Loading...
HomeMy Public PortalAboutAquaSwirlXCL_ApprovalLetter_020723February 7, 2023 AquaShield, Inc Mr. Mark Miller 2733 Kanasita Dr, Ste 111 Chattanooga, TN 37343 RE: AquaSwirl XCelerator Treatment System Redevelopment Use Level (RUL) Approval within the District Dear Sir, The Metropolitan St. Louis Sewer District (MSD) is pleased to provide RUL approval for the use of the AquaSwirl XCelerator HDS unit as a stand-alone water quality BMP, subject to the following provisions: • The XCelerator is only approved for use on public highway and roadway projects, and for redevelopment sites less than 5 acres. This approval is based upon compliance with requirements listed in MSD's Proprietary Water Quality Products and the MSD's Stormwater Management Program (Revised Jan. 2009). • The XCelerator must be sized such that the Maximum Treatment Flow Rate (MTFR) for the unit exceeds the Water Quality flow rate calculated for the unit's tributary area. The XCelerator's approved MTFRs will be those shown in Table 1 below, to match the certified flow rates provided by the New Jersey Department of Environmental Protection (NJDEP). Procedures for calculating the Water Quality flow rate are provided in Appendix D.10 of the Maryland Stormwater Design Manual (2000). Metropolitan St. Louis Sewer District 2350 Market Street St. Louis, MO 63103-2555 (314) 768-6200 Table 1: XCelerator Models and Approved MTFRs Model Manhole Diameter (ft) MTFR (cfs)50% Max. Sediment Storage Volume (ft3) XC-4 4.5 1.86 7.95 XC-5 5.5 2.78 11.88 XC-6 6.5 3.88 16.59 XC-7 7.5 5.17 22.09 XC-8 8.5 6.64 28.38 XC-9 9.5 8.29 35.44 XC-10 10.5 10.13 43.30 XC-11 11.5 12.15 51.94 XC-12 12.5 14.35 61.36 XC-13 13 15.53 66.37 The XCelerator will be configured as an off-line unit, downstream from a diversion manhole. In most cases, the BMP will be installed without the need to store the Water Quality volume upstream of the unit. All devices shall provide a minimum sediment storage capacity of 10 cubic feet. All proprietary lids and covers should be captive components. The minimum size access hole is 30 inches in diameter. Confined space entry shall not be a requirement for routine maintenance. No special tools or attachments should be required to provide for routine maintenance with a vacuum pumping truck. A reinforced concrete pad shall be placed over the entire XCelerator when subject to H-20 (or greater) traffic loading. The pad shall extend not less than 12 inches beyond the outside diameter of the XCelerator. A professional engineer shall provide final approval of the design of the concrete pad and the calculations must be included in the submittal. Traffic rated foundry rims and covers must be installed such that no contact is made between the HOPE access riser and the cast iron frame. Project specific design calculations and maintenance plans furnished by the manufacturer must be included within the project's Stormwater Management Facilities Report prepared by the consulting engineer. The initial installation of the XCelerator within the MSD will be subject to the following additional requirements: 1) A manufacturer's or vendor's representative must be onsite during the proprietary BMP installation to ensure the product's installation requirements are met. 2) Shop drawings indicating flow lines, weirs, pipe inverts, etc will be required prior to installation. 3) The manufacturer or vendor must arrange for an as- built survey of the proprietary BMP to be performed by a Missouri-registered Professional Land Surveyor once the device has been installed. 4) The manufacturer or vendor must perform quarterly inspections of the proprietary BMP during its first year of operation, which will include visual inspections and qualitative analysis of the BMP' s sediment removal. MSD requests to be invited to these inspections to further enhance familiarity and understanding of the device. 5) Formal reports shall be submitted to MSD, including the as-built drawings and quarterly inspection reports. The reports shall include summaries, photographs of the structure, outfall conditions, etc. The reports shall also evaluate the level of the Owner's adherence to the approved maintenance plan, and offer suggestions for any areas of improvement. MSD reserves the ability to withdraw or modify this approval based on subsequent information, including information indicating that this BMP does not satisfy MSD rules, requirements, or construction specifications. Sincerely, Curtis Zurliene, PE Civil Engineer (BMP Committee Chairman) Engineering / Development Review Metropolitan St. Louis Sewer District