingGreenCC Pond
Holy NameSchool Pond
ElmCreekPond
MedinaLake
BakerNationalGC Pond
Elm CreekLinks GCPonds
Morris TBaker ParkRes Pond
B and VPar ThreeGC Pond
ElmCreek
WolsfeldWoods SNA
VinlandNationalCenter
Document Path: K:\02712-530\GIS\Maps\Transportation Plan\Figure3_ExistingFunctionalClass.mxd
Figure 10-3: Roadway Functional Classification (Existing & Planned)Medina Transportation PlanMedina, MN Ü0 2,750Feet
Existing Functional ClassRoads
PrincipalArterial
A MinorAugmentor
A MinorReliever
A MinorExpander
A MinorConnector
B Minor
Major Collector
Minor Collector
Planned Functional ClassRoads
PrincipalArterial
A MinorAugmentor
A MinorReliever
A MinorExpander
A MinorConnector
B Minor
Major Collector
Minor Collector
Data Source | Met Council 2016
MEMORANDUM
TO: City Council Members
FROM: Erin Barnhart, Finance Director
DATE: June 12, 2019
SUBJ: 2020 Preliminary General Fund Budget Summary
General Fund
Medina’s 2020 preliminary general fund budget estimates an overall increase of 3.9% or
$130,036. The increase is currently attributed to:
• Annual contract increases
• Building(s) operation increases
• 2020 Presidential election expenses
• Decrease in revenue (court fines)
• Staffing
o Addition of full-time police officer
o 2.5% COLA increase
To date we have received the proposed 2020 budget for the Hamel Fire Department. We have
not received proposals for the remaining three contracts (Loretto, Long Lake and Maple Plain)
all of which are currently being estimated at 3% increases.
Beginning in 2020, Employees who have reached the capped healthcare premium amount will
contribute 50% of their overall rate increase.
Capital Levies (not part of General Fund)
Municipal Park Fund – Increase levy from $14,000 to $112,000 to finance 30-year park
replacement needs in lieu of bonding.
Equipment Fund – Increase levy from $134,500 to $250,000 to finance on going equipment
replacement needs in lieu of bonding.
Capital Improvement Plan (CIP)
Attached is the draft 2020 CIP. Staff continues to review 2020 changes and additions. The Park
Commission will be reviewing the CIP at their June 19th meeting. An updated draft will be
brought forward to the July 16th City Council Work Session for further review.
Work Session
CITY OF MEDINA
GENERAL FUND
PRELIMINARY 2020 BUDGET
2020 Amount Percentage
2017 2017 2018 2018 2019 2019 Prelim Increase Increase
Budget Actual Budget Actual Budget YTD Budget (Decrease) (Decrease)
REVENUES & OTHER FINANCING SOURCES:
1 Property Tax Levy 3,134,977 3,132,281 3,229,026 3,154,881 3,325,897 0 3,455,933 130,036 3.9%
2 Other Taxes 30,000 73,488 30,000 51,358 33,000 0 56,819 23,819 72.2%
3 Licenses and Permits 372,800 595,499 374,300 592,277 377,400 241,244 415,850 38,450 10.2%
4 Intergovernmental 207,618 256,433 232,118 271,965 263,910 54,420 279,773 15,863 6.0%
5 Charges for Services 112,831 143,411 124,564 130,169 123,146 96,542 131,087 7,941 6.4%
6 Fines and Forfeitures 105,000 96,050 105,000 88,044 110,000 50,915 95,000 (15,000) -13.6%
7 Special Assessments 1,000 12,545 0 1,761 1,715 0 0 (1,715) -100.0%
8 Miscellaneous 128,167 182,453 108,225 215,518 123,698 83,163 108,070 (15,628) -12.6%
9 Sale of Assets 30003000000 0 N/A
10 Transfers In 217,048 217,049 223,110 208,110 213,572 0 219,183 5,611 2.6%
11 Total Revenues & Other Financing Sources 4,309,741 4,709,209 4,426,643 4,714,083 4,572,338 526,283 4,761,714 189,376 4.1%
EXPENDITURES & OTHER FINANCING USES:
General Government:
12 Mayor & Council 26,294 25,323 25,144 25,273 25,644 12,811 25,543 (101) -0.4%
13 Administration 591,789 568,959 602,321 599,335 630,578 333,730 655,524 24,946 4.0%
14 Elections 10,900 1,501 10,900 15,235 11,400 1,069 15,400 4,000 35.1%
15 Assessing 88,872 90,515 90,493 91,229 93,840 46,446 93,590 (250) -0.3%
16 Planning & Zoning 190,150 191,825 193,840 169,879 189,411 74,177 191,105 1,694 0.9%
17 Comprehensive Plan 8,000 125 8,000 0 8,000 0 8,000 0 0.0%
18 Data Processing 72,850 73,271 82,083 79,586 82,083 32,978 88,704 6,621 8.1%
19 Police/Public Works Facility 69,415 69,521 69,415 79,670 76,415 35,194 77,500 1,085 1.4%
20 Municipal Building 48,410 39,740 39,100 40,994 60,810 28,074 61,000 190 0.3%
21 Unallocated 2,300 0 2,100 0 2,100 0 0 (2,100) -100.0%
22 Total General Government 1,108,980 1,060,780 1,123,396 1,101,200 1,180,281 564,478 1,216,366 36,085 3.1%
Public Safety:
23 Police 1,564,597 1,525,729 1,617,770 1,647,492 1,651,875 710,640 1,792,384 140,509 8.5%
24 Police Records Management 8,850 8,561 8,850 8,693 8,850 8,905 13,500 4,650 52.5%
25 Fire 394,172 426,262 424,716 413,375 446,242 190,052 424,590 (21,652) -4.9%
26 Building Inspections 300,006 240,836 312,013 409,365 318,343 171,026 330,718 12,375 3.9%
27 Emergency Management 5,200 4,246 5,200 3,990 5,200 4,722 5,800 600 11.5%
28 Total Public Safety 2,272,825 2,205,634 2,368,549 2,482,916 2,430,510 1,085,346 2,566,992 136,482 5.6%
Public Works:
29 Public Works 708,212 618,315 706,455 641,221 726,877 241,443 729,449 2,572 0.4%
30 Sanitation & Recycling 15,112 13,302 18,146 12,567 20,080 6,459 20,528 448 2.2%
31 Total Public Works 723,324 631,617 724,601 653,789 746,957 247,902 749,978 3,020 0.4%
Parks & Recreation:
32 Community Building 33,950 32,540 37,127 50,694 41,146 12,915 41,519 373 0.9%
33 Parks 168,662 165,077 170,970 242,850 169,444 90,669 182,859 13,415 7.9%
34 Total Parks & Recreation 202,612 197,617 208,097 293,544 210,590 103,584 224,378 13,788 6.5%
35 Transfers Out 2,000 2,000 2,000 53,362 4,000 0 4,000 0 0.0%
36 Total Expenditures & Other Financing Uses 4,309,741 4,097,648 4,426,643 4,584,810 4,572,338 2,001,310 4,761,714 189,375 4.1%
EXCESS (DEFICIENCY) OF REVENUES AND
OTHER FINANCING SOURCES OVER (UNDER)
37 EXPENDITURES AND OTHER FINANCING USES 0 611,561 0 129,273 0 (1,475,027) 0 0 N/A
Page 1
City of Medina
2020 Property Tax Levy Scenario Summary
Actual Proposed
Pay Pay
2019 2020
Property Tax Information:
1 Estimated Market Value Change (Taxable)N/A 4.9%
2 Estimated Tax Capacity Change (Taxable)N/A 4.3%
3
4 General Fund Levy $3,325,897 $3,455,933
5 % Change N/A 3.9%
6
7 Debt Service & Capital Levies $676,997 $895,819
8 % Change N/A 32.3%
9
10 Total Levy $4,002,894 $4,351,752
11 % Change N/A 8.7%
12
13 City Local Tax Capacity Rate 21.503% 22.452%
14 % Change N/A 4.4%
15
16
17 Estimated Property Taxes:
18
19 $700,000 Home With No Market Value Change $1,747 $1,824
20 % Change N/A 4.4%
21
22 $700,000 Home With 5.0% Market Value Increase $1,747 $1,930
23 % Change N/A 10.4%
24
25 $5,000,000 C/I Property With No Market Value Change $21,200 $22,115
26 % Change N/A 4.3%
27
28 $5,000,000 C/I Property With 5.0% Market Value Increase $21,200 $23,238
29 % Change N/A 9.6%
Page 2
City of Medina
Property Tax Levies
2020 Proposed
Proposed Amount Percentage
Pay Pay Increase Increase
2019 2020 (Decrease) (Decrease)
1 General Fund Levy 3,325,897 3,455,933 130,036 3.9%
2
3 Debt Service & Capital Levies:
4
5 Public Works and Police Department Facility:
6
7 2012A G.O. Capital Improvement Plan (CIP) Bonds - $6.1 million 241,710 243,705 1,995 0.8%
8 2013A G.O. Refunding Bonds (2007A recharacterized CIP portion)135,681 137,361 1,680 1.2%
9
10 Total Public Works and Police Department Facility 377,391 381,066 3,675 1.0%
11
12 Other Debt Service & Capital Levies:
13
14 2010A G.O. Improvement Bonds - Holy Name Drive and Pioneer Trail 29,500 29,500 0 0.0%
15 2011A G.O. Bonds - Hunter Drive South 0 0 0 N/A
16 2011B Taxable G.O. Improvement Bonds - Hunter Drive North 59,000 60,000 1,000 1.7%
17 2015A G.O. Improvement Bonds - Tower Drive 62,606 63,253 647 1.0%
18 Municipal Park Fund Levy 14,000 112,000 98,000 700.0%
19 Capital Equipment Fund Levy 134,500 250,000 115,500 85.9%
20
21 Total Other Debt Service & Capital Levies 299,606 514,753 215,147 71.8%
22
23 Total Debt Service & Capital Levies 676,997 895,819 218,822 32.3%
24
25 Total Levies 4,002,894 4,351,752 348,858 8.7%
Page 3
City of Medina
Property Tax Levies
2020 Proposed
General Fund Levy, 3455933,
79.41%
2012A G.O. PD/PW …
2013A G.O. Refunding PD/PW
Facility, 137361, 3.16%
2010A G.O. Holy Name/Pioneer Tr
Imp, 29500, 0.68%
2011B Taxable G.O.
Hunter Dr N, 60000,
1.38%
2015A G.O. Tower Dr Imp, 63253,
1.45%
Municipal Park Fund Levy,
112000, 2.57%
Capital Equipment Fund Levy,
250000, 5.74%
Page 4
City of Medina
2020 Proposed Property Tax Scenario
Residential Homesteads
SCENARIO - GENERAL FUND LEVY PLUS 3.9%
2019 2020 2019-2020
Budget Proposed Change
1 City Tax Rate:21.503% 22.452% 4.4%
2
3 General Fund Levy:$3,325,897 $3,455,933 $130,036
4
5 Debt Service & Capital Levies:$676,997 $895,819 $218,822
6
7 Total Levy:$4,002,894 $4,351,752 $348,858
8
9 Change in Total Levy:8.7%
10
11 2019 CITY PROPERTY TAXES
12
13 Homestead City Local City
14 Market Market Value Tax Tax Capacity Property
15 Value Exclusion Capacity Rate Taxes
16 2019 2019 2019 2019 2019
17
18 $100,000 ($28,200) $718 21.503% $154
19 $200,000 ($19,200) $1,808 21.503% $389
20 $300,000 ($10,200) $2,898 21.503% $623
21 $400,000 ($1,200) $3,988 21.503% $858
22 $500,000 $0 $5,000 21.503% $1,075
23 $600,000 $0 $6,250 21.503% $1,344
24 $750,000 $0 $8,125 21.503% $1,747
25 $800,000 $0 $8,750 21.503% $1,882
26 $900,000 $0 $10,000 21.503% $2,150
27 $1,000,000 $0 $11,250 21.503% $2,419
28
29 2020 CITY PROPERTY TAXES (WITH NO MARKET VALUE CHANGE)
30
31 Market Homestead City Local City Property Percentage
32 Value Market Value Tax Tax Capacity Property Taxes Tax
33 2020 Exclusion Capacity Rate Taxes Increase Increase
34 NO CHANGE 2020 2020 2020 2020 (Decrease) (Decrease)
35
36 $100,000 ($28,200) $718 22.452% $161 $7 4.4%
37 $200,000 ($19,200) $1,808 22.452% $406 $17 4.4%
38 $300,000 ($10,200) $2,898 22.452% $651 $28 4.4%
39 $400,000 ($1,200) $3,988 22.452% $895 $38 4.4%
40 $500,000 $0 $5,000 22.452% $1,123 $47 4.4%
41 $600,000 $0 $6,250 22.452% $1,403 $59 4.4%
42 $750,000 $0 $8,125 22.452% $1,824 $77 4.4%
43 $800,000 $0 $8,750 22.452% $1,965 $83 4.4%
44 $900,000 $0 $10,000 22.452% $2,245 $95 4.4%
45 $1,000,000 $0 $11,250 22.452% $2,526 $107 4.4%
46
47 2020 CITY PROPERTY TAXES (WITH MARKET VALUE INCREASE)
48
49 Market
50 Value Homestead City Local City Property Percentage
51 2020 Market Value Tax Tax Capacity Property Taxes Tax
52 INCREASE OF Exclusion Capacity Rate Taxes Increase Increase
53 5.0%2020 2020 2020 2020 (Decrease) (Decrease)
54
55 $105,000 ($27,800) $772 22.452% $173 $19 12.3%
56 $210,000 ($18,300) $1,917 22.452% $430 $42 10.7%
57 $315,000 ($8,900) $3,061 22.452% $687 $64 10.3%
58 $420,000 $0 $4,200 22.452% $943 $85 10.0%
59 $525,000 $0 $5,313 22.452% $1,193 $118 11.0%
60 $630,000 $0 $6,625 22.452% $1,487 $144 10.7%
61 $787,500 $0 $8,594 22.452% $1,930 $182 10.4%
62 $840,000 $0 $9,250 22.452% $2,077 $195 10.4%
63 $945,000 $0 $10,563 22.452% $2,372 $221 10.3%
64 $1,050,000 $0 $11,875 22.452% $2,666 $247 10.2%
Page 5
2020 CIP: DEPARTMENT
Project Cost
City Proposed
Portion Project Cost
City Proposed
Portion Project Cost
City Proposed
Portion Project Cost
City Proposed
Portion Project Cost
City Proposed
Portion Potential Revenue Source
Roads
1
Tamarack North of Medina to Blackfoot
Overlay 54,000$ 43,200$ Reserves/Bonds/Assessments
2 Tamarack - Medina to 24 - Overlay 49,985$ 39,988$ Reserves/Bonds/Assessments
3 Tamarack City Limits to CSAH 24 Overlay 77,675$ 62,140$ Reserves/Bonds/Assessments
4 Clydesdale trail overlay 600/101 150,000$ 75,000$ Reserves/Bonds/Assessments
5 Oakview Road - Overlay Reserves/Bonds/Assessments
6 Deer Hill Road East - Overlay Reserves/Bonds/Assessments
7 Dusty Trail - Overlay Reserves/Bonds/Assessments
8 Chestnut Road - Overlay 50,000$ 25,000$ Reserves/Bonds/Assessments
9 Hickory Drive - Reconstruct Reserves/Bonds/Assessments
10 Hackamore 750,000$ 325,000$ Reserves/Bonds/Assessments
11 Willow Drive North to 24 - reclaim 200,000$ 160,000$ Reserves/Bonds/Assessments
12 Brockton Lane Upgrade Reserves/Bonds/Assessments
13 Iroquois Drive Overlay 26,000$ 13,000$ Reserves/Bonds/Assessments
14 Maplewood Drive Overlay 29,328$ 14,664$ Reserves/Bonds/Assessments
15 Bobolink Road Overlay 86,326$ 43,163$ Reserves/Bonds/Assessments
16 Morningside Road Overlay 100,654$ 50,327$ Reserves/Bonds/Assessments
17 Elsinore Circle N of Morningside Rd Overlay 18,789$ 9,395$ Reserves/Bonds/Assessments
18 Arrowhead & CR 118 Whistleless Crossing 450,000$ 450,000$ State Bonding/Grant
19 Roads Sub-total 1,350,000$ 850,000$ 442,757$ 275,877$ 250,000$ 185,000$ -$ -$ -$ -$
20
21 Public Works
22 Tandem 230,000$ 230,000$ Equipment Bonds/Cap Equip Fund
23 Water Truck / Tanker Replacement Equipment Bonds/Cap Equip Fund
24 Air Compressor 30% Parks 25,000$ 25,000$ Equipment Bonds/Cap Equip Fund
25 Self propeled broom 50% Stormwater 250,000$ 125,000$ Equipment Bonds/Cap Equip Fund
26 Backhoe 125,000$ 125,000$ Equipment Bonds/Cap Equip Fund
27 Skid Steer Upgrade w/ Bucket 4,000$ 4,000$ 4,000$ 4,000$ 4,000$ 4,000$ 4,000$ 4,000$ Equipment Bonds/Cap Equip Fund
28 ATV 50% PW / 50% Parks Equipment Bonds/Cap Equip Fund
29 Zero Turn Lawn Mower Equipment Bonds/Cap Equip Fund
30 Small Trailer Equipment Bonds/Cap Equip Fund
31 Single Axle Truck 220,000$ 220,000$ Equipment Bonds/Cap Equip Fund
32 Loader w/ Graple Bucket Equipment Bonds/Cap Equip Fund
33 Public Works Sub-total 154,000$ 154,000$ 224,000$ 224,000$ 4,000$ 4,000$ 484,000$ 359,000$ -$ -$
34
35 Police
36 PD Squad Cars 75,000$ 75,000$ 75,000$ 75,000$ 75,000$ 75,000$ 80,000$ 80,000$ Equipment Bonds/Cap Equip Fund
37 Traffic Squad 35,000$ 35,000$ Equipment Bonds/Cap Equip Fund
38 PD Squad Camera 60,000$ 60,000$ Fed Drug Forfeiture Fund
39 Portable Radios 6,000$ 6,000$ 4,000$ 4,000$ DWI Forfeiture Fund
40 Portable Radios 40,000$ 40,000$ DWI Forfeiture Fund
41 PD Squad Laptops/Software MDC DWI Forfeiture Fund
42 Records Management 50,000$ 50,000$ Equipment Bonds/Cap Equip Fund
43 Bunkers & Helmets Equipment Bonds/Cap Equip Fund
44 PD Server Equipment Bonds/Cap Equip Fund
45 Weapon Cams DWI Forfeiture Fund /Donations
46 Miscellaneous 8,000$ 8,000$ DWI Forfeiture Fund
47 Police Sub-total 129,000$ 129,000$ 164,000$ 164,000$ 135,000$ 135,000$ 80,000$ 80,000$ -$ -$
48
49 Fire
50 HAMEL
51 Ongoing PPE Replacement 10,000$ 10,000$ 10,000$ 12,000$ 12,000$ Equipment Bonds/Cap Equip Fund
52 Command Vehicle Replacement 4,320$ 4,320$ 4,320$ 4,320$ 4,320$ Equipment Bonds/Cap Equip Fund
53 Engine 11 Refurbishment 20,000$ 20,000$ 20,000$ 20,000$ 20,000$ Equipment Bonds/Cap Equip Fund
54 Pumper/Tanker 38,917$ 38,917$ 38,917$ 38,917$ 38,917$ Equipment Bonds/Cap Equip Fund
55 Annual Contract 75,000$ 75,000$ 75,000$ 77,000$ 77,000$ Equipment Bonds/Cap Equip Fund
56 Hamel Fire Sub-total 73,237$ 75,000$ 73,237$ 75,000$ 73,237$ 75,000$ 75,237$ 77,000$ 75,237$ 77,000$
57
58 Loretto & Long Lake
59 Fire (Loretto)28,290$ 28,290$ 28,290$ 28,290$ 28,290$ Equipment Bonds/Cap Equip Fund
60 Fire (Long Lake)6,000$ 6,000$ 6,000$ 6,000$ 6,000$ Equipment Bonds/Cap Equip Fund
61 Fire Sub-total -$ 34,290$ -$ 34,290$ -$ 34,290$ -$ 34,290$ -$ 34,290$
62
63 Emergency Management
64 Siren Maintenance 5,000$ 5,000$ 5,000$ 5,000$ 5,000$ 5,000$ 5,000$ 5,000$ 5,000$ 5,000$ Equipment Bonds/Cap Equip Fund
65 Civil Defense Sirens 30,000$ 30,000$
Revolving Cap. Impr. Fund/
County Grant
66 Civil Defense Sub-total 5,000$ 5,000$ 35,000$ 35,000$ 5,000$ 5,000$ 5,000$ 5,000$ 5,000$ 5,000$
67
68
69 Administration/Data Processing
70 Vehicle Equipment Bonds/Cap Equip Fund
71 Administration Sub-total -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
72
73 City Buildings
74 City Hall Repairs/Renovation 15,000$ 15,000$ 10,000$ 10,000$ 15,000$ 15,000$ 10,000$ 10,000$ 15,000$ 15,000$ Revolving Cap. Impr. Fund
75 Community Building Repairs 10,000$ 10,000$ 15,000$ 15,000$ 10,000$ 10,000$ 15,000$ 15,000$ 10,000$ 10,000$ Revolving Cap. Impr. Fund
76 PW//Police/ Renovations 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ Revolving Cap. Impr. Fund
77 600 Clydesdale - Parking Lot Revolving Cap. Impr. Fund
2020
2020 - 2024 Capital Improvement Plan
2021 2022 2023 2024
1
DR
A
F
T
2020 CIP: DEPARTMENT
Project Cost
City Proposed
Portion Project Cost
City Proposed
Portion Project Cost
City Proposed
Portion Project Cost
City Proposed
Portion Project Cost
City Proposed
Portion Potential Revenue Source
2020
2020 - 2024 Capital Improvement Plan
2021 2022 2023 2024
78 City Hall Septic Revolving Cap. Impr. Fund
79 PW/PD Garage Floor Revolving Cap. Impr. Fund
80 City Building Sub-total 35,000$ 35,000$ 35,000$ 35,000$ 35,000$ 35,000$ 35,000$ 35,000$ 35,000$ 35,000$
81
82
83
84 Water (high growth expectation)
85 Water Treatment Plant Expansion 1,400,000$ 1,400,000$ Future - Water Capital
86
Chippewa Watermain Extension - Arrowhead
to Mohawk Water Capital Improvement
87 Brockton Lane Upgrade Water Capital Improvement
88 Chippewa West of Mohawk 435,000$ 435,000$ Water Capital Improvement
89 Hickory Drive Watermain Water Maintenance
90 Medina Morningside Water Maintenance
91 Pressire Tank IB replacement Water Maintenance
92 Water Tower (and land acquisition)2,600,000$ 2,600,000$ Future Water Cap (2020-2023)
93 Water Sub-total -$ -$ 1,400,000$ 1,400,000$ 3,035,000$ 3,035,000$ -$ -$ -$ -$
94
95 Sewer
96 Hickory Drive Sewer Sewer Fund/Assessments
97 Brockton Lane Sewer Line Replacement Sewer Fund/Assessments
98 Sewer Sub-total -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
99
100 Storm Water
101 Baker Ravine SWU; Grants; Env. Fund
102 Hickory Improvments (and land acquisition)SWU; Grants; Env. Fund
103 Long Lake Creek Sub Watershed 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ SWU; Grants; Env. Fund
104 Ardmore Projects SWU; Grants; Env. Fund
105 Storm Water Sub-total -$ 10,000$ -$ 10,000$ -$ 10,000$ -$ 10,000$ -$ 10,000$
106
107 Parks
108 Trails
109 Hackamore Trail 500,000$ 250,000$ Park Ded/Cost Share w/ Corcoran
110 Co Rd 101/School Connection Park Ded/Cost Share/Grants
111 Annual Trail Replacement 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ Municipal Park Fund
112 General Landscaping - all parks (rolling)Environmental Fund
113 Small Equip/Improvements - all parks (rolling)Municipal Park
114 Hamel Legion Park
115 Cricket Field Park Dedication Fund
116 Holy Name Park
117 Hunter Lions Park
118 Replace tennis court Municipal Park Fund
119 Lakeshore Park
120 Large Playground Equipment 100,000$ 100,000$ Park Dedication Fund
121 Bench by water Park Dedication Fund
122 Rainwater Nature Area
123 Maple Park
124 Replace baseball backstop 5,000$ 5,000$ Municipal Park Fund
125 Walnut Park
126 Medina Morningside Park
127 Playground curb/rubber under swings 50,000$ 50,000$ Municipal Park Fund
128 Replace baseball backstop 5,000$ 5,000$ Municipal Park Fund
129 Medina Lake Preserve
130 Trail Head 25,000$ 25,000$ 25,000$ 25,000$ Park Dedication Fund
131 Park Clean-up 25,000$ 25,000$ 25,000$ 25,000$ Municipal Park Fund
132 Land Acquisitions / New Trails (rolling)250,000$ 250,000$ Park Dedication Fund
133 Tomann Preserve - Park Development
134 The Park at Fields of Medina
135 New Park Development 500,000$ 500,000$ Park Dedication Fund
136 Park Land by Medina Golf & CC
137 Parks Sub-total 565,000$ 315,000$ 860,000$ 860,000$ 15,000$ 15,000$ 60,000$ 60,000$ 60,000$ 60,000$
138
139 TOTAL:2,311,237$ 1,607,290$ 3,233,994$ 3,113,167$ 3,552,237$ 3,533,290$ 739,237$ 660,290$ 175,237$ 221,290$