Loading...
HomeMy Public PortalAbout1680th Board Agenda 1-11-20241 AGENDA 1680th MEETING OF THE BOARD OF TRUSTEES METROPOLITAN ST. LOUIS SEWER DISTRICT January 11, 2024 5:00 P.M. ROLL CALL & PUBLIC BOARD MEETING MSD OFFICES 2350 MARKET STREET ROOM 109 1. ROLL CALL 2. APPROVAL OF THE JOURNAL OF THE PRECEDING MEETINGS: o December 14, 2023 • 1679th Meeting 3. COMMENTS BY THE CHAIR 4. REPORT OF THE BOARD COMMITTEES: o Audit Committee o Finance Committee o Program Management Committee o Stakeholder Relations Committee 5. REPORT OF EXECUTIVE DIRECTOR 6. COMMENTS FROM THE PUBLIC To submit your comments and questions for the Board Meeting, please email: BoardComments@stlmsd.com no later than 12:00pm, the day of Board meeting, January 11, 2024. To observe the Board meeting remotely, you may access the meeting at: MSD Streaming Meetings - Metropolitan St. Louis Sewer District (msdprojectclear.org). 7. SUBMISSION OF PUBLIC HEARING REPORTS 8. COMMUNICATIONS 9. CONSENT AGENDA: - Items 10 through 39 Members of the public are invited to attend MSD Board of Trustees meetings in person, attendees are welcome, though seating will be somewhat restricted by seating spacing. MSD will continue to live stream all Board of Trustees meetings at www.youtube.com/msdprojectclear indefinitely. 2 CONSENT AGENDA Item # ORDINANCES 10 Adoption of Ordinance No. 16261 - CSO Volume Reduction Green Infrastructure (11146) A supplemental appropriation of Five Million Dollars ($5,000,000.00) from the General Fund to be used for construction of green infrastructure in CSO Volume Reduction Green Infrastructure (11146) in the City of St. Louis and St. Louis County, Missouri. 11 Adoption of Ordinance No. 16262 - CSO Volume Reduction Green Infrastructure – River Des Peres (13078) A supplemental appropriation of One Million Dollars ($1,000,000.00) from the General Fund to be used for construction of green infrastructure in CSO Volume Reduction Green Infrastructure – River Des Peres (13078) in the City of St. Louis and St. Louis County, Missouri. 12 Adoption of Ordinance No. 16264 - Earth City UPS Pump Station (P-702) Replacement Phase II (13599) A supplemental appropriation of Seventy-Five Thousand Dollars ($75,000.00) from the Sanitary Replacement Fund to be used for pump station improvements in Earth City UPS Pump Station (P-702) Replacement Phase II (13599) in Unincorporated St. Louis County, Missouri. 13 Adoption of Ordinance No. 16265 - Bissell - Coldwater - Missouri - Meramec Public I/I Reduction (2023) Contract F (13124) A supplemental appropriation of Two Million Seven Hundred Forty Thousand Dollars ($2,740,000.00) from the Sanitary Replacement Fund to be used for sanitary sewer rehabilitation in Bissell - Coldwater - Missouri - Meramec Public I/I Reduction (2023) Contract F (13124) in the City of Florissant and Unincorporated St. Louis County, Missouri. 14 Adoption of Ordinance No. 16266 - Edmundson Sanitary Relief (Edmund Ave to Bataan Dr) (12159) An appropriation of Two Million Six Hundred Thousand Dollars ($2,600,000.00) from the Sanitary Replacement Fund to be used for sanitary sewer construction in Edmundson Sanitary Relief (Edmund Ave to Bataan Dr) (12159) in the City of Woodson Terrace, City of Breckenridge Hills, and Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 53042 with Gershenson Construction Co., Inc. for sanitary sewer construction. 15 Adoption of Ordinance No. 16268 - Woodson Sanitary Relief (Flora Ave to Lackland Rd) (12300) An appropriation of Three Million Dollars ($3,000,000.00) from the Sanitary Replacement Fund to be used for sanitary sewer construction in Woodson Sanitary Relief (Flora Ave to Lackland Rd) (12300) in the City of Overland, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 53044 with Keeley Construction Group, Inc. for sanitary sewer construction. 16 Adoption of Ordinance No. 16269 - East Essex Ave 802 - 804 Storm Sewer (10587) An appropriation of Three Hundred Ten Thousand Dollars ($310,000.00) from the Operations, Maintenance, Construction, and Improvement Fund of Deer Creek to be used for storm sewer construction in East Essex Ave 802-804 Storm Sewer (10587) in the City of Glendale, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 53043 with Gershenson Construction Co., Inc. for storm sewer construction. 17 Adoption of Ordinance No. 16270 - Quailways Dr. #8 Channel Improvements (10310) An appropriation of Five Hundred Fifty Thousand Dollars ($550,000.00) from the Operations, Maintenance, Construction, and Improvement Fund of Deer Creek to be used for channel stabilization in Quailways Dr. #8 Channel Improvements (10310) in the City of Creve Coeur, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 53020 with Keeley Construction Group, Inc. for channel stabilization. 3 18 Adoption of Ordinance No. 16271 - Conway Meadows Sanitary Relief (Conway Rd to I-64) (12129) An appropriation of Two Hundred Sixty Thousand Dollars ($260,000.00) from the Sanitary Replacement Fund to be used for design of sanitary sewers in Conway Meadows Sanitary Relief (Conway Rd to I-64) (12129) in the City of Chesterfield, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 53056 with Cole & Associates, Inc. for design of sanitary sewers. 19 Adoption of Ordinance No. 16272 - Coldwater Creek OMCI Stormwater Design (2024) (Contract A) (12462) An appropriation of Three Hundred Twenty Thousand Dollars ($320,000.00) from the Operations, Maintenance, Construction, and Improvement Fund of Coldwater Creek to be used for design in Coldwater Creek OMCI Stormwater Design (2024) (Contract A) (12462) in the Cities of Calverton Park and Overland, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 53058 with Tepa Engineering Services, LLC for design. 20 Adoption of Ordinance No. 16273 - Earlsfield Sanitary Relief and Kingston Pump Station (P-326) Elimination (13520) An appropriation of Three Hundred Sixteen Thousand Dollars ($316,000.00) from the Sanitary Replacement Fund to be used for design of sanitary sewers in Earlsfield Sanitary Relief and Kingston Pump Station (P-326) Elimination (13520) in Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 53061 with George Butler Associates, Inc. for design of sanitary sewers. 21 Adoption of Ordinance No. 16274 - Hillsdale Dr #7501 Storm Sewer (11063) An appropriation of One Hundred Seventy Thousand Dollars ($170,000.00) from the Operations, Maintenance, Construction, and Improvement Fund of Wellston to be used for design in Hillsdale Dr #7501 Storm Sewer (11063) in the City of Greendale, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 53059 with Taliaferro & Browne, Inc. for design. 22 Adoption of Ordinance No. 16275 - Pembroke Drive Storm Improvements (10309) An appropriation of Two Hundred Twenty-Four Thousand Dollars ($224,000.00) from the Operations, Maintenance, Construction, and Improvement Fund of the Seminary Branch of River Des Peres to be used for design in Pembroke Drive Storm Improvements (10309) in the City of Marlborough, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 53060 with Terra Engineering, LTD for design. 23 Adoption of Ordinance No. 16276 - Royal Arms Ct Sanitary Relief (13406) An appropriation of Two Hundred Fifty-One Thousand Dollars ($251,000.00) from the Sanitary Replacement Fund to be used for design of sanitary sewers in Royal Arms Ct Sanitary Relief (13406) in the Cities of Crestwood and Grantwood Village, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 53062 with Stock & Associates Consulting Engineers, Inc. for design of sanitary sewers. 24 Adoption of Ordinance No. 16277 - Strassner Ave Sanitary Relief (Black Creek Trunk to Swallow Dr) (12219) An appropriation of Two Hundred Eighty-Seven Thousand Dollars ($287,000.00) from the Sanitary Replacement Fund to be used for design of sanitary sewers in Strassner Ave Sanitary Relief (Black Creek Trunk to Swallow Dr) (12219) in the City of Brentwood, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 53057 with Hart Engineering, LLC for design of sanitary sewers. 25 Adoption of Ordinance No. 16278 - University City Branch OMCI Stormwater Design (2024) (Contract A) (12523) An appropriation of Two Hundred Twenty-Five Thousand Dollars ($225,000.00) from the Operations, Maintenance, Construction, and Improvement Fund of University City to be used for design in University City Branch OMCI Stormwater Design (2024) (Contract A) (12523) in the Cities of Overland and University City, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 53063 with Oates Associates, Inc. for design. 4 26 Adoption of Ordinance No. 16279 - Radar Rainfall Data (2020) (12006) A supplemental appropriation of One Hundred Fifty Thousand Dollars ($150,000.00) from the General Fund to be used for rainfall data gathering and analysis in Radar Rainfall Data (2020) (12006) throughout the Metropolitan St. Louis Sewer District service area; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to appropriate additional funds to Contract No. 21868 with Vieux and Associates, Inc. for rainfall data gathering and analysis. 27 Adoption of Ordinance No. 16280 - General Services Agreement – Facility & Sewer Design (2024) Contract B (13101) An appropriation of Four Hundred Seventy-Five Thousand Dollars ($475,000.00) from the Sanitary Replacement Fund to be used for general engineering services in General Services Agreement – Facility & Sewer Design (2024) Contract B (13101) in various locations within the District; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 53069 with GHD, Inc. for general engineering services. 28 Adoption of Ordinance No. 16281 - General Services Agreement – Water Quality Support Services (2024) (13299) An appropriation of One Hundred Fifty Thousand Dollars ($150,000.00) from the Stormwater Regulatory Fund to be used for water quality and environmental regulatory support in General Services Agreement – Water Quality Support Services (2024) (13299) in various locations within the District; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 53039 with HDR Engineering, Inc. for water quality and environmental regulatory support. 29 Adoption of Ordinance No. 16282 - General Services Agreement – Property Appraisal (2024) Contract A (13091) An appropriation of Seventy-Five Thousand Dollars ($75,000.00) from the General Fund to be used for property appraisal services in General Services Agreement – Property Appraisal (2024) Contract A (13091) in various locations within the District; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 53064 with Real Estate Analysts Limited for property appraisal services. 30 Adoption of Ordinance No. 16283 - General Services Agreement – Property Appraisal (2024) Contract B (13092) An appropriation of Seventy-Five Thousand Dollars ($75,000.00) from the General Fund to be used for property appraisal services in General Services Agreement – Property Appraisal (2024) Contract B (13092) in various locations within the District; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 53065 with Mueller and Neff Real Estate Appraisers, LLC for property appraisal services. 31 Adoption of Ordinance No. 16284 - General Services Agreement – Property Appraisal (2024) Contract C (13093) An appropriation of Seventy-Five Thousand Dollars ($75,000.00) from the General Fund to be used for property appraisal services in General Services Agreement – Property Appraisal (2024) Contract C (13093) in various locations within the District; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 53066 with Volkert, Inc. for property appraisal services. 32 Adoption of Ordinance No. 16285 - General Services Agreement – Property Appraisal (2024) Contract D (13094) An appropriation of Seventy-Five Thousand Dollars ($75,000.00) from the General Fund to be used for property appraisal services in General Services Agreement – Property Appraisal (2024) Contract D (13094) in various locations within the District; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 53067 with DJ Howard and Associates, Inc. for property appraisal services. 5 33 Adoption of Ordinance No. 16286 - General Services Agreement – Property Appraisal (2024) Contract E (13859) An appropriation of Seventy-Five Thousand Dollars ($75,000.00) from the General Fund to be used for property appraisal services in General Services Agreement – Property Appraisal (2024) Contract E (13859) in various locations within the District; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 53068 with Planning and Valuation Consultants, Inc. for property appraisal services. 34 Adoption of Ordinance No. 16287 - Coldwater Creek OMCI Reimbursements Program (13488) A supplemental appropriation of One Million Forty-Seven Thousand Two Hundred Twenty-Five Dollars ($1,047,225.00) from the Operation, Maintenance, Construction, and Improvement Fund of Coldwater Creek for cost share for municipal stormwater expenditures in Coldwater Creek OMCI Reimbursements Program (13488) in St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into intergovernmental agreements with municipalities where revenue is collected by the Coldwater Creek OMCI in St. Louis County, Missouri. 35 Adoption of Ordinance No. 16288 - Deer Creek OMCI Reimbursements Program (13487) A supplemental appropriation of One Million Six Hundred Fifty-Eight Thousand Four Hundred Forty-Three Dollars ($1,658,443.00) from the Operation, Maintenance, Construction, and Improvement Fund of Deer Creek for cost share for municipal stormwater expenditures in Deer Creek OMCI Reimbursements Program (13487) in St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into intergovernmental agreements with municipalities where revenue is collected by the Deer Creek OMCI in St. Louis County, Missouri. 36 Adoption of Ordinance No. 16289 - Gravois Creek OMCI Reimbursements Program (13678) A supplemental appropriation of Seven Hundred Eighty-Seven Thousand One Hundred Twenty-Seven Dollars ($787,127.00) from the Operation, Maintenance, Construction, and Improvement Fund of Gravois Creek for cost share for municipal stormwater expenditures in Gravois Creek OMCI Reimbursements Program (13678) in St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into intergovernmental agreements with municipalities where revenue is collected by the Gravois Creek OMCI in St. Louis County, Missouri. 37 Adoption of Ordinance No. 16290 - Seminary OMCI Reimbursements Program (13491) A supplemental appropriation of One Hundred Thirty-One Thousand Three Hundred Ninety-Seven Dollars ($131,397.00) from the Operation, Maintenance, Construction, and Improvement Fund of the Seminary Branch of River Des Peres for cost share for municipal stormwater expenditures in Seminary OMCI Reimbursements Program (13491) in St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into intergovernmental agreements with municipalities where revenue is collected by the Seminary Branch of River Des Peres OMCI in St. Louis County, Missouri. 38 Adoption of Ordinance No. 16291 - Sugar Creek OMCI Reimbursements Program (13490) A supplemental appropriation of One Hundred Fifty-Three Thousand One Hundred Seventy-Six Dollars ($153,176.00) from the Operation, Maintenance, Construction, and Improvement Fund of Sugar Creek for cost share for municipal stormwater expenditures in Sugar Creek OMCI Reimbursements Program (13490) in St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into intergovernmental agreements with municipalities where revenue is collected by the Sugar Creek OMCI in St. Louis County, Missouri. 39 Adoption of Ordinance No. 16292 - University City OMCI Reimbursements Program (13489) A supplemental appropriation of Four Hundred Eighty-One Thousand Four Hundred Three Dollars ($481,403.00) from the Operation, Maintenance, Construction, and Improvement Fund of University City for cost share for municipal stormwater expenditures in University City OMCI Reimbursements Program (13489) in St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into intergovernmental agreements with municipalities where revenue is collected by the University City OMCI in St. Louis County, Missouri. 6 UNFINISHED BUSINESS Item # ORDINANCES 40 Adoption of Ordinance No. 16267 - Weston Place Pump Station (P-771) Improvements (12279) An appropriation of Two Million One Hundred Thousand Dollars ($2,100,000.00) from the Sanitary Replacement Fund to be used for pump station improvements in Weston Place Pump Station (P-771) Improvements (12279) in the City of Town and Country, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 53041 with Unnerstall Contracting Company, LLC for pump station improvements. RESOLUTIONS • None NEW BUSINESS Item # ORDINANCES Pg # 41 Introduction of Ordinance No. 16294 - Daniel Boone - Lawnview Creek I/I Reduction (12326) 10 An appropriation of Six Hundred Thousand Dollars ($600,000.00) from the Sanitary Replacement Fund to be used for sanitary sewer construction and private I/I removal in Daniel Boone – Lawnview Creek I/I Reduction (12326) in the City of Florissant and Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 53053 with Plattin Creek Excavating, LLC DBA PCX Construction, LLC for sanitary sewer construction and private I/I removal. 42 Introduction of Ordinance No. 16295 - Outer Ladue and Chipper Storm Sewer (11034) 11 An appropriation of Three Hundred Seventy-Five Thousand Dollars ($375,000.00) from the Operations, Maintenance, Construction, and Improvement Fund of Deer Creek to be used for storm sewer construction in Outer Ladue and Chipper Storm Sewer (11034) in the City of Frontenac, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 53027 with Plattin Creek Excavating, LLC DBA PCX Construction, LLC for storm sewer construction. 43 Introduction of Ordinance No. 16296 - General Services Agreement – Geotechnical (2024) Contract A (13105) 12 An appropriation of Eighty-Five Thousand Dollars ($85,000.00) from the Districtwide Stormwater Fund to be used for general geotechnical services in General Services Agreement – Geotechnical (2024) Contract A (13105) in various locations within the District; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 53081 with Geotechnology, LLC for general geotechnical services. 44 Introduction of Ordinance No. 16297 - General Services Agreement – Geotechnical (2024) Contract B (13106) 13 An appropriation of Eighty-Five Thousand Dollars ($85,000.00) from the Sanitary Replacement Fund to be used for general geotechnical services in General Services Agreement – Geotechnical (2024) Contract B (13106) in various locations within the District; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 53082 with Hanson Professional Services, Inc. for general geotechnical services. 45 Introduction of Ordinance No. 16298 - General Services Agreement – Geotechnical (2024) Contract C (13107) 14 An appropriation of Eighty-Five Thousand Dollars ($85,000.00) from the Sanitary Replacement Fund to be used for general geotechnical services in General Services Agreement – Geotechnical (2024) Contract C (13107) in various locations within the District; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 53083 with Terracon Consultants, Inc. for general geotechnical services. 7 46 Introduction of Ordinance No. 16299 - General Services Agreement – Sewer and Channel Design (2024) Contract A (13095) 15 An appropriation of One Hundred Thousand Dollars ($100,000.00) from the Sanitary Replacement Fund and making an appropriation of One Hundred Thousand Dollars ($100,000.00) from the Districtwide Stormwater Fund to be used for general engineering services in General Services Agreement – Sewer and Channel Design (2024) Contract A (13095) in various locations within the District; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 53084 with KdG, a Division of Shive-Hattery, Inc. for general engineering services. 47 Introduction of Ordinance No. 16300 - General Services Agreement – Survey Services (2024) Contract A (13113) 16 An appropriation of Fifty Thousand Dollars ($50,000.00) from the Districtwide Stormwater Fund to be used for general surveying services in General Services Agreement – Surveying Services (2024) Contract A (13113) in various locations within the District; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 53076 with Civil Design, Inc. for general surveying services. 48 Introduction of Ordinance No. 16301 - General Services Agreement – Survey Services (2024) Contract B (13114) 17 An appropriation of Fifty Thousand Dollars ($50,000.00) from the Sanitary Replacement Fund to be used for general surveying services in General Services Agreement – Surveying Services (2024) Contract B (13114) in various locations within the District; and authorizing the Executive Director and Secretary- Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 53077 with Prairie Engineers, Inc. for general surveying services. 49 Introduction of Ordinance No. 16302 - General Services Agreement – Survey Services (2024) Contract C (13115) 18 An appropriation of Fifty Thousand Dollars ($50,000.00) from the Districtwide Stormwater Fund to be used for general surveying services in General Services Agreement – Surveying Services (2024) Contract C (13115) in various locations within the District; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 53078 with Sabur, Inc. for general surveying services. 50 Introduction of Ordinance No. 16303 - General Services Agreement – Survey Services (2024) Contract D (13116) 19 An appropriation of Fifty Thousand Dollars ($50,000.00) from the Sanitary Replacement Fund to be used for general surveying services in General Services Agreement – Surveying Services (2024) Contract D (13116) in various locations within the District; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 53079 with Volz Incorporated for general surveying services. 51 Introduction of Ordinance No. 16304 - General Services Agreement - Survey Services (2024) Contract E (13117) 20 An appropriation of Fifty Thousand Dollars ($50,000.00) from the Sanitary Replacement Fund to be used for general surveying services in General Services Agreement – Surveying Services (2024) Contract E (13117) in various locations within the District; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 53080 with Juneau Associates, Inc. for general surveying services. 52 Introduction of Ordinance No. 16305 - Smith Creek Ladue Road Sanitary Relief (Royal Manor Dr. to Hewlett Ct) (12202) 21 Declaring the necessity for the acquisition of easements and temporary easements in certain real property within The Metropolitan St. Louis Sewer District for the purpose of construction of sewers and related appurtenances in the project known as Smith Creek Ladue Road Sanitary Relief (Royal Manor Dr to Hewlett Ct) (12202) in the City of Creve Coeur, Missouri to serve the needs of residents of the area, and authorizing staff to proceed with further condemnation efforts related to the project, including but not limited to the purchase and/or the filing of all necessary court pleadings or documents to commence and prosecute formal legal proceedings for the acquisition of said easements and temporary construction easements. 8 53 Introduction of Ordinance No. 16306 - Upper Fishpot East Sanitary Relief (Field Ave to Wolff Ln) (12242) 22 Declaring the necessity for the acquisition of easements and temporary easements in certain real property within The Metropolitan St. Louis Sewer District for the purpose of construction of sewers and related appurtenances in the project known as Upper FishPot East Sanitary Relief (Field Avenue to Wolff Lane) (12242) in the City of Ellisville, Missouri to serve the needs of residents of the area, and authorizing staff to proceed with further condemnation efforts related to the project, including but not limited to the purchase and/or the filing of all necessary court pleadings or documents to commence and prosecute formal legal proceedings for the acquisition of said easements and temporary construction easements. 54 Introduction of Ordinance No. 16307 - Linear Asset Management Services 23 Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter a contract with Aquasight, LLC to provide software and professional services in Linear Asset Management Services Districtwide. 55 Introduction of Ordinance No. 16308 - Hellmich Hill Retter General Legal Services 24 Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with the law firm of Hellmich Hill & Retter LLC, whereby Hellmich Hill & Retter LLC, will provide General Legal Services to the District commencing on July 1, 2024. 56 Introduction of Ordinance No. 16309 - Quarles & Brady General Legal Services 25 Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with the law firm of Quarles & Brady LLP, whereby Quarles & Brady LLP will provide General Legal Services to the District commencing on July 1, 2024. 57 Introduction of Ordinance No. 16310 - Rynearson Suess General Legal Services 26 Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with the law firm of Rynearson, Suess, Schnurbusch & Champion L.L.C. (RSSC), whereby RSSC will provide General Legal Services to the District commencing on July 1, 2024. 58 Introduction of Ordinance No. 16311 - Thompson Coburn General Legal Services 27 Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with the law firm of Thompson Coburn L.L.P., whereby Thompson Coburn L.L.P., will provide General Legal Services to the District commencing on July 1, 2024. 59 Introduction of Ordinance No. 16312 - White Coleman General Legal Services 28 Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with the law firm of White Coleman & Associates, LLC, whereby White Coleman & Associates, LLC will provide General Legal Services to the District commencing on July 1, 2024. 60 Introduction and Adoption of Ordinance No. 16313 - UKG Kronos: Payroll, Time Reporting, and Benefits-Software as a Service (SaaS) Project 29 Making a contract amendment to the contract approved by Ordinance No. 15893 for professional services in Payroll, Time Reporting and Benefits-Software as a Service (SaaS) Project Districtwide; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 1 to the contract with UKG Kronos for professional services. Item # RESOLUTIONS 61 Adoption of Resolution No. 3871 – Infiltration & Inflow Cost Allocation Services (13422) 30 The adoption of Resolution No. 3871 will exercise option year (3) of the contract previously authorized by Ordinance No. 15613, adopted February 11, 2021, which authorized the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Stantec Consulting Services, Inc., whereby Stantec Consulting Services Inc. will provide Professional Services - Rate Commission Support in Infiltration and Inflow Cost Allocation Services (13422) throughout The Metropolitan St. Louis Sewer District Service Area. 9 62 Adoption of Resolution No. 3872 – FY23 Year-End Interfund Transfers of Available Appropriations 32 Transferring unencumbered appropriated balances totaling Three Million Four Hundred Eight Thousand Five Hundred Fifty-four Dollars and Seven Cents ($3,408,554.07) from the General Insurance Fund #4105, 2023B WIFIA Project Bond Fund #6844, Districtwide Stormwater Fund #5120, and the Sanitary Replacement Fund #6660 to the Water Backup Insurance Fund #4104, Improvement Fund #4102, General Insurance Fund #4105, Wastewater Emergency Fund #4122, Stormwater Regulatory Fund #5110, Wellston OMCI Fund #5589, and Maline Creek OMCI Fund #5576; and transferring fund balances totaling Six Thousand Eight Hundred Thirty-one Dollars and Fifteen Cents ($6,831.15) from the Districtwide Stormwater Fund #5120 to the Watkins Creek OMCI Fund #5587, to allow for the proper classification of expenses in the District’s year-end financial statements. 63 Adoption of Resolution No. 3873 – Investment Management Services Jan 2024 34 Resolution No. 3873 will exercise option year three (3) of the contract previously authorized by Ordinance No. 15567, adopted December 10, 2020, which authorized the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with US Bancorp Asset Management (US Bancorp) whereby US Bancorp would provide investment management services for the District. 64 ITEMS PROPOSED FOR INTRODUCTION AND ADOPTION AT THE NEXT BOARD MEETING • None 65 ANY OTHER BUSINESS THAT MAY PROPERLY BE BROUGHT BEFORE THE BOARD: • None 66 ADJOURNMENT 10 AGENDA ITEM NUMBER: 41 1/11/2024 NAME OF PROJECT Daniel Boone - Lawnview Creek I/I Reduction (12326) LOCATION: Various sites in the City of Florissant and unincoporated St. Louis County TYPE OF PROJECT: Sanitary Sewer Construction and Private I/I Removal (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract What does action accomplish?: Implements the construction of a CIP project, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: Plattin Creek Excavating, LLC DBA PCX Construction, LLC Previous District Contract: No* 555 E Outer 21 Rd Arnold, MO 63010 Consultant: N/A Agency: N/A Number of bidders: 4 Low Bid: $478,868.00 High Bid: $574,873.00 Appropriation Amount: $600,000.00 Designer’s Estimate: $ 491,000 Total MWBE Participation: 41.23% (MBE Goal is 10% - WBE Goal is 10%) X-L Contracting, Inc. (African American) – 29.42% - MBE Bahr Hydroexcavation, LLC – 2.97% - WBE Diamond Hauling, LLC – 3.98% - WBE Superior Industrial Coatings LLC dba TPC Infrastructure – 4.86% - WBE Type of Contract: Unit Cost Properties Affected: 4 Properties Benefiting: 2,200 Designed by: Wood Environmental & Infrastructure Solutions, Inc. The work to be done under Contract #53053 consists of the removal of private inflow sources from 4 private properties, 1 point repair, and the construction of approximately 291 lineal feet of 15-inch diameter sanitary pipe sewer and appurtenances. The purpose of this project is to help alleviate sanitary sewer surcharging and building backups, and to help reduce inflow/infiltration (I/I) in the Coldwater Creek Watershed. This project is scheduled to be completed in 365 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY 2024, Pg. 73 Amount: $ 480,000 Fund Name: 6660 - Sanitary Replacement Fund Additional Comments: An additional contingency of $82,000 for utility relocation (Electric - $12,000, Water - $20,000, ITS Conduit - $50,000) is included in the appropriation. Another $10,000 is requested to be added to contingency for any unexpected rock excavation. This project is expected to be funded by Bond proceeds. *Plattin Creek Excavating, LLC DBA PCX Construction, LLC is a site development, excavation, grading, and utility contractor located in Arnold, Missouri. PCX has a bond capacity of $30,000,000 through West Bend Mutual Insurance Company. PCX is located at 555 East Outer 21 Road in Arnold, Missouri, and has been in business since 2001. PCX has not completed an MSD capital project. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 08/13/20– Ord. No. 15441 – Amount: $307,000 - Wood Environmental & Infrastructure Solutions, Inc. - Design Contract No. 11011-Amendment 11 AGENDA ITEM NUMBER: 42 1/11/2024 NAME OF PROJECT Outer Ladue and Chipper Storm Sewer (11034) LOCATION: Near Geyer Road between Chipper Road and Steeplechase Court in the City of Frontenac, Missouri TYPE OF PROJECT: Storm Sewer Construction (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract What does action accomplish?: Implements the construction of a CIP project SUMMARY EXPLANATION/BACKGROUND: Contractor: Plattin Creek Excavating, LLC DBA PCX Construction, LLC Previous District Contract: No* 555 E Outer 21 Rd Arnold, MO 63010 Consultant: N/A Agency: N/A Number of bidders: 6 Low Bid: $323,159.00 High Bid: $453,401.10 Appropriation Amount: $375,000.00 Designer’s Estimate: $ 426,000 Total MWBE Participation: 21.63% (MBE Goal is 10% - WBE Goal is 10%) X-L Contracting, Inc. (African American) – 11.53% - MBE TraMar Contracting, Inc. dba TraMar Traffic – 4.27% - WBE Midwest Turf Contractors, Inc. – 5.83% - WBE Type of Contract: Unit Cost Properties Affected: 7 Properties Benefiting: 4 Designed by: HR Green, Inc. The work to be done under Contract #53027 consists of the construction of approximately 904 lineal feet of storm sewers, varying in size from 12-inch to 30-inch in diameter, and appurtenances. The purpose of this project is to alleviate basement and yard flooding at residences along Outer Ladue Road. This project is scheduled to be completed in 230 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY 2024, Pg. 161 Amount: $ 538,000 Fund Name: 5566 - Deer Creek OMCI Fund Additional Comments: An additional contingency of $20,000 for utility relocation (Electric - $20,000) is included in the appropriation. This project was one of 9 design projects included in OMCI Stormwater Infrastructure Improvement Design (2021) (13193). *Plattin Creek Excavating, LLC DBA PCX Construction, LLC is a site development, excavation, grading, and utility contractor located in Arnold, Missouri. PCX has a bond capacity of $30,000,000 through West Bend Mutual Insurance Company. PCX is located at 555 East Outer 21 Road in Arnold, Missouri, and has been in business since 2001. PCX has not completed an MSD capital project. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 02/11/21– Ord. No. 15611 – Amount: $955,000 - HR Green, Inc. - OMCI Stormwater Infrastructure Improvement Design (2021) (13193) - Design Contract No. 2201 12 AGENDA ITEM NUMBER: 43 1/11/2024 NAME OF PROJECT: General Services Agreement – Geotechnical (2024) Contract A (13105) LOCATION: Various locations within the District TYPE OF PROJECT: General Geotechnical Services (011.0 Design Phase Project Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a geotechnical services contract. What does action accomplish?: Supplements District staff and provides unique technical services. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: Geotechnology, LLC 11816 Lackland Rd., Suite 150 St. Louis, MO 63146 Corporate Headquarters – St. Louis, Missouri Number of proposers: (5) Basilico Engineering, Inc.; Geotechnology, LLC.; Hanson Professional Services, Inc.; Reitz & Jens Inc.; Terracon Consultants, Inc. Appropriation Amount: $85,000.00 Designer’s Estimate: N/A Total MWBE Participation: 31.00% (31% MBE/WBE Goal) 7NT Engineering, LLC – 20.00% - MBE Kaskaskia Engineering Group, LLC – 11.00% - WBE Type of Contract: Hourly Billing Rate Plus Reimbursables Properties Affected: To Be Determined Properties Benefiting: To Be Determined Designed by: N/A This ordinance authorizes the District to enter into Contract #53081, for one (1) year with one (1) option year with Geotechnology, Inc. for geotechnical services associated with the design of projects as needed throughout the District. Services provided include rock and soil analysis, testing, recommendations and evaluation of foundations, slopes, and bedding for projects to be completed either in-house or by design consultants. Projects will be issued by letter agreement per individual scopes of services. This contract is for a total maximum amount of $85,000. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2024, Pg. 18 Amount: $85,000 Fund Name: #5120 – Districtwide Stormwater Fund Additional Comments: There were four (4) other proposals considered for this project. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 13 AGENDA ITEM NUMBER: 44 1/11/2024 NAME OF PROJECT: General Services Agreement – Geotechnical (2024) Contract B (13106) LOCATION: Various locations within the District TYPE OF PROJECT: General Geotechnical Services (011.0 Design Phase Project Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a geotechnical services contract. What does action accomplish?: Supplements District staff and provides unique technical services, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: Hanson Professional Services, Inc. 13801 Riverport Drive, Suite 300 St. Louis, MO 63043 Corporate Headquarters – Springfield, Illinois Number of proposers: (5) Basilico Engineering, Inc.; Geotechnology, LLC.; Hanson Professional Services, Inc.; Reitz & Jens Inc.; Terracon Consultants, Inc. Appropriation Amount: $85,000.00 Designer’s Estimate: N/A Total MWBE Participation: 31.00% (31% MBE/WBE Goal) TSI Geotechnical, Inc. – 31.00% - MBE Type of Contract: Hourly Billing Rate Plus Reimbursables Properties Affected: To Be Determined Properties Benefiting: To Be Determined Designed by: N/A This ordinance authorizes the District to enter into Contract #53082, for one (1) year with one (1) option year, with Geotechnology, Inc. for geotechnical services associated with the design of projects as needed throughout the District. Services provided include rock and soil analysis, testing, recommendations and evaluation of foundations, slopes, and bedding for projects to be completed either in-house or by design consultants. Projects will be issued by letter agreement per individual scopes of services. This contract is for a total maximum amount of $85,000. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2024, Pg. 19 Amount: $85,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: There were four (4) other proposals considered for this project. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 14 AGENDA ITEM NUMBER: 45 1/11/2024 NAME OF PROJECT: General Services Agreement – Geotechnical (2024) Contract C (13107) LOCATION: Various locations within the District TYPE OF PROJECT: General Geotechnical Services (011.0 Design Phase Project Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a geotechnical services contract. What does action accomplish?: Supplements District staff and provides unique technical services, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: Terracon Consultants, Inc. 11600 Lilburn Park Road St. Louis, MO 63146 Corporate Headquarters : Olathe, Kansas Number of proposers: (5) Basilico Engineering, Inc.; Geotechnology, LLC.; Hanson Professional Services, Inc.; Reitz & Jens Inc.; Terracon Consultants, Inc. Appropriation Amount: $85,000.00 Designer’s Estimate: N/A Total MWBE Participation: 33.00% (31% MBE/WBE Goal) Millennia Professional Services of Illinois, LTD. – 11.00% - WBE ABNA Engineering, Inc. (African American) – 11.00% - MWBE Kaskaskia Engineering Group, LLC – 11.00% - WBE Type of Contract: Hourly Billing Rate Plus Reimbursables Properties Affected: To Be Determined Properties Benefiting: To Be Determined Designed by: N/A This ordinance authorizes the District to enter into Contract #53083, for one (1) year with one (1) option year, with Geotechnology, Inc. for geotechnical services associated with the design of projects as needed throughout the District. Services provided include rock and soil analysis, testing, recommendations and evaluation of foundations, slopes, and bedding for projects to be completed either in-house or by design consultants. Projects will be issued by letter agreement per individual scopes of services. This contract is for a total maximum amount of $85,000. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2024, Pg. 20 Amount: $85,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: There were four (4) other proposals considered for this project. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 15 AGENDA ITEM NUMBER: 46 1/11/2024 NAME OF PROJECT: General Services Agreement – Sewer and Channel Design (2024) Contract A (13095) LOCATION: Various Locations Within the District TYPE OF PROJECT: General Engineering Services (011.0 Design Phase Project Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a design contract. What does action accomplish?: Provides funding for the design of small capital improvements and Operations projects, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: KdG, a Division of Shive-Hattery, Inc. 2043 Woodland Parkway, Suite 201 St. Louis, Missouri 63146 Corporate Headquarters: Cedar Rapids, Iowa Agency: N/A Number of proposers: (3) ABNA Engineering, Inc.; Farnsworth Group, Inc.; KdG, a Division of Shive-Hattery, Inc. Appropriation Amount: $200,000.00 Designer’s Estimate: N/A Total MWBE Participation: 31.00% (31% MBE/WBE Goal) David Mason & Associates (African American) – 21.00% - MBE TSi Geotechnical, Inc. (African American) – 10.00% - MBE Type of Contract: Hourly Billing Rate Plus Reimbursables Properties Affected: To Be Determined Properties Benefitting: To Be Determined Designed by: N/A This ordinance authorizes the District to enter into Contract # 53084, for one (1) year with one (1) option year with with KdG, a Division of Shive-Hattery, Inc. for the design of various projects. This project consists of the design of small sanitary, combined, and stormwater projects as needed throughout the District in support of an ongoing internal design effort. Projects will be issued by letter agreement per individual scope of services. This contract is for a total maximum amount of $200,000. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2024, Pg. 26 Amount: $200,000 Fund Name: #6660 – Sanitary Replacement Fund $100,000 #5120 – Districtwide Stormwater Fund $100,000 Additional Comments: There were two (2) other proposals considered on this project. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 16 AGENDA ITEM NUMBER: 47 1/11/2024 NAME OF PROJECT: General Services Agreement – Survey Services (2024) Contract A (13113) LOCATION: Various Locations Within the District TYPE OF PROJECT: General Surveying Services (011.8 General Services – Survey) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a surveying contract. What does action accomplish?: Supplements District staff during peak workloads SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: Civil Design, Inc. 5220 Oakland Avenue St. Louis, MO 63110 Corporate Headquarters : St. Louis, Missouri Agency: N/A Number of proposers: (7) Civil Design, Inc.; Cole & Associates, Inc.; Farnsworth Group, Inc; Juneau Associates, Inc.; Prairie Engineers; Sabur, Inc.; and Volz Incorporated Appropriation Amount: $50,000.00 Designer’s Estimate: N/A Total MWBE Participation: 100.00% (No MWBE Goal) Civil Design, Inc. (Woman) – 100.00% - WBE Prime Type of Contract: Hourly Billing Rate Properties Affected: N/A Properties Benefiting: Entire Watershed Designed by: N/A This ordinance authorizes the District to enter into Contract #53076 with Civil Design, Inc. for surveying services associated with the design of sanitary and stormwater projects. Services provided include land surveys, property strip maps, and easements for projects to be completed either in-house or by design consultants. Additional general surveying services will be provided on an as needed basis for legal research, legal descriptions, topographic and land surveys for District facilities, and other requirements of the various District departments. Work will be assigned on a project-by-project basis. This contract is for a maximum amount of $50,000, which is included in the FY2024 Capital Improvement Program. Contracts are for one (1) year with one (1) option year based on performance. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2024, Pg. 27 Amount: $50,000 Fund Name: #5120 – Districtwide Stormwater Fund Additional Comments: There were six (6) other proposals considered on this project. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 17 AGENDA ITEM NUMBER: 48 1/11/2024 NAME OF PROJECT: General Services Agreement – Survey Services (2024) Contract B (13114) LOCATION: Various Locations Within the District TYPE OF PROJECT: General Surveying Services (011.8 General Services – Survey) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a surveying contract. What does action accomplish?: Supplements District staff during peak workloads SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: No Consultant: Prairie Engineers, Inc 8873 Hazelwood Tech Ct. Hazelwood, MO 63042 Corporate Headquarters : Columbia, Illinois Agency: N/A Number of proposers: (7) Civil Design, Inc.; Cole & Associates, Inc.; Farnsworth Group, Inc; Juneau Associates, Inc.; Prairie Engineers; Sabur, Inc.; and Volz Incorporated Appropriation Amount: $50,000.00 Designer’s Estimate: N/A Total MWBE Participation: 100.00% (No MWBE Goal) Prairie Engineers, Inc (Woman) – 100.00% WBE Prime Type of Contract: Hourly Billing Rate Properties Affected: N/A Properties Benefiting: Entire Watershed Designed by: N/A This ordinance authorizes the District to enter into Contract #53077 with Prairie Engineers, Inc. for surveying services associated with the design of sanitary and stormwater projects. Services provided include land surveys, property strip maps, and easements for projects to be completed either in-house or by design consultants. Additional general surveying services will be provided on an as needed basis for legal research, legal descriptions, topographic and land surveys for District facilities, and other requirements of the various District departments. Work will be assigned on a project-by-project basis. This contract is for a maximum amount of $50,000, which is included in the FY2024 Capital Improvement Program. Contracts are for one (1) year with one (1) option year based on performance. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2024, Pg. 28 Amount: $50,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: There were six (6) other proposals considered on this project. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 18 AGENDA ITEM NUMBER: 49 1/11/2024 NAME OF PROJECT: General Services Agreement – Survey Services (2024) Contract C (13115) LOCATION: Various Locations Within the District TYPE OF PROJECT: General Surveying Services (011.8 General Services – Survey) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a surveying contract. What does action accomplish?: Supplements District staff during peak workloads SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: Sabur, Inc. 1751 Ashby Road St. Louis, MO 63114 Corporate Headquarters : St. Louis, Missouri Agency: N/A Number of proposers: (7) Civil Design, Inc.; Cole & Associates, Inc.; Farnsworth Group, Inc; Juneau Associates, Inc.; Prairie Engineers; Sabur, Inc.; and Volz Incorporated Appropriation Amount: $50,000.00 Designer’s Estimate: N/A Total MWBE Participation: 100.00% (No MWBE Goal) Sabur, Inc. (African American) – 100.00% - MBE Prime Type of Contract: Hourly Billing Rate Properties Affected: N/A Properties Benefiting: Entire Watershed Designed by: N/A This ordinance authorizes the District to enter into Contract #53078 with Sabur, Inc. for surveying services associated with the design of sanitary and stormwater projects. Services provided include land surveys, property strip maps, and easements for projects to be completed either in-house or by design consultants. Additional general surveying services will be provided on an as needed basis for legal research, legal descriptions, topographic and land surveys for District facilities, and other requirements of the various District departments. Work will be assigned on a project-by-project basis. This contract is for a maximum amount of $50,000, which is included in the FY2024 Capital Improvement Program. Contracts are for one (1) year with one (1) option year based on FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2024, Pg. 29 Amount: $50,000 Fund Name: #5120 – Districtwide Stormwater Fund Additional Comments: There were six (6) other proposals considered on this project. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 19 AGENDA ITEM NUMBER: 50 1/11/2024 NAME OF PROJECT: General Services Agreement – Survey Services (2024) Contract D (13116) LOCATION: Various Locations Within the District TYPE OF PROJECT: General Surveying Services (011.8 General Services – Survey) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a surveying contract. What does action accomplish?: Supplements District staff during peak workloads SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: Volz Incorporated 10849 Indian Head Industrial Blvd St. Louis, MO 63132 Corporate Headquarters : St. Louis, Missouri Agency: N/A Number of proposers: (7) Civil Design, Inc.; Cole & Associates, Inc.; Farnsworth Group, Inc; Juneau Associates, Inc.; Prairie Engineers; Sabur, Inc.; and Volz Incorporated Appropriation Amount: $50,000.00 Designer’s Estimate: N/A Total MWBE Participation: 0.00% (No MWBE Goal) N/A – There are no MWBE goals for this Professional Services project. Type of Contract: Hourly Billing Rate Properties Affected: N/A Properties Benefiting: Entire Watershed Designed by: N/A This ordinance authorizes the District to enter into Contract #53079 with The Sterling Company for surveying services associated with the design of sanitary and stormwater projects. Services provided include land surveys, property strip maps, and easements for projects to be completed either in-house or by design consultants. Additional general surveying services will be provided on an as needed basis for legal research, legal descriptions, topographic and land surveys for District facilities, and other requirements of the various District departments. Work will be assigned on a project-by-project basis. This contract is for a maximum amount of $50,000, which is included in the FY2024 Capital Improvement Program. Contracts are for one (1) year with one (1) option year based on performance. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2024, Pg. 30 Amount: $50,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: There were six (6) other proposals considered on this project. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 20 AGENDA ITEM NUMBER: 51 1/11/2024 NAME OF PROJECT: General Services Agreement – Survey Services (2024) Contract E (13117) LOCATION: Various Locations Within the District TYPE OF PROJECT: General Surveying Services (011.8 General Services – Survey) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a surveying contract. What does action accomplish?: Supplements District staff during peak workloads SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: No Consultant: Juneau Associates, Inc 330 N. Fourth Street, Suite 200 St. Louis, MO 63102 Corporate Headquarters : St. Louis, Missouri Agency: N/A Number of proposers: (7) Civil Design, Inc.; Cole & Associates, Inc.; Farnsworth Group, Inc; Juneau Associates, Inc.; Prairie Engineers; Sabur, Inc.; and Volz Incorporated Appropriation Amount: $50,000.00 Designer’s Estimate: N/A Total MWBE Participation: 0.00% (No MWBE Goal) N/A – There are no MWBE goals for this Professional Services project. Type of Contract: Hourly Billing Rate Properties Affected: N/A Properties Benefiting: Entire Watershed Designed by: N/A This ordinance authorizes the District to enter into Contract #53080 with Juneau Associates, Inc, for surveying services associated with the design of sanitary and stormwater projects. Services provided include land surveys, property strip maps, and easements for projects to be completed either in-house or by design consultants. Additional general surveying services will be provided on an as needed basis for legal research, legal descriptions, topographic and land surveys for District facilities, and other requirements of the various District departments. Work will be assigned on a project-by-project basis. This contract is for a maximum amount of $50,000, which is included in the FY2024 Capital Improvement Program. Contracts are for one (1) year with one (1) option year based on performance. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2024, Pg. 31 Amount: $50,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: There were six (6) other proposals considered on this project. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 21 AGENDA ITEM NUMBER: 52 1/11/2024 NAME OF PROJECT: Smith Creek Ladue Road Sanitary Relief (Royal Manor Dr. to Hewlett Ct) (12202) LOCATION: South of Ladue Rd., East of Mason Rd., North of Conway Rd., and West of Ballas Rd., in the City of Creve Coeur, Missouri TYPE OF PROJECT: Easement Condemnation DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Authorizes staff to proceed with further condemnation efforts including the filing of all necessary court pleadings or documents. What does action accomplish?: Acquires permanent easements and temporary construction easements to a construct a sanitary sewer project with appurtenances, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: N/A Consultant: N/A Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: N/A District’s Estimate: N/A Total MWBE Participation: N/A Type of Contract: N/A Properties Affected: 4 Properties Benefiting: 304 Designed by: N/A This ordinance authorizes the staff to proceed with further condemnation efforts including the filing of all necessary court pleadings or documents leading to the acquisition of permanent easement and/or temporary construction easements on four (4) parcels of ground located in the City of Creve Coeur, Missouri. The easements and temporary construction easements are needed to construct this project, which consists of approximately 5,325 lineal feet of 8-inch to 15-inch sanitary sewer and appurtenances The purpose of this project is to alleviate basement backups and surcharging of the sanitary sewer. Currently, the District has been unable to negotiate a settlement with the owners. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2025 Amount: $3,977,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: None PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 22 AGENDA ITEM NUMBER: 53 1/11/2024 NAME OF PROJECT: Upper Fishpot East Sanitary Relief (Field Ave to Wolff Ln) (12242) LOCATION: South of Clayton Rd., East of Strecker Rd., North of Manchester Rd., and West of Kehr’s Mill Rd. in the City of Ellisville, Missouri TYPE OF PROJECT: Easement Condemnation DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Authorizes staff to proceed with further condemnation efforts including the filing of all necessary court pleadings or documents. What does action accomplish?: Acquires permanent easements and temporary construction easements to a construct a sanitary sewer project with appurtenances, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: N/A Consultant: N/A Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: N/A District’s Estimate: N/A Total MWBE Participation: N/A Type of Contract: N/A Properties Affected: 2 Properties Benefiting: 387 Designed by: N/A This ordinance authorizes the staff to proceed with further condemnation efforts including the filing of all necessary court pleadings or documents leading to the acquisition of permanent easement and/or temporary construction easements on two (2) parcels of ground located in the City of Ellisville, Missouri. The easements and temporary construction easements are needed to construct this project, which consists of the construction of approximately 3,234 lineal feet of, 8-inch to 15- inch sanitary sewers and appurtenances and 256 feet of 12-inch to 54inch storm sewer and appurtenances. The purpose of this project is to alleviate building backups and overcharging of the sanitary sewer. Currently, the District has been unable to negotiate a settlement with the owners. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2024 Pg. 106 Amount: $2,680,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: None PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 23 AGENDA ITEM NUMBER: 54 1/11/2024 NAME OF PROJECT: Linear Asset Management Services LOCATION: District-wide TYPE OF PROJECT: Software and Professional Services DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary? Authorizes the District to enter into a contract with a Linear Asset Management service provider. What does action accomplish? This contract will provide a software solution along with services to import MSD data and configure the solution to help MSD improve decision support for asset rehabilitation or replacement project capital planning. SUMMARY EXPLANATION/BACKGROUND: Contractor: Aquasight LLC Previous District Contract: No 1650 W Big Beaver Troy, MI 48084 Consultants: N/A Agency: N/A Number of bidders: 4 Low Bid: $229,500 High Bid: $380,000 Agelix Consulting, Aquasight, Decision Optimization Technology, OpenGov Appropriation Amount: N/A District Estimate: N/A Total MWBE Participation: 0.0% (No MWBE Goal) N/A – There are no MWBE goals for this procurement Type of Contract: Lump sum with annual subscription Properties Affected: N/A Properties Benefiting: N/A Designed by: N/A This ordinance authorizes the District to enter into a contract with Aquasight LLC. The purpose of this contract is to provide District staff with software solution configured to MSD data and needs for prioritizing capital work on MSD linear assets. These services and the resulting output will form the basis for District capital rehabilitation activities. The cost for services is $359,000 for year one. This annual software subscription is renewable at $86,000 per year for up to four (4) additional years based on performance and effectiveness. FUNDING/COST SUMMARY: Budgeted: Engineering Department Operating Budget Budget Year: FY2023 Amount: $350,000 Fund Name: N/A Additional Comments: This action is in support of MSD’s FY2024 Strategic Business and Operating Plan strategy to address customer and regulatory needs through a comprehensive infrastructure management program. The milestone for this strategy is to purchase and implement software tools to support the asset management plan for linear assets. The District, through the Purchasing division, solicited qualification proposals for this project. Four responsive proposals were received. All proposals were evaluated based on four weighted criteria. Aquasight had the highest overall score as the best firm for the services requested in the RFP. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: None. 24 AGENDA ITEM NUMBER: 55 Proposed Ordinance No. 16308 NAME OF PROJECT: Hellmich Hill & Retter, LLC - General Legal Services LOCATION: District Wide TYPE OF PROJECT: Legal DEPARTMENT REQUESTING ACTION: General Counsel REQUESTED ACTION: Why is this action necessary?: To secure legal consulting services to assist the Office of General Counsel in areas concerning General Litigation areas of liability and human resources matters. What does action accomplish?: Authorizes the District to enter into a contract with Hellmich Hill & Retter LLC SUMMARY EXPLANATION/BACKGROUND: Consultant: Hellmich Hill & Retter LLC 1049 North Clay Avenue Kirkwood, MO 63122 Agency: N/A Number of proposers: 7 Appropriation Amount: N/A District’s Estimate: N/A MBE/WBE Participation: 0% (There is no MWBE goal) Type of Contract: Professional Services Properties Affected: N/A Properties Benefiting: N/A Designed by: N/A FUNDING/COST SUMMARY: Budgeted: Operating Budget Budget Year: FY2025 Amount: N/A Fund Name: N/A Additional Comments: Notifications regarding the RFP for said services was sent to over 100 law firms, placed on social media and on the District’s website. Seven proposals were received. After careful consideration, Hellmich Hill & Retter LLC was deemed to be one of the most responsive to the needs of the District. Contract to begin July 1, 2024. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 25 AGENDA ITEM NUMBER: 56 Proposed Ordinance No. 16309 NAME OF PROJECT: Quarles & Brady LLP - General Legal Services LOCATION: District Wide TYPE OF PROJECT: Legal DEPARTMENT REQUESTING ACTION: General Counsel REQUESTED ACTION: Why is this action necessary? To secure legal consulting services to assist the Office of General Counsel in areas concerning General Litigation areas of liability, human resources, and administrative matters. What does action accomplish? Authorizes the District to enter into a contract with Quarles & Brady LLP. SUMMARY EXPLANATION/BACKGROUND: Consultant: Quarles & Brady LLP 8182 Maryland Avenue Clayton, MO 63105 Agency: N/A Number of proposers: 7 Appropriation Amount: N/A District Estimate: N/A MBE/WBE Participation: 0% (There is no MWBE goal) Type of Contract: Professional Services Properties Affected: N/A Properties Benefiting: N/A Designed by: N/A FUNDING/COST SUMMARY: Budgeted: Operating Budget Budget Year: FY2025 Amount: NA Fund Name: N/A Additional Comments: Notifications regarding the RFP for said services was sent to over 100 law firms, placed on social media and on the District’s website. Seven proposals were received. After careful consideration, Quarles & Brady LLP was deemed to be one of the most responsive to the needs of the District. Contract to begin July 1, 2024. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 26 AGENDA ITEM NUMBER: 57 Proposed Ordinance No. 16310 NAME OF PROJECT: Rynearson, Suess, Schnurbusch & Champion LLC - General Legal Services LOCATION: District Wide TYPE OF PROJECT: Legal DEPARTMENT REQUESTING ACTION: General Counsel REQUESTED ACTION: Why is this action necessary?: To secure legal consulting services to assist the Office of General Counsel in areas concerning General Litigation areas of liability, human resources, and administrative matters. What does action accomplish?: Authorizes the District to enter into a contract with Rynearson, Suess, Schnurbusch & Champion L.L.C. SUMMARY EXPLANATION/BACKGROUND: Consultant: Ryearson, Suess, Schnurbusch & Champion L.L.C. One South Memorial Drive, 18th Floor St. Louis, MO 63102 Agency: N/A Number of proposers: 7 Appropriation Amount: N/A District’s Estimate: N/A MBE/WBE Participation: 0% (There is no MWBE goal) Type of Contract: Professional Services Properties Affected: N/A Properties Benefiting: N/A Designed by: N/A FUNDING/COST SUMMARY: Budgeted: Operating Budget Budget Year: FY2025 Amount: N/A Fund Name: N/A Additional Comments: Notifications regarding the RFP for said services was sent to over 100 law firms, placed on social media and on the District’s website. Seven proposals were received. After careful consideration, Rynearson, Suess, Schnurbusch & Champion L.L.C. was deemed to be one of the most responsive to the needs of the District. Contract to begin July 1, 2024. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 27 AGENDA ITEM NUMBER: 58 Proposed Ordinance No. 16311 NAME OF PROJECT: Thompson Coburn LLP - General Legal Services LOCATION: District Wide TYPE OF PROJECT: Legal DEPARTMENT REQUESTING ACTION: General Counsel REQUESTED ACTION: Why is this action necessary?: To secure legal consulting services to assist the Office of General Counsel in areas concerning General Litigation areas of liability, human resources, real estate, environmental, and administrative matters. What does action accomplish?: Authorizes the District to enter into a contract with Thompson Coburn L.L.P. SUMMARY EXPLANATION/BACKGROUND: Consultant: Thompson Coburn L.L.P. One U.S. Bank Plaza St. Louis, MO 63101 Agency: N/A Number of proposers: 7 Appropriation Amount: N/A District’s Estimate: N/A MBE/WBE Participation: 0% (There is no MWBE goal) Type of Contract: Professional Services Properties Affected: N/A Properties Benefiting: N/A Designed by: N/A FUNDING/COST SUMMARY: Budgeted: Operating Budget Budget Year: FY2025 Amount: N/A Fund Name: N/A Additional Comments: Notifications regarding the RFP for said services was sent to over 100 law firms, placed on social media and on the District’s website. Seven proposals were received. After careful consideration, Thompson Coburn LLP was deemed to be one of the most responsive to the needs of the District. Contract to begin July 1, 2024. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 28 AGENDA ITEM NUMBER: 59 PROPOSED ORDINANCE NO. 16312 NAME OF PROJECT: White Coleman & Associates, LLC - General Legal Services LOCATION: District Wide TYPE OF PROJECT: Legal DEPARTMENT REQUESTING ACTION: General Counsel REQUESTED ACTION: Why is this action necessary?: To secure legal consulting services to assist the Office of General Counsel in areas concerning General Litigation areas of liability and real estate. What does action accomplish?: Authorizes the District to enter into a contract with White Coleman & Associates, LLC SUMMARY EXPLANATION/BACKGROUND: Consultant: White Coleman & Associates, LLC 500 North Broadway, Suite 1300 St. Louis, MO 63102 Agency: N/A Number of proposers: 7 Appropriation Amount: N/A District’s Estimate: N/A MBE/WBE Participation: 100% (There is no MWBE goal) Type of Contract: Professional Services Properties Affected: N/A Properties Benefiting: N/A Designed by: N/A FUNDING/COST SUMMARY: Budgeted: Operating Budget Budget Year: FY2025 Amount: N/A Fund Name: N/A Additional Comments: Notifications regarding the RFP for said services was sent to over 100 law firms, placed on social media and on the District’s website. Seven proposals were received. After careful consideration, White Coleman & Associates, LLC was deemed to be one of the most responsive to the needs of the District. Contract to begin July 1, 2024. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 29 AGENDA ITEM NUMER: 60 INTRODUCTION AND ADOPTION OF PROPOSED ORDINANCE NO 16313 NAME OF PROJECT: Payroll, Time Reporting and Benefits-Software as a Service (SaaS) Project LOCATION: District Wide TYPE OF PROJECT: Professional Services DEPARTMENT REQUESTING ACTION: Information Technology REQUESTED ACTION: Why is this action necessary?: Authorizes staff to amend an existing contract to support payroll, time reporting and benefits SaaS. The District is implementing a new Payroll and Benefits System which requires integration with internal and external financial systems. What does action accomplish?: This action will provide authorization to enter in to change orders above the original contract amount. SUMMARY EXPLANATION/BACKGROUND: Contractor: UKG Kronos 2000 Ultimate Way Weston, FL 33326 Previous District Contract: Yes* Consultants: N/A Agency: N/A Number of bidders: N/A Low Bid: High Bid: Appropriation Amount: N/A District Estimate: N/A MBE/WBE Participation: Plan Approval Date: N/A Type of Contract: Lump Sum Properties Affected: N/A Properties Benefiting: N/A Designed by: N/A FUNDING/COST SUMMARY: Budgeted: Information Technology Budget Year: FY24 Amount: $45,000 Fund Name: General Fund Additional Comments: This ordinance authorizes the District to enter into Amendment No. 1 to the original contract with UKG Kronos. The project has identified that additional funds are required to integrate the system with internal and external applications. An estimate of $25,000 has been provided by UKG Kronos. This ordinance requests authorization to enter into change orders up to an additional $45,000 over the original contract amount. This allows for $25,000 for current change orders and $20,000 for contingency. Because of project delays, the four one-year contract extensions are still available for this project. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 04/14/2022 - Ord. No. 15893 - UKG Kronos - Original Contract for Professional Service Agreement 30 AGENDA ITEM NUMBER: 61 Adoption of Resolution No 3871 1/11/2024 NAME OF PROJECT: Infiltration & Inflow Cost Allocation Services (13422) LOCATION: Throughout the Metropolitan Sewer District Service Area TYPE OF PROJECT: Professional Services – Rate Commission Support DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Authorizes staff to exercise option year three (3) of an existing contract. What does action accomplish?: Updates the Inflow and Infiltration Cost Allocation Study Report to be utilized for the FY2023 Wastewater Rate Proposal. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: Stantec Consulting Services Inc. 1859 Bowles Avenue, Suite 250 Fenton, MO 63026 Corporate Headquarters: New York, NY and Edmonton, Alberta, Canada (Parent Co.) Agency: N/A Number of proposers: N/A Appropriation Amount: N/A Designer’s Estimate: N/A Total MWBE Participation: 0.0% (No MWBE Goal) N/A – There are no MWBE goals for this Professional Services project. Type of Contract: Unit Cost Properties Affected: N/A Properties Benefitting: N/A Designed by: N/A This resolution authorizes the District to exercise option year three (3) of an existing contract with Stantec Consulting Services, Inc. This project will update the Inflow and Infiltration Cost Allocation Study Report to be utilized for the FY2023 Wastewater Rate Proposal. This project will also include technical support during the FY2023 Wastewater Rate Commission Proceedings. The contract is for a total amount of $300,000. FUNDING/COST SUMMARY: Budgeted: Engineering Department Operating Budget Budget Year: FY2021 Amount: Approx. $300,000 Fund Name: N/A Additional Comments: In October 2019, the District’s Board accepted the Wastewater Rate Commission’s Recommendation Report under Resolution No. 3547. In its Report, the Rate Commission stated that it believes the Infiltration and Inflow (I/I) allocation used in the District’s wastewater rate model of approximately 60% to volume and 40% to customers merits further examination. In a November 5 2019 letter to the Rate Commission, the Chair of the MSD Board of Trustees stated that MSD is committed to performing a new I/I allocation study prior to the next rate proposal to determine what, if any, changes should be made to the I/I allocation. A new I/I allocation study was performed and no changes were recommended to be made to I/I allocation. This study was presented to and accepted by the Rate Commission. Future consultant services will be for completing documentation of data analysis and to prepare guidance for future analysis in the next rate proposal. The proposed resolution will be the third of four (4) one-year renewals provided for in the original contract based on performance. 31 PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 10/10/19 – Res. No. 3547 – Acceptance of the Rate Commission’s Recommendation Report 02/11/21 – Ord. No. 15613 – Infiltration & Inflow Cost Allocation Services (13422) – Original Contract 03/10/22 – Res. No. 3738 – Infiltration & Inflow Cost Allocation Services (13422) – Option Year One 01/12/23 – Res. No. 3807 – Infiltration & Inflow Cost Allocation Services (13422) – Option Year Two 32 AGENDA ITEM NUMBER:62 RESOLUTION NO. 3872 NAME OF PROJECT: Budget Transfer LOCATION: Finance TYPE OF PROJECT: N/A DEPARTMENT REQUESTING ACTION: Finance REQUESTED ACTION: Why is this action necessary?: To properly classify expenses for The District’s year-end financial statements, and to increase fund balance in the Watkins Creek OMCI Fund #5587. What does action accomplish?: Allows District staff to transfer unencumbered FY23 appropriated balances from the General Insurance Fund #4105, 2023B WIFIA Project Bond Fund #6844, Districtwide Stormwater Fund #5120, and the Sanitary Replacement Fund #6660 to the Water Backup Insurance Fund #4104, Improvement Fund #4102, General Insurance Fund #4105, Wastewater Emergency Fund #4122, Stormwater Regulatory Fund #5110, Wellston OMCI Fund #5589, and Maline Creek OMCI Fund #5576; and provides additional fund balance to the Watkins Creek OMCI Fund #5587 for a project appropriation. SUMMARY EXPLANATION/BACKGROUND: Contractor: NA Previous District Contract: NA Consultant: NA Agency: NA Number of bidders: NA Low Bid: NA High Bid: NA Appropriation Amount: NA District’s Estimate: NA MBE/WBE Participation: NA Plan Approval Date: NA Type of Contract: NA Properties Affected: NA Properties Benefiting: NA Designed by: NA FUNDING/COST SUMMARY: Budgeted: NA Budget Year: FY 2023 Amount: NA Fund Name: General Insurance Fund #4105, Districtwide Stormwater Fund #5120, Sanitary Replacement Fund #6660, 2023B WIFIA Project Bond Fund #6844, Water Backup Insurance Fund #4104, Improvement Fund #4102, Wastewater Emergency Fund #4122, Stormwater Regulatory Fund #5110, Wellston OMCI Fund #5589, Maline Creek OMCI Fund #5576, and Watkins Creek OMCI Fund #5587. Additional Comments: This resolution approves the transfer of$3,408,554.07 of unencumbered appropriated balances and$6,831.70 of fund balances between multiple funds as indicated in the tables below. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 06/09/2022 - Ordinance No. 15905 - Fiscal Year 2023 Budget Ordinance 33 Fund Cost Center Natural Account Business Line (xxxx) (xxxxx) (xxxxx) (xxxxx) Amount 4105 00102 54130 - Bond & Liability Insurance 00 $1,328,500.00 6844 00202 58040 - Debt Issue Cost 00 $1,200,000.00 4105 00103 54400 - Judgments & Claims Settlements 00 $400,000.00 4105 00104 51110 - Workers' Comp Settlements 00 $185,000.00 5120 00109 59205 - SW CIRP Interfund Labor 20 $154,962.24 6660 00109 59206 - WW CIRP Interfund Labor 10 $140,091.83 Total Transfer From: $3,408,554.07 Fund Cost Center Natural Account Business Line (xxxx) (xxxxx) (xxxxx) (xxxxx) Amount 4104 00105 54922 - Overcharged Main (OC) Claims Paid 00 $2,882,000.00 4105 00104 54390 - Hospital & Medical Services 00 $199,500.00 4122 00109 59206 - WW CIRP Interfund Labor 10 $137,998.47 5576 00109 59205 - SW CIRP Interfund Labor 20 $99,229.09 5110 00109 59205 - SW CIRP Interfund Labor 20 $52,857.85 4104 00105 54912 - Blocked Main (BM) and Sewer Backup (SBU) Claims Paid 00 $23,000.00 4105 00103 54520 - Professional Service 00 $6,000.00 4105 00104 54520 - Professional Service 00 $3,000.00 5589 00109 59205 - SW CIRP Interfund Labor 20 $2,875.30 4102 00109 59206 - WW CIRP Interfund Labor 10 $2,093.36 Total Transfer To: $3,408,554.07 Fund Cost Center Natural Account Business Line (xxxx) (xxxxx) (xxxxx) (xxxxx) Amount 5120 00000 48120 – Fund Transfer 20 $6,831.70 Total Available Funds for Transfer: $6,831.70 Fund Cost Center Natural Account Business Line (xxxx) (xxxxx) (xxxxx) (xxxxx) Amount 5587 00000 48120 – Fund Transfer 20 $6,831.70 Total Funds Needed: $6,831.70 34 AGENDA ITEM NUMBER: 63 NAME OF PROJECT: Investment Management Services LOCATION: District Wide TYPE OF PROJECT: Investment Advisory –Investment Management DEPARTMENT REQUESTING ACTION: Secretary-Treasurer REQUESTED ACTION: Why is this action necessary? This action is necessary to authorize renewal of a contract with US Bancorp to provide investment management services to The District What does action accomplish? This action authorizes renewal of a contract with US Bancorp for investment management services for the 3rd one year renewal term with the possibility of one more renewal year. SUMMARY EXPLANATION/BACKGROUND: Contractor: Not Applicable Previous District Contract: N/A Consultants: US Bancorp Asset Management, Inc. (US Bancorp) 800 Nicollet Mall Minneapolis, Minnesota 55402 Low Bid: N/A High Bid: N/A Appropriation Amount: None District Estimate: NA MBE/WBE Participation: 0% (There is no MBE/WBE Goal) Plan Approval Date: Not Applicable Type of Contract: AUM (Assets Under Management) Properties Affected: Not Applicable Properties Benefiting: All Designed by: Not Applicable FUNDING/COST SUMMARY: Budgeted: $55,000(F24) Budget Year: 2024/2025 Amount: est. $205,000 Fund Name: General Additional Comments US Bancorp will manage the investments in the District’s portfolio in accordance with MSD’s Investment Policy. US Bancorp will provide market insight, commentary, and general investment advisory assistance to Secretary-Treasurer’s Office staff. Contract was amended in April 2023 from fixed rate to an AUM model due to the addition of the Operating Account portfolio. US Bancorp also subcontracts with Bingham Arbitrage Rebate Services, Inc. to provide arbitrage rebate calculation reports on the funds US Bancorp manages. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 12/10/2020 – Ordinance 15567 Authorizes District to Enter into a contract with US Bancorp for one year and four optional renewal years. 12/08/2022 – Resolution 3802 Authorizes District to exercise 2nd option year of contract