Loading...
HomeMy Public PortalAbout08.20.2019 Complete Work Session Packet Posted 5/29/2009 Page 1 of 1 WORK SESSION AGENDA MEDINA CITY COUNCIL Tuesday, August 20, 2019 6:00 P.M. Medina City Hall 2052 County Road 24 I. Call to Order II. Chippewa Road and Arrowhead Drive Visioning Study Update* (30 minutes) III. 2020 Budget* (30 minutes) IV. Adjourn *If work session is not finished by 7 p.m., it will recess, and discussion will continue following the regular City Council meeting. Posted 8.15.19 MEMORANDUM TO: City Council, through City Administrator Scott Johnson FROM: Jim Stremel, City Engineer; Chuck Rickart, Traffic Engineer DATE: August 15, 2019 MEETING: August 20, 2019 SUBJECT: Chippewa Rd & Arrowhead Dr Visioning Study – Concept Plan Review Background: The City’s 2040 Comprehensive Plan identifies the need to extend Chippewa Road from Mohawk Drive to Arrowhead Drive. These improvements were identified in conjunction with the capacity and operations needs for TH 55. The plan indicates that “MnDOT and the City of Medina should work cooperatively, as redevelopment occurs, to close existing direct access driveways onto TH 55 and relocate direct access to a frontage/backage road system, consistent with the 2007 TH 55 design concept vision”. That concept vision included the idea of connecting Chippewa Road from Mohawk Drive to Arrowhead Drive, completing the roadway network in the area. The 2040 Comprehensive Plan anticipates residential and commercial growth within the Chippewa Road and Arrowhead Drive corridors north of TH 55. A visioning study for the Chippewa Road and Arrowhead Drive corridors has commenced as directed by City Staff and Council. The primary goal of this study is to develop a cohesive plan that can be provided to property owners, developers, and other stakeholders which guide the transportation needs, right-of-way, public utilities, and other parameters within this corridor. The intent of this memo is to provide an update to the City Council as to what has been completed with the study to date including the traffic forecasting, traffic analysis, and concept plan development. City staff and the engineering team are asking for City Council comments, questions, and direction in determining a preferred option that can then be developed in greater detail. Traffic Forecasting & Analysis: WSB’s traffic engineers developed a 2040 ADT traffic forecast for Chippewa Road, Arrowhead Drive, and each of the primary intersections within the corridor. The projected traffic was based on traffic generation for the proposed development and/or anticipated land use as well as the historical traffic count trends for the area. The estimated existing and projected 2040 traffic volumes are shown below: 2 Location Existing 2019 Projected 2040 Arrowhead Drive Meander Rd to Chippewa Rd 1050 5800 Arrowhead Drive North of Chippewa Rd 1050 1320 Chippewa Road Arrowhead Dr to Mohawk Dr NA 7100 Chippewa Road West of Mohawk Dr 690 3900 Mohawk Drive TH 55 to Chippewa Rd 375 1800 Mohawk Drive North of Chippewa Rd 100 900 A traffic analysis was completed evaluating the existing and projected traffic operations for Chippewa Road and Arrowhead Drive corridors, including the intersections of Chippewa Road at Mohawk Drive, Chippewa Road at Arrowhead Drive, Arrowhead Drive at Meander Road and Arrowhead Drive at TH 55. The traffic operations were evaluated using Synchro/SimTraffic software for the signal and stop sign analysis and RODEL software for the roundabout analysis. The analysis documented the corridor operation and recommendation for intersection control and lane configuration improvements. The results of the operations analysis assuming the future projected 2040 traffic conditions provided the following conclusions and recommendations: TH 55 at Arrowhead Drive: · The southbound Arrowhead Dr left turn to TH 55 requires 200 feet of vehicle queue storage. · With the two traditional intersection concepts (OSI driveway in existing location in Figure 2 or relocated to the existing Meander Rd in Figure 1) the full 200 feet of vehicle queue storage to TH 55 can be provided. · With the roundabout option (Figure 3) at the existing Meander Rd intersection, 190 feet of the required 200 feet vehicle queue storage to TH 55 could be provided. Arrowhead Drive at Meander Road/OSI Driveway: · The northbound Arrowhead Dr left turn into the OSI driveway requires 100 feet of vehicle queue storage. · With the traditional intersection option (Figure 1) of the relocating the OSI driveway to line up with Meander Rd the following was concluded: o Only 25 feet of northbound left turn vehicle queue storage can be provided for the OSI driveway. The analysis also indicates that in the short term with the OSI expansion and moderate traffic from the north on Arrowhead Drive, this configuration would be adequate. o A double left turn configuration at the TH 55 intersection is feasible and would provide a longer queue length at the left turn lane into OSI (the double left turn lanes 3 at TH 55 would be shorter in length). With that being said, there would be significant coordination with MnDOT, possible signal phasing changes, widening of Arrowhead Dr on the north side of the intersection, and possible lane configuration changes on the south side of the TH 55 intersection. · With the traditional intersection option (Figure 2) of the relocated Meander Rd to line up with the existing OSI driveway the following was concluded: o 120 feet of northbound left turn vehicle queue storage can be provided for the OSI driveway. o The Meander Road approach can be designed with 30 MPH curves to lessen the impacts to the wetland north of Meander Road. o The intersection could be shifted 20 feet south to lessen the impacts to the wetland north of Meander Road. · With the roundabout option (Figure 3) at the existing Meander Road the left turn volume and queueing can into OSI driveway can be accommodated. Arrowhead Drive at future Chippewa Road: · With the alignment option (Figure 1) that provides a curve on Chippewa Road to Arrowhead Drive with a traditional tee intersection the following was concluded: o Northbound Arrowhead Dr right turn lane o Eastbound Chippewa Road right turn lane o Side street stop control, stopping southbound Arrowhead Drive · With the alignment option (Figure 1) that provides a traditional four-legged intersection, the following was concluded: o Northbound Arrowhead Dr right turn lane o Eastbound Chippewa Road right turn lane o All-way stop control · With the roundabout concept (Figure 3) all approaches only require a single lane. Chippewa Road at Mohawk Drive: · With the alignment option (Figure 1 and 2) that provides a traditional four-legged intersection the following was concluded: o Northbound Mohawk Dr right turn lane o Side street stop control, stopping northbound and southbound on Mohawk Drive · With the roundabout concept (Figure 3) all approaches only require a single lane. Concept Plan Development: From the traffic forecasting and analysis, three horizontal geometric concept plans were developed based on a 40 MPH design speed that included the recommended geometric improvements, preliminary intersection control design (stop condition or roundabout), and right-of-way needs. Exhibits have been enclosed with this memo for reference. · Option 1 (Figure 1) is comprised of a “T” intersection at the Arrowhead Drive and Chippewa Road point of intersection with traditional intersections at Mohawk Drive and Meander Road. 4 o Chippewa Rd/Mohawk Dr Intersection: Provides area access for existing and future development. o Chippewa Rd/Arrowhead Dr Intersection: Encourages traffic to follow Arrowhead Dr to Chippewa Rd, and discourages traffic north on Arrowhead Dr towards the Bridgewater development Additional cost and right of way required to provide the curved alignment than a traditional intersection. o Arrowhead Dr/Meander Rd Intersection: Does not impact wetland on the north side of the existing Meander Rd Does not provide sufficient vehicle queue storage for the northbound left turn into the OSI driveway for future 2040 traffic condition. o Arrowhead Dr/TH 55 Intersection: Provides the required vehicle queue storage for the southbound left turn to TH 55. · Option 2 (Figure 2) is comprised of traditional intersections at Mohawk Dr, Arrowhead Dr, and Meander Rd. o Chippewa Rd/Mohawk Dr Intersection: Provides area access for existing and future development. o Chippewa Rd/Arrowhead Dr Intersection: Does not encourages traffic to follow Chippewa Rd. Less cost and right of way required than Option 1. o Arrowhead Dr/Meander Rd Intersection: Impacts the wetland on the north side of the existing Meander Rd Provides sufficient vehicle queue storage for the northbound left turn into the OSI driveway for future 2040 traffic condition. o Arrowhead Dr/TH 55 Intersection: Provides the required vehicle queue storage for the southbound left turn to TH 55 · Option 3 (Figure 3) is comprised of roundabout intersections at Mohawk Dr, Arrowhead Dr, and Meander Rd. o Chippewa/Mohawk Intersection: Provides area access for existing and future development Higher cost than a traditional intersection Additional right of way needed from adjacent properties to the west o Chippewa/Arrowhead Intersection: Higher cost than a traditional intersection Additional right of way needed from surrounding properties o Arrowhead/Meander Intersection: Provides better traffic operations than Option 1 or Option 2 Higher cost than a traditional intersection and may require a retaining wall to accommodate grading on the west side No (or minimal) impact to the wetland on the north side of Meander Rd Additional right of way needed on the OSI property o Arrowhead/TH 55 Intersection: Does not provide the required vehicle queue storage for the southbound left turn to TH 55 5 Next Steps: Based on City Council input and direction, WSB will proceed with further refinement of the preferred option including additional geometric design (vertical), water/sewer utility review, and more refined cost estimating of the preferred option. A review of the environmental permitting requirements and timelines will also be included with the final report. Consider scheduling a public informational open house on Tuesday, October 15th prior to or in conjunction with the Council work session. The proposed format for this community engagement element is an informal open house in the council chambers. At the November 5th City Council meeting, provide a final report, preferred concept plan, costs estimate, and other conclusions and recommendations developed during the process. City Council Action Requested: Provide input and direction to City Staff on a preferred option. Confirm format for open house. W S B F il e n a m e : D a t e : P r in t e d : 8 / 1 5 / 2 0 1 9 K: \ 0 1 4 4 3 4 - 0 0 0 \ C a d \ E x h ib it s \ P r e l i m in a r y A li g n m e n t s \ O p t i o n 1 T In t e r s e c t i o n s . d g n City of Medina Chippewa Road & Arrowhead Drive Corridor Visioning Study 2' LC TRAIL 8' URBAN SECTION WITH TRAIL THRU LANE 16' THRU LANE 16' 80'R/W R/W BLVD 6' CURB & GUTTER B618 CONCRETE CURB & GUTTER B618 CONCRETE CHIPPEWA ROAD 2' URBAN SECTION WITH TRAIL THRU LANE 16' THRU LANE 16' 80'R/WR/W CURB & GUTTER B618 CONCRETE CURB & GUTTER B618 CONCRETE TRAIL 10.67' ARROWHEAD DRIVE LC N 0 SCALE IN FEET 150 300 Figure 1 MINNESOTA 55 Meander Road A r r o w h e a d D r i v e M o h a w k D r i v e Chippewa Road T Intersection OHW = 980.6 DNR Jurisdictional Wetlands WCA Wetlands OHW: 978.3 OHW: 980.6 OHW Separation Average Daily Traffic XXX EXISTING ADT PROJECT 2040 ADT(XXX) Queue Analysis SB LEFT NB LEFT 200 25 AVAILABLE 200 100 REQUIRED 1050 (5800) 1 0 3 0 ( 1 3 2 0 ) 0 (7100) 1 0 0 ( 9 0 0 ) 690 (3900) 3 7 5 ( 1 8 0 0 ) S T O P STOP S T OP STOP STOP W S B F il e n a m e : D a t e : P r in t e d : 8 / 1 5 / 2 0 1 9 K: \ 0 1 4 4 3 4 - 0 0 0 \ C a d \ E x h ib it s \ P r e l i m in a r y A li g n m e n t s \ O p t i o n 2 T r a d it i o n a l In t e r s e c t i o n s . d g n City of Medina Chippewa Road & Arrowhead Drive Corridor Visioning Study 2' LC TRAIL 8' URBAN SECTION WITH TRAIL THRU LANE 16' THRU LANE 16' 80'R/W R/W BLVD 6' CURB & GUTTER B618 CONCRETE CURB & GUTTER B618 CONCRETE CHIPPEWA ROAD 2' URBAN SECTION WITH TRAIL THRU LANE 16' THRU LANE 16' 80'R/WR/W CURB & GUTTER B618 CONCRETE CURB & GUTTER B618 CONCRETE TRAIL 10.67' ARROWHEAD DRIVE LC N 0 SCALE IN FEET 150 300 Figure 2 Traditional Intersection MINNESOTA 55 Meander Road A r r o w h e a d D r i v e M o h a w k D r i v e Chippewa Road WCA Wetlands OHW = 980.6 DNR Jurisdictional Wetlands OHW: 978.3 OHW: 980.6 OHW Separation 3 7 5 ( 1 8 0 0 ) 690 (3900) 0 (7100) 1 0 3 0 ( 1 3 2 0 ) 1050 (5800) Average Daily Traffic XXX EXISTING ADT PROJECT 2040 ADT(XXX) Queue Analysis SB LEFT NB LEFT 200 100 REQUIRED 200 120 AVAILABLE STOP 1 0 0 ( 9 0 0 ) S T O P S T OP S T O PSTOP S T OP STOP W S B F il e n a m e : D a t e : P r in t e d : 8 / 1 5 / 2 0 1 9 K: \ 0 1 4 4 3 4 - 0 0 0 \ C a d \ E x h ib it s \ P r e l i m in a r y A li g n m e n t s \ O p t i o n 3 R o u n d a b o u t In t e r s e c t i o n s . d g n City of Medina Chippewa Road & Arrowhead Drive Corridor Visioning Study 2' LC TRAIL 8' URBAN SECTION WITH TRAIL THRU LANE 16' THRU LANE 16' 80'R/W R/W BLVD 6' CURB & GUTTER B618 CONCRETE CURB & GUTTER B618 CONCRETE CHIPPEWA ROAD 2' URBAN SECTION WITH TRAIL THRU LANE 16' THRU LANE 16' 80'R/WR/W CURB & GUTTER B618 CONCRETE CURB & GUTTER B618 CONCRETE TRAIL 10.67' ARROWHEAD DRIVE LC N 0 SCALE IN FEET 150 300 Figure 3 Roundabout Intersection MINNESOTA 55 Meander Road A r r o w h e a d D r i v e M o h a w k D r i v e Chippewa Road OHW = 980.6 DNR Jurisdictional Wetlands WCA Wetlands OHW: 978.3 OHW Separation OHW: 980.6 Queue Analysis SB LEFT NB LEFT 190 NA AVAILABLE Average Daily Traffic XXX EXISTING ADT PROJECT 2040 ADT(XXX) 1050 (5800) 1 0 3 0 ( 1 3 2 0 ) 0 (7100) 3 7 5 ( 1 8 0 0 ) 1 0 0 ( 9 0 0 ) 690 (3900) 200 NA REQUIRED MEMORANDUM TO: City Council Members FROM: Erin Barnhart, Finance Director DATE: August 13, 2019 SUBJ: 2020 Preliminary Budget Summary Background The following is a summary of the budget discussion from the July 16th work session with the following adjustments: • General Fund budget increase of $170,543 has been decreased to $164,063. • Proposed tax rate increase of 22.617% has decreased to 22.531% (fiscal disparities) • Equipment capital levy rounded from $312,409 to $312,500. • All proposed fire budgets have been received. Tax Levy 2020 overall increase = 9.7% 4.6% change in market value • 1.9% new construction from 2018 • 2.7% change in MV 4.7% change in tax capacity 2020 tax rate = 22.531%; 4.7% increase General Fund Medina’s 2020 preliminary General Fund budget estimates an overall increase of $164,063; 3.3% levy increase. Enterprise Funds Proposed increases for 2020: • Water 1.5% • Sewer 2% • Storm Water 3% Work Session 2 Municipal Park Fund Increase levy from $14,000 to $112,000; a $98,000 increase to finance 30-year park replacement (current assets) needs in lieu of bonding. Equipment Fund Increase levy from $134,500 to $312,500, a $178,000 increase to finance on going equipment replacement needs in lieu of bonding. Supplemental Revenue • Conduit Bond – allocated to Equipment fund • Antenna revenue – allocate to ALHOA Water/Sewer Connection Fees • No proposed changes for 2020 – per 2018 utility rate analysis. • Adam’s Pest Control request discussion. (See attached memo in budget packet.) Resolution No. 2019- September 3, 2019 Member _____ introduced the following resolution and moved its adoption: CITY OF MEDINA RESOLUTION NO. 2019- RESOLUTION APPROVING PROPOSED TAX LEVY FOR 2020 WHEREAS, the State of Minnesota has adopted legislation, which requires all municipalities to pass a resolution adopting a preliminary budget and certifying the total proposed tax levy amount to the County Auditor prior to September 30, 2019; and WHEREAS, it is the desire of the City of Medina, Minnesota, to comply with this law and submit a proposed property tax levy including general operating and debt levies; and NOW THEREFORE, BE IT RESOLVED, by the city council of the City of Medina, County of Hennepin, Minnesota, that the following sums of money be proposed for 2020 upon the taxable property in the City of Medina, for the following purposes: To raise $3,434,452 as adequate revenue for the general fund operating budget, $533,819 as adequate revenue for debt service, $312,500 for capital equipment and $112,000 for municipal park fund. General Fund $3,434,452 Capital Equipment $ 312,500 Municipal Park Fund $ 112,000 Debt Service: 2010A G.O. Improvement Bonds $ 29,500 2011B Taxable G.O. Improvement Bonds $ 60,000 2012A G.O. CIP Bonds $ 243,705 2013A G.O. Refunding Bonds $ 137,361 2015A G.O. Improvement Bonds $ 63,253 Total Levy: $4,392,771 BE IT FURTHER RESOLVED, that the City Clerk, Jodi Gallup, is hereby instructed to transmit a certified copy of this resolution to the county auditor of Hennepin County, Minnesota. Date: September 3, 2019. ____________________________________ Kathleen Martin, Mayor ATTEST: ___________________________________ Jodi M. Gallup, City Clerk Agenda Item Resolution No. 2019- 2 September 3, 2019 The motion for the adoption of the foregoing resolution was duly seconded by member _____ and upon vote being taken thereon, the following voted in favor thereof: And the following voted against same: Whereupon said resolution was declared duly passed and adopted. CITY OF MEDINA GENERAL FUND PRELIMINARY 2020 BUDGET 2020 Amount Percentage 2017 2017 2018 2018 2019 2019 Prelim Increase Increase Budget Actual Budget Actual Budget YTD Budget (Decrease) (Decrease) REVENUES & OTHER FINANCING SOURCES: 1 Property Tax Levy 3,134,977 3,132,281 3,229,026 3,154,881 3,325,897 1,689,572 3,434,452 108,555 3.3% 2 Other Taxes 30,000 73,488 30,000 51,358 33,000 44,342 75,000 42,000 127.3% 3 Licenses and Permits 372,800 595,499 374,300 592,277 377,400 340,075 390,669 13,269 3.5% 4 Intergovernmental 207,618 256,433 232,118 271,965 263,910 72,426 279,773 15,863 6.0% 5 Charges for Services 112,831 143,411 124,564 130,169 123,146 101,711 138,087 14,941 12.1% 6 Fines and Forfeitures 105,000 96,050 105,000 88,044 110,000 51,608 95,000 (15,000) -13.6% 7 Special Assessments 1,000 12,545 0 1,761 1,715 444 0 (1,715) -100.0% 8 Miscellaneous 128,167 182,453 108,225 215,518 123,698 87,141 104,237 (19,461) -15.7% 9 Sale of Assets 30003000000 0 N/A 10 Transfers In 217,048 217,049 223,110 208,110 213,572 0 219,183 5,611 2.6% 11 Total Revenues & Other Financing Sources 4,309,741 4,709,209 4,426,643 4,714,083 4,572,338 2,387,319 4,736,401 164,063 3.6% EXPENDITURES & OTHER FINANCING USES: General Government: 12 Mayor & Council 26,294 25,323 25,144 25,273 25,644 15,828 25,543 (101) -0.4% 13 Administration 591,789 568,959 602,321 599,335 630,578 410,546 660,430 29,852 4.7% 14 Elections 10,900 1,501 10,900 15,235 11,400 1,069 15,400 4,000 35.1% 15 Assessing 88,872 90,515 90,493 91,229 93,840 54,194 98,066 4,226 4.5% 16 Planning & Zoning 190,150 191,825 193,840 169,879 189,411 97,359 191,105 1,694 0.9% 17 Comprehensive Plan 8,000 125 8,000 0 8,000 0 8,000 0 0.0% 18 Data Processing 72,850 73,271 82,083 79,586 82,083 47,456 88,704 6,621 8.1% 19 Police/Public Works Facility 69,415 69,521 69,415 79,670 76,415 39,705 77,500 1,085 1.4% 20 Municipal Building 48,410 39,740 39,100 40,994 60,810 30,695 61,000 190 0.3% 21 Unallocated 2,300 0 2,100 0 2,100 0 0 (2,100) -100.0% 22 Total General Government 1,108,980 1,060,780 1,123,396 1,101,200 1,180,281 696,852 1,225,748 45,467 3.9% Public Safety: 23 Police 1,564,597 1,525,729 1,617,770 1,647,492 1,651,875 903,372 1,747,303 95,428 5.8% 24 Police Records Management 8,850 8,561 8,850 8,693 8,850 8,905 13,500 4,650 52.5% 25 Fire 394,172 426,262 424,716 413,375 446,242 284,886 414,109 (32,133) -7.2% 26 Building Inspections 300,006 240,836 312,013 409,365 318,343 89,455 330,718 12,375 3.9% 27 Emergency Management 5,200 4,246 5,200 3,990 5,200 4,722 5,800 600 11.5% 28 Total Public Safety 2,272,825 2,205,634 2,368,549 2,482,916 2,430,510 1,291,341 2,511,430 80,920 3.3% Public Works: 29 Public Works 708,212 618,315 706,455 641,221 726,877 361,076 749,449 22,572 3.1% 30 Sanitation & Recycling 15,112 13,302 18,146 12,567 20,080 8,040 21,105 1,025 5.1% 31 Total Public Works 723,324 631,617 724,601 653,789 746,957 369,116 770,555 23,597 3.2% Parks & Recreation: 32 Community Building 33,950 32,540 37,127 50,694 41,146 15,851 41,808 662 1.6% 33 Parks 168,662 165,077 170,970 242,850 169,444 134,395 182,859 13,415 7.9% 34 Total Parks & Recreation 202,612 197,617 208,097 293,544 210,590 150,247 224,667 14,077 6.7% 35 Transfers Out 2,000 2,000 2,000 53,362 4,000 0 4,000 0 0.0% 36 Total Expenditures & Other Financing Uses 4,309,741 4,097,648 4,426,643 4,584,810 4,572,338 2,507,555 4,736,401 164,062 3.6% EXCESS (DEFICIENCY) OF REVENUES AND OTHER FINANCING SOURCES OVER (UNDER) 37 EXPENDITURES AND OTHER FINANCING USES 0 611,561 0 129,273 0 (120,236) (0) (0) N/A 1 City of Medina 2019 Proposed Property Tax Scenario Residential Homesteads SCENARIO - GENERAL FUND LEVY PLUS 3.3% 2019 2020 2019-2020 Budget Proposed Change 1 City Tax Rate:21.528% 22.531% 4.7% 2 3 General Fund Levy:$3,325,897 $3,434,452 $108,555 4 5 Debt Service & Capital Levies:$676,997 $958,319 $281,322 6 7 Total Levy:$4,002,894 $4,392,771 $389,877 8 9 Change in Total Levy:9.7% 10 11 2019 CITY PROPERTY TAXES 12 13 Homestead City Local City 14 Market Market Value Tax Tax Capacity Property 15 Value Exclusion Capacity Rate Taxes 16 2019 2019 2019 2019 2019 17 18 $100,000 ($28,200) $718 21.528% $155 19 $200,000 ($19,200) $1,808 21.528% $389 20 $300,000 ($10,200) $2,898 21.528% $624 21 $400,000 ($1,200) $3,988 21.528% $859 22 $500,000 $0 $5,000 21.528% $1,076 23 $600,000 $0 $6,250 21.528% $1,345 24 $750,000 $0 $8,125 21.528% $1,749 25 $800,000 $0 $8,750 21.528% $1,884 26 $900,000 $0 $10,000 21.528% $2,153 27 $1,000,000 $0 $11,250 21.528% $2,422 28 29 2020 CITY PROPERTY TAXES (WITH NO MARKET VALUE CHANGE) 30 31 Market Homestead City Local City Property Percentage 32 Value Market Value Tax Tax Capacity Property Taxes Tax 33 2020 Exclusion Capacity Rate Taxes Increase Increase 34 NO CHANGE 2020 2020 2020 2020 (Decrease) (Decrease) 35 36 $100,000 ($28,200) $718 22.531% $162 $7 4.7% 37 $200,000 ($19,200) $1,808 22.531% $407 $18 4.7% 38 $300,000 ($10,200) $2,898 22.531% $653 $29 4.7% 39 $400,000 ($1,200) $3,988 22.531% $899 $40 4.7% 40 $500,000 $0 $5,000 22.531% $1,127 $50 4.7% 41 $600,000 $0 $6,250 22.531% $1,408 $63 4.7% 42 $750,000 $0 $8,125 22.531% $1,831 $82 4.7% 43 $800,000 $0 $8,750 22.531% $1,971 $88 4.7% 44 $900,000 $0 $10,000 22.531% $2,253 $100 4.7% 45 $1,000,000 $0 $11,250 22.531% $2,535 $113 4.7% 46 47 2020 CITY PROPERTY TAXES (WITH MARKET VALUE INCREASE) 48 49 Market 50 Value Homestead City Local City Property Percentage 51 2020 Market Value Tax Tax Capacity Property Taxes Tax 52 INCREASE OF Exclusion Capacity Rate Taxes Increase Increase 53 5.0%2020 2020 2020 2020 (Decrease) (Decrease) 54 55 $105,000 ($27,800) $772 22.531% $174 $19 12.5% 56 $210,000 ($18,300) $1,917 22.531% $432 $43 11.0% 57 $315,000 ($8,900) $3,061 22.531% $690 $66 10.5% 58 $420,000 $0 $4,200 22.531% $946 $88 10.2% 59 $525,000 $0 $5,313 22.531% $1,197 $121 11.2% 60 $630,000 $0 $6,625 22.531% $1,493 $147 10.9% 61 $787,500 $0 $8,594 22.531% $1,936 $187 10.7% 62 $840,000 $0 $9,250 22.531% $2,084 $200 10.6% 63 $945,000 $0 $10,563 22.531% $2,380 $227 10.6% 64 $1,050,000 $0 $11,875 22.531% $2,676 $254 10.5% 2 OPERATING 2016 1 Hamel 202,215.00$ 64.61% 221,000.00$ 66.47% 238,000.00$ 70.37% 257,500.00$ 71.10% 266,550.00$ 72.21% 2 Loretto 79,978.87$ 25.56% 79,799.83$ 24.00% 71,380.21$ 21.11% 75,505.99$ 20.85% 71,277.00$ 19.31% 3 Long Lake 25,263.00$ 8.07% 26,015.00$ 7.82% 22,994.00$ 6.80% 23,165.00$ 6.40% 25,061.00$ 6.79% 4 Maple Plain 5,502.26$ 1.76% 5,667.33$ 1.70% 5,837.35$ 1.73% 6,012.47$ 1.66% 6,223.00$ 1.69% 5 312,959.13$ 332,482.16$ 338,211.56$ 362,183.46$ 369,111.00$ 7 CAPITAL1 8 Hamel 70,000.00$ 70.99% 73,000.00$ 73.00% 73,000.00$ 68.04% 73,000.00$ 74.58% 75,000.00$ 75.09% 9 Loretto 22,600.50$ 22.92% 21,000.00$ 21.00% 28,290.00$ 26.37% 18,877.00$ 19.29% 18,877.00$ 18.90% 10 Long Lake 6,000.00$ 6.09% 6,000.00$ 6.00% 6,000.00$ 5.59% 6,000.00$ 6.13% 6,000.00$ 6.01% 11 Maple Plain -$ 0.00% -$ 0.00% -$ 0.00% -$ 0.00% -$ 0.00% 12 98,600.50$ 100,000.00$ 107,290.00$ 97,877.00$ 99,877.00$ 13 TOTAL CONTRACT 14 Hamel 272,215.00$ 66.14% 294,000.00$ 68.94% 311,000.00$ 70.28% 330,500.00$ 71.84% 341,550.00$ 72.83% 15 Loretto 102,579.37$ 24.92% 100,799.83$ 23.64% 99,670.21$ 22.52% 94,382.99$ 20.52% 90,154.00$ 19.22% 16 Long Lake 31,263.00$ 7.60% 25,994.00$ 6.10% 25,994.00$ 5.87% 29,165.00$ 6.34% 31,061.00$ 6.62% 17 Maple Plain 5,502.26$ 1.34% 5,667.33$ 1.33% 5,837.35$ 1.32% 6,012.47$ 1.31% 6,223.00$ 1.33% 18 411,559.63$ 426,461.16$ 442,501.56$ 460,060.46$ 468,988.00$ 19 20 23 MARKET VALUE2 2016 24 Hamel 1,091,236,400 74.32% 1,159,793,700 74.28% 1,225,474,500 74.75% 1,260,512,200 74.61% 1,339,983,100 75.18% 25 Loretto 201,880,400 13.75% 211,332,400 13.53% 220,747,500 13.46% 229,443,300 13.58% 235,285,700 13.20% 26 Long Lake 160,510,500 10.93% 175,143,000 11.22% 176,168,100 10.75% 181,686,900 10.75% 188,447,300 10.57% 27 Maple Plain 14,678,000 1.00% 15,182,100 0.97% 17,138,100 1.05% 17,885,000 1.06% 18,707,100 1.05% 28 1,468,305,300 1,561,451,200 1,639,528,200 1,689,527,400 1,782,423,200 30 CALLS3 2016 31 Hamel 165 72.05% 170 186 32 Loretto 45 19.65% 30 18 33 Long Lake 16 6.99% 19 13 34 Maple Plain 3 1.31% 16 13 35 229 235 230 37 CONSUMER PRICE INDEX (CPI-U)4 (June-June)2016 38 1st Half 2015 229.374 1st Half 2016 232.777 1st Half 2017 238.152 1st Half 2018 243.77 1st Half 2019 39 1st Half 2016 232.777 1st Half 2017 238.152 1st Half 2018 243.77 1st Half 2019 1st Half 2020 40 % Change from  Prior Year 1.48% % Change from  Prior Year 2.31% % Change from  Prior Year 2.36% % Change from  Prior Year % Change from  Prior Year 42 43 44 45 46 47 2020 FIRE CONTRACT DETAIL The City of Medina is divided into four geographic areas (see map attached) each covered by a different fire department: Hamel, Loretto, Maple Plain and Long Lake. Each area is served by a fire department not more than ten minutes travel time away. The ten minute designation meets the code and standards of the National Fire Protection Association (NFPA), national standard used throughout the state of Minnesota. 2017 2018 2019 2 Market Values are based on prior year valuations. Pertains to Hamel, Loretto & Long Lake contracts where increases are based on market value and calls. Analytics by Contract Methodology 2017 2018 2019 2020 2017 2018 2019 2020 2017 2018 2019 2020 1 2013 Capital was combined with operating budget. 3 Call numbers come from prior year actuals. Pertains to Hamel, Loretto & Long Lake contracts as above. 4Consumer Price Index from US Dept. of Labor, Minn / St Paul, All Urban Consumers (CPI-U), June to June. Base Year 1982-1984 = 100. Pertains to Maple Plain Fire Contract where increases are based on CPI-U data alone. 3 Analytics by Contract Methodology 49 50 POPULATION4 2016 51 Hamel 4,668 74.87% 4,763 75.17% 5,074 76.33% 5,162 76.55% 5,359 76.99% 52 Loretto 801 12.85% 802 12.67% 801 12.05% 804 11.92% 814 11.69% 53 Long Lake 662 10.62% 663 10.47% 664 9.98% 666 9.88% 675 9.70% 54 Maple Plain 104 1.67% 107 1.69% 109 1.64% 112 1.65% 113 1.62% 55 6,235 6,336 6,647 6,744 6,961 56 57 HOUSEHOLDS5 2016 58 Hamel 1,621 74.87% 1,644 75.17% 1,774 76.33% 1,805 76.55% 1,850 76.99% 59 Loretto 278 12.84% 277 12.67% 280 12.05% 281 11.92% 281 11.69% 60 Long Lake 230 10.62% 229 10.47% 232 9.98% 233 9.88% 233 9.70% 61 Maple Plain 36 1.66% 37 1.69% 38 1.64% 39 1.65% 39 1.62% 62 2,165 2,187 2,324 2,358 2,403 63 64 PER CAPITA6 2016 65 Hamel 58$ 20.35% 62$ 22.09% 61$ 22.00% 64$ 22.94% 64$ 23.13% 66 Loretto 128$ 44.70% 126$ 44.96% 124$ 44.67% 117$ 42.07% 111$ 40.19% 67 Long Lake 47$ 16.48% 39$ 14.02% 39$ 14.06% 44$ 15.68% 46$ 16.70% 68 Maple Plain 53$ 18.47% 53$ 18.92% 54$ 19.28% 54$ 19.31% 55$ 19.99% 69 287 279 279 279 276 70 71 BUILDING PERMITS ISSUED 2016 72 # Value # Value # Value # Value # Value 73 Single Family 64 $34,036,649 60 $29,700,500 56 $31,235,936 31 $16,306,708 0 $0 74 Multi Family 0 $0 0 $0 0 $0 0 $0 0 $0 75 Commercial/Industrial 5 $13,201,640 2 $3,180,250 0 $0 0 $0 0 $0 76 69 $47,238,289 62 $32,880,750 56 $31,235,936 31 $16,306,708 0 $0 77 78 MEDINA COST OF LIVING ADJUSTMENT (COLA)8 2016 79 2.00% 2.00% 3.00% 2.50% 2.50% 80 81 SOCIAL SECURITY COST OF LIVING ADJUSTMENT (CPI-W)9 (Sept-Sept)2016 82 0.00% 0.30% 2.20% 2.70% 0.00% 84 85 86 Updated 8/7/19 87 88 4 2017 2018 2019 2020 2017 2018 2019 2020 2017 2018 2019 2020 2020 4 Population is mathematically estimated by district. 5 Households are mathematically estimated by district. 2017 2018 2019 2020 2017 2018 2019 2020 6 “Per Capita” is calculated by dividing contract amount by population. While creating an apparent anomaly in a rural area with a low population (e.g. the area served by Loretto which is primarily rural), the “Per Capita” metric supplies useful data regarding areas with approximately equal population density. 7 Medina Annual COLA (determined by comparison with other MN Cities. Information compiled by League of MN Cities). 8 Social Security Annual COLA (determined by Consumer Price Index (CPI-W) Sept. of prior year to Sept. of current year). 1982-1984=100. 2017 2018 2019 Sewer Liftstation/CIP Page 1 of 3 August 20, 2019 Willow Backage Road City Council Worksession MEMORANDUM TO: Mayor Martin and Members of the City Council FROM: Dusty Finke, Planning Director; through City Administrator Scott Johnson DATE: August 15, 2019 MEETING: August 20, 2019 Worksession SUBJ: Capital Improvement Plan – Willow/Highway 55 Lift Station and Backage Road Background Last month, the City received an application for development from Jar-Har LLP (Adam’s Pest Control) for property north of Highway 55 and west of Willow Drive. The potential development presented two improvements which related to the City’s Capital Improvement Plan (CIP) which staff is seeking direction:  Sewer lift station/forcemain along Willow Drive  Potential backage road from Willow Drive Sewer Lift Station The City’s 2040 Comprehensive Plan identified the need for a lift station to serve properties to the west of Willow Drive, including the Adam’s Pest Control site. These sites would not be serviceable with sanitary sewer via gravity. The improvement is identified as the “Highway 55 Lift Station” and “Highway 55 Gravity Line” at a cost of approximately $700,000 in the table summarizing the necessary Sanitary Sewer Capital Improvements: The Comp Plan anticipated that the cost of some of these improvements would be paid by the City with Sewer Connection Fees charged on all new construction. The Plan also anticipated that some of these improvements would be expected to be partially or fully constructed by developers to serve a specific site. Sewer Liftstation/CIP Page 2 of 3 August 20, 2019 Willow Backage Road City Council Worksession Staff began internal discussions related to the funding of the lift station on Willow/Highway 55 as soon as development was discussed in this area. A new lift station has not been constructed in the City for almost 20 years, through two full Comprehensive Plan cycles, so there is not recent practice to rely upon. The City has generally expected pipes and streets to be constructed in connection with a particular development. However, other types of improvements, such as water towers and water treatment plant expansions, are paid for by the City with connection fees from all new construction. A regional lift station seems to fall somewhere in between. Unlike a water tower, a lift station would not “serve” all property in the system. On the other hand, a regional lift station would serve numerous development sites. It is also worth considering that the need for a lift station would depend on topography, existing City infrastructure, and how the City plans. During the analysis, staff reviewed the following information:  Existing balance of the Sewer Capital Fund (approximately $2.8 million)  Projected future sewer connection fee revenue (approximately +$950,000 by 2040)  Anticipated costs of future lift station The Willow/Highway 55 lift station is the only one anticipated under the current Comp Plan (although there may be a chance a lift station is necessary for development along Medina Road/Brockton Lane). However, as staff projected further into the future, we anticipated 2-3 potential lift stations to serve the Future Development Area in the longer term (Mohawk Drive/Katrinka Road, west of Loretto). These future lift stations would only be necessary for additional development, which would produce connection fees beyond the $950,000  Anticipated portions of other improvements staff anticipated being constructed by development Staff projects that the “Upsize Hamel Road” pipe improvement would be fully funded with connection fees. The other trunk sewers would be anticipated to be constructed by developers. However, staff recommends reserving additional funds in case the City decides to fund some portion or provide credits for over- sizing or over-depth. Staff’s initial conclusion is that the proper course is to fund regional lift station improvements with sewer connection fees. If these improvements are not planned to be funded with the connection fee revenue, it would likely be necessary to lower the connection fees for all properties and to raise the connection fees significantly for properties which would need a lift station. Staff recommends that $700,000 be added to the CIP for the “Willow/Highway 55 Lift Station” in 2020 and $200,000 be added for the “Hamel Road Sewer Upsizing” in 2025. Backage Road The property proposed to be developed by Adam’s Pest Control currently only has frontage on Highway 55 and does not have access to any other street. Adam’s would prefer to have access to Willow Drive, but there is property owned by another party between the site and Willow Drive and no right-of-way exists to allow for it. Sewer Liftstation/CIP Page 3 of 3 August 20, 2019 Willow Backage Road City Council Worksession As such, Adam’s is proposing direct access onto Highway 55 via a right-in/right-out. Staff is coordinating with the City Engineer and MnDOT related to this proposed access, but initial indications are that a right-in/right-out may actually be more problematic than a full access because it would likely encourage unsafe U-turn maneuvers at nearby driveways and intersections. Adam’s and staff have engaged with the property owner adjacent to Willow Drive to the east to see if there was a possibility that the property owner would take part in construction of the backage road. The owner indicated that they would be willing to provide the right-of-way for construction of the street, but that they would not contribute to the cost. Adam’s has indicated that they may be willing to construct the roadway, but has requested financial assistance to do so. The estimated cost of the roadway is $640,000 + additional costs for stormwater management. Adam’s has also indicted that they would be willing to close their access onto Highway 55 three years after the backage road is constructed. Staff also engaged MnDOT to determine if state funding would be available to provide for the backage road. There are obvious benefits to the regional and state transportation system if access can be limited and then eliminated onto Highway 55. Unfortunately, MnDOT staff indicated that there are no readily available funding sources through which they could contribute. The City has historically expected new roadways to be constructed by the developer of the site served. The City’s ability to require construction in this case is complicated by the fact that there is no right-of-way. Staff believes it may be worthwhile for the City to consider collaborating with the two owners to allow Adam’s to construct the backage road immediately upon development. Construction of the backage road immediately with development would reduce the costs of improvements which Adam’s would need to construct onto Highway 55 and allow that investment to be shifted to the backage road. It would also reduce the cost of MnDOT closing the access onto Highway 55 in the future. The City would likely be responsible for some share of the backage road if it were constructed in the future in order to remove Adam’s access from Highway 55 (or to extend the backage road to Adam’s if some portion of it is constructed by the developer adjacent to Willow). Staff has discussed the possibility of fee reductions rather than a direct contribution towards the cost of the roadways. These reductions could be provided in various ways to the applicant such as sewer/water connection fees, building permits fees, engineering inspections, etc. The City could choose which fund(s) the city would reimburse from which would not necessarily need to match the fees being reduced, as the City could transfer funds as appropriate. In initial discussions, staff has considered reductions of sewer connection fees and potential reductions to other fees to be reimbursed by the road fund, since the reductions support improvements to the transportation network. Staff will present more specific information at the worksession. 2020 CIP: DEPARTMENT Project Cost City Proposed Portion Project Cost City Proposed Portion Project Cost City Proposed Portion Project Cost City Proposed Portion Project Cost City Proposed Portion Potential Revenue Source Roads 1 Tamarack North of Medina to Blackfoot Overlay 54,000$ 43,200$ Reserves/Bonds/Assessments 2 Tamarack - Medina to 24 - Overlay 49,985$ 39,988$ Reserves/Bonds/Assessments 3 Tamarack City Limits to CSAH 24 Overlay 77,675$ 62,140$ Reserves/Bonds/Assessments 4 Clydesdale trail overlay 600/101 150,000$ 75,000$ Reserves/Bonds/Assessments 5 Oakview Road - Overlay 43,000$ 21,500$ Reserves/Bonds/Assessments 6 Deer Hill Road East - Overlay 27,000$ 23,500$ Reserves/Bonds/Assessments 7 Dusty Trail - Overlay 4,000$ 2,000$ Reserves/Bonds/Assessments 8 Tower Dr West Overlay/curb 42,000$ 21,000$ Reserves/Bonds/Assessments 9 Chestnut Road - Overlay 50,000$ 25,000$ Reserves/Bonds/Assessments 10 Town Line Rd South 100,000$ 100,000$ Assessment Escrow Fund 11 Foxberry Farms Overlay/10% curb 283,000$ 142,000$ Reserves/Bonds/Assessments 12 Hackamore Medina/ Portion 600,000$ 450,000$ 600,000$ 450,000$ Reserves/Bonds/Developer 13 Willow Drive North to 24 - reclaim 200,000$ 160,000$ Reserves/Bonds/Assessments 14 Shire Dr Overlay 32,000$ 16,000$ Reserves/Bonds/Assessments 15 Iroquois Drive Overlay 30,000$ 15,000$ Reserves/Bonds/Assessments 16 Maplewood Drive Overlay 29,328$ 14,664$ Reserves/Bonds/Assessments 17 Bobolink Road Overlay 90,000$ 45,000$ Reserves/Bonds/Assessments 18 Morningside Road Overlay 110,000$ 55,000$ Reserves/Bonds/Assessments 19 Elsinore Circle N of Morningside Rd Overlay 20,000$ 10,000$ Reserves/Bonds/Assessments 20 Arrowhead & CR 118 Whistleless Crossing 450,000$ 60,000$ Reserves/State Bonding/Grant 21 Roads Sub-total 555,000$ 122,500$ 1,063,000$ 682,000$ 474,660$ 351,828$ 820,000$ 560,000$ 129,328$ 114,664$ 22 23 Public Works 24 Tandem 230,000$ 230,000$ Equipment Bonds/Cap Equip Fund 25 Water Truck / Tanker Replacement 20,000$ 20,000$ Equipment Bonds/Cap Equip Fund 26 Air Compressor 25,000$ 25,000$ Equipment Bonds/Cap Equip Fund 27 Ditch Mower Replacement/Loretto 90,000$ 45,000$ Equipment Bonds/Cap Equip Fund 28 Backhoe Replacement 130,000$ 130,000$ Equipment Bonds/Cap Equip Fund 29 Skid Steer Upgrade w/ Bucket/Harly Rake 12,000$ 12,000$ 4,000$ 4,000$ 4,000$ 4,000$ 4,000$ 4,000$ Equipment Bonds/Cap Equip Fund 30 Single Axle Truck 220,000$ 220,000$ Equipment Bonds/Cap Equip Fund 31 Public Works Sub-total 167,000$ 167,000$ 4,000$ 4,000$ 244,000$ 244,000$ 234,000$ 234,000$ 90,000$ 45,000$ 32 33 Police 34 PD Squad Cars 75,000$ 75,000$ 75,000$ 75,000$ 75,000$ 75,000$ 80,000$ 80,000$ 126,000$ 126,000$ Equipment Bonds/Cap Equip Fund 35 Traffic Squad 35,000$ 35,000$ Equipment Bonds/Cap Equip Fund 36 PD Squad Camera / Body Cams 100,000$ 100,000$ Equipment Bonds/Cap Equip Fund 37 Portable Radios 6,000$ 6,000$ 4,000$ 4,000$ 4,000$ 4,000$ DWI Forfeiture Fund/Cap Equip 38 Squad Radios 40,000$ 40,000$ DWI Forfeiture Fund/Cap Equip 39 Records Management 70,000$ 70,000$ Equipment Bonds/Cap Equip Fund 40 Miscellaneous 8,000$ 8,000$ 8,000$ 8,000$ 8,000$ 8,000$ DWI Forfeiture Fund/Cap Equip 41 Police Sub-total 129,000$ 129,000$ 114,000$ 114,000$ 257,000$ 257,000$ 80,000$ 80,000$ 134,000$ 134,000$ 42 43 Fire 44 HAMEL 45 Ongoing PPE Replacement 10,000$ 10,000$ 10,000$ 12,000$ 12,000$ Equipment Bonds/Cap Equip Fund 46 Command Vehicle Replacement 4,320$ 4,320$ 4,320$ 4,320$ 4,320$ Equipment Bonds/Cap Equip Fund 47 Engine 11 Refurbishment 20,000$ 20,000$ 20,000$ 20,000$ 20,000$ Equipment Bonds/Cap Equip Fund 48 Pumper/Tanker 38,917$ 38,917$ 38,917$ 38,917$ 38,917$ Equipment Bonds/Cap Equip Fund 49 Annual Contract 75,000$ 75,000$ 75,000$ 77,000$ 77,000$ Equipment Bonds/Cap Equip Fund 50 Hamel Fire Sub-total 73,237$ 75,000$ 73,237$ 75,000$ 73,237$ 75,000$ 75,237$ 77,000$ 75,237$ 77,000$ 51 52 Loretto & Long Lake 53 Fire (Loretto)28,290$ 28,290$ 28,290$ 28,290$ 28,290$ Equipment Bonds/Cap Equip Fund 54 Fire (Long Lake)6,000$ 6,000$ 6,000$ 6,000$ 6,000$ Equipment Bonds/Cap Equip Fund 55 Fire Sub-total -$ 34,290$ -$ 34,290$ -$ 34,290$ -$ 34,290$ -$ 34,290$ 56 57 Emergency Management 58 Siren Maintenance 5,000$ 5,000$ 7,500$ 7,500$ 7,500$ 7,500$ 7,500$ 7,500$ 7,500$ 7,500$ Equipment Bonds/Cap Equip Fund 59 Civil Defense Sirens 30,000$ 30,000$ Revolving Cap. Impr. Fund 60 Civil Defense Sub-total 5,000$ 5,000$ 37,500$ 37,500$ 7,500$ 7,500$ 7,500$ 7,500$ 7,500$ 7,500$ 61 62 63 Administration/Data Processing 64 Vehicle Equipment Bonds/Cap Equip Fund 65 Administration Sub-total -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 66 67 City Buildings 68 City Hall Repairs/Renovation 15,000$ 15,000$ 10,000$ 10,000$ 15,000$ 15,000$ 10,000$ 10,000$ 15,000$ 15,000$ Revolving Cap. Impr. Fund 69 Community Building Repairs 10,000$ 10,000$ 15,000$ 15,000$ 10,000$ 10,000$ 15,000$ 15,000$ 10,000$ 10,000$ Revolving Cap. Impr. Fund 70 PW/Police Repairs/Renovations 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ Revolving Cap. Impr. Fund 71 City Buildings - Parking Lot 20,000$ 20,000$ 20,000$ 20,000$ 20,000$ 20,000$ 20,000$ 20,000$ 20,000$ 20,000$ Revolving Cap. Impr. Fund 72 City Building Sub-total 55,000$ 55,000$ 55,000$ 55,000$ 55,000$ 55,000$ 55,000$ 55,000$ 55,000$ 55,000$ 73 74 75 76 Water (high growth expectation) 2020 2020 - 2024 Capital Improvement Plan 2021 2022 2023 2024 1 2020 CIP: DEPARTMENT Project Cost City Proposed Portion Project Cost City Proposed Portion Project Cost City Proposed Portion Project Cost City Proposed Portion Project Cost City Proposed Portion Potential Revenue Source 2020 2020 - 2024 Capital Improvement Plan 2021 2022 2023 2024 77 Water Treatment Plant Expansion 1,400,000$ 1,400,000$ Future - Water Capital 78 Chippewa Watermain Extension - Arrowhead to Mohawk 400,000$ 400,000$ Water Capital Improvement 79 Chippewa West of Mohawk 435,000$ 435,000$ Water Capital Improvement 80 Water Tower (and land acquisition)2,600,000$ 2,600,000$ Future Water Cap (2020-2023) 81 Water Sub-total -$ -$ 835,000$ 835,000$ 1,400,000$ 1,400,000$ 2,600,000$ 2,600,000$ -$ -$ 82 83 Sewer 84 Willow Dr Lift Station 700,000$ 700,000$ Sewer Capital Fund I / I Maintenance 100,000$ 100,000$ 100,000$ 100,000$ Sewer Capital Fund Hunter/Hamel Rd Upsize 750,000$ 750,000$ Sewer Capital Fund 86 Sewer Sub-total -$ -$ 800,000$ 800,000$ 100,000$ 100,000$ -$ -$ 750,000$ 750,000$ 87 88 Storm Water 89 Long Lake Creek Sub Watershed 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ Storm Water Fund/Grants 90 Storm Water Sub-total -$ 10,000$ -$ 10,000$ -$ 10,000$ -$ 10,000$ -$ 10,000$ 91 92 Municipal Park Replacements 93 Trails 97 Annual Trail Replacement 25,000$ 25,000$ 25,000$ 25,000$ 25,000$ 25,000$ 30,000$ 30,000$ 30,000$ 30,000$ Municipal Park Fund 98 Hamel Legion Park 99 Holy Name Park 100 Hunter Lions Park 101 Full Park Reconstruction/Tennis Court 10,000$ 10,000$ 500,000$ 450,000$ Municipal Park Fund/Grants 102 Lakeshore Park 103 Large Playground Equipment 100,000$ 100,000$ Municipal Park Fund 104 Rainwater Nature Area 105 Maple Park 106 Walnut Park 107 Basketball Hoop/Striping 5,000$ 5,000$ Municipal Park Fund 108 Medina Morningside Park 109 Playground curb/rubber under swings 50,000$ 50,000$ Municipal Park Fund 110 Replace baseball backstop 5,000$ 5,000$ Municipal Park Fund 111 Parking Area 10,000$ 10,000$ Municipal Park Fund 112 Medina Lake Preserve 114 Park Clean-up 25,000$ 25,000$ 25,000$ 25,000$ Municipal Park Fund 115 Tomann Preserve - Park Development 116 The Park at Fields of Medina 117 105,000$ 105,000$ 125,000$ 125,000$ 25,000$ 25,000$ 555,000$ 505,000$ 55,000$ 55,000$ 118 119 New Park Development 120 Trails 121 Arrowhead Dr RR Crossing 130,000$ 130,000$ Park Dedication Fund 122 Hackamore Trail 174,000$ 87,000$ 174,000$ 87,000$ Park Ded/Cost Share w/ Corcoran 123 Medina Road Trail 200,000$ 200,000$ Park Dedication Fund 124 Medina Lake Preserve 125 Trail Head 25,000$ 25,000$ 25,000$ 25,000$ Park Dedication Fund 126 Park Land by Medina Golf & CC 500,000$ 500,000$ Park Dedication Fund 127 Land Acquisitions / New Trails 250,000$ 250,000$ Park Dedication Fund 128 Parks Sub-total 130,000$ 130,000$ 374,000$ 287,000$ 750,000$ 750,000$ 199,000$ 112,000$ 25,000$ 25,000$ 129 130 TOTAL:1,219,237$ 832,790$ 3,480,737$ 3,058,790$ 3,386,397$ 3,309,618$ 4,625,737$ 4,274,790$ 1,321,065$ 1,307,454$ 2