Loading...
HomeMy Public PortalAbout01.07.2020 Work Session Packet Posted 5/29/2009 Page 1 of 1 WORK SESSION AGENDA MEDINA CITY COUNCIL Tuesday, January 7, 2020 5:00 P.M. Medina City Hall 2052 County Road 24 I. Call to Order II. Annual Goal Setting Session III. Adjourn Posted 1.3.2020 Draft 2020 Goals Overarching (1) Institutionalize Employee Shared/Core Values. Hold an employee training session and continue the employee discussion on our core values (On-going). (2) Continue to stay involved with business networking groups, business forums, business tours, attract business and other opportunities to strengthen ties with our local businesses (On-going). (3) Continue to implement electronic document management in the City (includes Laserfiche at City Hall) Administration (1) Work with Council and Staff to try and attract campus business users on Highway 55 (On-going) (2) Continue planning process for Hackamore Road project with the City of Corcoran (4th Quarter) (3) Implement electronic email notification system instead of manually saving in outlook when people want to subscribe or unsubscribe. (1st Quarter). This item will be implemented in conjunction with the full address database switch. (4th Quarter) (4) Switch the address database away from Microsoft Access to a new system that is functional in the cloud. (4th Quarter) (5) Negotiate new police union contract, which currently ends 12/31/2020. (4th Quarter) (6) Complete hiring processes for two new police officers, internal sergeant promotion, and vacant public works position. (1st Quarter) (7) Successfully administer new Presidential Primary election, along with the State Primary and General Elections. (1st - 4th Quarter) (8) Introduce new voting assistance equipment called the Omni Ballot to replace the Automarks. Medina will be one of four pilot cities in Hennepin County introducing the new voting equipment in 2020. (3rd Quarter) Public Works Streets (1) Complete 2020 overlay CIP. (2) Work with Corcoran on Hackamore Road reconstruct plans and agreements (3) Work to update pavement management plan and format (4) Street visioning for Tamarack Drive and Highway 55 intersection Stormwater (5) Replace Ardmore Creek culvert (6) Replace Deerhill Road East culvert (7) Complete Ardmore Creek and Lakeshore Park projects (8) Complete storm water asset management plan Water/Sewer (9) Plan for the 2021 filter media replacement at the water treatment plant (10) Plan for the Chippewa watermain extension (11) Continue with inflow and infiltration reduction into the sewer system (12) Replace control panel at the Morningside lift station (13) Bring Loretto on board with the sewer system Parks/Trails (14) Work with Three Rivers Park to complete the Baker Park raving project (15) Work with Three Rivers Park to begin studying Diamond Lake Regional Trail Master Plan (16) Begin Hunter Park future concept plan (17) Replace damaged portions of the Hamel Legion Park Trail (18) Look at options for park land purchase in the Chippewa/Mohawk area Finance (1) Research and implement new city credit cards or p-cards; specifically, cards with cash back benefits. (2nd quarter) (2) Research workflow software and costs within Laserfiche to have implemented in 2021 or 2022 budget. (2nd quarter) (3) Long-term budget analysis (General Fund and Municipal Park Fund.) (2nd quarter) Public Safety (1) Provide quality public safety services for our citizens, businesses and visitors by working professionally (2) Personnel: - 1st Quarter Replace Public Safety Director Replace Patrol Sergeant Hire two officers (3) Complete Fire Grant Process (4) Evaluate possible second sergeant - 2nd Quarter (5) Evaluate part-time administrative assistant - 2nd Quarter (6) Review Tobacco Ordinance -2nd Quarter (7) Review Third Party Gift Card Procurement Ordinance - 2nd Quarter (8) Review Policy and Procedure Manual -4th Quarter (9) Equipment Replacement: Squad Radios - 1st Quarter Evaluate Thermal Cameras – 4th Quarter Evaluate two Squads - 3rd Quarter Research Bodycam/Squad Camera Solutions for 2021 – 3rd Quarter Digital Speed Sign - 3rd Quarter (10) Retention Compensation study how do we compare to our competition - 3rd Quarter Planning (1) Tamarack Drive Corridor Study (1st Quarter) (2) Stormwater Inventory (1st Quarter) (3) Diamond Lake Regional Trail Master Plan (2nd Quarter) (4) Affordable and Lifecycle Housing Strategy (3rd Quarter) (5) Electric Vehicle charging requirements (3rd Quarter) (6) Stormwater Maintenance Policy (4th Quarter) (7) Developer’s Handbook updates (4th Quarter) 2020 CIP: DEPARTMENT Project Cost City Proposed Portion Project Cost City Proposed Portion Project Cost City Proposed Portion Project Cost City Proposed Portion Project Cost City Proposed Portion Potential Revenue Source Roads 1 Tamarack North of Medina to Blackfoot Overlay 54,000$ 43,200$ Road/Bonds/Assessments 2 Tamarack - Medina to 24 - Overlay 49,985$ 39,988$ Road/Bonds/Assessments 3 Tamarack City Limits to CSAH 24 Overlay 77,675$ 62,140$ Road/Bonds/Assessments 4 Tamarack Drive/Highway 55 Interesection 40,000$ 40,000$ 4,000,000$ 4,000,000$ Road Fund / Assessments / Bonds / Developer 5 Clydesdale trail overlay 600/101 150,000$ 75,000$ Road/Bonds/Assessments 6 Oakview Road - Overlay 43,000$ 21,500$ Road/Bonds/Assessments 7 Deer Hill Road East - Overlay 27,000$ 23,500$ Road/Bonds/Assessments 8 Dusty Trail - Overlay 4,000$ 2,000$ Road/Bonds/Assessments 9 Tower Dr West Overlay/curb 42,000$ 21,000$ Road/Bonds/Assessments 10 Chestnut Road - Overlay 50,000$ 25,000$ Road/Bonds/Assessments 11 Town Line Rd South 100,000$ 100,000$ Assessment Escrow Fund 12 Foxberry Farms Overlay/10% curb 283,000$ 142,000$ Road/Bonds/Assessments 13 Hackamore Medina/ Portion 100,000$ 100,000$ 550,000$ 400,000$ 550,000$ 400,000$ Road Fund/Bonds/Developer 14 Willow Drive North to 24 - reclaim 370,000$ 300,000$ Road/Bonds/Assessments 15 Shire Dr Overlay 32,000$ 16,000$ Road/Bonds/Assessments 16 Iroquois Drive Overlay 30,000$ 15,000$ Road/Bonds/Assessments 17 Maplewood Drive Overlay 29,328$ 14,664$ Road/Bonds/Assessments 18 Bobolink Road Overlay 90,000$ 45,000$ Road/Bonds/Assessments 19 Morningside Road Overlay 110,000$ 55,000$ Road/Bonds/Assessments 20 Elsinore Circle N of Morningside Rd Overlay 20,000$ 10,000$ Road/Bonds/Assessments 21 Arrowhead & CR 118 Whistleless Crossing 450,000$ 60,000$ Reserves/State Bonding/Grant 22 Roads Sub-total 695,000$ 262,500$ 1,013,000$ 632,000$ 644,660$ 491,828$ 770,000$ 510,000$ 4,129,328$ 4,114,664$ 23 24 Public Works 25 Tandem 230,000$ 230,000$ Equipment Bonds/Cap Equip Fund 26 Water Truck / Tanker Replacement 20,000$ 20,000$ Equipment Bonds/Cap Equip Fund 27 Air Compressor 25,000$ 25,000$ Equipment Bonds/Cap Equip Fund 28 Ditch Mower Replacement/Loretto 130,000$ 130,000$ Equipment Bonds/Cap Equip Fund 29 Backhoe Replacement 130,000$ 130,000$ Equipment Bonds/Cap Equip Fund 30 Skid Steer Upgrade w/ Bucket/Harly Rake 4,000$ 4,000$ 12,000$ 12,000$ 4,000$ 4,000$ 4,000$ 4,000$ Equipment Bonds/Cap Equip Fund 31 Single Axle Truck 220,000$ 220,000$ Equipment Bonds/Cap Equip Fund 32 Public Works Sub-total 289,000$ 289,000$ 12,000$ 12,000$ 244,000$ 244,000$ 234,000$ 234,000$ -$ -$ 33 34 Police 35 PD Squad Cars 75,000$ 75,000$ 75,000$ 75,000$ 75,000$ 75,000$ 80,000$ 80,000$ 126,000$ 126,000$ Equipment Bonds/Cap Equip Fund 36 Traffic Squad 35,000$ 35,000$ Equipment Bonds/Cap Equip Fund 37 PD Squad Camera / Body Cams 100,000$ 100,000$ Equipment Bonds/Cap Equip Fund 38 Portable Radios 6,000$ 6,000$ 4,000$ 4,000$ 4,000$ 4,000$ DWI Forfeiture Fund/Cap Equip 39 Squad Radios 40,000$ 40,000$ DWI Forfeiture Fund/Cap Equip 40 Records Management 70,000$ 70,000$ Equipment Bonds/Cap Equip Fund 41 Miscellaneous 8,000$ 8,000$ 8,000$ 8,000$ 8,000$ 8,000$ DWI Forfeiture Fund/Cap Equip 42 Police Sub-total 129,000$ 129,000$ 179,000$ 179,000$ 192,000$ 192,000$ 80,000$ 80,000$ 134,000$ 134,000$ 43 44 Fire 45 HAMEL 46 Ongoing PPE Replacement 10,000$ 10,000$ 10,000$ 12,000$ 12,000$ Equipment Bonds/Cap Equip Fund 47 Command Vehicle Replacement 4,320$ 4,320$ 4,320$ 4,320$ 4,320$ Equipment Bonds/Cap Equip Fund 48 Engine 11 Refurbishment 20,000$ 20,000$ 20,000$ 20,000$ 20,000$ Equipment Bonds/Cap Equip Fund 49 Pumper/Tanker 38,917$ 38,917$ 38,917$ 38,917$ 38,917$ Equipment Bonds/Cap Equip Fund 50 Annual Contract 75,000$ 75,000$ 75,000$ 77,000$ 77,000$ Equipment Bonds/Cap Equip Fund 51 Hamel Fire Sub-total 73,237$ 75,000$ 73,237$ 75,000$ 73,237$ 75,000$ 75,237$ 77,000$ 75,237$ 77,000$ 52 53 Loretto & Long Lake 54 Fire (Loretto)28,290$ 28,290$ 28,290$ 28,290$ 28,290$ Equipment Bonds/Cap Equip Fund 55 Fire (Long Lake)6,000$ 6,000$ 6,000$ 6,000$ 6,000$ Equipment Bonds/Cap Equip Fund 56 Fire Sub-total -$ 34,290$ -$ 34,290$ -$ 34,290$ -$ 34,290$ -$ 34,290$ 57 58 Emergency Management 59 Siren Maintenance 5,000$ 5,000$ 7,500$ 7,500$ 7,500$ 7,500$ 7,500$ 7,500$ 7,500$ 7,500$ Equipment Bonds/Cap Equip Fund 60 Civil Defense Sirens 30,000$ 30,000$ 30,000$ 30,000$ Revolving Cap. Impr. Fund 61 Civil Defense Sub-total 35,000$ 35,000$ 37,500$ 37,500$ 7,500$ 7,500$ 7,500$ 7,500$ 7,500$ 7,500$ 62 63 64 Administration/Data Processing 65 Vehicle Equipment Bonds/Cap Equip Fund 66 Administration Sub-total -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 67 68 City Buildings 69 City Hall Repairs/Renovation 15,000$ 15,000$ 10,000$ 10,000$ 15,000$ 15,000$ 10,000$ 10,000$ 15,000$ 15,000$ Revolving Cap. Impr. Fund 70 Community Building Repairs 10,000$ 10,000$ 15,000$ 15,000$ 10,000$ 10,000$ 15,000$ 15,000$ 10,000$ 10,000$ Revolving Cap. Impr. Fund 71 PW/Police Repairs/Renovations 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ Revolving Cap. Impr. Fund 72 City Buildings - Parking Lot 20,000$ 20,000$ 20,000$ 20,000$ 20,000$ 20,000$ 20,000$ 20,000$ 20,000$ 20,000$ Revolving Cap. Impr. Fund 73 City Building Sub-total 55,000$ 55,000$ 55,000$ 55,000$ 55,000$ 55,000$ 55,000$ 55,000$ 55,000$ 55,000$ 74 75 76 77 Water (high growth expectation) 78 Water Treatment Plant Expansion 1,400,000$ 1,400,000$ Future - Water Capital 79 Chippewa Watermain Extension - Arrowhead to Mohawk 400,000$ 400,000$ Water Capital Improvement 80 Chippewa West of Mohawk 435,000$ 435,000$ Water Capital Improvement 81 Water Tower (and land acquisition)2,600,000$ 2,600,000$ Future Water Cap (2020-2023) 82 Water Sub-total -$ -$ 835,000$ 835,000$ 1,400,000$ 1,400,000$ 2,600,000$ 2,600,000$ -$ -$ 2020 2020 - 2024 Capital Improvement Plan 2021 2022 2023 2024 1 2020 CIP: DEPARTMENT Project Cost City Proposed Portion Project Cost City Proposed Portion Project Cost City Proposed Portion Project Cost City Proposed Portion Project Cost City Proposed Portion Potential Revenue Source 2020 2020 - 2024 Capital Improvement Plan 2021 2022 2023 2024 83 84 Sewer 85 Willow Dr Lift Station 700,000$ 700,000$ Sewer Capital Fund 86 I / I Maintenance 100,000$ 100,000$ 100,000$ 100,000$ Sewer Capital Fund 87 Hunter/Hamel Rd Upsize 750,000$ 750,000$ Sewer Capital Fund 88 Sewer Sub-total -$ -$ 800,000$ 800,000$ 100,000$ 100,000$ -$ -$ 750,000$ 750,000$ 89 90 Storm Water 91 Long Lake Creek Sub Watershed 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ Storm Water Fund/Grants 92 Storm Water Sub-total -$ 10,000$ -$ 10,000$ -$ 10,000$ -$ 10,000$ -$ 10,000$ 93 94 Municipal Park Replacements 95 Trails 96 Annual Trail Replacement 25,000$ 25,000$ 25,000$ 25,000$ 25,000$ 25,000$ 30,000$ 30,000$ 30,000$ 30,000$ Municipal Park Fund 97 Hamel Legion Park 98 Holy Name Park 99 Hunter Lions Park 100 Full Park Reconstruction/Tennis Court 20,000$ 20,000$ 500,000$ 450,000$ Municipal Park Fund/Grants 101 Lakeshore Park 102 Redesign/Large Playground Equipment 20,000$ 20,000$ 150,000$ 150,000$ Municipal Park Fund 103 Rainwater Nature Area 104 Maple Park 105 Walnut Park 106 Basketball Hoop/Striping 5,000$ 5,000$ Municipal Park Fund 107 Medina Morningside Park 108 Playground curb/rubber under swings 50,000$ 50,000$ Municipal Park Fund 109 Replace baseball backstop 5,000$ 5,000$ Municipal Park Fund 110 Parking Area 10,000$ 10,000$ Municipal Park Fund 111 Medina Lake Preserve 112 Park Clean-up 25,000$ 25,000$ 25,000$ 25,000$ Municipal Park Fund 113 Tomann Preserve - Park Development 114 The Park at Fields of Medina 115 135,000$ 135,000$ 175,000$ 175,000$ 25,000$ 25,000$ 555,000$ 505,000$ 55,000$ 55,000$ 116 117 New Park Development 118 Trails 119 Arrowhead Dr RR Crossing 130,000$ 130,000$ Park Dedication Fund 120 Arrowhead Trail Connection RR-Loram 75,000$ 75,000$ Park Dedication Fund 121 Hackamore Trail 174,000$ 87,000$ 174,000$ 87,000$ Park Ded/Cost Share w/ Corcoran 122 Medina Road Trail 200,000$ 200,000$ Park Dedication Fund 123 Medina Lake Preserve 124 Trail Head 25,000$ 25,000$ 25,000$ 25,000$ Park Dedication Fund 125 Park Land by Medina Golf & CC 500,000$ 500,000$ Park Dedication Fund 126 Sioux Dr./HWY 55 Ped Crossing Future Study 127 Land Acquisitions / New Trails (rolling-used as development occurs)250,000$ 250,000$ 250,000$ 250,000$ 250,000$ 250,000$ 250,000$ 250,000$ 250,000$ 250,000$ Park Dedication Fund 128 Parks Sub-total 455,000$ 455,000$ 624,000$ 537,000$ 750,000$ 750,000$ 449,000$ 362,000$ 275,000$ 275,000$ 129 130 TOTAL:1,866,237$ 1,479,790$ 3,803,737$ 3,381,790$ 3,491,397$ 3,384,618$ 4,825,737$ 4,474,790$ 5,481,065$ 5,512,454$ 2