Loading...
HomeMy Public PortalAbout13-8604 Change order for JVA Engineering Contractor Inc for Rutland Street Drainage Sponsored by: Commissioner Santiago and Mayor Taylor RESOLUTION NO. 13-8604 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF OPA-LOCKA, FLORIDA, REQUESTING APPROVAL OF A CHANGE ORDER FOR JVA ENGINEERING CONTRACTOR, INC., TO PERFORM ADDITIONAL WORK FOR RUTLAND STREET ROADWAY AND DRAINAGE IMPROVEMENTS BETWEEN 23RD AVENUE AND 22ND AVENUE, INCLUDING DRIVEWAY APRONS FROM NW 24TH AVENUE TO NW 22ND AVENUE, IN AN AMOUNT NOT TO EXCEED $149,490.00, PAYABLE FROM CAPITAL PROJECTS FUND, PAYABLE FROM ACCOUNT NUMBER 47-541807, ITEM IS NOT BUDGETED; PROVIDING FOR INCORPORATION OF RECITALS; PROVIDING FOR AN EFFECTIVE DATE WHEREAS, the City issued a Request for Proposals for the improvement of Rutland Street Drainage System; and WHEREAS, JVA Engineering was awarded the contract for the Rutland Street roadway and drainage improvement; and WHEREAS, a Change Order is requested to extend the scope of services to include the remaining portion of Rutland Street from NW 23rd Avenue to NW 22nd Avenue (roadway and drainage improvement), and also driveway aprons between NW 24th Avenue and NW 22nd Avenue; and WHEREAS, the City Commission of the City of Opa-locka desires to approve the Change Order for additional work for Rutland Street Roadway Drainage improvements between 23rd Avenue and 22nd Avenue, including driveway aprons from NW 24th Avenue to NW 22nd Avenue. NOW, THEREFORE, BE IT DULY RESOLVED BY THE CITY COMMISSION OF THE CITY OF OPA-LOCKA, FLORIDA: Resolution No. 13-8604 Section 1. The recitals to the preamble herein are incorporated by reference. Section 2. The City Commission of the City of Opa-locka, hereby approves a Change Order for JVA Engineering Contractor, Inc., to perform additional work on Rutland Street Roadway and Drainage improvements between 23rd Avenue and 22nd Avenue, including driveway aprons from NW 24th Avenue to NW 22nd Avenue, in an amount not to exceed $149,490, payable from Account Number 47-541807, this item is not budgeted. Section 3. This resolution shall take effect immediately upon adoption. this 22°d day of May, 2013. MOTION FAILED 17 RA L. YLOR MAYOR Attest to: :06,),Ak Jo 3 a Flores Ci Clerk Approved as to form and legal sufficiency: (Id/ /09k-' J.v-`eph' . Geller t REE SPOON MARDER PA 'ty Attorney Moved by: COMMISSIONER JOHNSON Seconded by: COMMISSIONER SANTIAGO Commission Vote: 4-0 Commissioner Holmes: NO Commissioner Johnson: NO Commissioner Santiago: NO Vice-Mayor Kelley: NO Mayor Taylor: NOT PRESENT 2 oQa-1-ocw O `9 L �'F fl2 ' j ORNOHPSE� City of Opa-Locka Agenda Cover Memo Commission Meeting 05/08/2013 Item Type: Resolution Ordinance Other Date: X (EnterXin box) Fiscal Impact: Ordinance Reading: 1st Reading 2"Reading (EnterXin box) Yes No (EnterXin box) x Public Hearing: Yes No Yes No (EnterXin box) x x Funding Source: (Enter Fund&Dept) Advertising Requirement: Yes No Ex: (EnterXin box) x Account#47-541807 ITEM BUDGETED: NO Contract/P.O.Required: Yes No RFP/RFQ/Bid#: (EnterXin box) Change Order Strategic Plan Related Yes No Strategic Plan Priority Area: Strategic Plan Obj./Strategy: (list the (Enter X in box) specific objective/strategy this item will address) X Enhance Organizational n Bus.&Economic Dev 0 1. Will improve drainage and Public Safety - pavement of Rutland Street Quality of Education Q Qual.of Life&City Image so Communcation Sponsor Name Department: City Manager City Manager Short Title: Change Order for the pavement and drainage improvements for Rutland Street between NW 23`d Avenue and NW 22nd Avenue Staff Summary: The City of Opa-locka issued a Request for Proposal (RFP) to solicit competitive proposals from qualified firm for the improvement of Rutland Street Drainage System. JVA Engineering Contractor was awarded the contract for the Rutland Street Roadway and Drainage Improvements. The original scope included only the portion of Rutland Street between NW 24 Avenue and NW 23rd Avenue without driveway aprons due limited grant fund. The change order is to extend the scope of services to include the remaining portion of the Rutland Street from NW 23 Avenue to NW 22 Avenue for Roadway and Drainage Improvements and also all the driveways between NW 24th Avenue and NW 22nd Avenue. Staff recommends approval in order to improve Rutland Street drainage and roadway condition. 1. Agenda 2. Change Order Quote 3. Copy of Resolution# 12-8443 (:f It soh 1� +0ry O4A0 RP,EO Memorandum To: Mayor Myra L.Taylor Vice Mayor Joseph L.Kelley Commissioner Tim•thy Holmes Commissioner Doro iy Johnsoi Commissioner Luis Santi • FROM: Kelvin L. Baker,City Manage DATE: May 01,2013 RE: Change Order for JVA Engineering Contractor for the Rutland Street Drainage and Roadway Improvements. Request: A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF OPA- LOCKA, FLORIDA, REQUESTING APPROVAL OF A CHANGE ORDER FOR JVA ENGINEERING CONTRACTOR, INC. TO PERFORM ADDITIONAL WORK FOR THE RUTLAND STREET ROADWAY AND DRAINAGE IMPROVEMENTS BETWEEN NW 23RD AVENUE AND NW 22" AVENUE INCLUDING DRIWAY APRONS FROM NW 24TH AVENUE TO NW 22ND AVENUE IN AN AMOUNT NOT TO EXCEED ONE HUNDRED FOURTY NINE THOUSAND FOUR HUNDRED NINETY DOLLARS AND TWO CENTS ($149,490.02).THIS IS A NON BUDGETED ITEM. Description: The City of Opa-locka issued a Request for Proposal (RFP) to solicit competitive proposals from qualified firm for the improvement of Rutland Street Drainage System. JVA Engineering Contractor was awarded the contract for the Rutland Street Roadway and Drainage Improvements. The original scope included only the portion of Rutland Street between NW 24 Avenue and NW 231d Avenue without driveway aprons due limited grant fund. The change order is to extend the scope of services to include the remaining portion of the Rutland Street from NW 23 Avenue to NW 22 Avenue for Roadway and Drainage Improvements and also all the driveways between NW 24th Avenue and NW 22nd Avenue. Account Number: PTP Fund: 47-541807 Financial Impact: This was not budgeted. It will impact City's FY 2012-2013 budget by$149,490.02. Implementation Timeline: As soon as possible per grant requirements. Legislative History: Resolution#: 12-8443 Recommendation(s): Staff recommends approval in order to improve Rutland Street drainage and roadway condition. Analysis: Rutland Street between NW 23rd Avenue and NW 22nd Avenue experiences frequent flooding and the pavement surface has deteriorated significantly. Under this change order the roadway surface will be milled and resurfaced as necessary in addition the drainage and driveway apron improvements. The proposed change order will help improving the street level of service. Attachment: 1. Change Order Quote 2. Resolution 12-8443 PREPARED BY: Mohammad Nasir,PE,City Engineer/CIP Director END OF MEMORANDUM J N Q I NEE R 1 N G CONTRACTOR. INC 6600 N.W.32 Avenue Miami,FL.33147 Tel: (305)696-7902 Fax: (305)696-7903 Change Order# 001 PROJECT: Rutland Street Drainage& SUBMITTED TO: City of Opa-Locka Roadway Imprvements NAME Mohammad Nasir ADDRESS: 12950 LeJeune Road City of Opa-Locka CITY/STATE: Opa-Locka, FL 33054 4/25/2013 PHONE: 305 953-2828 mnasir @opalockafl.gov FAX: 305 953-2824 DESCRIPTION OF WORK TO BE PERFORMED WE HEREBY SUBMIT SPECIFICATIONS AND ESTIMATES FOR We proposed performed all materials,labor and equipment necessary to the follow Scope of Work: Unit Description Quantity Unit Total Rutland Between NW 23rd Ave&NW 22nd Ave 1" Depth Asphalt Milling 13,300 SF 0.50 6,650.00 Furnish&Install 1"Asphalt Paving Type S 13,300 SF 1.00 13,300.00 Furnish&Install 8"Limerock Base 6,650 SF 2.75 18,287.50 Excavate&Compact Existing Subbase for Driveways 4,950 SF 0.75 3,712.50 Furnish &Install 6"Limerock Base for Driveways 4,950 SF 1.50 7,425.00 Furnis&Install 1"Asphalt Pavement for Driveways 4,950 SF 1.25 6,187.50 Swale Grading&Sod Restoration 13,300 SF 1.15 15,295.00 Furnish&Install 4'X4' Ballast Stone Trench Drain 664 LF 70.08 46,532.52 F&I Striping 1 LS 1500.00 1,500.00 MOT 1 LS 1500.00 1,500.00 Survey&Asbuilt 1 LS 1500.00 1,500.00 Design&Permitted Set of Plans 1 LS 8000.00 8,000.00 Rutalnd Between NW 24th Ave& 23rd Ave Excavate&Compact Existing Subbase for Driveways 5,600 SF 0.75 4,200.00 Furnish&Install 6"Limerock Base for Driveways 5,600 SF 1.50 8,400.00 Furnish&Install 1"Asphalt Pavement for Driveways 5,600 SF 1.25 7,000.00 Total $149,490.02 NOTE • Permit fees,Insurance fees,bond fees,densities,proctors,impact fees,not included. • JVA reserves the right to revise and update its proposal prior to a contract issued • Bid predicated on JVA having a clear safe,unobstructed work area with no overhead hazards •Any downtime as a result of unforeseen conditions or work being performed by others affecting areas where •Work to be performed in normal hours(M-F,8:OOAM-5:OOPM) • Proposal prepared without plans and soil reports • JVA can not complete their task will be paid by owner The work and performed by the Co may result in a lien being placed on the premises described above,in case the owner or contractor default its in any payment under this contract. Owner hereby agrees to accept full responsibility for all fences,sidewalks,all underground pipes,wires,septic tanks, drain lines,well,ect unless stated above. Owner is liable in full amount of contract in the event owner cancel after work has started. The Co shall not be responsible for damage or delays do to strikes,fires,accidents,or the others cause beyond its control,not for inherent defects in the premises on which work to be done. In the event of any default of this contract by owner-owner agrees to pay all cost and reasonable attorneys by JVA Engineering Contractor,INC.as a result of said default. All materials are guaranteed to be as specified. All work to be completed in a workman like manner according to standard practices. Any alteration or deviation from above specifications involving extra cost will be executed only upon written orders and will become an extra charge over and above the estimate. This proposal subject to acceptance within_30_days and is void thereafter at the option of the under signed. Work shall begin 10 days of this contract being signed by all parties here and return to the co. WE HEREBY PROPOSE TO FURNISH LABOR AND MATERIALS COMPLETE IN SPECIFICATIONS, FOR One Hundred Forty Nine Thousand Four Hundred Ninety THE SUM OF: Dollars and Two Cents $149,490.02 ACCEPTANCE OF CHANGE ORDER The above prices,specifications and conditions and conditions are hereby accepted. You are specified payment will be made as outlined above. Accepted by: Signature: Date: Sponsored by: City Manager RESOLUTION NO. 12-8443 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF OPA-LOCKA, FLORIDA, TO AUTHORIZE THE CITY MANAGER TO EXECUTE CONTRACT WITH JVA ENGINEERING CONTRACTOR, INC FOR IMPROVEMENTS FOR RUTLAND STREET DRAINAGE SYSTEM AND ROADWAY,IN AN AMOUNT NOT TO EXCEED ONE HUNDRED TWENTY SEVEN THOUSAND EIGHT HUNDRED FIFTY DOLLARS($127,850),PAYABLE FROM THE PTP FUND AND CAPITAL PROJECTS FUND, ACCOUNT NUMBERS 47-541807 AND 44-541807; PROVIDING FOR INCORPORATION OF RECITALS; PROVIDING FOR AN EFFECTIVE DATE WHEREAS, pursuant to Resolution No. 12-8415, the City of Opa-locka issued Request for Proposals(RFPs) for improvements of Rutland Street Drainage System; and WHEREAS, three bidders responded to RFP 12-1607100 for improvements of Rutland Street Drainage System, 1) JVA Engineering, 2) FLA Engineering, and 3) Williams Paving Company, Inc.; and WHEREAS, the RFP Evaluation Committee ranked the bidders based on price proposal, references, local work force participation and other criteria, and recommends awarding the contract to JVA Engineering Contractor, Inc.; and WHEREAS, the City of Commission of the City of Opa-locka desires the City Manager to execute contract with JVA Engineering Contractor, Inc. for improvements to Rutland Street Drainage System. NOW,THEREFORE, BE IT DULY RESOLVED BY THE CITY COMMISSION OF THE CITY OF OPA-LOCKA,FLORIDA: Section 1. The recitals to the preamble herein are incorporated by reference. Resolution No. 12-8443 Section 2. The City Commission of the City of Opa-locka, authorizes the City manager to execute contract with JVA Engineering Contractor, Inc for improvements of Rutland Street Drainage System and Roadway, in an amount not to exceed One Hundred Twenty Seven Thousand Eight Hundred Fifty Dollars($127,850),payable from the PTP Fund and Capital Projects Fund, Account Numbers 47-541807 and 44-541807. Section 3. This resolution shall take effect immediately upon adoption. PASSED AND ADOPTED this 12th day of September, 2012. (izitii; - MY TAYLOR MAYOR ttest to: Approved as t, form and legal sufficiency: i/J /. / anna Flores J•ti- eller terim City Clerk Att1 rney Moved by: VICE MAYOR JOHNSON Seconded by: COMMISSIONER HOLMES Commission Vote: 4-0 Commissioner Holmes: YES Commissioner Miller: OUT OF ROOM Commissioner Tydus: YES Vice-Mayor Johnson: YES Mayor Taylor: YES